QUOTATION FOR TENDER NO.

-NG01013039
TENDER TITLE: LIFTING EQUIPMENT/ACCESSORIES INSPECTION-LAND 2 (EAST)
S/N WORK DESCRIPTION UNIT UNIT RATE
(N)
SERVICES
1 Inspection and Load test of one unit manual/electric gantry Per unit 18000
crane, SWL less than 3 Tons, measurement of deflections,
trolley or hoist mechanism and carriage roller clearances,
stenciling of test data, report writing, and other deliverables
as described in the scope of work etc
2 Inspection (only) of one unit manual/electric gantry crane, Per unit
SWL less than 3 Tons, measurement of deflections, trolley or
hoist mechanism and carriage roller clearances, stenciling of
test data, report writing, and other deliverables as described
in the scope of work etc.
3 Inspection and Load test of one unit manual/electric gantry Per unit
crane, SWL 3 -5.9Tons, measurement of deflections, trolley or
hoist mechanism and carriage roller clearances, stenciling of
test data, report writing, and other deliverables as described
in the scope of work etc
4 Inspection (only) of one unit manual/electric gantry crane, Per unit
SWL 3-5.9 Tons, measurement of deflections, trolley or hoist
mechanism and carriage roller clearances, stenciling of test
data, report writing, and other deliverables as described in
the scope of work etc.
5 Inspection and Load test of manual/electric gantry cranes, Per unit
SWL (6 - 10) Tons, measurement of deflections, trolley or
hoist mechanism and carriage roller clearances, stenciling of
test data report writing, and other deliverables as described
in the scope of work etc etc.
6 Inspection (only) of manual/electric gantry cranes, SWL (6 - Per unit
10) Tons, measurement of deflections, trolley or hoist
mechanism and carriage roller clearances, stenciling of test
data, report writing, and other deliverables as described in
the scope of work etc.
7 Inspection and Load test of manual /electric gantry cranes, Per unit
SWL above 10 Tons, measurement of deflections, trolley or
hoist mechanism and carriage roller clearances, stenciling of
test data, report writing, and other deliverables as described
in the scope of work etc etc.
8 nspection (only) of manual /electric gantry cranes, SWL Per unit
above 10 Tons, measurement of deflections, trolley or hoist
mechanism and carriage roller clearances, stenciling of test
data, report writing, and other deliverables as described in
the scope of work etc etc.
9 Inspection and Load test of one unit manual/electric jib crane Per unit
and davit, SWL (0.25 1) Tons measurement of deflections,
trolley or hoist mechanism and carriage roller clearance,
stenciling of test data, report writing, and other deliverables
as described in the scope of work etc etc.
10 Inspection (only) of one unit manual/electric jib crane and Per unit
davit, SWL (0.25 1) Tons measurement of deflections,
trolley or hoist mechanism and carriage roller clearance,
stenciling of test data, report writing, and other deliverables
as described in the scope of work etc.
11 Inspection and Load test of manual/electric jib cranes and Per unit
davits, SWL (1 3) Tons measurement of deflections, trolley
or hoist mechanism and carriage roller clearances, stenciling
of test data, report writing, and other deliverables as
described in the scope of work etc etc.
12 Inspection (only) of manual/electric jib cranes and davits, Per unit
SWL (1 3) Tons measurement of deflections, trolley or hoist
mechanism and carriage roller clearances, stenciling of test
data , report writing, and other deliverables as described in
the scope of work etc.
13 Inspection and Load test of manual/electric jib cranes and Per unit
davits, SWL (3 10) Tons measurement of deflections, trolley
or hoist mechanism and carriage roller clearances, stenciling
of test data, report writing, and other deliverables as
described in the scope of work etc etc
14 Inspection (only) of manual/electric jib cranes and davits, Per unit
SWL (3 10) Tons measurement of deflections, trolley or
hoist mechanism and carriage roller clearances, stenciling of
test data , report writing, and other deliverables as described
in the scope of work etc.
15 Inspection and colour coding of lifting slings, shackles and Per unit
lifting accessories (per unit). Inscribe (using metal tags) SPDC
unique number.
16 Inspection and colour coding of lifting points on equipment Per point
skids (four points per skid)
18 Provision and erection of scaffolds Per location
Mobilization/Demobilization Per location
19 Helicopter Under Water Escape Training (HUET) Per person
21 Community Labour Per person
22 CASHES -PPE, Comunity homage (Lumpsum). Per station
23 Inter-district call-out (Land to Swamp, and vice versa) Per district
5.1 Total (A)

B STANDBYRATE
(Only applicable in the event of extra ordinary situation, like community actions on SPDC location where
immediate evacuation by SPDC is delayed)
S/N EQUIPMENT DESCRIPTION NO OF UNIT DAILY RATE

1 SOLID TEST WEIGHTS (0.25T - 5.0T) 1 30000


3 WATER TEST BAG (1- 10T) 1
WATER TEST BAG (10- 25 T) 1
4 SCAFFOLD 1
5 PICK UP VAN (4 X 4) 1
6 DYNAMOMETER (0.25- 25T) 1
TOTAL FOR EQUIPMENT (D)
C
S/N PERSONNEL DESCRIPTION NO OF UNIT DAILY RATE

1 SUPERVISOR 1
2 SAFETY OFFICER 1
3 TECHNICIAN 1
4 SCAFFOLDER 1
5 ARTIST 1
6 DRIVER 1
TOTAL FOR PERSONNEL (E)
GRAND TOTAL (A+B+C+D+E)
AND 2 (EAST)
QTY Total Amount
(N)

20 360000
tion where
NO of days TOTAL
ESTIMATE
4 120000

NO of days TOTAL
ESTIMATE