Sunteți pe pagina 1din 4

RESUME

OF
ROGELIO A. SANDOVAL

POSITION APPLIED FOR : Welder GTAW / SMAW

PERSONAL DATA

Name : Rogelio A. Sandoval


Address : 228 Banaba
Cell No. :
Nationality : Filipino
Age : 40 years old
Gender : Male
Height : 53
Weight : 165 lbs.
Birth Date : November 24, 1971
Place of Birth : Bauan, Batangas
Religion : Roman Catholic
Civil Status : Married
Fathers Name : Lope Sandoval
Mothers Name : Carmen Aguilon
SSS No. : 04-0770734-6

EDUCATIONAL ATTAINMENT

Primary : Ilat Elementary School


Ilat, San Pascual, Batangas
1977 1983

Secondary : Bauan High School


Bauan, Batangas
1983 1986
WORK EXPERIENCE

Company : GS Engineering & Construction


Address : Al Ruwais Abu Dhabi U.A.E.
Project : Al Ruwais Refinery PKG #7
Position : GTAW / SMAW
Date of Employed : April 27, 2011 to April 28, 2012
Nature of Work : I was assigned in fabrication and jetty area. I weld
any kind of metal low temperature, carbon steel,
stainless steel, on different size of pipe with 10% or
100% x ray.

Company : SEJONG Emirates


Address : Jebel Ali Dubai U.A.E.
Project : Dewa, Desalination Plant Station M
Position : GTAW / SMAW
Date Employed : February 17, 2009 to March 14, 2010
Nature of Work : Assigned to weld on the field and boiler, piperack
area on different types of metal such as stainless
steel, carbon steel, alloy P91 with electric stress and
low alloy with 100%RT.

Company : SEJONG Emirates


Address : Jebel Ali Dubai U.A.E.
Project : Dewa Desalination Plant Station L
Position : GTAW / SMAW
Date Employed : July 28, 2007 to April 15, 2008
Nature of Work : Assigned to weld on the field and boiler, piperack
area on different types of metal such as stainless
steel, carbon steel, alloy P91 with electric stress and
low alloy with 100%RT.

Company : CHINWUI HENG Welder


Address : Brunei Darusalam
Project : B.L.N.G. Shell Refinery
Position : GTAW / SMAW
Date Employed : April 13, 2007 to July 09, 2007
Nature of Work : On this project, I was assigned to weld on
fabrication and site. I weld any kind of metal carbon
steel, stainless steel on different size to 64 with
100% x ray.

Company : GAMA Industry


Address : Sakhalin, Russia
Project : Chiyoda, Shell Refinery
Position : GTAW / SMAW
Date Employed : November 14, 2005 to October 06, 2006
Nature of Work : Work as a Tig Welder or stainless and carbon steel
with 100% x-ray. I was assigned to weld on tie in
situation in Jetty area and in fabrication shop and
motor connection during shutdown on different size
of pipe to 56 with 100% T and Visual check of
welding instruction.

Company : PLANT ENGINEERING CONSTRUCTION


PRIVATE LTD
Address : 21 Shipyard Raod Singapore 628144
Project : Palau Bokum Shell Refinery / SCC Chemical Plant
Position : GTAW / SMAW
Date Employed : October 15, 2004 to July 03, 2005
Nature of Work : On this company I was work on many Project such
as shutdown in Palau Bokum Shell Refinery.
Transfer from Jurong Island SCC Project. I was
assigned and experience to weld different size of
pipe from 1/2 to 42 stainless and 100% RT and
Visual check of welding instructor.

Company : KELLOG Brown & Root


Address : Tabango, Batangas City
Project : Shell Refinery
Position : GTAW / SMAW
Date Employed : March 15, 2004 to July 19, 2004
Nature of Work : Work as a Tig Welder or stainless and carbon steel
with 100% x-ray was assigned to weld on tie in
situation in Jetty area and in fabrication shop and
motor connection during shutdown on different size
of pipe 1 to 42 with 100% RT and Visual check
of welding instructor.

Company : INMA
Address : Jubail, K.S.A.
Project : Berri Gas Plant / Petrokemya
Position : GTAW / SMAW / FCAW
Date Employed : 2000 to 2003
Nature of Work : Welding of pre-fabrication spools for Saudi
Aramco, BErri, K.S.A. under ARCC, from 2 to
48 that includes carbon steel, low Temp. C.S.
stainless steel, from Sch. 40 to 160 as per required
Wps. Base on aramco standard.

Company : BELLILI SAUDI


Address : Jubail, K.S.A.
Project : SADAF / PETROKEMYA
Position : GTAW / SMAW / FCAW
Dare Employed : 1998 to 2000
Nature of Work : Full welding in pressure vessel high and low
pressure piping. Desalination fabrication, supply of
Heat Exchanger reator.

Company : ARABIAN METAL PRODUCTS ORG.


Address : Jubail, K.S.A.
Project : Yamamah Hunter Project, Naval Base
Position : SMAW Welder
Date Employed : 1996 to 1998
Nature of Work : Full welding of pipe 100% to 10% x-ray.

Company : B.F. METAL


Address : Cainta Rizal, Philippines
Project : Rufino Towe & SM South Mall
Position : SMAW / MIG Welder
Date Employed : 1994 to 1995
Nature of Work : Full welding of box columns, tanks, trusses, girder
beams etc.

Company : AG&P
Address : San Roque, Bauan, Batangas Philippines
Project : Hongkong Project
Position : SMAW Welder
Date Employed : 1993 to 1994
Nature of Work : Full welding of carbon steel with 100% to 10% x-
ray.

Company : KEPPHIL PHIL., SHIPYARD


Address : Bauan, Batangas Philippines
Project : Repair Ship
Position : SMAW Welder
Nature of Work : Full welding of pipe and structural works.

I hereby certify that the above information is true and correct to the best of my knowledge
and belief.

ROGELIO A. SANDOVAL
Applicant

S-ar putea să vă placă și