3 Td

Transmission lines
Supports

Introduction
This English text is to be regarded as a translation of the Swsh guideline. The Swedish
text and the interpretation thereof shall govern the contract and the legal relations
between parties.

These guidelines describe the requirements on supports and cover design and inspec-
tion. The guidelines intend to guarantee satisfactory performance of supports during
the lifetime of the overhead line and shall be used at purchasing of supports.

TEKNISK RIKTLINJE 2015-04-29 TR05-03Eutg 3

1/50
Notes Change notes Date

1 (A) Revision av standarder och ny mall 09 / 07 / 2010

2 Template changed. Clause 3.5.1.3 MT-creosote oil, full penetration of 02 / 04 / 2012


creosote oil added, NTR 1 1998 replaced with NT1 2011, 3.5.4.2 and
3.6.2.3 chamfering of edges added, 3.6.4 placement of marking
specified, Clause 3.8.1 All documentation shall be in Swedish or
English added. Clause 3.8.3 added.

3 Template changed. Changed clause numbers. Clause 5-9 re- 29 / 04 / 2015


structured. Clause 5.1.3, 5.2.2 table 5B, 6.2.3, 6.4, 8 and 9 revised.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
2/50
Content

1 References ................................................................................................................. 7

2 Scope ..........................................................................................................................9

3 Definition ...................................................................................................................9

4 Description .............................................................................................................. 10

5 Requirement ............................................................................................................ 10

5.1 Material ...................................................................................................... 10


5.1.1 Steel .............................................................................................. 11
5.1.2 Staywire ....................................................................................... 11
5.1.3 Wood ............................................................................................ 11
5.1.4 Concrete ....................................................................................... 12
5.2 Design ......................................................................................................... 12
5.2.1 Steel supports .............................................................................. 12
5.2.2 General requirements for steel design and detailing ............... 13
5.2.3 Wood ............................................................................................ 15
5.2.4 Concrete ....................................................................................... 15
5.2.5 Support electrical clearances ..................................................... 15
5.3 Load conditions .......................................................................................... 16
5.4 Workmanship and detailing ..................................................................... 18
5.4.1 General ......................................................................................... 18
5.4.2 Details .......................................................................................... 18
5.5 Documentation ...........................................................................................23
5.5.1 Drawings and calculations.........................................................23
5.6 Plates and warning signs ......................................................................... 24
5.6.1 General ........................................................................................ 24
5.6.2 Warning signs ............................................................................ 24
5.6.3 Number plates ............................................................................ 24
5.6.4 Aerial number plates.................................................................. 24
5.6.5 Aerial warning signs ................................................................. 24
5.6.6 Crossarm plates (line designation plates) ................................ 24
5.6.7 Navigable waterway crossing signs ......................................... 24

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
3/50
5.6.8 Prohibitory climbing signs .........................................................25

6 Manufacture ............................................................................................................25

6.1 Inspection plan ...........................................................................................25


6.2 Workmanship .............................................................................................25
6.2.1 Materials ......................................................................................25
6.2.2 Dimensions ................................................................................. 26
6.2.3 Surface finish ............................................................................... 27
6.2.4 Welding ....................................................................................... 28
6.3 Specification Deviations ........................................................................... 28
6.4 Assembly Marking .................................................................................... 28
6.4.1 Bolted structures ........................................................................ 29
6.4.2 Welded structures ...................................................................... 29
6.5 Manufacturing requirements .................................................................. 29
6.5.1 Mass production ......................................................................... 29
6.5.2 Machining ................................................................................... 29
6.5.3 Welding ....................................................................................... 30
6.5.4 Fitting ........................................................................................... 31
6.5.5 Heat treatment ............................................................................ 31
6.5.6 Hot-dip galvanising ....................................................................32
6.6 Bolted connections .....................................................................................32
6.6.1 Bolts ..............................................................................................32
6.6.2 Nuts ..............................................................................................33
6.6.3 Washers .......................................................................................34

7 Testing .....................................................................................................................34

7.1 Sample test .................................................................................................35


7.1.1 Steel details ..................................................................................35
7.1.2 Bolts and nuts ..............................................................................35
7.2 Routine test .................................................................................................36
7.3 Samples ....................................................................................................... 37
7.4 Shop assembly ............................................................................................ 37
7.5 Support test ................................................................................................ 37

8 Delivery .................................................................................................................... 37

8.1 General ....................................................................................................... 37

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
4/50
8.2 Quality documentation ............................................................................. 38
8.2.1 Certificate.................................................................................... 38
8.2.2 Deviation report ......................................................................... 38
8.2.3 Separate reports and inspection companies ............................ 38
8.3 Tranport and storing ................................................................................ 38
8.3.1 Loading and unloading ............................................................. 38
8.3.2 Transport .................................................................................... 38
8.3.3 Storing .........................................................................................39

9 Assembly ..................................................................................................................39

9.1 General .......................................................................................................39


9.2 Bolted connections .....................................................................................39
9.2.1 Clamp length for Swedish steel structural bolt ........................ 40
9.2.2 Tightening torque ........................................................................ 41
9.3 Repair method for galvanised steel .......................................................... 41
9.3.1 Bigger damages on hot-dip galvanised steel ............................ 41

10 Appendix-Hinged lattice column design calculation ............................................43

10.1 Euler load ...................................................................................................43


10.2 Wind load ...................................................................................................43
10.3 Beam calculation ...................................................................................... 44
10.4 Initial distortion ........................................................................................ 44
10.5 Main member ............................................................................................ 44
10.5.1 Square-cross section ...................................................................45
10.5.2 Triangular cross-section ............................................................45
10.6 Diagonals .................................................................................................. 46
10.6.1 Square cross-section .................................................................. 46
10.6.2 Triangular cross-section ........................................................... 46
10.7 Buckling ..................................................................................................... 46
10.8 Stay elongation .......................................................................................... 47
10.9 End sections ................................................................................................ 47
10.10 Natural frequency ...................................................................................... 47

11 Appendix-Correction of SS-EN 50341 .................................................................. 48

11.1 SS-EN 50341:7.7.5.1/SE.1 partial factors for stays ................................ 48


11.2 SS-EN 50341:J.11 bolted connections ...................................................... 48

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
5/50
11.3 SS-EN 50341:4.2.2.4.3/se.2 wind forces on lattice towers with
triangular cross-section ........................................................................... 48
11.4 SS-EN 50341:4.3 ....................................................................................... 48

12 Appendix-Cold-formed steel profiles .................................................................... 49

12.1 Buckling calculation ................................................................................. 49


12.2 Calculation alternative BSK ..................................................................... 50
12.3 Calculation alternative SS-EN 1993-1-1 section 6.3 ............................... 50

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
6/50
1 References

Note that standards, regulations etc. which are referred to in these guidelines are sub-
ject to continuous change and can be withdrawn, revised or replaced. The contractor
shall immediately inform the client of such changes.

BSK 07 Boverkets handbok om Stlkonstruktioner (National


Board of Housing, Building and Planning, Steel Design
Manual)

Bygg K Handboken Bygg del Konstruktionsteknik (Manual


"Bygg" section for design technology)

EBR handbok UNDERHLL LEDNINGAR 0,4 420 kV (OVER-


HEAD LINES MAINTENANCE 0,4 - 420 kV)

NTR Dokument nr 1: 2013 Nordiska trskyddsklasser. Del 1: Furu och andra lt-
timpregnerbara barrtrslag.

NTR Dokument nr 3: 2013 Nordiska regler fr kvalitetskontroller av impregnerat


tr Del 1 Furu och andra ltt impregnerbara barr-
trdslag.

SS-EN ISO 5817-3 Smltsvetsfrband i stl, nickel, titan och deras lege-
ringar-Kvalitetsniver fr diskontinuiteter och form-
avvikelser.

SS 02 01 30 Statistisk acceptanskontroll - Metoder och provtag-


ningsplaner fr attributkontroll (Sampling procedures
and tables for inspection by attributes - Swedish stan-
dard based on ISO 2859)

SS-EN ISO 8501-1 Preparation of steel substrates before application of


paints and related products- - Visual assessment of
surface cleanliness. Part 1, Rust grades

SS-EN ISO 8501-3 Preparation of steel substrates before application of


paints and related products- - Visual assessment of
surface cleanliness. Part 3, Preparation grades of welds,
edges and other areas with surface imperfections

SS 06 52 01 Svetsarprvning (Welder performance qualification)

SS 424 08 06 Linor av hrd frzinkad stltrd fr luftledningar - Fe


140 -linor. (Hard zinc-coated steel wire strands for
overhead lines - Fe140 wire strands.)
SS-EN 1993-1-1 Eurocode 3: Design of steel structures - Part 1-1: General rules and
rules for buildings

SS-EN 10025-2 Hot rolled products of structural steels - Part 2: Tech-


nical delivery conditions for non-alloy structural steels

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
7/50
SS-EN 10025-3 Hot-rolled products of structural steels - Part 3: Tech-
nical delivery conditions for normalised/normalised
rolled weldable fine grain structural steels

SS-EN 10149 Hot-rolled flat products made of high yield strength


steels for cold forming

SS-EN 50341 Overhead electrical lines exceeding 45 kV (AC)

SS-EN 287-1 Qualification test of welders - Fusion welding - Part 1:


Steels

SS-EN ISO 898-1 Mechanical properties of fasteners made of carbon steel


and alloy steel - Part 1: Bolts, screws and studs

SS-EN ISO 2320 Prevailing torque type steel hexagon nuts - Mechanical
and performance requirements

SS-EN ISO 4014 Hexagon head bolts - Product grades A and B

SS-EN ISO 4032 Hexagon nuts, style 1 - Product grades A and B

SS-EN ISO 4759-3 Tolerances for fasteners - Part 3: Plain washers for
bolts, screws and nuts - Product grades A and C

SS-EN ISO 5817-3 Welding - Fusion-welded joints in steel, nickel, titani-


um and their alloys (beam welding excluded) - Quality
levels for imperfections

SS-EN ISO 9001 Quality management systems - Requirements

SS-EN ISO 10684 Fasteners - Hot dip galvanised coatings

SS-EN ISO 13920 Welding - General tolerances for welded constructions -


Dimensions for length and angles - Shape and position

IEC 60652 Loading tests on overhead line structures

SS-ISO 216 Writing paper and certain classes of printed matter -


Trimmed sizes - A and B series

SS-ISO 898-2 Mechanical properties of fasteners - Part 2: Nuts with


specified proof load values - Coarse thread

SS-ISO 965-4 ISO general purpose metric screw threads - Tolerances


- Part 4: Limits of sizes for hot-dip galvanised external
screw threads to mate with internal screw threads
tapped with tolerance position H or G after galvanising

SS-ISO 2553 Welded, brazed and soldered joints - Symbolic repre-


sentation on drawings

SS-ISO 5455 Technical drawings Scales

SvK TR 05-12 Insulator set fittings

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
8/50
2 Scope

These guidelines are applicable to supports made from steel, wood or concrete for
overhead lines.

3 Definition

Technical terms and definitions used in these guidelines:

Support
Structure made from steel, wood or concrete intended to carry one or more overhead
line circuits.

Steel support
Lattice or beam design intended to carry one or more overhead line circuits.

Tubular steel support


Tapered steel design with tubular concentric or polygonal cross-section.

Wooden support
Support of pressure impregnated pine.

Concrete support
Tapered reinforced concrete design with circular cross-section.

Laminated wood support


Impregnated wooden support of waterproof laminated wood.

Lattice
Arrangement of individual rolled steel sections bolted together intended to transfer
axial compression and tension forces.

Beam
A homogenous or welded built-up steel element intended to withstand and transfer
imposed loads by bending and shear stress.

Bar
Element with a uniform cross-section throughout its longitudinal axis intended to
withstand and transfer imposed structural loads.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
9/50
Bars are usually made by hot rolling or cold forming. Aluminium bars can be formed
by extruding.

Main member
Principal part of the lattice design intended to withstand and transfer imposed struc-
tural loads.

Diagonal
Secondary part of the lattice design intended to withstand and transfer imposed struc-
tural loads for the purpose of supporting the main members.

Redundant
A low loaded support element for the purpose of supporting and restraining other
structural members.

Thickness of material
Thickness of the material in question related to the cross-section of the element.

4 Description

Supports shall carry insulator strings, phase conductors and shieldwires for one or
more circuits. The supports can either be stayed or self-supported.

5 Requirement

5.1 Material
Unless otherwise specified, all material delivered shall correspond to the latest availa-
ble edition of the appropriate Swedish Standard and Code of Practice or alternatively
foreign standards that the client deems to be equivalent or superior.

If no standard is applicable or exists, which is the case in respect of patents for special
material, all such material and workmanship shall be of the best quality and detailed
information shall be submitted to the client for approval.

If the standard to be followed is not written in Swedish or English the supplier shall
submit a translated copy in Swedish or English for the standards in question.

The contractor shall timeously inform the client regarding the applicable standards for
the materials to be supplied.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
10/50
The material shall be inspected and tested to verify compliance with the applicable
specifications or standards.

5.1.1 Steel
Structural steel can be coal, coal-manganese, micro-alloyed or cold-formed steel and
be manufactured either by the basic open hearth or electric oven processes.

The number of steel qualities in a support should be limited to two with yield points
within the ranges 220-275 MPa and 350-420 MPa.

The applicable impact property class for steel is to be chosen in accordance with
BSK07 clause 7:23. Impact property class D is valid for steel with a yield point exceed-
ing 300 MPa. Steel to impact property class E is to be used for tubular steel poles and
class D for cold-formed profiles.

BSK07 clauses 7:24 and 9:72 are applicable for steel plates which are subject to tensile
load in the direction of the plate thickness. Testing procedures shall be specified on the
workshop drawings.

The minimum bending radius of cold-formed angle sections shall be in accordance


with applicable standard such as SS-EN 10149. For cold-formed angle sections with 6-
8 mm thickness the minimum bending radius shall be no less than 10 mm. No ad-
vantage is to be taken of an increase in the yield point resulting from cold-forming.

5.1.2 Staywire
Staywire shall conform to Swedish Standard SS 424 08 06 or equivalent. The ultimate
tensile strength shall be a minimum of fuk = 1370 N/mm2. See Svk TR05-04E for
specification of material, type test and sample test.

5.1.3 Wood
Wooden poles/sleepers shall preferably be of pine and fulfil the requirements of Swe-
dish Standard SS-EN 50341:7.5/SE.1.

Wooden poles/sleepers shall be pressure impregnated with MT-creosote oil WEI type
B in accordance with the requirements for Preservative class A of NTR Document nr
3:2013 with the additional requirements that all wooden poles shall have full penetra-
tion of preservative to the heartwood. The penetration shall be controlled with drilling
test and documented.

Wooden poles/sleepers shall be produced and marked of approved production plants


in accordance with NTR Dokument nr 1 Nordiska trskyddsklasser 2013 och NTR
document nr 3, Nordiska regler fr kvalitetskontroll och mrkning av impregnerat tr
2013.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
11/50
For glued laminated wood, Swedish Standard SS-EN 50341:7.8/SE.1.1.is applicable.
Glued laminated wood is to be impregnated in accordance with SS-EN
50341:7.9.7/SE.1, where SS 05 61 10 is to be replaced with NTR Document nr 1:2013.

5.1.4 Concrete
Concrete poles shall fulfil the requirements of Swedish Standard SS-EN 50341:7.6.

5.2 Design
5.2.1 Steel supports
Design calculations for lattice steel supports shall be performed in accordance with
Swedish Standard SS-EN 50341:7.3 and annex B. Design calculations for Tubular steel
poles shall be performed in accordance with Swedish Standard SS-EN 50341:7.4 and
annex B as applicable and relevant.

As stated in Swedish Standard SS-EN 50341:7.3.1/SE.2 steel designs shall be calculat-


ed either entirely in accordance with BSK 07 or with Swedish Standard SS-EN 1993-1-1
with the national annex NA. Calculations where these systems are mixed are not ac-
ceptable.

Directions for the application of Annex J of SS-EN 50341:

Sections J6, J7 and J10 are applicable when calculations are performed in ac-
cordance with BSK

Sections J1-J7 (inclusive), J10 and J11 are applicable when calculations are
performed in accordance with SS-EN 1993-1-1 together with the national an-
nex NA. Buckling curve b with = 0,34 is applicable for angle sections.

Sections J8 and J9 are not to be used.

The entire support is to be modeled in a three dimensional computer program with pin
jointed bracing. A line through the center of gravity of the members shall be used as
the system line. The length of members between node points shall be used for the cal-
culation of slenderness ratios.

Calculations for self-supporting lattice supports and stayed, not hinged, lattice sup-
ports can be performed by using first order theory. Calculations for tubular steel sup-
ports and stayed supports with hinged lattice columns at both ends shall be performed
using second order theory.

Structural parts shall have dimensions such that they will not be damaged due to vi-
brations or alternating stresses.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
12/50
Members principally only subject to tensile loads but which, due to deformation in
adjacent parts, can also be subject to compressive loads shall be designed for compres-
sive load.

The partial factor f for loads due to dead weight during the erection of supports is 2,7
for bolted gusset plates and 1,65 for other parts of the lattice structure.

Members subject to combined bending and compression shall be designed by using


relevant standard calculation formulae.

The supplier shall submit to the client for approval for all steel sections, regardless of
their method of manufacture, buckling curves, radii of gyration and effective length
factors.

Cold-formed bars are also to be checked for torsional-flexural buckling in accordance


with appendix C.

The design value of resistance for stays is stated in Swedish Standard SS-EN
50341:7.7.5/SE.1.

Hinged lattice columns are to be designed in accordance with appendix A.

For crossarms with straps connecting the crossarm tip to the tower body the buckling
of the complete crossarm over its entire length must be considered in addition to buck-
ling of individual members.

5.2.2 General requirements for steel design and detailing


In addition to the requirements stipulated in clause 5.2.1 the following are applicable
for steel design and detailing:-

The slenderness ratio for main members comprising angle sections with split panel
type bracing and a panel height L is to be calculated as follows:

support, or part of support, where all main members are subject to compres-
sion: 1,25L/i yy.

support, or part of support, where some main members are subject to com-
pression and other main members are subject to tension: 1,1L/i yy.

For cylindrical members is 1,0L/i yy applicable.

Redundant members which support main members, or other parts, shall be designed
to withstand a compressive force in accordance with Swedish standard SS-EN
50341:J10.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
13/50
The slenderness ratio is to be increased, in accordance with Swedish Standard SS-EN
50341:J.6.3.1/SE.1.2, for angle sections having bolted connections in one leg only.

For calculation of slenderness ratios further reference is made to Swedish Standard


SS-EN 50341:J6.

Slenderness ratios are not to be reduced due to multiple bolt member connections.

For steel members buried underground the following rust factors in millimetres shall
be applied:

Table 5A
Zink covering Zink weight Designation in ac- Rust factor
( m) ( g/m2) cordance with. (mm)
SS-EN ISO 1461

215 1550 Fe/Zn 215 1,5

140 1000 Fe/Zn 165 3,0

Bolts 3,0

The table above implies that the calculated thickness of material shall be increased by
the rust factor value when determining the required thickness of material. An appro-
priate steel quality should be chosen to ensure that the zinc coating will be a minimum
of 215 m.

The ratio of the free length of a member and the radius of gyration, L/i, shall not ex-
ceed:

Table 5B
L/i

a) Main member in compression


Main member 120
Other members 180
Redundant members 250

b) Members in tension 350

The stress in members in tension shall be calculated using the nett area after deducting
the area of bolt holes. When calculations are performed in accordance with BSK the
nett area of angle sections having bolted connections in one leg only is to be further
reduced by 10 %, NRtd = 0,9Anfyd. Section J4 is to be applied if calculations are per-
formed in accordance with Swedish standard SS-EN 50341:J4.

Bolts are to be designed in accordance with BSK as normally tightened bolts. The bolts
shall be assembled in accordance with clause 9.2.

If packers are used between members in a bolted joint the load is to be increased in
accordance with BSK clause 6:42.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
14/50
Bolted connections subject to shear forces are to be checked for block shear.

Minimum thicknesses of material shall be:

Table 5C

Open Hollow/closed
profile profile

Main members in towerbody and crossarm *) 6 4

Earthwire peak member *) 5 4

*) Exemption. UPE bems 4

Other members 4 3

Redundant members 3 2,5

Gusset plates 6 or the minimum thickness of


connecting details.

Members buried under ground 7 7

The maximum length of members shall not exceed twelve (12) metres due to transpor-
tation considerations.

5.2.3 Wood
Wooden supports shall be designed in accordance with Swedish Standard SS-EN
50341:7.5/ SE.1. using resistance values as stated.

Glued laminated supports shall be designed in accordance with Swedish Standard SS-
EN 50341:7.8/ SE1.

5.2.4 Concrete
Concrete supports are to be designed in accordance with Swedish Standard SS-EN
50341:7.6.1/ SE.1.

5.2.5 Support electrical clearances


The minimum clearance between phase conductors and earthed parts of the support
shall be in accordance with Swedish Standard SS-EN 50341:5.4.3/SE.4.

Where there is the possibility that a stay broken by flashover will cause structural col-
lapse the clearance between the phase conductors and stays shall be in accordance
with Swedish Standard SS-EN 50341:5.4.3/ SE.5.

Relative displacement of supports and insulator strings shall be considered. The angle
of the conductor in the vertical plane and, for angle supports the horizontal line devia-
tion angle, shall also be considered.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
15/50
For work on energised circuits the following safety distances are applicable:

Table 5D
System Distance in air to the outer ex- Distance in air to the outer
voltage tremity of the danger area(m) extremity safe area
(kV) (m)

220 1,6 3,0

400 2,5 4,0

5.3 Load conditions


Supports and all component parts thereof shall be designed to withstand without fail-
ure ultimate limit state load combinations as specified in Swedish Standard SS-EN
50341:4.2.

Wind and ice loads are to be calculated in accordance with Swedish Standard SS-EN
50341:4. Consideration must be given to increased loads in areas where wind speeds
and ice loads can be expected to exceed those stated in Swedish Standard SS-EN
50341:4.

All members on which a linesman can stand shall be designed for a load of 1.3 kN,
acting at the most unfavourable point, without causing permanent deformation. The
load of 1.3 kN includes the partial factor Q and the stress it causes in the steel shall be
calculated with the elastic modulus Wx and be limited to fyd. For inclined members the
load shall be assumed to act perpendicular to the direction of the member.

The wind load on non-lattice crossarms is to be calculated with the drag factor Ct = 2,0
for all members except those that are cylindrical for which Ct = 1,2 shall apply.
Crossarms with only tension straps attached to the conductor attachment points are
regarded as non-lattice crossarms.

The wind load on supports is to be divided into transverse and longitudinal compo-
nents relative to the direction of the line. For lattice supports these components are
then to be distributed on several nodes.

QT=QWtcos (transverse to the line)

QL=QWtsin (longitudinal with the line)

where:

QWt = wind load in accordance with Swedish Standard SS-EN 50341:4.2.2.4.3


for supports and crossarms respectively. To be calculated with gust response
factor Gq=1,0

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
16/50
= angle of incidence of the wind with face 1 of the tower panel in a horizon-
tal plane according to the load case in question. The support and the conduc-
tor can have different angles of incidence.

The face with the greatest product, AtCt , shall apply for lattice supports with triangu-
lar cross-section.

Wind loads on conductors and shieldwires are given by:

QWc = qhGqGcGclDahcos2

where:
qh = dynamic wind pressure in accordance with Swedish Standard SS-
EN 50341:4.2.2.2 /SE.1.1.

Gq= gust respons factor in accordance with Swedish Standard SS-EN


50341:4.2.2.3. SE.1.

Gc= structural resonance factor in accordance with Swedish Standard


SS-EN 50341:4.2.2.4.1/SE.1

Ccl= drag factor in accordance with Swedish Standard SS-EN


50341:4.2.4.2/SE.2 for ice covered conductors and in accordance with
Swedish Standard SS-EN 50341:4.2.2.4.1 for non ice covered conduc-
tors.

D = conductor diameter inclusive of ice cover when loaded with ice.

ah = wind span

= angle of incidence in accordance with Swedish Standard SS-EN


50341:4.2.2.4.1 figure 4.2.1.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
17/50
Wind loads on staywires are to be calculated with the drag factor Ccl =1.2.

QWc
Face 1 (At1Ct1)
Face 2 (At2Ct2) )
Line
direction
Support(leg,
crossarm)

Supports are to be designed for the following cases of angles of incidence:

Table 5E
to supports to conductors

0 0
20 0
45 45
60 45
90 90

Support legs with eccentricity shall also be designed for a load case with a reduced
wind load, 0.25qh, on the legs and staywires together with a simultaneous full wind
load on crossarms and conductors.

5.4 Workmanship and detailing


5.4.1 General
All work, methods of work and workmanship, whether fully specified herein or not,
shall be of the highest quality. The generally accepted requirements and commonly
recognised good practice for first class work of this nature are to be followed in all
respects. All work shall be to the satisfaction and approval of the Purchaser. Such ap-
proval will not release the manufacturer from his responsibilities arising from damag-
es due to poor workmanship.

5.4.2 Details
Members
All diagonal bracing for hinged standard support legs shall be identical in all respects
with the exception of those for end sections. The use of gusset plates or packing for the
attachment of diagonal bracings to the main members shall be avoided as far as possi-
ble. This can be achieved either by increasing the flange thickness or by utilising a
larger bolt diameter.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
18/50
Support leg joints and both end sections for hinged support legs shall be provided with
plan bracings. Additional plan bracings shall be provided in sections of structures
where required due to design considerations such as stiffness, stability or other factors.
Plan bracings can either be made as a stiff frame or be composed of horizontal edge
members with internal horizontal diagonal members.

At their point of intersection diagonals shall be connected with a minimum of one bolt.

At each point of connection compound members shall be joined with two bolts if the
connecting flange is wider than 100 mm.

Member joints
Joints in all members shall either be of the gusset plate or overlapping type.
The number of bolts in a joint shall be equal in both flanges. Main member joints in
support legs shall be located directly above the position of plan or diagonal bracings.

Bolted connections
Bolted connections shall conform to the requirements in clause 6.6.

Angle section members with bolts in one flange only shall have the bolts placed be-
tween the projection of the axis of the centre of gravity and the centre line of the
flange.

Bolts holes are to be placed such that socket wrenches can be used on bolts when as-
sembling without fouling member flanges. The bolt hole diameters shall be equal to
the bolt diameter plus 1.5 mm.

Fall protection arrangement


Supports, including crossarms, shall be provided with an arrangement that limits the
risk of personnel who are working and moving in supports from falling. Should per-
sonnel fall the arrangement shall also reduce the risk of injuries.

The arrangement shall be suited to the work situation to ensure that it is actually used.
The pace of work may not be considerably impaired and it shall be possible to be in
varying working positions and motions when using the arrangement.

The design shall particularly consider the risks which are related to falling taking
place above or in proximity of live parts.

In the case of falling it shall be possible for the distressed personnel to put themselves
out of danger.

When using the arrangement it shall be possible to rescue distressed personnel within
a maximum time of 10 to 15 minutes to reduce the risk of aggravated injuries.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
19/50
The arrangement shall be approved by the employer. The contractor may propose that
an alternative arrangement be used that has not previously been presented to the em-
ployer for approval. In this case the contractor shall submit thorough documentation
of the arrangement, including assembly instructions, to the employer.

Climbing arrangements
The climbing arrangements shall be designed so that it is possible to enter crossarms
and earthwire peaks.

The climbing arrangements shall start 2,5 m above ground.

It shall be possible to climb inside the supports where clearances to the safe area in
accordance with 5.2.5 cannot be maintained when climbing on the outside. Passages in
and out shall be marked on the support.

Supports consisting of several support legs, where it is possible to pass over a crossarm
to the other legs, shall be provided with step-bolts in one leg to the crossarm and in
every earthwire peak from the crossarm.

Supports consisting of several support legs, where it is not possible to pass over a
crossarm to the other legs, shall be provided with step-bolts in every leg to the
crossarm and in every earthwire peak from the crossarm.

The step-bolts shall be located in diagonally opposite main members relative to the
position in the other support leg.

Step-bolts for supports with triangular cross section shall be designed to make it pos-
sible to climb with feet in parallel. The design of the step-bolts shall be approved by
the client.

The distance between step-bolts should be 300 to 400 mm and shall, if possible, be
common in each respective support.

Step-bolts shall withstand a load of 1.5 kN without permanent deformation. Steel qual-
ity and manufacturing methods shall be such that if the step-bolt is loaded to failure
the failure will be non-brittle.

Safety clearance distances shall be observed when climbing on the outside of the sup-
ports. Long support legs, where climbing is performed inside, shall be equipped with a
horizontal rest platform midway between ground level and the crossarm.

When detailing the support climbing arrangements consideration must be given to the
fact that the shieldwire can be in two different positions, either in the running-out
block or in the clamp.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
20/50
Supports where climbing with step-bolts is not convenient are to be fitted with ladders,
rest platforms and anti-climbing devices. A rest platform is to be fitted at the lower end
of each section of ladder where horizontal movement has to take place to allow for
further climbing. The section of ladder which is closest to the ground shall, at the lower
end, be provided with a horizontal rest platform and a lockable anti-climbing device.
The anti-climbing device shall consist of a 2 metre high pivoting door, made from steel
sheet, which in the locked position shall be in contact with the rungs of the ladder. The
width of the ladder shall be 400-450 mm with rungs 20mm minimum diameter spaced
at 300-400mm.

Ladder rungs shall withstand a load of 1.5 kN with no permanent deformation and a
load of 2.6 kN with a maximum of 7 mm deformation of which 2 mm can be perma-
nent. Ladders together with attachments shall be designed for an ultimate load of 2.6
kN for every 2 metres. The load acting on ladder rungs is to be distributed over 100
mm of their length. Alternative climbing arrangements shall be submitted to the client
for approval.

A 1.6 metre long horizontal footstep for working purposes can in some cases be re-
quired in the shieldwire peak. Any such footstep shall be designed with anti-slippage
devices at both ends. The load on this for a linesman shall be in accordance with clause
5.3.

Angle supports which are equipped with suspension insulator sets having a swing out
angle more than eight degrees at every day stress conductor tension shall be designed
such that an insulator ladder can be suspended immediately above the suspension
clamp of the inner phase.

Conductor attachments
Shieldwire attachments shall be interchangeable. The attachment detail shall allow
adequate space for a vertical angle of entry of the shieldwire into the clamp of 20 de-
grees.

It shall be possible to position a derrick for working with the shieldwire.

The attachment of suspension insulator sets to crossarms shall be designed such that
the pivot point of the insulator swing is as close as possible to the lower edge of the
crossarm and allows swing transverse to the direction of the line.

The attachment of V-string insulator sets to crossarms shall be designed such that the
upper pivot point of the insulator swing is as close as possible to the lower edge of the
crossarm and allows swing longitudinally in the direction of the line.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
21/50
The attachment of tension insulator sets to crossarms shall be designed such that the
innermost pivot point of the insulator set is as close as possible to the crossarm and
allows swing transverse to the direction of the line.

Attachment to supports shall be of clevis-tongue type fittings in accordance with SvK


TR 05-12E. Shackle connections are not permitted.

In supports with "I" or "V"-string suspension insulator sets attachments, for hoisting
of conductors and earthwires, shall be located in close vicinity to the conductor and
earthwire attachment points.

In supports with tension insulator sets attachments, for hoisting and terminating of
conductors and earthwires during conductor stringing and clamping in, shall be locat-
ed in close vicinity to the conductor and earthwire attachment points.

Stays
For double stay systems, the minimum bending radius at attachment points is 80 mm
for 142 mm2, 90 mm for 185 mm2 and 155 mm for 284 mm2 staywire.

Pre-forming of stays can be performed as cold bending and shall done slowly without
hammering. The temperature of the stay wire shall be higher than -10C immediately
before the bending is performed.

When pre-forming stays careful observations should be made to ensure that individual
strands are not damaged or cracked and that separation of strands is not unacceptably
large.

Test bending shall be performed at the clients request. The test is then to be approved
by the client. Stays shall be marked with yellow and black housings immediately above
wedged stay clamp.

Double stays shall be twisted 7 and a half turns in the lay direction of the wire.

The ends of stay wires shall be tied. It shall be performed with a 2,0 mm galvanised
steel wire (DIN 1548 soft wire with thick coat or equal). The length shall be > 3 times
the stay wire diameter.

Attachment of a hinged support leg


Supports with a hinged attachment between the support leg and the crossarm shall be
provided with a hinge built up of one inside and two outside gusset plates with a single
bolt performing as hinge. The hinge bolt shall be locked by punching the threads and a
cotter pin provided through the bolt outside the nut.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
22/50
5.5 Documentation
The documentation shall be performed in accordance with the requirements in Sake
TR 08-04.

5.5.1 Drawings and calculations


The contractor shall prepare all drawings required for the work.

The contractor shall present the drawings in such a way that they unambiguously spec-
ify how all details are to be made.

All designs shall be in accordance with these guidelines and shall take due considera-
tion of the requirements regarding manufacture and assembly. The contractor shall be
responsible for all his designs.

The contractor shall furnish the client with workshop drawings, erection drawings and
calculations for review, as called for in this specification, or that are required to verify
compliance with the contract or for any other reasons as requested by the client.

The contractor shall furnish the client with copies of drawings and calculations which
the latter shall review. In this respect the contractor shall ensure that the drawings are
produced timeously to allow time for review and amendments to be made before they
are used for manufacturing or construction purposes.

Drawings prepared by the contractor, which are subject to review by the client, may
not be used for manufacturing or construction purposes before they have been ap-
proved by the client.

The review of drawings by the client does not release the contractor from any of his
obligations in accordance with these guidelines, or from his responsibility of ensuring
that the designs and drawings are correct.

Design calculations are to be reviewed and approved by the client.

Before finalisation the design of each complicated detail, it shall be submitted to the
client for review and approval. Should the clients review reveal the need for further
actions to be taken, such as more detailed inspections, such actions shall be deemed to
be included in the contractors obligations.

SI units shall be used in all documents, calculations and drawings.

Drawings and calculations shall include details of the body of the support, support leg
lengths and foundations that have been included on the support assembly drawing.
Inspection plan in accordance with clause 6.1 and, drawings and calculations, in ac-
cordance with TR08-04E Documentation contents for overhead lines shall be sub-
mitted to the client for supervision and approval.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
23/50
5.6 Plates and warning signs
5.6.1 General
Plates and signs shall be mounted in accordance with the handbook of EBR UN-
DERHLL LEDNINGAR 0,4 420 kV chapter 301K together with the additional
requirements of this chapter.

5.6.2 Warning signs


All supports shall be fitted with the sign "SVENSKA KRAFTNT, LIVSFARLIG LED-
NING, VISTAS EJ NRA STOLPE OCH STAG VID SKVDER".

5.6.3 Number plates


Every support is to be fitted with a plate giving support number, line designation and
the text "SVENSKA KRAFTNT".

The plate is to be fitted to the left support leg so that it can be read looking towards the
higher support numbers.

Where permanent ladders are fitted to the supports the plates are to be fitted to the
ladder side of the support. At road crossings, where the line runs parallel with a road
and where permanent ladders are fitted to the supports, the plates are to be fitted on
the road side of the support irrespective of the position of the ladder.

5.6.4 Aerial number plates


Every fifth support is to be fitted with aerial number plates both towards lower and
higher support number.

5.6.5 Aerial warning signs


Lines that cross under another line, or run in parallel with other lines being higher
within the proximity zone, or have high obstacles within the proximity zone, are to be
fitted with aerial warning signs.

5.6.6 Crossarm plates (line designation plates)


Crossarm plates are to be fitted to the three supports closest to a substation or a junc-
tion in the line.

Crossarm plates are to be fitted to every support between a substation and a junction
in the line if the junction is located within five supports from the substation

5.6.7 Navigable waterway crossing signs


The Swedish National Maritime Administration shall be contacted regarding the ne-
cessity of installing signs where power lines cross navigable waterways.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
24/50
5.6.8 Prohibitory climbing signs
Signs shall be fitted to support legs where the safety distance for the safe area can be
infringed during climbing.

6 Manufacture

6.1 Inspection plan


Before manufacturing is started, an inspection plan shall be drawn up by the contrac-
tor and presented to the client for his review and approval. This inspection plan shall
be based on the workshop drawings and the detailed calculations. The inspection plan
shall conform to the requirements of BSK 07 or SS-EN 1993-1-1 and with the national
annex NA.

The inspection plan shall include testing of cold-formed profiles to ensure that there
can be no possibility of hydrogen embrittlement.

6.2 Workmanship
Workmanship, manufacturing, marking, and packing shall fulfil the requirements
stipulated in the clients technical specifications.

The contractor and his suppliers shall afford the client every opportunity to monitor
and inspect the manufacture and testing of materials in the rolling mills, foundries and
manufacturing workshops.

6.2.1 Materials
The material shall have the quality specified for each individual member.

The material shall be free from exterior and interior deficiencies, such as cracks, lami-
nations, pipes, slag pockets, etc. which can reduce strength, serviceability or detrimen-
tally affect the suitability of the material with respect to processing and machining.
Steel surfaces may not have more rust than grade C as stated in Swedish Standard SS-
EN ISO 8501-1.

The material shall be marked, with a marking system presented by the manufacturer.
The system shall consist of colour or text, in order to identify the material quality.

For material that shall be galvanised with thick zinc coat (Fe/Zn 215) shall the silicon -
value in steel be in accordance with SS-EN 1461:2009 table NA.2.1.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
25/50
6.2.2 Dimensions
Dimensions shall accurately comply with those given in every individual case. Those
that are dependent on the position of the structure and on its underlay shall generally
be applicable when the structure is placed on a flat and stable underlay. Dimensions
are valid at room temperature and before surface coating. However, dimensions are
valid for galvanised coated threads after surface coating. Hot dip galvanised external
threads shall have dimensions in accordance with SS-ISO 965-4 before hot dip galva-
nising.

The following tolerances are applicable unless otherwise stated:

Applicable tolerances for welded structures are class A as given in EN ISO 13920 Ta-
bles 6A and 6B.

Table 6A
Permissible deviations for linear dimensions.

Nominal dimension Permissible deviation


(mm) (mm)

2- - 30 1
(30) - 120 1
(120) - 400 1
(400) - 1000 2
(1000) - 2000 3
(2000) - 4000 4
(4000) - 8000 5
(8000) - 12000 6
(12000) - 16000 7
(16000) - 20000 8
(20000) - 9

Table 6B
Permissible deviations for angular dimensions.

Reference length Permissible angular


(shortest leg of angle) deviation
mm*)
(mm)

0 - 400 0,33( 20') 6


(400) - 1000 0,25( 15') 4,5
(1000) - and greater 0,17( 10') 3

*) Valid for a measured length of 1000 mm (mm/m). For other measuring lengths the
deviation dimension is proportional to the measuring length.

For bolted connections the tolerances in table 6C are applicable, unless otherwise stat-
ed on the drawing.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
26/50
Table 6C
Nominal Permissible deviation
(mm) (mm)

- 30 1
(30) - 120 1,5
(120) - 315 2
(315) - 500 3
(500) - 1000 3,5
(1000) - 4

In addition to the tolerances given above the following shall apply:


a) Bolt and rivet holes + 0,30 mm
- 0,15 mm

b) Holes centres in the same connection group 1 mm

c) Width and height of lattice support at location of crossarm 2 mm

d) Width and height of lattice crossarm at connection to support 2 mm

e) The difference in diagonal measurements in a cross-section of a lattice support or


crossarm may not be greater than 0,75 times the tolerance in Table 6A or Table 6C
respectively.

f) Longitudinal relative displacement of the main members in a lattice support may not
exceed 2 mm

g) The distortion of supports, crossarms or members may not exceed the length mul-
tiplied by 0.0015.

h) The degree of twist about its own longitudinal axis for a tower leg or crossarm may
be up to 3 per 10 m with a maximum of 5. For lengths less than 3,5 m the twist may
be a maximum of 1.

6.2.3 Surface finish


Surfaces of members incorporated in the structure shall be free from slag, weld spat-
ter, scale, cracks, drilling and hole punching burrs, etc. Surfaces shall before all sur-
face treatment fulfill the below stated pre-treatment grades in accordance with SS-EN
ISO 8501-3.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
27/50
Table 6D
Surface Pre-treatment grade in accordance with SS-EN ISO 8501-3

Cut edges P3 with the change, that edges shall be rounded with a radius
less than 1 mm on material with a
thickness < 15 mm

Edges in holes Hole >26 mm P3


Hole 26 mm P2. However after making of holes shall all
edges, be rounded to avoid sharp edges. The radius shall not
be more than 0,5 mm.

Welding spatter P3

Other surfaces P2

Surfaces that shall be coated shall be free from paint, grease, oil and other impurities.
Contact surfaces on both sides of a bolt hole shall be even so that the washer/nut and
bolt head lie flat. Raised characters or other forms of unevenness around a hole shall
be ground off.

6.2.4 Welding
Welding shall only be used where specifically directed and then be performed and
inspected according to BSK in addition to any other instructions given in each particu-
lar case. Welds shall meet the specification requirements in accordance with quality
level C of SS-EN ISO 5817. Cavities and gaps, usually starting points for corrosion
attack and which may be acid pockets during hot-dip galvanising, shall be filled with a
covering weld.

6.3 Specification Deviations


Any proposed deviation from the specification, or other contractual terms and condi-
tions which may have an effect with regard to function, strength, interchangeability
and serviceable life, shall be referred to the client for his consideration and decision.
When delivering the members concerned, the manufacturer shall ensure that the devi-
ation report is included in the documentation package. He shall also certify that any
conditions applicable to the acceptance of any deviations have been fulfilled.

6.4 Assembly Marking


In cases where specific assembly marking specifications are not given the following
marking specifications will apply.

All steel details shall be marked. On the basis on marking designation shall every sin-
gle detail be traceable to the manufacture drawing. A description of how the marking
shall be performed shall be presented by the manufacturer and be included in the doc-
umentation. Assembly marking, before surface coating shall, be made by machine
stamping with 10 mm high characters on angle sections including flats and plates up to
8 mm thick. For material thicknesses greater than 8 mm, channels and H-beams in-
cluded, the marking should be made with 15mm high characters. Erection marking

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
28/50
shall be performed and placed in such a way that there is no risk of stress concentra-
tion and at least 10 mm from edge. On angle sections and beams the marking shall be
made 100-150 mm from the last hole in a group of holes at one end and on the side of a
flange facing outwards. If this area is not suitable for marking, it shall be made further
in towards the middle of the angle section or beam. Erection marking of main mem-
bers in support legs shall be placed at the lower end. For main members in crossarms
the erection marking shall be placed at the end of the joint or at any end if there is no
joint. In certain cases the position of the erection marking is to be indicated on the
relevant drawing.

Stamped designations forming the erection mark shall be separated from each other by
a point.

If the erection marking is not distinct after hot-dip galvanising, it shall be painted in a
colour contrasting sharply with the surface and be of good durability such as quick-
drying PVC. Marking with markers is not allowed.

The erection marking shall be placed on the outside of the structure in such a way that
makes it visible after assembly. Otherwise the marking shall be placed as mentioned
above.

6.4.1 Bolted structures


Details for bolted connections shall be marked according to a system such that the
individual detail can be unambiguously identified on the relevant drawing.

6.4.2 Welded structures


Welded parts, which are to be fitted together, shall have mark designations on the
external side of the joint in such a way that the markings on the different units will be
situated immediately opposite each other.

6.5 Manufacturing requirements


6.5.1 Mass production
In mass production corresponding parts shall be fully interchangeable. Before mass
production is commenced, jigs and fixtures shall be checked for rigidity to ensure that
dimensions given on the drawings can be maintained. When production is in progress,
jigs and fixtures shall be regularly checked to ensure that they have not been altered by
wear or damage.

6.5.2 Machining
Cutting
Cutting shall not be made at lower temperature than +5oC. Sheared surfaces shall be
treated so that they fulfil the requirement for the surface structure in clause 6.2.3.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
29/50
Straightening and bending
Bending may be done at room temperature for plates and flats if the thickness of mate-
rial does not exceed the following values:

Table 6E
Steel with ultimate stress Thickness of material

2 25 mm
Lower than 470 N/mm

2 20 mm
470 N/mm and higher

Plates and flats with thicknesses exceeding the values above, and rolled sections, irre-
spective of dimensions, shall be bent at a red heat of approximately 850 C.

Material with an ultimate stress higher than 430 N/mm2 may not be quenched with
water.

Cold working to elongate material is not allowed.

Cold bending is only permitted when fabrication trials have shown that the material
withstands cold working without cracks or dangerous stresses occurring which, in
conjunction with subsequent hot-dip galvanising, can cause intercrystalline crack for-
mation.

If the bending procedure is complicated, or when regarded as necessary, the steel


manufacturer's instructions should be obtained.

Holes
Steel according to Swedish Standards SS EN 10025-2 and SS-EN 10025-3, or equiva-
lent, may be punched to full-size provided that the thickness does not exceed 13mm
and the diameter of the hole exceeds the thickness of the material. In other cases, the
holes are to be punched or drilled to a diameter that is at least 3 mm less than the
nominal hole diameter and subsequently reamed or drilled to the final diameter.

The stipulated hole tolerance shall be maintained for the entire depth of the hole.
Cracks after punching are not allowed. Punching shall not be performed at a steel tem-
perature lower than +5 C. Hole edges shall be treated so that they fulfil the require-
ments for the surface structure in clause 6.2.3.

Incorrect holes
Incorrect holes shall neither be partly nor wholly filled by welding.

6.5.3 Welding
The manufacturer may only carry out welding after the client has approved the appli-
cable welding method.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
30/50
Approval will be granted after assessing whether the following conditions have been
met:

Premises and equipment


Welding is to be performed in premises and with equipment suitable for the purpose.
The equipment shall be well suited for the type of welding to be performed so that the
correct quality is achieved. All equipment shall be regularly checked and maintained.

Filler metal
Only filler metal intended for the parent metal and the welding method in question is
allowed. Such materials are to be handled and stored so as to ensure the correct quali-
ty.

Responsible staff
The manufacturer shall have competent staff having the necessary qualifications to
supervise the work and thus ensure the correct quality.

Competent tradesmen
Welder's competence shall be tested according to Swedish Standard SS 06 52 01 or SS-
EN 287-1 - Approval Testing of Welders. Only approved welders shall be used.

Welding method
Welding methods should be well established and documented in a method statement.
A method test may be required.

Inspection
Welding conditions are to be inspected regularly before and during welding. Inspec-
tions are to be carried out after welding to ensure that stipulated requirements have
been met.

6.5.4 Fitting
Structural members are to be straight before assembly. When any member is being
fitted it shall not be forced into place in such a manner that it becomes distorted.

Members incorporated in the steel structure which are not provided with complete
dimensions on a drawing shall be fitted with the aid of accurately made jigs or tem-
plates.

6.5.5 Heat treatment


Complicated welded plate details and thick plates where flame cutting has been used,
shall be normalised. The normalising requirement is to be given on the drawing for
each individual member.

Other heat treatment may be specified or agreed in each particular case.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
31/50
6.5.6 Hot-dip galvanising
All steel shall be galvanised if nothing else is mentioned.
The hot-dip galvanisation shall fulfil the requirement in accordance with SS-EN ISO
1461 where the appendix should be applied. Details underground shall also fulfil the
requirement in the NA appendix. Hot-dip galvanised structures shall have a coherent
and well-adhered coating. The coating shall be even as far as shape and characteristics
permit. The thickness of the zinc coating is to be given in each individual case. Unless
otherwise specified the zinc thickness must not be less than those given in the follow-
ing table:

Table 6F
Thickness Fe/Zn 95 Fe/Zn 115 Fe/Zn 215

Min. value for Min. average Min. local Min. average Min. local Min. average
local sample valuee value value value value
m m m m m m
(g/mm) (g/mm) (g/mm) (g/mm) (g/mm) (g/mm)

Steel > 6 mm 85 95 100 115 190 215


(610) (685) (720) (830) (1370) (1550)

Steel 6 mm 70 85
(500) (610)

Fe/Zn 95, for constructions of rolled steel in air


Fe/Zn 115, for wedged secured steel in rock
Fe/Zn 215 for constructions of rolled steel in the ground

Also thermal cut edges on steel material where t 10 mm shall be included in the test
areas for zinc thickness. Surfaces with zinc values below permitted local values shall be
considered un-galvanised (bare). After galvanisation shall the construction be cleaned
so that it can be handled without risk of hand injuries.

The galvanisation shall be equal with paint in accordance with ISO 8501-3. Before hot-
dip-galvanisation shall all surfaces fulfil the requirement of surface structure in ac-
cordance with clause 6.2.3.

6.6 Bolted connections


I nothing else is mentioned shall the bolts in towers be Swedish steel structural Bolt SB
in accordance with clause 6.6.1 and 6.6.2 with steel structural washer SBRB in accord-
ance with clause 6.6.3.

6.6.1 Bolts
Bolts in towers shall have metric threads and be of strength class 8.8 and fulfil the
requirements of EN ISO 898-1 and relevant parts of SS-EN ISO 4014 product class A.

Structrural steel bolts shall have undersized metric threads in accordance with ISO
965-4. Bolts shall be hotdip galvanised in accordance with SS-EN ISO 10684.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
32/50
Table 6G Swedish steel structural Bolt SB
Svensk Stlbyggnadsskruv SB shall be in accordance with clause 6.1.1 with the below
changes for l, ls, lg in SS-EN ISO 4014.

Shanklength
l M12 M16 M20 M22 M24
nom min max ls lg ls lg ls lg ls lg ls lg
30 29,4 30,4 5,0 10,0
35 34,5 35,5 10,0 15,0
40 39,5 40,5 15,0 20,0 10,0 16,0
45 44,5 45,5 20,0 25,0 15,0 21,0 10,0 17,5
50 49,5 50,5 25,0 30,0 20,0 26,0 15,0 22,5 12,0 19,5
55 54,4 55,6 30,0 35,0 25,0 31,0 20,0 27,5 17,0 24,5
60 59,4 60,6 35,0 40,0 30,o 36,0 25,0 32,5 22,0 29,5 19,5 28,0
65 64,4 65,6 40,0 45,0 35,0 41,0 30,0 37,5 27,0 34,5 24,5 33,0
70 69,4 70,6 45,0 50,0 40,0 46,0 35,0 42,5 32,0 39,5 29,5 38,0
75 74,4 75,6 50,0 55,0 45,0 51,0 40,0 47,5 37,0 44,5 34,5 43,0
80 79,4 80,6 55,0 60,0 50,0 56,0 45,0 52,5 42,0 49,5 39,5 48,0
85 84,3 85,7 55,0 61,0 50,0 57,5 47,0 54,5 44,5 53,0
90 89,3 90,7 60,0 66,0 55,0 62,5 52,0 59,5 49,5 58,0
95 94,3 95,7 65,0 71,0 60,0 67,5 57,0 64,5 54,5 63,0
100 99,3 100,7 70,0 76,0 65,0 72,5 62,0 69,5 59,5 68,0
105 104,3 105,7 70,0 77,5 67,0 74,5 64,5 73,0
110 109,3 110,7 75,0 82,5 72,0 79,5 69,5 78,0
115 114,3 115,7 80,0 87,5 77,0 84,5 74,5 83,0
120 119,3 120,7 85,0 92,5 82,0 89,5 79,5 88,0
125 124,2 125,8 84,5 93,0
130 129,2 130,8 89,5 98,0
135 134,2 135,8 94,5 103,0
140 139,2 140,8 99,5 108,0
145 144,2 145,8 104,5 113,0
150 149,2 150,8 109,5 118,0

In addition to the marking requirements


in SS-EN ISO 898-1 shall the Swedish
steel structural Bolt be marked with SB
.
on the upper side of the bolt head.

6.6.2 Nuts
Nuts shall be of strength class 8 and fulfill the requirements of ISO 898-2 and EN ISO
4032. Bolts shall be hot-dip galvanized in accordance with SS-EN-ISO 10684.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
33/50
Nut shall be marked with strength class 8
and with the manufacturers trade mark
(x) on the nut contact surface with low-
ered marking

The threads of nuts shall be protected with suitable oil so that they can endure 6
months outdoor storage without any rust damage to the threads. This does not apply
for nuts treated with friction reducing agent.

6.6.3 Washers
Washers shall fulfill the requirements for product grade C of ISO 4759-3. Washers
shall have a minimum hardness of 200 HV and a minimum yield point of 220 N/mm2.
Washers shall be galvanised in accordance with SS-EN ISO 10684.

Stlbyggnadsbricka SBRB

Washers to Swedish steel structural Bolt SB shall be steel structural washer SBRB and
be manufactured in accordance with ISO 4759-3 with exemption of the thickness
tolerance that shall be 0,5 mm and have measures as below.

Table H
Dimension d1 d2
mm mm

M12 13 24
M16 17 30
M20 21 37
M22 23 39
M24 25 44

7 Testing

Testing shall be performed according to the standard that has been approved by the
client. Where no standard exists all test details shall be submitted to the client for ap-
proval.

The contractor shall keep the client informed regarding:

Progress of the manufacturing in order that inspection and testing can be


performed in the presence of the clients representative.

To which standard the test is to be performed.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
34/50
Before every inspection and test the contractor shall make sure that the work is com-
pletely in accordance with the specifications and that it is ready for inspection and
testing.

7.1 Sample test


Representative samples of all materials from lots ready for despatch, selected at ran-
dom by the client, shall be subject to tests in order to verify their conformity with the
specification. Test samples shall be provided by the manufacturer in addition to or-
dered lot at no cost for the client.

7.1.1 Steel details


Steel details shall be tested in accordance with the inspection program.

7.1.2 Bolts and nuts


Each lot to be delivered shall be inspected by the manufacturer. The inspection pro-
gram stated below shall then be executed. Sample sizes and acceptable AQL values are
stipulated in tables 7D and 7E respectively of Swedish Standard SS 02 01 30. Every
single lot shall origin from the same manufacturer, batch, and dimension.

Table 7A
Structural steel bolts, shall be inspected as follows:

Inspection AQL
level

Gauging of "da, r, d, s" and thread tolerance S-3 1,5


Other dimensions (incl. thickness of zinc coating) S-3 4,0
Marking S-3 0,1
Hardening flaws S-3 0,1
Material composition S-3 0,1
Strength test S-2 0,1

Table 7B
Nuts for structural steel bolts shall be inspected as follows:

Inspection level AQL

Gauging of "s" and thread tolerance S-3 1,5


Other dimensions (incl. thickness of zinc coating) S-3 4,0
Marking S-3 0,1
Material composition S-3 0,1
Strength test S-2 0,1
Locking properties for torque type steel
hexagon nuts in accordance with SS-EN ISO 2320 S-3 1,5

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
35/50
Table 7C
Washers for structural steel bolts shall be inspected as follows:

Inspection AQL
level

Gauging (incl. thickness of zinc coating) S-3 4,0


Strength test by hardness testing S-2 1,5

Table 7D
Inspection level S2, inspection size and subject to agreement.

Lot size Inspection size Subject to


agreement
AQL
0,1 1,5

2 25 2 0 0
26 150 3 0 0
151 1200 5 0 0
1201 35000 8 0 0
35001 - 13 0 0

Table 7E
Inspection level S3, inspection size and subject to agreement.

Subject to agreement
AQL
Lot size Inspection size 0,1 1,5 4,0

2 - 15 2 0 0 0
16 50 3 0 0 0
51 150 5 0 0 0
151 500 8 0 0 1
501 3200 13 0 0 1
3201 35000 20 0 1 2
35001 500000 32 0 1 3
500001 - 50 0 2 5

If the quantity of failing units in the inspection group is greater than the subject to
agreement, shall the lot be rejected.

The inspection shall be documented in accordance with

The result from the inspections shall be presented in an inspection certificare type 3.1
in accordance with SS-EN 10204.

7.2 Routine test


Routine tests shall be performed by the contractor in accordance with the applicable
standard and the clients instructions.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
36/50
7.3 Samples
Representative samples of all materials from lots ready for despatch, selected at ran-
dom by the client, shall be subject to tests in order to verify their conformity with the
specification.

7.4 Shop assembly


One hot dip galvanised support of each type and height ordered, including every com-
bination of leg extensions, shall be assembled at the manufacturers premises in the
presence of the client to the extent necessary to ensure correct fit of parts, adequate
bolt lengths and proper field erection. At the same time important basic dimensions
and climbing arrangements shall be checked. Any defect shall be corrected to the cli-
ents satisfaction before delivery.

7.5 Support test


If requested by the client one support complete with fittings and leg extensions, if any,
shall undergo full-scale testing, in accordance with IEC Publication 60652 "Loading
tests on overhead line towers", at a testing station to be agreed. The client shall specify
if the testing is to be performed as a design test in accordance with IEC 60652:4.1 or as
a sample test in accordance with IEC 60652:4.2. The support shall be hot-dip galva-
nised and erected on rigid foundations.

The manufacturer shall prepare a comprehensive testing programme which is to be


approved by the client prior to testing. Test loads shall be ultimate loads calculated in
accordance with clause 5.3 and SS-EN 50341:7.11/SE.1.

8 Delivery

8.1 General
As a part of his obligations the contractor shall prepare a quality assurance pro-
gramme, in accordance with Swedish Standard SS-EN ISO 9001, which is to be re-
viewed and approved by the client before work commences. All quality documentation
related to the work shall be readily available for the clients representatives infor-
mation until completion of the work. All documentation shall be in Swedish or English.

Before delivery from the manufacturer the contractor shall submit quality documenta-
tion to the client.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
37/50
No part of the works shall be despatched to site before it has passed all the tests and
has been inspected and found to comply, in every respect, with the stipulations of the
specification to the satisfaction of the client who will issue the certificate of delivery.

8.2 Quality documentation


The quality documentation shall contain the following documents:

8.2.1 Certificate
A certificate, duly signed by the contractors representative who is authorised to sign
such Q.A. documents, which includes:

sufficient information to identify the part

references to those Standards and requirements which have been followed for
the manufacturing and inspection

reports for specified inspections that have been performed confirming that the
required results have been attained

8.2.2 Deviation report


Deviation reports together with every report related to major re-working.

8.2.3 Separate reports and inspection companies


Certificates for inspections that require separate reports, e.g. samples of materials,
non-destructive investigations, analysis, design and shop assembly reports. Certificate
from an independent inspection company, if such an organisation has been employed.

8.3 Tranport and storing


The support material shall be packed up in that way that it will not be damaged or
fouled at transport, construction and storing.

8.3.1 Loading and unloading


At loading and unloading shall the material not be deformed when lifted and shall not
be exposed for outer forces and strikes. Lifting tools of steel shall not be in contact with
the galvanised steel material. To avoid damages shall liner of wood or fabric straps be
used.

8.3.2 Transport
The material shall be loaded on a vehicle with a stable surface and in that way that
underlying material at stacking will not be deformed. Wooden liners or equal shall be
used so that galvanised surfaces will not be damaged. Wooden liners shall be free from
pollutions that can damage or discolour the material the coat.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
38/50
8.3.3 Storing
The stockyard shall be flat and shall not consist of coal cinder, carbonized coal, ashes
or other that can damage the material. The material shall not be placed directly on
ground or on material that can damage or discolour the surface as for example un-
galvanised steel or polluted wood. Stored galvanised material shall not be exposed for
spatter from grinding, welding, cutting as it could damage or discolour the surface of
the material.

9 Assembly

9.1 General
The assembly shall be performed in accordance with the relevant instructions such
that damage to the surface coating and structural distortions do not occur. The steel
shall not be in touch with ground during installation.

Steel details are not allowed to be straightened.

Waste, ice, snow or frost are not to be found between contact surfaces between details
that shall be assembled with bolted joint. At winter climate shall snow, ice and frost be
removed by heating.

Before tightening of bolt joint shall the complete tower section be installed and well
straightened in the whole section with the help of base works and lift jack so that the
tower leg/crossarm will be straight without deformity and that the required tolerances
in accordance with clause 6.2.2 e)-h) are fulfilled.

The assembly shall be documented and included in the contractor inspection pro-
gramme.

9.2 Bolted connections


Bolts shall be of Swedish steel structural bolt if nothing else is showed in the drawing.
Bolts shall be installed with the nut on the outer side in the tower leg and at the under-
side in the crossarm where it is practical possible.

After assembly, the nuts shall be locked by damaging the threads protruding through
the nut twice with punch marks. Bolts for articulation shall be locked by means of a
cotter pin through the bolt on the outside of the nut.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
39/50
9.2.1 Clamp length for Swedish steel structural bolt
The clamp length for bolt joints with Swedish steel structural bolt SB and steel struc-
tural washer SBRB in accordance with table 9A. The measure X can be used for control
of the clamp length.

Table 9A
L (mm) Clamp length t (mm)

M12 M16 M20 M22 M24

30 -7

35 7-12

40 12-17 7-12

45 17-22 12-17 8-13

50 22-27 17-22 13-18 10-15

55 27-32 22-27 18-23 15-20

60 32-37 27-32 23-28 20-25 18-23

65 37-42 32-37 28-33 25-30 23-28

70 42-47 37-42 33-38 30-35 28-33

75 47-52 42-47 38-43 35-40 33-38

80 52-57 47-52 43-48 40-45 38-43

85 52-57 48-53 45-50 43-48

90 57-62 53-58 50-55 48-53

95 62-67 58-63 55-60 53-58

100 67-72 63-68 60-65 58-63

X (mm) 5-10 6-11 7-12 9-14 9-14

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
40/50
9.2.2 Tightening torque
If nothing else is mentioned in the drawing shall the bolt joint be tightened with the in
accordance with the values in the table below.

Table 9B
Bolt- Tightening Lever arm
dimension torque at manual
(Nm) tightening (mm)

Fotstep M12 5010% 150

M12 7010% 150


The tightening torque shall be controlled with a torque wrench.
The control can be performed as a spot sample.
M16 16010% 350

M20 27010% 500

M22 44010% 800


The values shall only be adapted if it is specially stated. The
tightening torque shall be made as hard as possible with normal
M24 >300 1000
equipment, however shall the minimum tightening torque not be
less than 300 Nm.

9.3 Repair method for galvanised steel


After completed assembly shall the size of repaired hot-dip galvanised surfaces not
exceed the surfaces that the galvaniser is allowed to repair in accordance with SS-EN
ISO 1461. The client shall be informed of suggested repair method of the galvanisation
before the start of the assembly. Repair shall be performed and documented in accord-
ance with clause 9.3.1.

9.3.1 Bigger damages on hot-dip galvanised steel


Details with un-coated surfaces bigger than allowed for the galvaniser to repair in ac-
cordance with SS-EN ISO1461 shall be replaced or re-galvanised.

If it is not possible to replace shall repair measures be suggested and handled as a


deviation. The repair measures shall be performed by a certified painter. Deviations
shall be accepted by the client before the measures start.

The deviation with description of measures shall at least include:

The extent of surfaces that shall be repaired.

The reason for the necessary repair.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
41/50
Description of repair method including pre-treatment and requirement of
outer circumstances.

Safety data sheet and technical data sheet in Swedish shall for all products
that shall be used.

Inspection plan for proposed repair method shall include control of tempera-
ture, dew point, that pre-treated surfaces that shall be coated shall have the
purity and roughness that the repair method require and control of surface
thickness (see grundkontroll BSK07 clause kap.9.65).

The product supplier acceptance of proposed repair method inclusive pre-


treatment.

Performed repair shall fulfil corrosion class C4 in accordance with SS-EN ISO 12944,
life-length of 50 years and be UV-stable and durable. Filled in and signed con-
trol/inspection plan shall be included in the documentation.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
42/50
10 Appendix-Hinged lattice column design
calculation

P P
qT qL MG

L

L

P
P
P= axial foundation load (ultimate limit state)

MG = moment from stay load and load on crossarm (ultimate limit state)

10.1 Euler load


PE 0,95 2 E I/L2 1,6P

10.2 Wind load


The wind load for the vertical projection of square cross-sections in the ultimate limit
state transverse to the line is -

sin 2

qT Q qh Gq Gt 1 0,2 sin 2 2 At Ct qlad 1
tan 2
cos

The wind load for the vertical projection of square cross-sections in the ultimate limit
state longitudinally along the line is -


q L Q qh Gq Gt 1 0,2 sin 2 2 At Ct qlad sin 2
cos 2 sin 2 sin
Where Q=partial factor for variable action in accordance with SS-EN 50341:4.2.11/SE.1
qh= dynamic wind pressure in accordance with
SS-EN 50341:4.2.2.2/SE.1

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
43/50
Gq=gust response factor=1,0
Gt=structural resonance factor in accordance with
SS-EN 50341:4.2.2.4.3

=angle of incidence for the critical wind direction


in accordance with SS-EN 50341:4.2.2.4.1 figure 4.2.2

At = the effective area for H = 1.0 metre of the support leg length L.

Ct=drag factor in accordance with SS-EN 50341:4.2.2.4.3/SE.1

qlad = At.Ct for a ladder which is only to be considered if the support


leg is fitted with a ladder.

= inclination of the support leg considering stay elongation and the deflection of the
support

The term 1 0,2 sin 2 2 is to be set to 1.0 for equilateral triangular cross-sections.

10.3 Beam calculation


For non-computerised calculations the wind load qT and the dead weight qD are to be
projected perpendicular towards L.

new qT qT sin 2
new q D q D cos
The maximum moments MTW, MLW and MD and the maximum deflections yTW, yLW,
yD and yMG are to be calculated. The shear forces TTW, TLW and TD are to be calculat-
ed at the point where the taper starts. Designations TW indicate transverse wind, LW
longitudinal wind, D dead weight and MG indicate moment MG.

10.4 Initial distortion


The initial distortion is L/600 in the most unfavourable direction.

diagonally for square cross-sections, see clause 10.5.1.

0 and 60 degrees for triangular cross-sections, see clause 10.5.2.

10.5 Main member


The symbol + depends on the wind direction, the support leg inclination and the main
member in question.

In the figure CG denotes the centre of gravity of the cross-section.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
44/50
10.5.1 Square-cross section
x
A1 A2
y CG y
c1 c2
A1 e A2
a b
x
The main member forces are
P/ 2 A1 2 A2 M TW M D a/I x M LW M G / 2 c1 /I y

Q1 A1 P yTW yi y D e a/I x / 1 P/PE

P y LW yi y MG c1 /I y / 1 P/PE
P 2 A1 2 A2 M TW M D b I x M LW M G 2 c2 I y

Q2 A2 P yTW yi yD e b I x 1 P PE

P yLW yi yMG c2 I y 1 P PE
where yi 0, 71 L 600

10.5.2 Triangular cross-section


x
A2
y CG y
A1 c
A2
e
a b
x
The main member forces are
P/ A1 2 A2 M TW M D a/I x
Q1 A1
P yTW yiy y D e a/I x / 1 P/PE

P A1 2 A2 M TW M D b I x M LW M G 2 c I y

Q2 A2 P yTW y iy y D e b I x 1 P PE


P y y y c I 1 P P
LW ix MG y E
For Q1 is yiy L 600
For Q2 is yiy L 600 cos 60 and yix L 600 sin 60

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
45/50
10.6 Diagonals
The shear force 0.017P is always to be added.

The symbol + depends on the diagonal in question.

10.6.1 Square cross-section


The force in one diagonal is

D DT 0,017 P 2 cos
D DL 0,017 P 2 cos
where DT TTW TD 2 cos
DL TLW M G L 2 cos

10.6.2 Triangular cross-section


The force in one diagonal is

D DT 0,017 P 1,5 cos


D DL 0, 017 P 1, 5 cos

Where
DT TTW TD 2 cos 30 TLW M G L 3 TLW M G L e 3 b cos
DL TLW M G L 1,5 TLW M G L e 3 b cos

10.7 Buckling
The following applies when calculating the main member buckling load capacity

For quadratic cross-section is 1,25 l i x

For cold-formed profiles is to be taken at the greatest of 1,0 l/i and


1,25 l/ix.


l x x x x

The support buckling load capacity is also to be checked considering the support leg as
a built-up compression member in accordance with the handbook Bygg K 18:35.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
46/50
10.8 Stay elongation
The elongation of stays will alter the inclination angle of support legs and stays. This
will increase the load in support legs and stays compared with the loads derived from
nominal inclination angles.

10.9 End sections


The end sections shall be braced to the end plate to avoid bending in the main mem-
bers due to eccentric load.

The end sections shall be calculated with an eccentricity of 25 mm.

Washers between column and foundation shall be designed to withstand local com-
pression.

CL

P
25 mm

10.10 Natural frequency


The natural frequency shall be greater than 2 Hz.

For a uniform beam the formula is f 2 L2 EI m 2

where EI (Nm2) is calculated in the weakest direction

m (kg/metre) inclusive of zinc and bolts L (metres)

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
47/50
11 Appendix-Correction of SS-EN 50341

Supports which are designed in accordance with these guidelines shall be designed in
accordance with Swedish Standard SS-EN 50341 considering the following corrections.

11.1 SS-EN 50341:7.7.5.1/SE.1 partial factors for stays


The partial factor M for staywire shall be
M2 = 1,55 for straight line supports
M2 = 1,70 for angle supports

11.2 SS-EN 50341:J.11 bolted connections


This section is applicable for calculations in accordance with Swedish Standard SS-EN
1993-1-1 together with the national annex NA. The tension resistance per normally
tightened bolts shall be calculated in accordance with the formula in table J.2 but
0,6 f ub As
modified to: Ft , Rd
Mb

11.3 SS-EN 50341:4.2.2.4.3/se.2 wind forces on lattice


towers with triangular cross-section
The wind force acting at the center of gravity of one panel in a lattice tower with trian-
gular cross-section is: QWt qh Gt At Ct where Gt is to be taken from Swedish
Standard SS-EN 50341:4.2.2.4.3.

11.4 SS-EN 50341:4.3


Section 4.3 is not to be used in Sweden.

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
48/50
12 Appendix-Cold-formed steel profiles

12.1 Buckling calculation


Input symbols:

ix (mm) radius of gyration for principal axis of inertia in the strong direc-
tion

iy (mm) radius of gyration for principal axis of inertia in the weak direc-
tion

x0 (mm) distance between centre of gravity and shear centre of the cross
section

Lc (mm) buckling length design value

Kv (mm4) section factor of torsional stiffness (Saint-Venant)

Kw (mm6) section factor of warping stiffness

A (mm2) gross cross sectional area,

Aef (mm2) nett cross sectional area considering cross sectional class

E (N/mm2) modulus of elasticity = 210 000 N/mm2

G (N/mm2) shear modulus = 81 000 N/mm2

fyk (N/mm2) characteristic value of yield point for steel

fyd (N/mm2) design value of yield point for steel

Formulas
i0 i x2 i y2 x02
2
x
1 0
i0
1 2 E Kw
T G K
A i02
v
L2c
E
2
x 2
Lc

ix

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
49/50
2 E
y 2
check y x
Lc

i
y
1
Tx (( x T ) (( x T ) 2 4 x T ) )
2

12.2 Calculation alternative BSK


Curve "b" shall be applied for calculation of flexural buckling and flexural torsional
buckling.
f yk
c gives cTx
Tx
f yk
c gives cy
y
The smallest value of c is to be used for calculation of NRcd.
N Rcd c Aef f yd

12.3 Calculation alternative SS-EN 1993-1-1 section 6.3

Curve "b" shall be applied for calculation of flexural buckling and flexural torsional
buckling.
f yk
gives Tx
Tx
f yk
gives y
y
The smallest value of is to be used

TEKNISK RIKTLINJE 2015-04-29 utg 3

UUtgU
50/50

S-ar putea să vă placă și