116 HVAC / PCI (INC. CUARTO DE BOMBAS) S/. 651,169.41 S/. 0.00 84 das
APROBACION DE LAS ESP. TECNICAS DE LOS
S/. 0.00 S/. 0.00 3 das
117 EQUIPOS
118 PROCURA, SUM. DE HVAC / PCI S/. 651,169.41 S/. 651,169.41 77 das
124 EST. METLICA PARA CERRAMIENTOS S/. 190,430.77 S/. 190,430.77 15 das
125 SUM. Y/O FABRICACION DE LA FACHADA S/. 0.00 S/. 0.00 20 das
133 FABRICACION DEL MURO CORTINA S/. 0.00 S/. 0.00 15 das
134 INSTALACION DEL MURO CORTINA S/. 180,766.18 S/. 180,766.18 17 das
144 TRABAJOS PARA LA MEDIA TENSIN S/. 284,301.08 S/. 284,301.08 29 das
TRANSFORMADOR 3, 10/0.38-0.22 Kv de 500
S/. 143,706.21 S/. 143,706.21 9 das
145 Kva
PUESTA EN SERVICIO POR PARTE DE ENOSA S/. 0.00 S/. 0.00 12 das
146
147 HITO 04 S/. 0.00 S/. 0.00 0 das
148 EMPEDRADO PARA DESCARGA DE LLUVIA S/. 15,504.94 S/. 15,504.94 14 das
mi 07/05/14 mi 07/05/14
sb 05/04/14 mi 30/04/14