Documente Academic
Documente Profesional
Documente Cultură
AD 286 896!
UNCLASSIFIED
NOTICE; When government or other dra-vngs, speci-
fications or other data are used for any purpose
other than in connection with a definitely related.
government procurement operation, the, U. S.
Government thereby incurs no respons>-blity nor any
obligation whatsoever; and the fact that the Govern-
ment may have formulated, furnished, or in any way
supplied the said drawings, specifica tions, or other
data is not to be regarded by implicaztLon or other-
wise as in any manner licensing the hsolder or any
other person or corporation, or conve~mying any rights
or permission to manufacture, use or sell any
patented invention that may in any vw be related
thereto.
A NORTIIROP AIRCRAFT, INC.
NORTHROP DIVISION
HAWTHORNE, CALIFORNIA
21 OnTOBER 1959
PREPARED BY
M, E# Carlisle
Materials Research Laboratory
APPROVED BY
R- B. Jack~nah,9 Chief
Eng-ierdymg Laboratories
REVISIONS
.. ___________ _____________________________ . ..
NORTHROP CORPORATION
* Pagei 0
R
A
I,
R
ABSTRACT
D
I
This report presents the results of a cooperative test program V
conducted by members of the AIA-ARTC in an attempt to establish
a standard test method for hydrogen embrittlement. The six
basic methods investigated were the tensile test, stressed ring 0
test, sustained load notched tensile test, constant-rate bend N
test, torqued bolt test, and static bend test. Modifications
of the test specimens and procedures brought the total number
oof methods investigated to twelve. Conclusions are drawn as
to the most accurate methods now available and the direction
that further work on hydrogen embrittlement testing should take.
NORTHROP CORPORATION
Page ii 0
A
TABLE OF CONTENTS R
Section Page
o Table
Graph
I Phase I Standard Tensile Test Results (Convair) . . . . . 25
2 Phase I Special Ring Test Results (Douglas) . . .. .. 26
3 Phase I Notched Tensile Test Results (Lockheed) . .. 27
4 Phase I Notched Tensile Test Results (McDonnell) . . .. 28
5 Phase I Constant-Rate Bend Test Results (Norair) . . . . . 29
6 Phase I Torqued Bolt Test Results (North American) . . . . 30
7 Phase II Constant-Strain-Rate Tensile Test Results
(Convair) oo o-o o-o-oo * 31,
8 Phase II Notched Tensile Test Results (McDonnell) . o . . 32
9 Phase II Slow-Speed Bend Test Results (Norair) . ..... 33
10 Phase II Intermittent Bend Test Results (Norair) . . . .. 34
NORTHROP CORPORATION
N
Page 1 o
R
A
I
R
1. INTRODUCTION
N
Page 2
R
A
I
2. CONCLUSIONS AND RECOMMENDATIONS R
Of all methods investigated, the sustained load notched tensile test was
the most sensitive and reproducible. However, two versions of this test 0
were used, and they showed considerable difference in time to failure for I
specimens embrittled under identical conditions by the same laboratory. v
No one version can be recommended until additional work has been conducted I
on methods of sample preparation; notch size, radius, and finish; and test S
* duration. It is therefore recommended that ARTC undertake the work neces-
' sary to arrive at a standard sustained load notched tensile test. N
00
N
Pape 3
R
A
I
3. PHA31 I 1
Page 4
R
A
3.3 IntrQduction of HvroR
Page 5
N
0
3.3 Introduction of Hydrogen (con tinued) R
A
Norair - Cadmium 3.3 oz/gal. I
Sodium cyanide (total) 17.3 oz/gal. R
Sodium carbonate 2.48 oz/gal.
Sodium hydroxide 2.14 oz/gal.
4.0 oz/gal. D
North American - Cadmiun oxide
Sodium cyanide 13.5 oz/gal. v
Sodium hydroxide to pH of 13
7S
* An experimental potassium cyanide plating procedure was used by
Ryan on all except the North American specimens, which were plated 0
in a production bath. The Ryan cleaning procedure was the same as
stated above, except that a solution of 6 oz/gal. potassium cyanide
and 2 oz/gal. potassium hydroxide was used for the cyanide dip.
The experimental Ryan plating solution and procedure were:
N
Page 6 0
R
A
I
N
Page 7 0
R
A
i
R
3.4.7 Static Bend Test (R1yan)
These tests were made as shown in Figure 7 on specimens
0.108 by 0.5 by 4 inches. One specimen from each lot was
subjected to each of the outer fiber tension stress levels
noted by setting to a calculated deflection with the aid V
of a depth micrometer: 100,000, 140,000, 180,000, 220,000,
260000, and 280,000 psi. One specimen (embrittled by S
McDonnell and stressed to 280 000 psi) failed in 46 days.
The remainder of the tests were discontinued after 61 days. N
o
Since plating was perfonmed in small laboratory baths and was ap-
plied to high-strength steel not usually electroplated, the test
results are in no way indicative of normal production plating
quality. With this in mind,, it is noted that all test results
showed specimens plated by Ryan. in an experimental potassium cya-
nide bath to be superior to, or at least as good as, the other
specimens, which were plated in sodium cyanide baths. Further-
more, in many instances the Ryan specimens were at least as good
as the unplated controls. Since other high-efficiency baths were
not used, it is not possible to determine from the results of this
program if the Ryan bath was typical of other high-efficiency
baths or if it was one that caused almost no embxittlpient and
was superior to all other standard and high-efficiency baths.
NORTHROP CORPORATION
N
Page 8 0
R
A
I
4. PHASE II TESTS R
The Project had originally planned to test additional alloys by the best
short-term method selected from Phase I and, as a check, by the best D
long-teni method(s). Since the short-term tests were not sufficiently I
sensitive for the Phase I test material, this plan could not be pursued.
It was decided to attempt improvement of the shorter methods using the
same test material, and to repeat the McDonnell notched tensile tests S
for comparison.
~0
- N
4.1 Test Material
Transverse-quality 4340 alloy steel remaining from Phase I was used.
Page 9 o
R
A
N
Page 10 o
R
A
5. HYDROGEN ANALYSIS R
Convair, Fort Worth, analyzed the test material for hydrogen to determine
whether a correlation existed between embrittlement and the amount of 0
hydrogen actually present.
~v
5.1 Test Specimens
N
Page ll
R
A
Top of Bottom of v
Bar 1OM2 Bar 10M5
- S
N
Page 12
R
A
Cc1 - - - --
Douglas
CMI 227 6 284.6 11.5 1 31.8
0H2 237.4 286 ,4 125 1 37.6
052 06o8 283.6 1190 1 35.1
CE3 229.4 282..8 12.0 32.4
C03 232.8 285.7 10.5 1 31.0
Avg 226 6 284.6 11.5 33.6
N
Page 13 0
R
A
I
TABLE II. PHASE I STANDARD TENSILE TEST RESULTS (continued) R
U McDoonnell ------- F ,0
o CP1 219.4 287.0 7.5 14.3
CM2 229,2 286.6 12.0 30.3
C02 224,3 287.0 12.0 30.7
CL2 217.7 286.4 9.5 20.9
CJ3 2247 285.5 10.0 20.7
Avg 223.1 286.5 10.2 23.4
*Thread failvre
NORTHROP CORPORATION
N
Page 14 0
R
A
-i
NORTHROP CORPORATION
N
Page 15 0
R
A
I
R
TABLE III. PHASE I TORQUED BOLT TEST RESULTS (continued)
*Controls
QG
NORTHROP CORPORATIOh
Page 16 '
R
A
eThread failure
NORTHROP CORPORATION
N
Page 17 o
R
A
I
TABLE V. HYDROGEN CONTENT OF TEST MATERIAL R
IN PARTS PER MILLION BY WEIGHT
5 9 10 6 7
4 1 6 7
8 7 8 8 9
4 7 9 11 7
4 12 13 5 6
6 8 6
7
Avg 5 10 9 7 7
. .. .
14ORTHROP CORPORATION
Page 18
A
NOfE:I
Finish /minltrn m
O.100t.02.30 .002_ __ _ _ _ _ __ _ _ _ __ _ _ _
NOTE:
Fractional -tolerances 1 '32
2,525
A0O2
1 2 Radius
C. Stressed. Specimen
U 00
~ ~
A. ~ ~ ~ uigo ~
Spcmnnral-aefo ~
on ~ a -
N 0_T____
A. ral
Specimen
9 made from TubingulrRog ar
Fiue2NDrcinofSrsTppiaininEe-oI igTs
ether arrow-
CORPORATION
F7-ORTROP Pa'ge 20
0
R
A
2.25 Minv
.375 1.12 1
U I 0
*.190 N
__all I
N
0
R
A
0-60
~R
O ~ ~ 125 - 20
2.50
I N
A 18
1.50
H25
.51.50 -----
~ 3.75
A50
.002
Notch at X-X
Phase 11 Specimens Only
0.0156 R Din
Ix6 0
1/2
L f0.313 t .005 *-
-1/4 -
UA. 4340 Steel Bolt Specimen
a18-1/4 1-1/4
51-1/
Di oeIT
4I;
u4". 4- 4-4
B. 43 SteTetFxue(T1500pi)
Test
Bolt
Fixure
Nut t Tightened
Biur STeele
6.3 Test
Bl Fixture(lT1500pi
Seie n
N(Nrt Amerteieant
NORTHROP CORPORATION
Paqg. 24
I
A
V
I
0
o
4N
40
0
R
A
a 30
I 3I
S
*00
N
" 20
4,
.0
20
0
u
00-
o .--
TROLS
* I I
60 I
00
0 5
30--
20
40
10
0
COY DCLCMC NRHA RA
4.. -Vas
NORTHROP CORPORATION
800
N
0
A
I
R.
700 B
D
I
S
600
0
N
400
-Z
.
400- "-s
I,L
200-
0F
CON. CONV DAC LAC MAC NOR NAA RYAN
TROLS
100
9 0
R
A
I
R
75
D
I-
S z v
0
"-25 50 0
0 0N
0
25
180'- rrv
00
6VV
30a--
CO_ CN4, A MC NR NA RA
TRL
R
1750
0,0
. 1000
o750
00
25
0
14063 421 6 62 534 5 30 32 1
-CJNVDC A A ORNARA
40 I
30-S
300
00
200
I0
20
COTOSUA A
Ucnar
NORTHROP CORPORATION
Page 32 T
100-
' 0R
R
75 --
50-
I-
2 z
s 25"-
oV1
0
'A 0
z
z
7- 75
00
50
25--
0-- _.r
N
0
R
A
I
1800 R
D
I
V
I
1500 S
o 0
N
1200-
U 900
U-
60 --
300--
300
0
R
A
I
1,800 R
D
I
1 V
50 0. , S
120'0
tH
0 0
i2Oi
00
AN
Page 35 0
R
A
R
6. REFERENCES R
ARTC-58-l2
~I
-'
Minutes of First Meeting of Panel W-95 "t Standard
S