reinforcement
bottom layer top layer
Earth filling
total
excavation mat casting total filling
sand filling
length width total area thickness total (cf)
153.16 47.41 7261.3156 0.5 3630.6578
29 11 319 0.5 159.5
6437.932 2.67 17189.27844
22028.40805
brick work
l h area w volume
1190.95 2.67 3179.8365 1 3179.8365
a b c d
6"c/c 5" c/c 4" c/c 6" c/c
307.32 368.584 143.23 95.82
59 70.6 34 23
95.82
shear connector
footing column length nos.
area area area
p1 36 2.25 33.75 2.17 506.25
p2 49 2.25 46.75 2.17 327.25
p3 81 2.77777778 78.22222222 2.17 547.5556
p4 64 3.67361111 60.32638889 2.17 422.2847
p5 87.5 3.25 84.25 2.17 168.5
p6 40 3.25 36.75 2.17 73.5
u1 27 2.875 24.125 2.17 48.25
u2 132.25 3.25 129 2.17 129
u3 45 2.77777778 42.22222222 2.17 42.22222
u4 42.5 2.875 39.625 2.17 39.625
2304.438
total 16 mm 20 mm 10 mm
reinforcement 28743 2770.572 2400.3
total(cft)
31899.116
footing area
l w a nos. total
p1 6 6 36 15 540
p2 7 7 49 7 343
p3 9 9 81 7 567
p4 8 8 64 7 448
p5 12.5 7 87.5 2 175
p6 10 4 40 2 80
u1 4.5 6 27 2 54
u2 11.5 11.5 132.25 1 132.25
u3 4.5 10 45 1 45
u4 5 8.5 42.5 1 42.5
2426.8
total length
kg
1098.5625 527.31
710.1325 340.8636
1188.195556 570.3339
916.3578472 439.8518
365.645 175.5096
159.495 76.5576
104.7025 50.2572
279.93 134.3664 37613.19
91.62222222 43.97867
85.98625 41.2734
2400.302
CASTING
no. of
Type Foundation To G.L casting G.Lto 1st floor
column
l w length (cft) l w
RC1A 2 17 10 5.5 155.833333333 16 9
RC1B 1 22 10 5.5 100.833333333 21 9
RC1C 1 25 10 5.5 114.583333333 24 9
RC2A 1 21 10 5.5 96.25 20 9
RC1 9 10 10 5.5 412.5 8 8
RC2 7 10 10 5.5 320.833333333 8 8
RC3 13 10 10 5.5 595.833333333 8 8
RC4 8 10 10 5.5 366.666666667 8 8
RC5 7 10 10 5.5 320.833333333 8 8
RC5A 1 6 2 5.5 5.5 5 1
no. of
Type
column MAIN BAR STIRRUP
length nos. total length kg length
Foundation 24 264 126.72 7.833333
RC1A 2 5.5
To G.L
total wt.
16 mm 10 mm
13710 9993.62
ground
floor
dismentli
ng(cf) 3204.13
Making temporary
barricade for safety
REINFORCEMENT
26.25 4.935
115.29 21.67452
13.4166667 2.522333
57.9366667 10.89209
13.4166667 2.522333
57.9366667 10.89209
13.4166667 2.522333
57.9366667 10.89209
116.083333 21.82367
516.763333 97.15151
90.4166667 16.99833
402.056667 75.58665
167.416667 31.47433
746.176667 140.2812
154.583333 29.06167
688.823333 129.4988
135.333333 25.44267
1133.46333 213.0911
13.4166667 2.522333
108.476667 20.39361
870.18
Summary
Earth excavation 31899.16 904.1712018141
Earth filling 20857.12 591.1882086168
sand filling 22028.41 624.388
casting(mat+g.f) 11041.6 312.9705679138 casting(column)
reinforcement 63752.71
shuttering area 10102.74 939.7900775194
brick soling 15209.2 1414.8090790698
lokfix area 10239.2
epoxy bonding agent 3453.167 321.2248062016
floor
dismentaling 6808.556 633.3540093023
curing area 10102.74 939.7900775194
debris 10212.83 950.0310139535
steel props 316
GROUND FLOOR
CASTING 3204.13 90.8200238095
Summary
gr.floor rod kg
256.2931 78.86207 23251.303 4371.245
5" b/w new breaking
576.42 5764.2 72.466582
1403.26
10" b/w
53.58 535.8 1334.142 37.81582
149.5256
thai work
147.17 735.85 20.857426
plaster
3105.572
casting from 2nd to 4th
total casting
casting length width area deduction area thickness volume no.of floor
128.66 45.16 5810.2856 20 18.58 371.6
29 11 319
10650.35 6129.2856 371.6 0.42 2418.228 2
shuttering area
4th to roof 2nd to 4th
25357.9792 11515.371
3204.13044
10 mm 0.188
12mm 0.27
16mm 0.48
20mm 0.75
4836.456
ITEM OF WORKS, BILL OF QUANTITIES AND COST ESTIMATE FOR retrofitting of Badhon
Estimate Prepared By: N.Akhtar & Associates, Road #30, House # 437, DOHS,
Mohakhali, Dhaka
CIVIL WORKS
SL No. Schedule of item of works Quantity
1 Mobilization of all items of works equipment site leanning, labor shed making etc. all complete.
Contractor shall have to arrange office space and furnish them for full time use of supervising Engineers 1
of the consultants including contractors own office, storage, yard etc.
2 Earth excavation in foundation and plinth etc. all kinds of soil as shown in the drawings up to the
specified depth , removing of debris and shoring materials and slush, dewatering if required etc. And
removing of spoils at a selected place , consolidation of bed leveling and dressing etc. all works
complete. 904.171
3 Sand (FM shall not be less then 0.8) filling in all types of foundation and plinth etc. up to required level
as per drawing , proper mechanical compaction of sand (min. 95% )fill with plate , vibro or impact
compactor in 150mm layers maximum to obtain standard AASHO density of 95% at optimum moisture
contents in each layers , compaction shall be conformed of field and laboratory test. Removing of debris
, slush form the Pit/Trench etc.
624.388
4 Supplying and laying 75mm thick brick soling with 1st class bricks 1414.81
5 Supplying and applying Epoxy Bonding Agent between joint at old concrete and new concrete surface.
321.225
6 Probiding micro concrete at column & beam joint 220
7 Supplying and fixing epoxy bolt with 10 mm dia bar of 12'' length as per drawing 7934.76
8 Providing epoxy bolt with 16 mm dia bar of 4'' length embeded into the concrete 2304.44
9 Surface preparation by chipping the old concrete surface 321.225
10 Providing Steel Propping work (Rental only) 316
11 Steel reinforcement works in RCC works providing deformed bars of any size manufactured from
billets having min. yield strength as specified below unless otherwise specified , cleaning the steel
surface , cutting the bars in required length , making the bars as per shape and size placing the bar in
position providing necessary blocks, chairs, hangers, spacers etc all work complete by using 22 BWG
G.I. binding wire in all floors.
Deformed bar of ( Grade 60) 63753
12 Dismantling RCC floor work 633.354
13 Dismantling Brick work 72.4666
14 Dismantling Thai Aluminum work and refixing the same 20.8574
15 Debris/earth cleaning 950.031
16 1st class Kilm Burnt Brick Work with gray Portland cement and sand (FM 1.5) morter of specified
proportion, necessary scaffolding, raking out joint cleaning and soaking the brick at lerast for 24 hours
before use and curing at least for 7 days & wetting of good bricks , protecting the green works from rain
and sun in Foundation & Superstructure etc. all work complete in all floors :
125 mm thick brick wall above plinth level with 1:4 proportion upto ground,1st and 2nd floor.
1403.26
250mm thick brick wall above plinth level with 1:4 proportion in 1st and 2nd floor. 37.8158
17 12mm thick plaster both inside and outside(1:4) 3105.57
18 Making temporary barricade for safety & security around the column, with scaffolding tube, tarpaulin
and remove after work 1520.67
Providing floor RCC work in proportion (1:2: 4) including necessary form work (G.F) with bricks chips
90.82
19 Providing floor RCC work repair in proportion (1:1.25:3) including necessary form work (MAT) 312.971
20 Providing RCC work in column in proportion (1:1.25: 2.5) at jacketted column with
Admixture(COLUMN) 26
Providing RCC work in lift wall in proportion (1:1.5:3) 40
21 Providing form work steel or wooden 939.79
22 Curing agent over concrete surface 939.79
23 Reconstruction of Surface drain 134
24 Providing patent stone casting with NCF 760
Sub
Materials cost
A) Civil part
Description of Materials Qty
Stone Chips 20710
Fine sand 196191
Coarse sand 11062
Bricks 144669
Bricks chips 2893.3
Cement 12736
MS rod 63753
Micro concrete 25kg Bag 250
Admixture 80
Epoxy Bonding agent 60
Epoxy anchor Chemical (600ml Pac) 217
R retrofitting of Badhon Fashion
Main materials
M3 450.00 406,877.04
Kg 75.00 4,781,453.53
M2 1700.00 1,076,701.82
M3 2500.00 181,166.45
M2 1100.00 22,943.17
M3 370.00 351,511.48
M2 950.00 1,333,097.44
M3 6600.00 249,584.39 495 105
M2 280.00 869,560.19 225 50
212,894.10
M2 140.00
835,544.22
M3 9200.00
M3 14800.00 4,631,964.41 125 252 70
397,800.00
M3 15300.00 280 560 190
M3 14800.00 592,000.00
M2 500.00 469,895.04
M2 120.00 112,774.81
M 1500.00 201,000.00 150 150 30
M2 640.00 486,400.00
Sub Total 20,695,180.94 3470 405 812 150 445
79810 21060 154280 12750 200250
60
120
117
100
4600
80
70
75.00 14,218,125.00
1100.00 650,782.00
2,574,000.00
6600.00
280.00 2,903,600.00
10,732,959.18
13500.00
4,160,000.00
16000.00
500.00 3,272,500.00
51 9668325