PMA-262
Persistent Maritime Aircraft Systems
MQ-4C Triton UAS

Solutions Roadmap

Mr. Sean Burke, Program Manager

Donn Hynes (donn.hynes@navy.mil)


Drew Barrow (oscar.barrow.ctr@navy.mil)

April 2017

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
PMA
Logo
Here

Transformational Mixed Force: Effective, Efficient Mission Capability Tailored to the Warfighters Requirements

Globally Responsive and Persistent Force -


24/7 coverage of maritime areas of interest

Multi-Spectrum Intelligence Collection -


employ an array of sensors to provide the
COCOM Maritime Domain Awareness

Fully Networked Platforms collect and share


intelligence data to a wide variety of users

Why Triton?

Triton is a key capability in the Navys


Intelligence, Surveillance, Reconnaissance &
Targeting (ISR&T) Transition

Program approach delivers Baseline ISR


capability

Upgrades to Signals Intelligence (SIGINT)


capability for Multiple intelligence (Multi-INT)
capabilities

Multi-INT capability enables retirement of


EP-3
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
2
PMA
Logo
Here

Operational Assessment (OA) Hours and test events (as of 31 Mar 17)
(December 2015) Total development and operational test hours:
114 flights/726 flight hours
Milestone C (September 2016) Ground test: 1,294 hours

Low Rate Initial Production (LRIP) 1 Program is in flight test phase


(September 2016) Continue SIL testing of software/hardware
IFC 3 ground test complete
Early Operational Capability (EOC) FY2018 IFC 3 flight test (March 2017)

Initial Operational Capability (IOC) FY2021

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
3
Triton Baseline and Multi-INT Upgrades

Automatic Identification Advanced Mission Management


System (AMMS) Rolls-Royce AE3007H
System (AIS) 23+ Million hrs
Onboard Server
Data Correlation Graphite
Low Band Payload & Bandwidth Control Empennage
System
AN/ZLQ-1 ESM
Graphite 360 FOR
Wing High Band Upgrade

WB Satcom 9 CDL Dish Antenna


(Port and Starboard)
ESM Antennas
SIGINT Antennas
Metallic
TCAS Fuselage
ADS-B
Low Band Array
(Wings and aft
Fuselage)
Hail and
Bird Strike
External Stores Provisions Resistance
(each wing)
De-icing
AN/DAS-3 EO/IR
360 Field of Regard AN/ZPY-3 Multi-Function Active
Auto-Target Tracking Sensor (MFAS) Maritime Radar
Hi Res EO/IR at Multiple FOVs 360 X-Band 2D AESA Radar
Multi-Mode Color Video Maritime and Air/Ground Modes NAS JAX Triton MCS Triton MCS
JAN 2015

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited 28 July 2016; 2016-593 4
PMA
Logo
Here

Mission Radar enhancements


Sense and Avoid/Detect and Avoid
Assured Precision Navigation & Timing (PNT) / Assured
Communications
Maintenance / Sustainment
Pace the threat / Agility in Electronic warfare (EW)
contested environments
Fleet Interoperability for kill chain efficiencies

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
5
FLIGHT PLAN SUMMARY FOR ZPY-3 RADAR
PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -Enhanced HRR - Software and algorithms to enhance the Tritons High Range Resolution mode on the
SUW S C W
U
D
T
L
O E
A ZPY-3 Multi-Function Active System (MFAS) RADAR to enable automated classification and
PLACE STW P R
E
R
A
N A
S P identification of surface ships at long range, day or night, in any weather.
EW T I U S O
LOGO R V
E
A
D N
T P
E S
-Survivability for the ZPY-3.
E E C R O -Enhancements and future growth potential.
HERE I
C
K
C
O N
S T
T H S
L L S

CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
ZPY-3
ID
Enhanced High Range Resolution Mode TBD Potential FY-24 IOC w/POM-19 funding
Long Range RF Find, Fix, ID (ONR FNC) LRRFFFID FNC

SURVEILLANCE/DETECT/TRACK/ID
Survivability FY-24 IOC (IFC 5)
Counter Electronic Attack IFC 5 Development/Integration

SURVEILLANCE/DETECT/TRACK/ID
Enhancements TBD Potential FY-24 IOC
Increased Range (MSS/ISAR)
Other Modes (TBD / RF Comms)
Efficient 3-D Imaging SBIR PII

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 6
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR COMMUNICATIONS
PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT - Link-16 message will give MQ-4C In-flight targeting updates capability to network enabled weapons
SUW S C W
U
D
T
L
O E
A -TACAIR interoperability - TTNT waveform enhances Link-16 and enables TDOA.
PLACE STW P R
E
R
A
N A
S P -Communications survivability for protection of BLOS comms links critical to UAS
EW T I U S O
LOGO R V
E
A
D N
T P
E S
-CDL Transition: The NTCDL CDD approved requirements apply to all Navy platforms, including
E E C R O aircraft. BE-CDL is a threshold KPP.
HERE I
C
K
C
O N
S T
T H S -EMW investigation on RFI for SaAR from wireless mobile broadband
L L S
-Alt Comms / MUOS waveform provides alternative WBSC link
CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
COMMUNICATIONS
TRACK/LAUNCH/WEAPONS (PMA-201) /////////////////////////////////////////////////////////////////////////////////////////
Link-16 NEW Weapons Messages TBD Potential FY-24 IOC w/POM-19 funding
J11 Messages

PRE - POST (PMA-262) /////////////////////////////////////////////////////////////////////////////////////////


TACAIR Interoperability TBD Potential FY-24 IOC w/POM-19 funding
Tactical Targeting Network Tech (TTNT)

PRE ID / POST
Communications Survivability TBD
Anti-Jam Modem / Protected Tactical
Waveform

PRE ID / POST (PEO(U&W)/CSI ////////////////////////////////////////////////////////////////////////////////////


CDL Transition Rev B TBD
BE-CDL

PRE ID / POST
Electro-Magnetic Maneuver Warfare
RFI from Wireless Mobile Broadband SBIR PII

PRE ID / POST
Alternative Comms TBD
Mobile User Objective System
Other
Not Funded Partially Funded Funded Proposed $ All $ in Millions
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 7
(P) = POM FYDP as of PRR - Expected IOC ////////// SCORING //////////
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR AIR VEHICLE POWER
PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -Durability improvement increase HP extraction, durability and extended engine overhaul objectives.
STW S C W
U
D
T
L
O E
A -Increased electrical power generation to support future electrical requirements (payloads).
PLACE SUW P R
E
R
A
N A
S P Increasing electrical power generation requires increasing HP extraction which also includes durability
EW T I U S O
LOGO R V
E
A
D N
T P
E S
improvements that enable affordability.
E E C R O
HERE I
C
K
C
O N
S T
T H S
L L S

ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development / Test IFC 4 / IFC 5 / Production
AIR VEHICLE - POWER

ENABLERS
(PMA-262) //////////////////////////////////////////////////////////////////////////////////////////
RMA/AFFORDABILITY/SUSTAINABILITY
Durability Improvements TBD Potential FY-24 IOC w/POM-19 Funding
170 HPX Gearbox upgrade
IGB Upgrade
New Fan
Compressor Vanes
FADEC Software

ENABLER OTHER (PMA-262) //////////////////////////////////////////////////////////////////////////////////////////


Increased Electrical Power Generation TBD Potential FY-24 IOC w/POM-19 Funding
New 40/65KVA Generator
400 A DC (PDA)
IMMC mod 500 RPM idle spd
increase

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 8
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR AIR VEHICLE IMPROVEMENTS
PMA-[XXX] MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -NDI and maintenance efficiencies increase AV availability with composite joint design and
STW S C W
U
D
T
L
O E
A maintenance tools and bond-line monitoring tool (decrease NDI cycle times).
PLACE SUW P R
E
R
A
N A
S P -Structural design tool incorporates isogeometric analysis techniques for accurate transition to and
EW T I U S O
LOGO R V
E
A
D N
T P
E S
from CAD and FEM
E E C R O -Aircraft composite repair process that provides equivalent or better strength while reducing support
HERE I
C
K
C
O N
S T
T H S equipment requirements
L L S

ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
AIR VEHICLE IMPROVEMENTS

ENABLERS SUSTAINMENT /
PMA-262 //////////////////////////////////////////////////////////////////////////////////////////
AFFORDABILITY
NDI and Maintenance Efficiencies
Bolted Joints / Bonded Joints SBIR PII.e PIII TBD
Bond-line Monitoring SBIR PII.E

ENABLERS AFFORDABILITY / TESTABILITY PMA-262 //////////////////////////////////////////////////////////////////////////////////////////


Structural Design Tools
Isogeometric Design SBIR PII

ENABLER SUSTAINMENT PMA-262 //////////////////////////////////////////////////////////////////////////////////////////


Aircraft Composite Repair
Composite Repair Process SBIR PI SBIR PII

ENABLER PHS&T PMA-262 //////////////////////////////////////////////////////////////////////////////////////////


Prognostic Health Management
Analysis of AC Recovery Data SBIR PII

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 9
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR SENSE AND AVOID
PMA-[XXX] MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -Software modification to SaAR to improve terminal area, transit, and on-station flight safety/mission
SUW S C W
U
D
T
L
O E
A availability. Supports safe aircraft descent on-station during adverse weather conditions to conduct
PLACE STW P R
E
R
A
N A
S P ISR (FMV, imagery, etc.) tasks.
EW T I U S O
LOGO R V
E
A
D N
T P
E S
-Non-hermetic seal protects SaAR electronics in harsh environments and improves reliability and
E E C R O sustainability of the system
HERE I
C
K
C
O N
S T
T H S -Collision avoidance algorithms, HCI algorithms increases safety of AV operations
L L S

CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
SENSE AND AVOID

ENABLER SAFETY (PMA-262) ////////////////////////////////////////////////////////////////////////////////////////


Sense and Avoid Radar Wx Detection TBD Potential FY-24 IOC w/POM-19 funding
Weather Radar Mode
NARG #2 Pri
ENABLER SUSTAINABILITY (PMA-262) /////////////////////////////////////////////////////////////////////////////////////////
Sense and Avoid Radar IFC 5 Development / Integration
Non-hermetic Seal SBIR-PII

ENABLER SAFETY (PMA-262) /////////////////////////////////////////////////////////////////////////////////////////


Collision Avoidance Algorithms (SaAR) IFC 5 Development / Integration
Radar Autonomous Collision Avoidance RIF
Automated Collision Avoidance System FNC
Collision Avoidance Decision Making PII
Human Computer Interfacing SBIR PI
RNP RNAV

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 10
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR ASSURED PNT
PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -GPS Anti-Jam Upgrade (ADAP AE (digital) and SPA Antenna) addresses vulnerabilities in navigation
STW S C W
U
D
T
L
O E
A architecture and ensures continued availability of GPS signals in contested environments
PLACE SUW P R
E
R
A
N A
S P - M-Code Modernization for LN-251 EGI (LN-351) provides more robust PNT in GPS degraded
EW T I U S O
LOGO R V
E
A
D N
T P
E S
environments
E E C R O -Synthetic Digital Sextant provides alternative navigation source (GPS-like) for contested
HERE I
C
K
C
O N
S T
T H S environments utilizing the MTS-D EO/IR system (requires upgrade to the MTS-D).
L L S
-Stellar inertial star tracker provides alternative navigation source (reduces drift in EGIs)
ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
ASSURED PNT

SURVEILLANCE - ID PMW/A170 //////////////////////////////////////////////////////////////////////////////////////


GPS AJ Upgrade $Partial POM-17 End Game - Expected FY-20 IOC w/IFC 4.0
ADAP AE and GAS-1N Polar Antenna

SURVEILLANCE - ID PMW/A-170 ///////////////////////////////////////////////////////////////////////////////////////


M-Code Modernization TBD Potential FY-24 IOC w/POM-19 Funding
LN-351 EGI (LN-251 replacement)

SURVEILLANCE - ID (PMA-262) /////////////////////////////////////////////////////////////////////////////////////////


Alternative Navigation TBD Potential FY-24 IOC w/POM-19 Funding
Synthetic Digital Sextant TBD
Stellar Inertial Start Tracker RIF TBD

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 11
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR MTS-B (EO/IR)
PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -Enhanced algorithms for the MTS-B enable multi-target detection and tracking capability.
SUW S C W
U
D
T
L
O E
A -Wide area surveillance enhancement for MTS-B enables EO/IR coverage of large areas with fine
PLACE STW P R
E
R
A
N A
S P resolution, providing operators increased situational awareness
EW T I U S O
LOGO R V
E
A
D N
T P
E S
E E C R O
HERE C
I K
C S T
O N
T H S
L L S

CAPABILITIES FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
IFC 3.1 Development/Test IFC 4 / IFC 5 / Production
EO/IR

DETECT/TRACK PMA-262 ///////////////////////////////////////////////////////////////////////////////////////////


Enhanced Detect / Track Algorithms TBD
Multi-Target Detect / Track

SURVEILLANCE/DETECT/TRACK PMA-262 ///////////////////////////////////////////////////////////////////////////////////////////


Wide Area Surveillance TBD
WAMI

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 12
6 April 2017; 2017-246
FLIGHT PLAN SUMMARY FOR TEST AFFORDABILITY
PMA-262 MISSION(S) EFFECTS CHAIN EXECUTIVE SUMMARY
INT -Test/certification techniques for algorithms increases safety of AV operations
SUW S C W
U
D
T
L
O E
A -Track to Track Data Fusion Testbed reduces risk for Minotaur integration in IFC 4
PLACE STW P R
E
R
A
N A
S P
EW T I U S O
LOGO R V
E
A
D N
T P
E S
E E C R O
HERE I
C
K
C
O N
S T
T H S
L L S

ENABLERS FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21 FY-22 FY-23 FY-24
TEST AFFORDABILITY IFC 3.1 Development/Test IFC 4 / IFC 5 / Production

ENABLERS TESTABLE/SAFETY/OTHER PMA-262 ////////////////////////////////////////////////////////// //////////////////////////////


Sys Level Test Risk Reduction FY-20 IOC IFC 4
Test & Cert Techniques for Algorithms SBIR PII
Track to Track Data Fusion Test bed PII/PII.5 PIIE

Minotaur Integration
Risk Reduction

Not Funded Partially Funded Funded Proposed $ All $ in Millions


DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, (P) = POM FYDP as of PRR - Expected IOC ////////// SCORING ////////// 13
6 April 2017; 2017-246
PMA
Logo
Here

Reduced cost Test and Certification support

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited, 6 April 2017; 2017-246
14