Sunteți pe pagina 1din 1

Joint Measurement Sheet

Name of College :
Transportation of FIM's from Warehouse to Site maximum upto two
51 Transportation SITE S
times .
51.1 Beyond 50 KM by Pickup KM S
51.2 Beyond 50 KM by TATA 407 KM S
Charges for single test Functionality Test with Walk/ Drive Test
Tool and arrange license from Accuver (Cost 500 USD for 4
SCFT, Walk Test, Optimization,
52 phones), Walk test to be carried for physical optimization of small SITE S
Acceptance & Handover
cells to ensure best coverage, quality & performance, Submission
of Final Test Report with NOC obtained from Site Owner.
Lifting of material on Roof top Lifting of Rack & other materials etc.on roof top manually/ with
53 SITE S
Roof top up to 4 th floor tackles
Lifting of Materials Beyond 4 th Subject to prior approval of Small Cell Lead if applicable ( all
54 Per Floor S
foor Per floor Material )
Charges for de-installation of Outdoor APs along with its power
adapter/POE as per the design document requirement and
direction of engineer in charge. The De-installation charges shall
55 De-Installation of Outdoor AP's include removal of electrical power (5/15A Switches in the range of no S
15mtrs with clamping), backhaul connectivity and de installation of
clamping on either Pole, Wall or Ceiling. Cost to include the cost of
all manpower, tools tackles, clamps etc.
Charges for de-installation of Outdoor Cable as per direction of
engineer in charge. The De-installation charges shall include
removal of electrical power (5/15A Switches in the range of 15mtrs
56 De-Installation of Outdoor Cable Rmt S
with clamping), backhaul connectivity and de installation of
clamping on either Pole, Wall or Ceiling. Cost to include the cost of
all manpower, tools tackles, clamps etc.
57 Miscellaneous Work Site specific miscellaneous work (only budgetary purpose) SITE S
Charges for dismantling of existing installed electronics
equipment Like Battery as per direction of engineer in
charge. The De-installation charges shall include removal of
58 electrical cable and accessories including backhaul
connectivity and de installation of clamping on either Pole,
Wall or Ceiling. Cost to include the cost of all manpower, tools
tackles, clamps etc.
58a 75 Ah - 50 Kgs approx NO S
58b 60 Ah - 40 Kgs approx NO S
58c 40 Ah - 35 Kgs approx NO S
De-installation of Battery
Each/Set (LI-ION) 48V,
58d with/without CBMS, with 30 Ah - 30 Kgs approx NO S
accessories, brackets and
covers, etc.)
58e 20 Ah - 25Kgs approx NO S
58f 10 Ah - 15 Kgs approx NO S

Sign of TL Sign of Vendor Sign of WH Manager Sign of IANL


Name Name Name Name
Date Date&Time Date&Time Date
Time Stamp Stamp Time
Stamp

Sign of WiFi lead Sign of O&M Sign of CMP


Name Name Name
Date Date Date
Time Time Time
Stamp Stamp Stamp

S-ar putea să vă placă și