Documente Academic
Documente Profesional
Documente Cultură
VALORIZACION
CONCEPTOS ACUMULADA
ANTERIOR
(S/.)
2.0 AMORTIZACIONES
2.1 ADELANTO DIRECTO 0.00
2.2 ADELANTO DE MATERIALES 0.00
CGRNIN SAC
EN DE VALORIZACION N 02
NERO AL 31 ENERO DEL 2017
E VEHICULAR PRIMAVERA EN LA LOCALIDAD
VALORIZACION
VALORIZACIN
ACUMULADA
ACTUAL
ACTUAL
(S/.) (S/.)
12,214.98 79,234.22
0.00 0.00
12,214.98 79,234.22
0.00 0.00
0.00 0.00
0.00 0.00
12,214.98 79,234.22
2,198.70 14,262.16
14,413.68 93,496.38
14,413.68 93,496.38
14,413.68 93,496.38
CGRNIN SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
A PLATAFORMA (9.9KM)
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE OBRA DE 2.40 X 3.60 UND 1.00 727.89
01.02 CAMPAMENTO PROVISIONAL DE OBRA M2 40.00 60.70
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 8,139.38
01.04 TRANSPORTE DE MATERIALES GLB 1.00 13,369.87
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA Y DEFORESTACION MANUAL HA 3.92 931.12
02.02 TRAZO, NIVELACION Y REPLANTEO EN EJECUCION DE OBRA KM 9.79 361.69
03 MOVIMIENTO DE TIERRAS
03.01 EXPLANACIONES
03.01.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA-SIERRA M3 27,728.77 1.99
03.01.02 CORTE EN ROCA SUELTA CON MAQUINARIA ( PERF. Y DISPARO)-SIERRA M3 9,143.51 7.47
03.01.03 CORTE EN ROCA FIJA CON MAQUINARIA (PERF. Y DISPARO)-SIERRA M3 99.41 11.34
03.02 CONFORMACION DE TERRAPLENES
03.02.01 CONFORMACION DE TERRAPLENES-SIERRA REND.= 940 M3/DIA M3 8,061.71 3.23
03.02.02 PERFILADO Y COMPACTADO DE SUB-RASANTE REND.= 2860 M2/DIA M2 39,160.00 0.97
03.03 ELIMINACION DE MATERIAL EXCEDENTE D=3 KM M3 13,245.98 1.56
04 OBRAS DE ARTE Y DRENAJE
04.01 CUNETAS
04.01.01 CUNETAS LONGITUDINALES SIN REVESTIR M 7,151.28 2.98
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
04.02 ALCANTARILLAS
04.02.01 TRABAJOS PRELIMINARES
04.02.01.01 TRAZO NIVELACION Y REPLANTEO M2 175.59 1.40
04.02.02 MOVIMIENTO DE TIERRAS
04.02.02.01 EXCAVACION MANUAL DE ESTRUCTURAS EN TERRENO NORMAL M3 270.42 21.69
04.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE D=3 KM M3 307.29 1.56
04.02.03 CONCRETO SIMPLE
04.02.03.01 CONCRETO EN ALCANTARILLAS F'C=175 KG/CM2 + 30% PM M3 78.86 260.76
04.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ALCANTARILLAS M2 524.28 13.12
04.02.03.03 EMBOQUILLADO DE PIEDRA, PISO INGRESO Y SALIDA DE ALCANTARILLAS M3 21.53 173.96
04.02.04 CONCRETO ARMADO
04.02.04.01 CONCRETO EN LOSA Y SARDINEL DE ALCANTARILLA F'C=210 KG/CM2 M3 21.86 305.81
04.02.04.02 ACERO EN LOSA Y SARDINEL DE ALCANTARILLAS GRADO 60 KG 1,401.14 3.82
04.02.04.03 ENCOFRADO Y DESENCOFRADO EN LOSA Y SARDINEL DE ALCANTARILLA M2 127.16 33.30
04.02.05 PINTURA EN GENERAL
04.02.05.01 PINTURA EN CABECERA DE ALCANTARILLAS M2 17.00 12.41
04.03 BADENES DE CONCRETO
04.03.01 TRABAJOS PRELIMINARES
04.03.01.01 TRAZO NIVELACION Y REPLANTEO M2 52.88 1.40
04.03.02 MOVIMIENTO DE TIERRAS
04.03.02.01 EXCAVACION MANUAL DE ESTRUCTURAS EN TERRENO NORMAL M3 11.90 21.69
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
04.03.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO M3 8.72 18.16
04.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=3 KM M3 3.97 1.56
04.03.03 CONCRETO SIMPLE
04.03.03.01 CONCRETO EN BADENES F'C= 175KG/CM2 + 30% PM M3 11.90 259.67
04.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN BADENES M2 17.42 13.12
04.03.03.03 EMBOQUILLADO DE PIEDRA, PISO INGRESO Y SALIDA DE BADENES M3 15.89 173.96
04.03.04 JUNTAS
04.03.04.01 RELLENO DE JUNTAS DE DILATACION ASFALTICA E=3/4" M 10.50 5.23
05 SEALIZACIONES Y SEGURIDAD VIAL
05.01 SEALES INFORMATIVAS UND 2.00 666.62
05.02 HITOS KILOMETRICOS UND 9.00 113.52
06 VARIOS
06.01 ENSAYO DE DENSIDAD DE CAMPO A/C 500 M UND 19.00 42.02
06.02 ENSAYO DE RESITENCIA A COMPRESION DEL CONCRETO UND 19.00 37.83
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
PARCIAL
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
FACTOR DE RELACION(1.00000)
TOTAL
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
B PUENTE CARROZABLE
01 TRABAJOS PRELIMINARES.
01.01 LIMPIEZA DE TERRENO MANUAL M2 114.21 1.27
01.02 TRAZO NIVELACION Y REPLANTEO M2 114.21 1.40
01.03 FALSO PUENTE DE MADERA SEGN DISEO GLB 1.00 6,423.47
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION DE SUELO ARENOSO GRAVOSO BAJO AGUA M3 139.98 24.21
02.02 EXCAVACION DE SUELO ARENOSO GRAVOSO SECO M3 280.04 23.64
02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO C/ EQUIPO LIVIANO M3 81.97 18.16
02.04 REFINE NIVELACION Y COMPACTACION M3 113.75 0.74
02.05 ACARREO DE MATERIAL EXCEDENTE HASTA D=30MT M3 525.03 12.29
03 CONCRETO SIMPLE
03.01 SOLADO DE E=4" MEZCLA C:H 1:12 CEMENTO;HORMIGON M2 100.00 30.92
03.02 CONCRETO EN ESTRIBOS Y ALAS F'C=175KG/CM2+30%PG M3 284.45 270.43
03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRIBOS Y ALAS M2 372.60 33.30
04 CONCRETO ARMADO
04.01 CONCRETO EN VIGAS Y LOSAS F'C=280KG/CM2 M3 24.94 312.93
04.02 ACERO EN VIGAS Y LOSAS GRADO 60 KG 7,562.05 4.09
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
04.03 ENCOFGRADO Y DESENCOFRADO NORMAL EN VIGAS Y LOSAS M2 179.88 42.46
05 REVOQUES Y ENLUCIDOS
05.01 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA-MEZCLA 1:5 E=1.5 CM M2 179.88 15.01
06 DRENAJE
06.01 TUBERIA PVC SAL 4" (DRENAJE LOSA) M 2.00 10.84
06.02 TUBERIA PVC SAL 4" (DRENAJE ESTRIBO) M 30.00 10.84
07 ACCESORIOS
07.01 APOYO MOVIL DE NEOPRENE SHORE 70 DE 0.35 X 0.50 X 0.05 M. UND 2.00 565.28
07.02 APOYO FIJO DE NEOPRENE SHORE 70 DE 0035 X 0.50 X 0.05 M. UND 2.00 565.28
07.03 JUNTAS ASFALTICAS 1" M 8.80 10.29
07.04 JUNTAS DE DILATACION TIPO HONEL M 10.00 217.58
08 CARPINTERIA METALICA
08.01 BARANDA PARA PUENTES SEGN DISEO M 32.00 76.14
09 PINTURA
09.01 PINTURA EN BARANDAS METALICAS EN PUENTES M 32.00 10.74
10 ENSAYOS Y PRUEBAS
10.01 DISEO DE MEZCLA PARA CONCRETO UND 2.00 252.10
10.02 ENSAYO DE RESISTENCIA A LA COMPRESION DEL CONCRETO UND 10.00 37.83
10.03 ENSAYO DE REFRECCION SISMICA UND 1.00 5,000.00
11 ACCESOS
11.01 RELLENO Y COMPACTADO MANUAL CON MATERIAL DE PRESTAMO M3 96.40 51.26
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
12 MUROS DE ENCAUSAMIENTO
12.01 MAMPOSTERIA DE PIEDRA CON MORTERO C:H. 1:5 M3 31.33 177.56
13 SEALES INFORMATIVAS
13.01 SEALES INFORMATIVAS UND 1.00 666.62
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
PARCIAL
FACTOR DE RELACION(1.00000)
TOTAL
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
02.01 SEALIZACION AMBIENTAL UND 2.00 330.76
03 PROGRAMA DE CONTINGENCIAS
03.01 PROGRAMA DE CONTINGENCIA GLB 1.00 1,850.00
04 PROGRAMA DE SEGUIMIENTO Y VIGILANCIA
04.01 PROGRAMA DE SEGUIMIENTO Y VIGILANCIA MES 4.00 1,200.00
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
PARCIAL
FACTOR DE RELACION(1.00000)
TOTAL
CGRNING SAC
VALOR
01
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PAS
PROPIETARIO : GOBIERNO REGIONAL DE PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
Presupuesto
ITEM Descripcion de la partida
Und. Metrado P.Unitario
RESUME
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
PARCIAL
FACTOR DE RELACION(1.00000)
TOTAL
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
24,665.14
727.89 1.00 727.89 100.00% 0.00 0.00% 1.00 727.89
2,428.00 40.00 2,428.00 100.00% 0.00 0.00% 40.00 2,428.00
8,139.38 0.50 4,069.69 50.00% 0.00 0.00 0.00% 0.50 4,069.69
13,369.87 0.20 2,673.97 20.00% 0.00 0.00 0.00% 0.20 2,673.97
7,190.94 0.00 0.00 0.00
3,649.99 1.30 1,210.46 33.16% 1.50 1,396.68 38.27% 2.80 2,607.14
3,540.95 3.50 1,265.92 35.75% 0.00 0.00 0.00% 3.50 1,265.92
209,297.83 0.00 0.00 0.00
124,609.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00
55,180.25 9,582.60 19,069.37 34.56% 4,500.00 8,955.00 16.23% 14,082.60 28,024.37
68,302.02 3,194.20 23,860.67 34.93% 0.00 0.00 0.00% 3,194.20 23,860.67
1,127.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00
64,024.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00
26,039.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00
37,985.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00
20,663.73 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00
82,206.07 0.00 1,490.00 1.81% 0.00 0.00% 0.00 0.00
21,310.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00
21,310.81 500.00 1,490.00 6.99% 0.00 0.00% 500.00 1,490.00
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
6,728.41
145.05 0.00 0.00% 0.00 0.00% 0.00 0.00
159.89 0.00 0.00% 0.00 0.00% 0.00 0.00
6,423.47 0.00 0.00% 0.00 0.00% 0.00 0.00
18,034.45 0.00 0.00% 0.00 0.00% 0.00 0.00
3,388.92 0.00 0.00% 0.00 0.00% 0.00 0.00
6,620.15 0.00 0.00% 0.00 0.00% 0.00 0.00
1,488.58 0.00 0.00% 0.00 0.00% 0.00 0.00
84.18 0.00 0.00% 0.00 0.00% 0.00 0.00
6,452.62 0.00 0.00% 0.00 0.00% 0.00 0.00
92,423.39 0.00 0.00% 0.00 0.00% 0.00 0.00
3,092.00 0.00 0.00% 0.00 0.00% 0.00 0.00
76,923.81 0.00 0.00% 0.00 0.00% 0.00 0.00
12,407.58 0.00 0.00% 0.00 0.00% 0.00 0.00
46,370.95 0.00 0.00% 0.00 0.00% 0.00 0.00
7,804.47 0.00 0.00% 0.00 0.00% 0.00 0.00
30,928.78 0.00 0.00% 0.00 0.00% 0.00 0.00
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
3,144.94
1,892.80 0.00 0.00% 0.00 0.00% 0.00 0.00
424.00 0.00 0.00% 0.00 0.00% 0.00 0.00
92.00 0.00 0.00% 0.00 0.00% 0.00 0.00
736.14 0.00 0.00% 0.00 0.00% 0.00 0.00
661.52 0.00 0.00% 0.00 0.00% 0.00 0.00
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
CGRNING SAC
VALORIZACIN DE OBRA N 01
01 ENERO AL 31 ENERO DEL 2017
ANIEL ALCIDES CARRIN PASCO"
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
0.00% 0.00 0.00 0.00%
0.00% 0.00 0.00 0.00%
0.00% 175.59 245.83 100.00%
0.00% 0.00 0.00 0.00%
0.00% 270.42 5,865.41 100.00%
0.00% 307.29 479.37 100.00%
0.00% 0.00 0.00 0.00%
0.00% 78.86 20,563.53 100.00%
0.00% 524.28 6,878.55 100.00%
0.00% 21.53 3,745.36 100.00%
0.00% 0.00 0.00 0.00%
0.00% 21.86 6,685.01 100.00%
0.00% 1,401.14 5,352.35 100.00%
0.00% 127.16 4,234.43 100.00%
0.00% 0.00 0.00 0.00%
0.00% 17.00 210.97 100.00%
0.00% 0.00 0.00 0.00%
0.00% 0.00 0.00 0.00%
0.00% 52.88 74.03 100.00%
0.00% 0.00 0.00 0.00%
0.00% 11.90 258.11 100.00%
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
0.00% 8.72 158.36 100.00%
0.00% 3.97 6.19 100.00%
0.00% 0.00 0.00 0.00%
0.00% 11.90 3,090.07 100.00%
0.00% 17.42 228.55 100.00%
0.00% 15.89 2,764.22 100.00%
0.00% 0.00 0.00 0.00%
0.00% 10.50 54.92 100.00%
0.00% 0.00 0.00 0.00%
0.00% 2.00 1,333.24 100.00%
0.00% 9.00 1,021.68 100.00%
0.00% 0.00 0.00 0.00%
0.00% 19.00 798.38 100.00%
0.00% 19.00 718.77 100.00%
260,084.40
26,008.44
20,806.75
306,899.59
55,241.93
==========
362,141.51
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
362,141.51
362,141.51
79.48%
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
0.00% 179.88 7,637.70 100.00%
0.00% 0.00 0.00 0.00%
0.00% 179.88 2,700.00 100.00%
0.00% 0.00 0.00 0.00%
0.00% 2.00 21.68 100.00%
0.00% 30.00 325.20 100.00%
0.00% 0.00 0.00 0.00%
0.00% 2.00 1,130.56 100.00%
0.00% 2.00 1,130.56 100.00%
0.00% 8.80 90.55 100.00%
0.00% 10.00 2,175.80 100.00%
0.00% 0.00 0.00 0.00%
0.00% 32.00 2,436.48 100.00%
0.00% 0.00 0.00 0.00%
0.00% 32.00 343.68 100.00%
0.00% 0.00 0.00 0.00%
0.00% 2.00 504.20 100.00%
0.00% 10.00 378.30 100.00%
0.00% 1.00 5,000.00 100.00%
0.00% 0.00 0.00 0.00%
0.00% 96.40 4,941.46 100.00%
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
0.00% 0.00 0.00 0.00%
0.00% 31.33 5,562.95 100.00%
0.00% 0.00 0.00 0.00%
0.00% 1.00 666.62 100.00%
190,965.24
19,096.53
15,277.22
225,338.99
40,561.02
==========
265,900.01
265,900.01
265,900.01
100.00%
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
0.00% 2.00 661.52 100.00%
0.00% 0.00 0.00 0.00%
0.00% 1.00 1,850.00 100.00%
0.00% 0.00 0.00 0.00%
0.00% 4.00 4,800.00 100.00%
10,456.46
1,045.65
836.52
12,338.63
2,220.95
==========
14,559.58
14,559.58
14,559.58
100.00%
CGRNING SAC
do Actual Saldo
% Metrado Parcial %
461,506.10
46,150.61
36,920.49
544,577.20
98,023.90
==========
642,601.10
642,601.10
642,601.10
35.73%
CGRNING SAC
OBRA : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE Y
ALCANTARILLADO DE LA CIUDAD DE OROYA - JUNIN
PROPIETARIO: : GOBIERNO REGIONAL JUNIN
SUPERVISOR: : SERCONSULT S.A.
CONTRATISTA: : CONSORCIO ALTIPLANO
PLAZO EJECUCIN: : 540 das calendarios
A = Monto del adelanto en Efectivo de S/. concedido al contratista Sl. 6,207,736.91 (Sin I.G.V.)
V= Valorizacion Mensual
C= Monto del contrato principal Sl. 31,038,684.53 (Sin I.G.V.)
Saldo por
Val
Monto del Contrato Valorizacin Adelanto Amortizacin Amortizar
(C) (V) (A) (A x V) / C
1.00 31,038,684.53 6,207,736.91 - 6,207,736.91
2.00 31,038,684.53 6,207,736.91 - 6,207,736.91
3.00 31,038,684.53 6,207,736.91 362,888.66 5,844,848.25
4.00 31,038,684.53 6,207,736.91 - 5,844,848.25
5.00 31,038,684.53 6,207,736.91 - 5,844,848.25
6.00 31,038,684.53 6,207,736.91 - 5,844,848.25
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PASCO"
PROPIETARIO: : GOBIERNO REGIONAL DE PASCO
SUPERVISOR: : ING. LUIS E. ENCISO FLORES
CONTRATISTA: : CONSORCIO SAN CRISTOBAL
PLAZO EJECUCIN: : 270 das calendarios
DIRECTO S/. (dias) 15 dias 15 dias 15 dias 15 dias 15 dias 15 dias 15 dias 15 dias 15 dias 15 dias
Feb-11 Feb-11 Mar-11 Mar-11 Apr-11 Apr-11 May-11 May-11 Jun-11 Jun-11
01 : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD 528,653.75 150 - - 58,285.97 0,00 0,00 0,00 10,351.68 - - -
CGRNIN SAC
CURVA S : AVANCE DE OBRA PROGRAMADO VS. EJECUTADO ACUMULADO
01 ENERO AL 31 ENERO DEL 2017
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD DE YANAHUANCA, PROVINCIA DE DANIEL ALCIDES CARRIN PASCO"
PROPIETARIO: : GOBIERNO REGIONAL DE PASCO
CONTRATISTA: : CONSORCIO SAN CRISTOBAL
PLAZO EJECUCIN: : 270 DAS CALENDARIOS
ADELANTO EFECTIVO: : 0.00 (Sin I.G.V.)
MONTO CONTRATO: Sl. 6,205,568.92 (Sin I.G.V.)
100.00%
78.95% 79.84%
80.00%
78.95% 79.84%
71.45% 75.73% 75.73%
70.00% 71.45%
60.49%
60.00% 60.49%
50.00%
40.00% 37.42%
37.42%
30.37% Column F Column L
30.00% 30.37% Column F Column L
20.00%
13.61%
13.61%
10.00%
0.00%
0.00% 0.00%
ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO
MONTO TOTAL (Sin IGV) PORCENTAJES MONTO TOTAL (Sin IGV) PORCENTAJES
MES PARCIAL ACUMUL PARCIAL ACUMUL MES PARCIAL ACUMUL PARCIAL ACUMUL
S/. S/. % % S/. S/. % %
ABRIL 0.00 0.00 0.00% 0.00% ABRIL 0.00 0.00 0.00% 0.00%
MAYO S/. 844,460.93 S/. 844,460.93 13.61% 13.61% MAYO S/. 844,460.93 S/. 844,460.93 13.61% 13.61%
JUNIO S/. 1,040,478.29 S/. 1,884,939.22 16.77% 30.37% JUNIO S/. 1,040,478.29 S/. 1,884,939.22 16.77% 30.37%
JULIO S/. 436,934.89 S/. 2,321,874.11 7.04% 37.42% JULIO S/. 436,934.89 S/. 2,321,874.11 7.04% 37.42%
AGOSTO S/. 1,432,109.35 S/. 3,753,983.46 23.08% 60.49% AGOSTO S/. 1,432,109.35 S/. 3,753,983.46 23.08% 60.49%
SEPTIEMBRE S/. 680,057.72 S/. 4,434,041.18 10.96% 71.45% SEPTIEMBRE S/. 680,057.72 S/. 4,434,041.18 10.96% 71.45%
OCTUBRE S/. 265,744.18 S/. 4,699,785.36 4.28% 75.73% OCTUBRE S/. 265,744.18 S/. 4,699,785.36 4.28% 75.73%
NOVIEMBRE S/. 199,476.08 S/. 4,899,261.44 3.21% 78.95% NOVIEMBRE S/. 199,476.08 S/. 4,899,261.44 3.21% 78.95%
DICIEMBRE S/. 55,461.90 S/. 4,954,723.34 0.89% 79.84% DICIEMBRE S/. 55,461.90 S/. 4,954,723.34 0.89% 79.84%
ENERO S/. 489,088.26 S/. 5,443,811.59 7.88% 87.72% ENERO S/. 715,617.60 S/. 5,670,340.94 11.53% 91.38% INC ADICIONAL 1
FEBRERO S/. 761,757.33 S/. 6,205,568.92 12.28% 100.00% FEBRERO S/. 6,205,568.92
INFORME DE VALORIZACION N 02
01 ENERO AL 31 ENERO DEL 2017
OBRA : "CONSTRUCCIN DEL PUENTE VEHICULAR PRIMAVERA EN LA LOCALIDAD
PROPIETARIO : GOBIERNO REGIONAL PASCO
CONTRATISTA : CONSORCIO SAN CRISTOBAL
MES VALORIZADO : MAYO 2011
SUPERVISOR : ING. LUIS E. ENCISO FLORES
RESIDENTE : ING. FREDDY RAMOS GARCIA
PRESUPUESTO REFERENCIAL 6,205,568.92 (Sin I.G.V.)
PERIODO DE VALORIZACION : 01/05/2011 AL 15/05/2011
B.- REAJUSTES:
D.- DEDUCCIONES
E.- RETENCION
EN EFECTIVO 12,214.98
I.G.V. 18% 2198.70
MONTO TOTAL DE LA VALORIZACION 14,413.68
CONCEPTO
A) No DE VALORIZACION
Monto Valorizado (V)
Interes (I)
Pago de reajustes de (1 a la 3)
VALORIZACION BRUTA VB = (V+I+S)
FACTOR DE RELACION 1.00000
Amortizacion de los adelantos (D)
Directos
Materiales
MULTA Y PENALIDAD
Descuento por multa
Descuento por penalidad
MONTO A PAGAR AL CONTRATISTA
En efectivo (VN-FG) 12,214.98
R PRIMAVERA EN LA LOCALIDAD
TOTAL
03
12,214.98
12,214.98
0.00
12,214.98
14,413.68
14,413.68