05 Introduction
07 Success through integration
09 Services
11 Benefits
13 Rail experience
15 Results
17 Industry challenges
19 Team
20 Contact

On time. On budget. Safely


thinkspi.com/rail

3
"SPI's understanding of
engineering integration has
helped drive collaboration
and mitigate risk"
Network Rail | Thameslink
thinkspi.com/rail

Deliver on time, on
budget and safely
As specialists in project integration, SPI is D

er
e li t
ver fas
helping the rail industry deliver projects
faster, safer and at a lower cost.

With over 26bn of rail project experience, SPI works Lo t

s
w er c o s
both client side and with supply chain to mitigate
delivery risk with measurable results.

ntly
Sa

Our vision is to help industry deliver value for money el


ia
l
y + omp
f

whilst improving outcomes for the people that use, C


operate and maintain the asset.

IntegratedRail
5
Project
Management

Stakeholder
Engineering
Management

Integrating teams

Commercial + Construction
Procurement

Project
HSQE Controls

Output Feasibility Concept Detailed


Definition Design Design
thinkspi.com/rail

Success through
integration
SPI's Integrated Rail services enable . Hub & Spoke
project teams to mitigate risk and . Design & Build
improve outcomes on complex multi- . Joint Ventures
disciplinary projects. . Alliancing
. Asset Owners
The heart of Integrated Rail is the ethos,
. PMO
skill and experience of integrating people,
processes and technology for a range of . LDO

clients on multiple project types >> . Design Consultants


. Contractors
. Manufacturers

Construction Project Operations +


Commission closeout Maintenance

Integrated Rail
7
Services
3D+
VR Virtual
Signal Reality
Sighting Modelling
VR Driver
Route 4D
Learning Construction
Rehearsals
Digital
Federated Twin
Model
BIM Management

Consult
Implement
Support Engineering
Survey Data
Management
Management
As-Built
Management

Issue Dashboards
and Action and Reporting
Management Document
Paperless Control
Workflows -
Digital
Signatures Common
Data
Environments Information
H&S File Management
Management
Assurance Systems
+Compliance
thinkspi.com/rail

Modelling +
Simulation

Engineering
Integration

Project
Information
Management
9
Benefits

Visualise
plans and
improve
safety

Improve
efficiency,
reduce
delays
and
wastage

Trust your
data and
monitor
progress
easily
thinkspi.com/rail

Modelling and Simulation


Visualise and interpret engineering data using interactive models

Simulate construction programmes to mitigate clashes (4D)

Deliver virtual site tours for stakeholder engagement

Analyse the impact of design changes on the project time line

Uplift 2D and survey point-clouds to 3D for ease of use

Use one master federated model forIDC / Signal Sighting / Driver Learning

Engineering Integration
SupportPEMs+DPEsto manage data exchange betweenHub and Spokes

Balance Project Engineers' workloads

ManageTQs, IDC/Rs, Deliverables, DRNs

Provide real-time progress reporting

Manage issues and actions to completion

Easy evidence gathering forEntry Into Service and H&S files

Use CAD to support IDC resources

Coordinate and control surveys centrally

Project Information Management


Single source of truthfor all project data

Deliverables management with real-time progress

Automate reporting and KPI trackingwith easy to read dashboards

Track actions, requirements and agreements centrally

Reduce administration and overheads. Have fewer meetings

11
LIVERPOOL LIME ST.
NETWORK RAIL

Project: 125m remodelling


and resignalling project for one of
the UK's oldest stations.

Scope:
. Engineering Integration
. Project Data Management
. Federated Model Management
. Signal Sighting
. 4D Construction Simulation
. Paperless approvals
. Point Cloud to 3D conversions
. Virtual Reality Modelling

MIDLAND MAIN LINE NORTH LONDON RAIL NORTH WEST


ELECTRIFICATION INVESTMENT PROJECT ELECTRIFICATION
NETWORK RAIL NETWORK RAIL NETWORK RAIL

Project: 1bn+ electrification and route Project: Major 350m upgrade from North Project: 1bn+ programme to electrify
upgrade programme. London to Stratford for the Olympics 2012. over 300km of route across the north of
England.
Scope: Scope:
. CDE Administration . Design Delivery Management Scope:
. Project Data Management . CDE Administration . 3D Modelling
. Engineering Integration . Engineering Integration . Signal Sighting
. Federated Model Management . Federated Model Management . Driver Route Learning
. Signal Sighting
. 4D Construction Simulation Results: 25% reduction in design approvals Results: Accurate 3D representation
. Point Cloud to 3D conversions timescales. 80% improvement in TQ of railway corridor reducing conflicts
. Virtual Reality Modelling response times. Semi-automated project between OLE and Signalling assets.
dashboard and KPI tracker. IDC/R efficiency.
Results: Planning approval for listed
elements reduced from 8 weeks to 3.
thinkspi.com/rail

Rail experience
Whatever the nature and complexity of our clients' projects,
our involvement has created cost and time savings. By
leveraging technology, delivering lean processes and building
highly realistic interactive models, we have helped make a real
and measurable difference to rail project delivery.

THAMESLINK WEST COAST ROUTE BARKING


PROGRAMME MODERNISATION RIVERSIDE
NETWORK RAIL NETWORK RAIL TRANSPORT FOR LONDON / LOROL

Project: 2bn railway upgrade expanding Project: 340m Rugby to Nuneaton Project: 263m railway project as part
the existing service comprising stations upgrade as part of 10bn route of wider area development of 10,000
and track. modernisation programme. homes in London.

Scope: Scope: Scope:


. CDE troubleshooting and administration . Design Delivery Management . Point Cloud to 3D conversions
. Design Delivery Management . CDE Administration . 3D Modelling
. Engineering Integration . Engineering Integration
. Federated Model Management . Federated Model Management
. Signal Sighting
Results: Standardised approach to . 4D Construction Rehearsals
Engineering Data Management. 80%
improvement in TQ response times, 70% Results: 1yr recovered from 3+ yr design
improvement in DRN response times. programme. TQ response time cut by 50%.

13
Virtual Reality
Asset Modelling
VRAM is the interactive front-end
of an asset database allowing
managers, engineers and
stakeholders to visualise, navigate
and investigate asset information.
thinkspi.com/rail

Delivering results
Integrated Rail has delivered measurable results for clients. Our
solutions are helping deliver projects faster, safer and at a lower cost.

33% 10%
35%
Lower cost. Lower survey costs Faster. Improvement in Faster. Improvement in
and introduction of possession- design programme, design construction programme
free surveys through Integrated approval and technical query through BIM and virtual
Rail's survey management timescales construction

80% 66%
Savings. 6:1 Six Sigma Faster. Lower lead times for Faster. Faster stakeholder
quantified directly buried services information approvals through interactive
attributable savings. 6 for through Integrated Rail's visualisation
every 1 spent information management

IntegratedRail
15
Reducing
delivery
risks

Working with industry to make


rail projects a success for all is at
the core of Integrated Rail
Simon Wray | Managing Director | SPI
thinkspi.com/rail

Industry challenges
and the difference Integrated Rail makes

Silos We improve collaboration


Natural silo behaviour reduces IR integrates teams as an impartial co-
quality of communication and ordinator to improve collaboration and
vital data sharing. mitigate vital issues such as information-
related delays which impact the programme.

Skills Deploy professionals on site


Finding skilled resources for IR delivers expertise to supplement and
your information systems and support your project teams on-site and in the
control can be a challenge. office.

Time constraints Faster decision-making


Decision-making can take longer IR solutions improve quality of decision-
than necessary and seeking making. With simulation, modelling and digital
approvals can create delays. signatures we make decisions quicker and easier.

Data duplication Ensure quality robust data


Multiple teams inevitably IR ensures data is trustworthy. Processes
conduct varying surveys and and systems will automatically ensure work is
create unneccesary duplication. organised, accessible and useful to all parties.

IntegratedRail
17
SPI's services ensured fast and fluid
real time signal positioning during
meetings saving significant time and
site visit costs.
Project Manager | Mott MacDonald
thinkspi.com/rail

Professionals that deliver


We invest in our people and that reflects in our lasting
partnerships with clients. SPI's team of experts are valued by
clients for their professional as well as their personable service.
Contact any of our team to discuss your requirements.

Management Team

Simon Wray Keith Wakeford Michelle Zompi Tom Boreham


Managing Director Head of Modelling Head of Information BIM and Surveying
and Simulation Management Specialist

Dee O'Donovan Petra Cook Laura Hepworth Ash Mistry


Head of Business Head of HR Client Relationship Research Partner
Support Manager

IntegratedRail
19
"It has been noted by the project
team that SPI's virtual reality
product is the best seen"

Project Manager | Network Rail

Expert support for complex projects

IntegratedRail

Specialist Project Integration