Sunteți pe pagina 1din 35

4/14/2012

This tutorial is a PowerPoint file which


includes recorded narration. Automatic
slide sequencing is coupled to the sound track.

For the most effective use, please ensure that


your computer is equipped with a sound card
and that it is activated.

If you cannot hear this message from your


computers speakers, please connect them.

Effect of Evaporative Coolers and Foggers


on Power Plant Performance & Costs

www.petrodanesh.com ehsan.saadati@yahoo.com
1
4/14/2012

Effect of Evaporative Coolers and Foggers


on Power Plant Performance & Costs

Evaporative cooler

Effect of Evaporative Coolers and Foggers


on Power Plant Performance & Costs

Evaporative cooler
Fogger
Underspray
Overspray

www.petrodanesh.com ehsan.saadati@yahoo.com
2
4/14/2012

Effect of Evaporative Coolers and Foggers


on Power Plant Performance & Costs

Evaporative cooler
Fogger
Underspray
Overspray
Chillers discussed elsewhere

Effect of Installing Evaporative Cooler


on Plant Performance & Costs

Gas Turbine Inlet Air

www.petrodanesh.com ehsan.saadati@yahoo.com
3
4/14/2012

Effect of Installing Evaporative Cooler


on Plant Performance & Costs

Tdb = 80 F
Twb = 66.7 F
RH = 50%

Effect of Installing Evaporative Cooler


on Plant Performance & Costs

Tdb = 80 F
Twb = 66.7 F
RH = 50%

h = 85%

www.petrodanesh.com ehsan.saadati@yahoo.com
4
4/14/2012

Effect of Installing Evaporative Cooler


on Plant Performance & Costs

Tdb = 80 F Tdb = 68 F
Twb = 66.7 F Twb = 66.7 F
RH = 50% RH = 90%
Additional
Water Mass Flow

h = 85%

www.petrodanesh.com ehsan.saadati@yahoo.com
5
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
6
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
7
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
8
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
9
4/14/2012

85

4. 5

www.petrodanesh.com ehsan.saadati@yahoo.com
10
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
11
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
12
4/14/2012

Performance Impact of Evaporative Cooler

No Evaporative Cooler Installed - Baseline

Evaporative Cooler in Operation (h=85%)

Gas Turbine Power Increase: 2035 kW (3.2%)

Performance Impact of Evaporative Cooler

No Evaporative Cooler Installed - Baseline

Evaporative Cooler in Operation (h=85%)

Gas Turbine Power Increase: 2035 kW (3.2%)


Steam Turbine Power Increase: 289 kW (0.9%)

www.petrodanesh.com ehsan.saadati@yahoo.com
13
4/14/2012

Performance Impact of Evaporative Cooler

No Evaporative Cooler Installed - Baseline

Evaporative Cooler in Operation (h=85%)

Gas Turbine Power Increase: 2035 kW (3.2%)


Steam Turbine Power Increase: 289 kW (0.9%)
Net Plant Power Increase: 2304 kW (2.4%)

Performance Impact of Evaporative Cooler

No Evaporative Cooler Installed - Baseline

Evaporative Cooler in Operation (h=85%)

Gas Turbine Power Increase: 2035 kW (3.2%) Net Plant Heat Rate Increase: 9 BTU/kWH
Steam Turbine Power Increase: 289 kW (0.9%)
Net Plant Power Increase: 2304 kW (2.4%)

www.petrodanesh.com ehsan.saadati@yahoo.com
14
4/14/2012

Representative Cost Summary


Cooler Installed - D - re Cooler Installed D - re
No Cooler Not Operating no cooler - In Operation no cooler
Project Cost Summary Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,451,000 208,000 34,525,000 282,000
II Other Equipment 1,515,000 1,530,000 15,000 1,537,000 22,000
III Civil 1,743,000 1,745,000 2,000 1,757,000 14,000
IV Mechanical 4,106,000 4,132,000 26,000 4,146,000 40,000
V Electrical Assembly & Wiring 310,000 310,000 0 313,000 3,000
VI Buildings & Structures 1,772,000 1,772,000 0 1,783,000 11,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,346,000 38,000
Subtotal - Contractor's Internal Cost 46,996,000 47,281,000 285,000 47,407,000 411,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,024,000 36,000 6,043,000 55,000
Contractor's Price 52,984,000 53,305,000 321,000 53,449,000 465,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,797,000 28,000 4,810,000 41,000
Total - Owner's Cost 57,753,000 58,102,000 349,000 58,260,000 507,000
0

Representative Cost Summary


Cooler Installed - D - re Cooler Installed D - re
No Cooler Not Operating no cooler - In Operation no cooler
Project Cost Summary Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,451,000 208,000 34,525,000 282,000
II Other Equipment 1,515,000 1,530,000 15,000 1,537,000 22,000
III Civil 1,743,000 1,745,000 2,000 1,757,000 14,000
IV Mechanical 4,106,000 4,132,000 26,000 4,146,000 40,000
V Electrical Assembly & Wiring 310,000 310,000 0 313,000 3,000
VI Buildings & Structures 1,772,000 1,772,000 0 1,783,000 11,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,346,000 38,000
Subtotal - Contractor's Internal Cost 46,996,000 47,281,000 285,000 47,407,000 411,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,024,000 36,000 6,043,000 55,000
Contractor's Price 52,984,000 53,305,000 321,000 53,449,000 465,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,797,000 28,000 4,810,000 41,000
Total - Owner's Cost 57,753,000 58,102,000 349,000 58,260,000 507,000
0

www.petrodanesh.com ehsan.saadati@yahoo.com
15
4/14/2012

Representative Cost Summary


Cooler Installed - D - re Cooler Installed D - re
No Cooler Not Operating no cooler - In Operation no cooler
Project Cost Summary Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,451,000 208,000 34,525,000 282,000
II Other Equipment 1,515,000 1,530,000 15,000 1,537,000 22,000
III Civil 1,743,000 1,745,000 2,000 1,757,000 14,000
IV Mechanical 4,106,000 4,132,000 26,000 4,146,000 40,000
V Electrical Assembly & Wiring 310,000 310,000 0 313,000 3,000
VI Buildings & Structures 1,772,000 1,772,000 0 1,783,000 11,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,346,000 38,000
Subtotal - Contractor's Internal Cost 46,996,000 47,281,000 285,000 47,407,000 411,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,024,000 36,000 6,043,000 55,000
Contractor's Price 52,984,000 53,305,000 321,000 53,449,000 465,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,797,000 28,000 4,810,000 41,000
Total - Owner's Cost 57,753,000 58,102,000 349,000 58,260,000 507,000
0

Gas turbine package


Tanks
Site work
Piping
Engg & startup

Representative Cost Summary


Cooler Installed - D - re Cooler Installed D - re
No Cooler Not Operating no cooler - In Operation no cooler
Project Cost Summary Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,451,000 208,000 34,525,000 282,000
II Other Equipment 1,515,000 1,530,000 15,000 1,537,000 22,000
III Civil 1,743,000 1,745,000 2,000 1,757,000 14,000
IV Mechanical 4,106,000 4,132,000 26,000 4,146,000 40,000
V Electrical Assembly & Wiring 310,000 310,000 0 313,000 3,000
VI Buildings & Structures 1,772,000 1,772,000 0 1,783,000 11,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,346,000 38,000
Subtotal - Contractor's Internal Cost 46,996,000 47,281,000 285,000 47,407,000 411,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,024,000 36,000 6,043,000 55,000
Contractor's Price 52,984,000 53,305,000 321,000 53,449,000 465,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,797,000 28,000 4,810,000 41,000
Total - Owner's Cost 57,753,000 58,102,000 349,000 58,260,000 507,000
0

Also -
Gas turbine package Steam turbine
Tanks HRSG
Site work Pumps
Piping Civil works
Engg & startup Erection
Engg & startup

www.petrodanesh.com ehsan.saadati@yahoo.com
16
4/14/2012

Fogger

Typical Nozzle Construction Spray Pattern from Fogger

Effect of Installing Fogger


on Plant Performance & Costs
(Underspray)

Tdb = 80 F Tdb = 68 F
Twb = 66.7 F Twb = 66.7 F
RH = 50% RH = 90%
Additional
Water Mass Flow

Demineralized water

h = 85%

www.petrodanesh.com ehsan.saadati@yahoo.com
17
4/14/2012

Effect of Installing Fogger


on Plant Performance & Costs
(Overspray)

Tdb = 80 F Tdb = 66.7 F


Twb = 66.7 F Twb = 66.7 F
RH = 50% RH = >100%
Additional
Water Mass Flow

Demineralized water

0.5% Overspray

www.petrodanesh.com ehsan.saadati@yahoo.com
18
4/14/2012

85

www.petrodanesh.com ehsan.saadati@yahoo.com
19
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
20
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
21
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
22
4/14/2012

Effect of Installing Fogger


on Plant Performance & Costs
(Overspray)

Tdb = 80 F Tdb = 66.7 F


Twb = 66.7 F Twb = 66.7 F
RH = 50% RH = >100%
Additional
Water Mass Flow

Demineralized water

0.5% Overspray

www.petrodanesh.com ehsan.saadati@yahoo.com
23
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
24
4/14/2012

.5

www.petrodanesh.com ehsan.saadati@yahoo.com
25
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
26
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
27
4/14/2012

www.petrodanesh.com ehsan.saadati@yahoo.com
28
4/14/2012

Performance Impact of Fogger with Overspray

No Fogger Installed - Baseline

Fogger in Operation (0.5% Overspray)

Gas Turbine Power Increase: 5916 kW (9.5%)

Performance Impact of Fogger with Overspray

No Fogger Installed - Baseline

Fogger in Operation (0.5% Overspray)

Gas Turbine Power Increase: 5916 kW (9.5%)


Steam Turbine Power Increase: 552 kW (1.7%)

www.petrodanesh.com ehsan.saadati@yahoo.com
29
4/14/2012

Performance Impact of Fogger with Overspray

No Fogger Installed - Baseline

Fogger in Operation (0.5% Overspray)

Gas Turbine Power Increase: 5916 kW (9.5%)


Steam Turbine Power Increase: 552 kW (1.7%)
Net Plant Power Increase: 6390 kW (6.8%)

Performance Impact of Fogger with Overspray

No Fogger Installed - Baseline

Fogger in Operation (0.5% Overspray)

Gas Turbine Power Increase: 5916 kW (9.5%) Net Plant Heat Rate Decrease: 4 BTU/kWH
Steam Turbine Power Increase: 552 kW (1.7%)
Net Plant Power Increase: 6390 kW (6.8%)

www.petrodanesh.com ehsan.saadati@yahoo.com
30
4/14/2012

Representative Cost Summary

Fogger Installed - D - re Fogger installed D - re


No Cooler Not Operating no fogger 0.5% Overspray no fogger
Project Cost Summary Reference Cost Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,335,000 92,000 34,543,000 300,000
II Other Equipment 1,515,000 1,531,000 16,000 1,591,000 76,000
III Civil 1,743,000 1,745,000 2,000 1,783,000 40,000
IV Mechanical 4,106,000 4,132,000 26,000 4,176,000 70,000
V Electrical Assembly & Wiring 310,000 313,000 3,000 324,550 14,550
VI Buildings & Structures 1,772,000 1,772,000 0 1,798,000 26,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,350,000 42,000
Subtotal - Contractor's Internal Cost 46,996,000 47,168,000 172,000 47,565,000 569,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,012,000 24,000 6,072,000 84,000
Contractor's Price 52,984,000 53,181,000 197,000 53,638,000 654,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,786,000 17,000 4,827,000 58,000
Total - Owner's Cost 57,753,000 57,967,000 214,000 58,465,000 712,000

Representative Cost Summary

Fogger Installed - D - re Fogger installed D - re


No Cooler Not Operating no fogger 0.5% Overspray no fogger
Project Cost Summary Reference Cost Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,335,000 92,000 34,543,000 300,000
II Other Equipment 1,515,000 1,531,000 16,000 1,591,000 76,000
III Civil 1,743,000 1,745,000 2,000 1,783,000 40,000
IV Mechanical 4,106,000 4,132,000 26,000 4,176,000 70,000
V Electrical Assembly & Wiring 310,000 313,000 3,000 324,550 14,550
VI Buildings & Structures 1,772,000 1,772,000 0 1,798,000 26,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,350,000 42,000
Subtotal - Contractor's Internal Cost 46,996,000 47,168,000 172,000 47,565,000 569,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,012,000 24,000 6,072,000 84,000
Contractor's Price 52,984,000 53,181,000 197,000 53,638,000 654,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,786,000 17,000 4,827,000 58,000
Total - Owner's Cost 57,753,000 57,967,000 214,000 58,465,000 712,000

www.petrodanesh.com ehsan.saadati@yahoo.com
31
4/14/2012

Representative Cost Summary

Fogger Installed - D - re Fogger installed D - re


No Cooler Not Operating no fogger 0.5% Overspray no fogger
Project Cost Summary Reference Cost Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,335,000 92,000 34,543,000 300,000
II Other Equipment 1,515,000 1,531,000 16,000 1,591,000 76,000
III Civil 1,743,000 1,745,000 2,000 1,783,000 40,000
IV Mechanical 4,106,000 4,132,000 26,000 4,176,000 70,000
V Electrical Assembly & Wiring 310,000 313,000 3,000 324,550 14,550
VI Buildings & Structures 1,772,000 1,772,000 0 1,798,000 26,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,350,000 42,000
Subtotal - Contractor's Internal Cost 46,996,000 47,168,000 172,000 47,565,000 569,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,012,000 24,000 6,072,000 84,000
Contractor's Price 52,984,000 53,181,000 197,000 53,638,000 654,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,786,000 17,000 4,827,000 58,000
Total - Owner's Cost 57,753,000 57,967,000 214,000 58,465,000 712,000

Gas turbine package


Tanks
Site work
Piping
Engg & startup

Representative Cost Summary

Fogger Installed - D - re Fogger installed D - re


No Cooler Not Operating no fogger 0.5% Overspray no fogger
Project Cost Summary Reference Cost Reference Cost Reference Cost Reference Cost
I Specialized Equipment 34,243,000 34,335,000 92,000 34,543,000 300,000
II Other Equipment 1,515,000 1,531,000 16,000 1,591,000 76,000
III Civil 1,743,000 1,745,000 2,000 1,783,000 40,000
IV Mechanical 4,106,000 4,132,000 26,000 4,176,000 70,000
V Electrical Assembly & Wiring 310,000 313,000 3,000 324,550 14,550
VI Buildings & Structures 1,772,000 1,772,000 0 1,798,000 26,000
VII Engineering & Plant Startup 3,308,000 3,341,000 33,000 3,350,000 42,000
Subtotal - Contractor's Internal Cost 46,996,000 47,168,000 172,000 47,565,000 569,000
VIII Contractor's Soft & Miscellaneous Costs 5,988,000 6,012,000 24,000 6,072,000 84,000
Contractor's Price 52,984,000 53,181,000 197,000 53,638,000 654,000
IX Owner's Soft & Miscellaneous Costs 4,769,000 4,786,000 17,000 4,827,000 58,000
Total - Owner's Cost 57,753,000 57,967,000 214,000 58,465,000 712,000

Also -
Gas turbine package Steam turbine
Tanks HRSG
Site work Pumps
Piping Civil works
Engg & startup Erection
Engg & startup

www.petrodanesh.com ehsan.saadati@yahoo.com
32
4/14/2012

Effect of Installing GT Inlet Air Cooling Systems


on Plant Performance & Costs

Cost impact on plant is more than just the cooling system

Effect of Installing GT Inlet Air Cooling Systems


on Plant Performance & Costs

Cost impact on plant is more than just the cooling system

Must consider the following for a true economic evaluation -

www.petrodanesh.com ehsan.saadati@yahoo.com
33
4/14/2012

Effect of Installing GT Inlet Air Cooling Systems


on Plant Performance & Costs

Cost impact on plant is more than just the cooling system

Must consider the following for a true economic evaluation -


Additional revenue (more kW sold)

Effect of Installing GT Inlet Air Cooling Systems


on Plant Performance & Costs

Cost impact on plant is more than just the cooling system

Must consider the following for a true economic evaluation -


Additional revenue (more kW sold)
Added costs
Impact on overall plant investment
Additional financing, taxes & insurance
Increased consumption of fuel & water
Higher maintenance costs

www.petrodanesh.com ehsan.saadati@yahoo.com
34
4/14/2012

Effect of Installing GT Inlet Air Cooling Systems


on Plant Performance & Costs

Cost impact on plant is more than just the cooling system

Must consider the following for a true economic evaluation -


Additional revenue (more kW sold)
Added costs
Impact on overall plant investment
Additional financing, taxes & insurance
Increased consumption of fuel & water
Higher maintenance costs

Evaluate over the life of the project

www.petrodanesh.com ehsan.saadati@yahoo.com
35

S-ar putea să vă placă și