STEEL REINFORCEMENT (upto 2nd Bill)
1 A1 Footing 1480.83
9 B1 Confinement 269.86
Summary
GGPS SANDASAR QASIM DISTT: BATTGRAM
(a) (b) (c) (d) (e) (f) (g) ( h=d*e*g ) (j) ( k=h*j ) (l)
Footing
1 Column footing
A-H/1,A-H/3
Long & Short 3" 2'-7" 3"
Bars 16 X 12 1/2" 3.081 591.55 0.668 395.16
2 Walls
A-H/1,A-H/3 62'-3"
3" 3"
Long Bars 2 X 3 1/2" 62.75 376.50 0.668 251.5
8 Column
A-H/1,A-H/3
6" 12'-3"
Long Bars 16 X 8 1/2" 12.75 1632.00 0.668 1090.18
9"
3"
9"
Plinth beam
1 Walls
A-H/1,A-H/3 6" 64'-6" 6"
Long bars 2 X 8 1/2" 65.5 1048.00 0.668 700.06
9"
3"
9"
Stirrups 2 X 158 3/8" 3.5 1106.00 0.376 415.86
2 Wall
C-H/2 6" 45' 6"
Long Bars 1 X 6 1/2" 46 276.00 0.668 184.37
6"
3"
9"
Strirrup 1 X 93 3/8" 3 279.00 0.376 104.9
3 Walls
A/1-3,H/1-3
6" 26'-6" 6"
Long Bars 2 X 8 1/2" 27.5 440.00 0.668 293.92
9"
3"
9"
Stirrups 2 X 59 3/8" 3.5 413.00 0.376 155.29
4 Wall
C/1-3
6" 26'-6" 6"
Long Bars 1 X 6 1/2" 27.5 165.00 0.668 110.22
6"
3"
9"
Stirrups 1 X 59 3/8" 3 177.00 0.376 66.55
5 Wall
F/2-3
6" 16'-6" 6"
Long bars 1 X 6 1/2" 17.5 105.00 0.668 70.14
6"
3"
9"
Stirrups 1 X 40 3/8" 3 120.00 0.376 45.12
6 Wall
F-H/2A
6" 16'-6" 6"
Long Bars 1 X 6 1/2" 17.5 105.00 0.668 70.14
6"
3"
9"
Stirrups 1 X 40 3/8" 3 120.00 0.376 45.12
7 Wall
G/2A-3
6" 6'-3" 6"
Long bars 1 X 6 1/2" 7.25 43.50 0.668 29.06
6"
3"
9"
8 Columns
7' 6"
Long Bars 16 X 8 1/2" 7.5 960.00 0.668 641.28
9"
3"
9"
9 Confinement
6" 13'-6" 6"
Long Bars 17 X 4 1/2" 14.5 986.00 0.668 658.65
6"
3"
6"
Ties Bars 17 X 21 3/8" 2.5 892.50 0.376 335.58
10 Wall (WC1)
6" 13'-6" 6"
Long Bars 5 x 6 3/8" 14.5 435.00 0.376 163.56
6"
2'-7"
Short Bars 5 X 14 3/8" 6.17 431.90 0.376 162.39
11 Wall (WC2)
6" 13'-6" 6"
Long Bars 2 X 12 3/8" 14.5 348.00 0.376 130.85
6"
4'-9"
Short Bars 2 X 14 3/8" 10.5 294.00 0.376 110.54
12 Wall (WC3)
6" 13'-6" 6"
Long Bars 2 x 8 3/8" 14.5 232.00 0.376 87.23
6"
3'
Short Bars 2 X 14 3/8" 7 196.00 0.376 73.7
13 Wall (WC4)
6" 13'-6" 6"
Long Bars 1 x 8 3/8" 14.5 116.00 0.376 43.62
6"
2-3 1/2"
Short Bars 1 X 14 3/8" 5.58 78.12 0.376 29.37
(a) (b) (c) (d) (e) (f) (g) ( h=d*e*g ) (j) ( k=h*j ) (l)
Bond Beam
1 Walls A-H/1,A-H/3
6" 62'-6" 6"
Long Bars 2 X 8 1/2" 63.5 1016.00 0.668 678.69
9"
3"
9"
Stirrups 2 x 158 3/8" 3.5 1106.00 0.376 415.86
2 Walls C-H/2
6" 45' 6"
Long Bars 1 X 6 1/2" 46 276.00 0.668 184.37
6"
3"
9"
Stirrups 1 X 76 3/8" 3 228.00 0.376 85.73
3 Walls A/1-3,H/1-3
9"
3"
9"
Stirrups 2 X 59 3/8" 3.5 413.00 0.376 155.29
4 Walls C/1-3
(a) (b) (c) (d) (e) (f) (g) ( h=d*e*g ) (j) ( k=h*j ) (l)
Plinth beam
Confinement
4 Long Bars
Bond beam
Sheet-B1