Sunteți pe pagina 1din 3

CURRICULUM VITAE

MUHAMMAD ALAM
S/O : Nisar Ahmad
Date Of Birth : August 01, 1974.
Marital Status : Married
N.I.C Number : 36102-1870876-9.
PASSPORT No : CP1758761
Mobile : 0092-300-8675748
0092-333-8675748
E-mail : alam.mtm456@yahoo.com

Address : Village 5-Kassi Tehsil Kabirwala District Khanewal

OBJECTIVE
Want to serve in a reputable Organization with prospects of career growth and to improve my abilities
in a challenging environment. Maintain focus on achieving Bottom line results while formatting and
implementing advanced technology and business solution to meet a diversity of needs. Superior
record of delivering scale and mission critical projects on time is as under.

EDUCATION
DAE (Electronics)
PBTE LAHORE 2ND Division.

Maticulation Science
BISE MULTAN 1ST Division.

EXPERIENCE

MASOOD POWER UNIT NO 04 & 05


D.G KHAN ROAD MUZAFFAR GARH.
Senior Plant Engineer (1st February.2008 to 9 March 2016)
Caterpillar (6.1MW)

Worked as Senior Plant Engineer in Masood Power,D.G.Khan Road M Garh.

MAHMOOD POWER GAS.


CATERPILLAR + NIIGATA (9.7 MW +9.2 MW) = 18.9 MW

Assistant Electrical Engineer. (From Feb 2007 to 31.01.2008)


Participated in complete Erection of the plant and commissioning of Gas Engines G3520-C
(1.95 MW) Caterpillar (USA). Its Includes;
1. Installation and testing of power cables.
2. Testing and Installation of H.T and L.T panels (Bilal Engineering)
3. Testing and commissioning of V.C.B.(VIZTRO Tech) Bilal Engineering.
4. Earth Leakage testing.
5. Installation and commissioning of all control system of the engines.
6. Work on power panels and control panels of (TOYO DENKI)

Maintenance of Engines

1. Testing and services of Alternators.


2. Valve Lashing and Valve Recession.
3. Testing of Ignition Transformer and Spark Plugs.

ROOMI POWER PLANT MULTAN CATERPILLAR (4.2 MW)


Maintenance Supervisor (July, 2006 To 31 January, 2007)

Participated in complete Erection of the Plant and Commissioning of Gas Engines G3516-B
(1.1 MW) and G3520-C (1.95 MW) Caterpillar (USA). Its Includes;

1. Installation and Testing of Power cables.


2. Installation of step up Transformer (2000kva).
3. Testing and Installation of H.T and L.T panels (FICO , TERBERG).
4. Testing and Commissioning of ACB , VCB (ABB , MITSUBISHI).
5. Earth Leakage Testing.
6. Installation and Commissioning of all control System of the Engines.
7. Testing and Commissioning of steam Boiler (DDFC).
8. Installation of Cooling Towers (Liang Chi, China).

Maintenance of Engines

1. Testing and Services of Alternators.


2. Valve Lashing and Valve Recession.
3. Testing of Ignition Transformers and Spark Plugs.

MASOOD POWER PLANT KABIR WALA (7.4 MW)

Shift Supervisor (May, 2004 to June 29, 2006)

Participated in Complete Erection of the plant and Commissioning of Gas Engines


G3516-B (1.1 MW) and G3520-C (1.95 MW) Caterpillar (USA).Its Includes;

1. Installation and Commissioning of Caterpillar Gas Engines (USA) G3516-B(1.1 MW)


G3520-C (1.95 MW).
2. Installation and Jointing of H.T cables (185mm, Pakistan cables).
3. Installation of Step up Transformer (2500 kva ,Bilal Engineering).
4. Installation of L.T cables (70mm ,120mm , 300mm).
5. Installation and Commissioning of H.T , L.T and MCC panels (ALSTOM,Bilal
Engineering).
6. Earth Leakage testing.
7. Testing and Commissioning of ACB and VCB (ABB , TERASAKI).
My Responsibilities were to manage all plants Electrical Jobs, to check all
Auxialaries and to prepare all Reports.

RELIANCE WEAVING MILLS LTD MULTAN (5.6 MW).


Generator Operator (From April, 2001 to May, 2004)

Worked at Generator Operator (5.6 MW) Gas Fired Self Generation Plant G3516-A and
G3516-B Caterpillar (USA).

Maintenance of Engines.

1. Testing and Services of Engines.


2. Valve Lashing and Valve Recession.
3. Testing of Ignition Transformers and Spark Plugs.

GULISTAN TEXTILE MILLS LTD BHAWAL PUR (3.15 MW)

I worked as Generator Operator at (3.15 MW) Gas Fired self Power Generation plant
on Waukesha Engines participated in complete Erection of plant and Installation of Engines.

Maintenance of Engines

1. Testing and Services of Alternators.


2. Valve Lashing and Valve Recession.
3. Testing of Ignition Transformers and Spark Plugs.

PAKISTAN TELECOMMUNICATION COMPANY LIMITED (PTCL).


Wire man (From July 01, 1994 To June 30, 1995)

During my my service in P.T.C.L I performed these jobs

1. Installation of DRS System.


2. Installation of TDMA System.
3. Installation Rectifires and Batteries.
4. Erection of Gye type towers.
5. Laying of wave Guides etc.

S-ar putea să vă placă și