Sunteți pe pagina 1din 39

EDIFICIO E TALLERES Y

MANTENIMIENTO

MEMORIA DE CALCULO
Bajada de cargas Taller de Central de autobuses Pachuca Hidalgo

Anlisis de losa Nervada (Azotea)

Se analiza m2
Fino= 0.5m x 0.5m x 0.03m x 2000 kg/m3 =15 kg
Capa de compresin= 0.5m x 0.5m x 0.10m x 2400 kg/m3 =60 kg
Nervadura= 0.17m x 0.10m x 0.50 x 2400 kg/m3 x 2pzas = 40.8 kg
Casetn= 0.40m x 0.40m x 0.17 x 17 kg/m3 =0.46 kg

Wm= 101.26 kg x 4 = 405.04 kg/m2


Wv= 100.00 kg/m2
Ws= ___40.00 kg/m2__
Wt= 545.04 kg/m2

Anlisis de losa Nervada (Entrepiso)

Vitropiso = 0.5m x 0.5m x 0.015m x 1800 kg/m3 = 6.75


Pegazulejo= 0.5 x 0.5 x 0.02 x 1500 kg/m3 = 7.5
Fino= 0.5m x 0.5m x 0.03 x 2000 kg/m3 =15 kg
Capa de compresin= 0.5m x 0.5m x 0.10 x 2400 kg/m3 =60 kg
Nervadura= 0.25 x 0.10 x 0.50 x 2400 kg/m3 x 2pzas = 60 kg
Casetn= 0.40 x 0.40 x 0.25 x 17 kg/m3 =0.68 kg

Wm= 149.93 kg x 4 = 542.72 kg/m2


Wv= 300.00 kg/m2
Ws= ___40.00 kg/m2__
Wt= 939.72 kg/m
PLANTA ALTA

ARMADO 1

Losa Nervada Azotea


Caso 2 (Interior todos los lados continuos)

Datos: 10 m
fc = 250 kg/cm2
fc = 112.5 kg/cm2
fy = 5000 kg/cm2
fs = 2500 kg/cm2 10 m
K = 14.08
j = 0.91
m = 1.0

1.- Momentos positivos


M (+) corto = Coef. x Wlosa x lado corto2
M (+) largo = Coef. x Wlosa x lado largo2
M (+) corto = 0.027 x 545.04 kg/m2 x 102 = 1,471.6 kg/m
M (+) largo = 0.027 x 545.04 kg/m2 x 102 = 1,471.6 kg/m

2.- Momentos negativos


M (-) corto = Coef. x Wlosa x lado corto2
M (-) largo = Coef. x Wlosa x lado largo2
M (-) corto = 0.027 x 545.04 kg/m2 x 102 = 1,471.6 kg/m
M (-) largo = 0.027 x 545.04 kg/m2 x 102 = 1,471.6 kg/m
3.- Nervaduras cortas
M (+) corto = 1,471.6 kg/m x 0.50 = 735.80 x 100 = 73,580.4 kg/cm
M (-) corto= 1,471.6 kg/m x 0.50 = 735.8 x 100 = 73,580.4 kg/cm

Nervadura largas
M (+) largo = 1,471.6 kg/m x 0.50 = 735.8 x 100 = 73,580.4 kg/cm
M (-) largo = 1,471.6 kg/m x 0.50 = 735.8 x 100 = 73,580.4 kg/cm

4.- Peralte

73,580.4 kg/cm
= () = ( )= 22.86 = 27 cm
(14.08)(10)

5.- rea de acero 6.- Propuesta de varilla


() = ()()()

Nervaduras cortas
73,580.4 kg/cm
(+) = (2500)(0.91)(18.09 ) =1.78 cm2 1 No. 5 (5/8) = 1.99

73,580.4 kg/cm
() = (2500)(0.91)(18.09 )= 1.78 cm2 1 No. 5 (5/8) = 1.99

Nervaduras largas
73,580.4 kg/cm
(+) = (2500)(0.91)(18.09 )= 1.78 cm2 1 No. 5 (5/8) = 1.99

73,580.4 kg/cm
() = (2500)(0.91)(18.09 )= 1.78 cm2 1 No. 5 (5/8) = 1.99
6.- Comprobacin por cortante
W1 (sentido corto) = 545.04 x 0.50 = 272.52
W2 (Sentido largo) = 545.04 x 0.50 = 272.52

Cortante unitaria
1 0.5 272.52 0.5 10
1 = = = 681.3
2 2
2 0.5 272.52 0.5 10
2 = = = 681.3
2 2

Cortante mxima Cortante lmite


1 681.3
= = (10)(27)= 2.52 Vlim= 0.5Fc = 0.5250= 7.90

2 681.3
= = (10)(27)= 2.52

PLANTA BAJA

ARMADO 2

Losa Nervada Azotea


Caso 2 (Interior todos los lados continuos)

Datos: 10 m
fc = 250 kg/cm2
fc = 112.5 kg/cm2
fy = 5000 kg/cm2
fs = 2500 kg/cm2 10 m
K = 14.08
j = 0.91
m = 1.0

1.- Momentos positivos


M (+) corto = Coef. x Wlosa x lado corto2
M (+) largo = Coef. x Wlosa x lado largo2
M (+) corto = 0.027 x 939.72 kg/m2 x 102 = 2,537.24 kg/m
M (+) largo = 0.027 x 939.72 kg/m2 x 102 = 2,537.24 kg/m

2.- Momentos negativos


M (-) corto = Coef. x Wlosa x lado corto2
M (-) largo = Coef. x Wlosa x lado largo2
M (-) corto = 0.027 x 939.72 kg/m2 x 102 = 2,537.24 kg/m
M (-) largo = 0.027 x 939.72 kg/m2 x 102 = 2,537.24 kg/m
3.- Nervaduras cortas
M (+) corto = 2,537.24 kg/m x 0.50 = 1,268.62 x 100 = 126,862 kg/cm
M (-) corto= 2,537.24 kg/m x 0.50 = 1,268.62 x 100 = 126,862 kg/cm

Nervadura largas
M (+) largo = 2,537.24 kg/m x 0.50 = 1,268.62 x 100 = 126,862 kg/cm
M (-) largo = 2,537.24 kg/m x 0.50 = 1,268.62 x 100 = 126,862 kg/cm

4.- Peralte

126,862 kg/cm
= () = ( )= 30.01 = 35 cm
(14.08)(10)

5.- rea de acero 6.- Propuesta de varilla


() = ()()()

Nervaduras cortas
126,862 kg/cm
(+) = (2500)(0.91)(18.09 ) =3.08 cm2 1 No. 5 (5/8) = 1.99

1 No. 4 (1/2) = 1.27


126,862 kg/cm
() = (2500)(0.91)(18.09 )= 3.08 cm2 3.26

Nervaduras largas
126,862 kg/cm
(+) = (2500)(0.91)(18.09 )= 3.08 cm2 1 No. 5 (5/8) = 1.99

1 No. 4 (1/2) = 1.27


126,862 kg/cm
() = (2500)(0.91)(18.09 )= 3.08 cm2 3.26
6.- Comprobacin por cortante
W1 (sentido corto) = 939.72 x 0.50 = 469.86
W2 (Sentido largo) = 939.72 x 0.50 = 469.86

Cortante unitaria
1 0.5 469.86 0.5 10
1 = = = 2,349.3
2 2
2 0.5 469.86 0.5 10
2 = = = 2,349.3
2 2

Cortante mxima Cortante lmite


1 2,349.3
= = (10)(35)= 6.71 Vlim= 0.5Fc = 0.5250= 7.90

2 2,349.3
= = (10)(35)= 6.71

Clculo de trabe ms fatigada Azotea
Azotea T-1

Datos:
Longitud = 10 m
fc = 250 kg/cm2
fy = 5000 kg/cm2
fs = 2500 kg/cm2

1.- Anlisis de carga

Losa nervada
2 triangulos = 10m x 5m/ 2 = 25 m2 x 2= 50m2

2.- Determinar el tipo de trabe

Trabe empotrada en los dos sentidos con carga uniforme

3.- Carga de la trabe


Losa= 50 m2 x 545.04 kg = 27,252 kg
Peso de trabe= 0.20 x 0.6 x 6.00 x 2400 kg/m3= 1,728 kg
Wtotal = 28,980 kg

4.- Convertir carga a carga uniforme

28,980 kg
W= = = 2,898 kg
10
5.- Momentos
2 2
() = (+) =
12 24

(2,898 kg)(10)2 (2,898 kg)(10)2


() = (+) =
12 24

() = 24,150 x 100= (+) = 12,075 x 100=

() = 2,415,000 kg/cm (+) = 1,207,500 kg/cm

6.- Peralte

2,415,000 kg/cm
= () = ( )= 75.61 + 4 recubrimiento = 79.61 = 80 cm
(14.08)(30)

7.- Revisar proporcin Base-Peralte


Base = 1/2 d 1/3 d
Base = 1/2 (90) 1/3 (80)
Base= 40 26.6
Base= 30

8.- rea de acero por tensin 9.- Propuesta de varilla



() =
()()()

2,415,000 kg/cm
(+) = (2500)(0.91)(84.89) =12.5 cm2 2 No. 5 (1) = 3.98 cm2

3 No. 6 (3/4) = 8.61 cm2


12.59 cm2
10.- Acero por temperatura 11.- Propuesta de varillas

temp= 0.002bd = 0.002 x 30 x 80 = 4.8 4 No.4 (1/2) =5.06 cm2

12.- Clculo de estribos


1 10
5 5
No. = +1= = 13.33 = 14 + 1 = 15
0.15 0.15

Separacin de estribos
X= coef. tabla 4 x 1/5L x 100 = Xcm

X1= 0.017 x 2.00 x 100 = 3.4 = 5cm


X2= 0.03 x 2.00 x 100 = 6 = 5cm
X3= 0.03 x 2.00 x 100 = 6 = 5cm
X4= 0.04 x 2.00 x 100 = 8 = 10cm
X5= 0.04 x 2.00 x 100 = 8 = 10cm
X6= 0.04 x 2.00 x 100 = 8 = 10cm
X7= 0.04 x 2.00 x 100 = 8 = 10cm
X8= 0.04 x 2.00 x 100 = 8 = 10cm
X9= 0.06 x 2.00 x 100 = 12 = 15cm
X10= 0.06 x 2.00 x 100 = 12 = 15cm
X11= 0.06 x 2.00 x 100 = 12 = 15cm
X12= 0.06 x 2.00 x 100 = 12 = 15cm
X13= 0.09 x 2.00 x 100 = 18 = 20cm
X14= 0.09 x 2.00 x 100 = 18 = 20cm
X15= 0.14 x 2.00 x 100 = 28 = 30cm
13.- Comprobacin por cortante
Cortante unitaria
(2,898 kg)(10)
= = = 14,490
2 2

Cortante mxima Cortante lmite


14,490
= = (30)(80)= 6.03 Vlim= 0.5Fc = 0.5250= 7.90

Clculo de trabe ms fatigada Entrepiso
Entrepiso T-2

Datos:
Longitud = 10 m
fc = 250 kg/cm2
fy = 5000 kg/cm2
fs = 2500 kg/cm2

1.- Anlisis de carga

Losa nervada
2 triangulos = 10m x 5m/ 2 = 25 m2 x 2= 50m2

2.- Determinar el tipo de trabe

Trabe empotrada en los dos sentidos con carga uniforme

3.- Carga de la trabe


Losa= 50 m2 x 939.72 kg = 46986 kg
Peso de trabe= 0.20 x 0.6 x 6.00 x 2400 kg/m3= 1,728 kg
Wtotal = 48,714 kg

4.- Convertir carga a carga uniforme

48,714 kg
W= = = 4,871.4 kg
10
5.- Momentos
2 2
() = (+) =
12 24

(4,871.4 kg)(10)2 (4,871.4 kg)(10)2


() = (+) =
12 24

() = 40,595 x 100= (+) = 20,297.5 x 100=

() = 4,059,500 kg/cm (+) = 2,029,750 kg/cm

6.- Peralte

4,059,500 kg/cm
= () = ( )= 84.89 + 4 recubrimiento = 88.89 = 90 cm
(14.08)(40)

7.- Revisar proporcin Base-Peralte


Base = 1/2 d 1/3 d
Base = 1/2 (90) 1/3 (90)
Base= 45 30
Base= 40

8.- rea de acero por tensin 9.- Propuesta de varilla



() =
()()()

4,059,500 kg/cm
(+) = (2500)(0.91)(84.89) =21.02 cm2 3 No. 8 (1) = 15.21 cm2

3 No. 5 (3/4) = 5.97 cm2


21.18 cm2
10.- Acero por temperatura 11.- Propuesta de varillas
temp= 0.002bd = 0.002 x 40 x 90 = 7.2 3 No.3 (3/8) =2.13 cm2
4 No.4 (1/2) =5.06 cm2
2.19 cm2
12.- Clculo de estribos
1 10
5 5
No. = +1= = 13.33 = 14 + 1 = 15
0.15 0.15

Separacin de estribos
X= coef. tabla 4 x 1/5L x 100 = Xcm

X1= 0.017 x 2.00 x 100 = 3.4 = 5cm


X2= 0.03 x 2.00 x 100 = 6 = 5cm
X3= 0.03 x 2.00 x 100 = 6 = 5cm
X4= 0.04 x 2.00 x 100 = 8 = 10cm
X5= 0.04 x 2.00 x 100 = 8 = 10cm
X6= 0.04 x 2.00 x 100 = 8 = 10cm
X7= 0.04 x 2.00 x 100 = 8 = 10cm
X8= 0.04 x 2.00 x 100 = 8 = 10cm
X9= 0.06 x 2.00 x 100 = 12 = 15cm
X10= 0.06 x 2.00 x 100 = 12 = 15cm
X11= 0.06 x 2.00 x 100 = 12 = 15cm
X12= 0.06 x 2.00 x 100 = 12 = 15cm
X13= 0.09 x 2.00 x 100 = 18 = 20cm
X14= 0.09 x 2.00 x 100 = 18 = 20cm
X15= 0.14 x 2.00 x 100 = 28 = 30cm
13.- Comprobacin por cortante
Cortante unitaria
(4,871.4 kg)(10)
= = = 24,357
2 2

Cortante mxima Cortante lmite


26,930.15
= = = 6.76 Vlim= 0.5Fc = 0.5250= 7.90
(40)(90)
Clculo de columnas K1
Planta Alta

Datos:
Altura = 4.73
fc = 250 kg/cm2
fc = (0.25 x 250) = 62.5 kg/cm2
fy = 5000 kg/cm2
fs = 2500 kg/cm2
p = 0.0062
n=8

1.- Bajada de cargas


Planta Baja
Losa de azotea= 100 m2 x 545.04 = 54,504
Pp Columna= 0.4 x 0.4 x 4.73 x 2400 kg/m3 = 1,816.32
Planta Alta= P = 56,320 kg

2.- Determinar el rea de concreto


56,320
= = 62.5 = 858.53 cm2
(1+) (1+(8)(0.0062))

3.- Determinar la seccin

A= L1 x L2 Ms recubrimiento de 5cm por lado


L1= 858.53/20
L= 42.92 20 cm 30 cm
L= 45 cm 45cm 55 cm
4.- rea de acero 5.- Propuesta varilla

5.32
As= Ac x p No.5 = 1.99 = 2.51 = 4 No. 5 por reglamento

As= 858.53 x 0.0062 = 5.32

6.- Clculo de estribos

1 4.73
5 5
No. = +1= = 6.30 = 7 + 1 = 8
0.15 0.15

Separacin de estribos
X= coef. tabla 4 x 1/5L x 100 = Xcm
X1= 0.032 x 0.95 x 100 = 3.04 = 5cm
X2= 0.07 x 0.95 x 100 = 6.65 = 5cm
X3= 0.07 x 0.95 x 100 = 6.65 = 5cm
X4= 0.09 x 0.95 x 100 = 8.55 = 10cm
X5= 0.09 x 0.95 x 100 = 8.65 = 10cm
X6= 0.09 x 0.95 x 100 = 8.65 = 10cm
X7= 0.13 x 0.95 x 100 = 12.35 = 15cm
X8= 0.18 x 0.95 x 100 = 17.1 = 20cm
Clculo de columnas K2
Planta Baja

Datos:
Altura = 4.73
fc = 250 kg/cm2
fc = (0.25 x 250) = 62.5 kg/cm2
fy = 5000 kg/cm2
fs = 2500 kg/cm2
p = 0.0062
n=8

1.- Bajada de cargas


Planta Alta
Losa de azotea= 100 m2 x 545.04 = 54,504
Pp Columna= 0.4 x 0.4 x 4.73 x 2400 kg/m3 = 1,816.32
Planta Alta= P = 56,320 kg

Planta Baja
Losa de azotea= 100 m2 x 939.72 = 93,972
Pp Columna= 0.4 x 0.4 x 4.73 x 2400 kg/m3 = 1,816.32
Planta baja= 95,788.32

Peso total= 152,108.32

2.- Determinar el rea de concreto


152,108.32
= = 62.5 = 2,318.72 cm2
(1+) (1+(8)(0.0062))
3.- Determinar la seccin

A= L1 x L2 Ms recubrimiento de 5cm por lado


L1= 2,318.72 /30
L= 77.29 30 cm 40 cm
L= 80 cm 80 cm 90 cm

4.- rea de acero 5.- Propuesta varilla

14.37
As= Ac x p No.5 = = 7.22 = 8 No. 5
1.99

As= 2,318.72 x 0.0062 = 14.37

6.- Clculo de estribos

1 4.73
5 5
No. = +1= = 6.30 = 7 + 1 = 8
0.15 0.15

Separacin de estribos
X= coef. tabla 4 x 1/5L x 100 = Xcm
X1= 0.032 x 0.95 x 100 = 3.04 = 5cm
X2= 0.07 x 0.95 x 100 = 6.65 = 5cm
X3= 0.07 x 0.95 x 100 = 6.65 = 5cm
X4= 0.09 x 0.95 x 100 = 8.55 = 10cm
X5= 0.09 x 0.95 x 100 = 8.65 = 10cm
X6= 0.09 x 0.95 x 100 = 8.65 = 10cm
X7= 0.13 x 0.95 x 100 = 12.35 = 15cm
X8= 0.18 x 0.95 x 100 = 17.1 = 20cm
Cimentacin

Se calcula en base a la resistencia del terreno (RT) y rea de cimentacin (Az)


A mayor RT menor Az
A menor RT mayor Az

Cimiento de mampostera 0% 20%


Zapata aislada 20% 40%
Zapata corrida en 1 sentido 40% 60%
Zapata corrida en 2 sentidos 60% - 80%
Losa de cimentacin 80% - 100%

Zapata Central Z-1

1.- Determinar el elemento ms fatigado

Columna 100m2

2.- Bajada de cargas

Planta Alta
Losa de azotea= 100 m2 x 545.04 = 54,504
Pp Columna= 0.55 x 0.3 x 4.73 x 2400 kg/m3 = 1,873.08
Pp de trabe= 0.8 x 0.30 x 20 x 2400= 11,520

Planta Alta= P = 67,897.08 kg


Planta Baja
Losa de entrepiso= 100 m2 x 939.72 = 93,972
Pp Columna= 0.9 x 0.4 x 4.73 x 2400 kg/m3 = 4,086.72
Pp de trabe= 0.9 x 0.40 x 20 x 2400= 17,280

Planta baja= 115,338.72 kg

Peso total= 183,235.8 kg

Peso de cimentacin 15%


P = 183,235.8 kg
X 1.15__
210,721.17 kg

3.- rea de cimentacin

210,721.17
= = = 14.04 m2
15,000

100m2 = 100% X = 14.04% x 100/100 = 14.04 % = Cimiento de mampostera


14.04 m2 = X

NOTA: Por criterio constructivo y debido a los grandes claros del proyecto, se opta
por una cimentacin a base de zapatas aisladas, reduciendo costos en
excavacin, acarreo y materiales.
4.- Calcular el lado de la zapata

A= L2 3.75 m
L= A
L= 14.04 m2 3.75 m
L= 3.74 = 3.75 m

5.-Reaccin Neta

15% 183,235.8
= = = 13,030.1 kg/m2
2 3.752

6.- Momento

X=L- 0.40/2= 3.75-0.40= 3.35/2 =1.675

2 (13,030.1 kg/m2) (1.675)2


= = =18,278.78 x 100 = 1,827,878 kg/cm
2 2

7.- Peralte

1,827,878
= () = ((14.08)(100))= 36.03 + 7 de recubrimiento = 43.03 cm = 45 cm

8.- rea de acero

1,827,878 kg/cm
= ()()() = (2500)(0.91)(36.03) = 22.29 cm2
9.- Propuesta de varilla Separacin

22.29
No.8 = = 4.39 = 5 No. 8 100/5 = 20 cm
5.07

10.- Comprobacin por cortante

Cortante unitaria
=
=
=13,030.1 x 1.675
=21,825.41

Cortante mxima Cortante lmite


21,825.41
= = = 4.85 Vlim= 0.5Fc = 0.5250= 7.90
(100)(45)
Zapata Colindancia Z-2

1.- Determinar el elemento ms fatigado

Columna 50 m2

2.- Bajada de cargas

Planta Alta
Losa de azotea= 50 m2 x 545.04 = 27,252
Pp Columna= 0.55 x 0.3 x 4.73 x 2400 kg/m3 = 1,873.08
Pp de trabe= 0.8 x 0.30 x 15 x 2400= 6,640

Planta Alta= P = 35,765.08 kg

Planta Baja
Losa de entrepiso= 50 m2 x 939.72 = 46,986
Pp Columna= 0.9 x 0.4 x 4.73 x 2400 kg/m3 = 4,086.72
Pp de trabe= 0.9 x 0.40 x 15 x 2400= 12,960

Planta baja= 64,032.7 kg

Peso total= 99,797.78 kg


Peso de cimentacin 15%
P = 99,797.78 kg
X 1.15__
114,767.44 kg
3.- rea de cimentacin

114,757.44 kg
= = = 7.65 m2
15000

50m2 = 100% X = 7.65 x 100 / 50= 15.30 % = Cim. Mamposteria


7.65 m2 = X

NOTA: Por criterio constructivo y debido a los grandes claros del proyecto, se opta
por una cimentacin a base de zapatas aisladas, reduciendo costos en
excavacin, acarreo y materiales.

4.- Calcular el lado de la zapata

A= L2 2.80 m
L= A
L= 7.47 m2 2.80 m
L= 2.76 = 2.80 m

5.-Reaccin Neta

15% 99,797.78
= = = 12,729.30 kg/m2
2 2.802

6.- Momento

X=L- 0.40= 2.80-0.40= 2.40

2 12,888.67 kg/m2) (2.40)2


= = =36,660.40 x 100 = 3,666,040
2 2
7.- Peralte

3,666,040
= () = ((14.08)(100))= 51.02 + 7 de recubrimiento = 58.02cm = 60 cm

8.- rea de acero

3,666,040 kg/cm
= ()()() = (2500)(0.91)(51.93) = 31.93 cm2

9.- Propuesta de varilla Separacin

31.93
No.8 (1) = = 6.29 = 6 No. 8 100/6 = 16.66 = 15 cm
5.07

10.- Comprobacin por cortante

Cortante unitaria
=
=
=12,729.30 kg/m2 x 2.40
=30,550.32

Cortante mxima Cortante lmite


30,550.32
= = = 5.09 Vlim= 0.5Fc = 0.5250= 7.90
(100)(60)
Zapata central Z-3

Se calcula en base a la resistencia del terreno (RT) y rea de cimentacin (Az)


A mayor RT menor Az
A menor RT mayor Az

Cimiento de mampostera 0% 20%


Zapata aislada 20% 40%
Zapata corrida en 1 sentido 40% 60%
Zapata corrida en 2 sentidos 60% - 80%
Losa de cimentacin 80% - 100%

1.- Determinar el elemento ms fatigado


Columna 100m2

2.- Bajada de cargas

Planta Baja
Losa de azotea= 100 m2 x 545.04 = 54,504
Pp Columna= 0.55 x 0.3 x 4.73 x 2400 kg/m3 = 1,873.08
Pp de trabe= 0.8 x 0.30 x 20 x 2400= 11,520

Planta Alta= P = 67,897.08 kg


Peso de cimentacin 15%
P = 67,897.08 kg
X 1.15__
78,081.64 kg
3.- rea de cimentacin

78,081.64
= = = 5.20 m2
15,000

100m2 = 100% X = 5.2% x 100 / 100 = 5.2% = Cimiento de mampostera


5.2 m2 = X

NOTA: Por criterio constructivo y debido a los grandes claros del proyecto, se opta
por una cimentacin a base de zapatas aisladas, reduciendo costos en
excavacin, acarreo y materiales.

4.- Calcular el lado de la zapata

A= L2 2.30 m
L= A
L= 4.43m2 2.30 m
L= 2.28 = 2.30 m

5.-Reaccin Neta

15% 67,897.08
= = = 12,834.98 kg/m2
2 2.302

6.- Momento

X=L- 0.30/2= 2.30-0.30= 2.00/2 =1.00

2 (12,834.98 kg/m2) (1.00)2


= = =6,417.49 x 100 = 641,749.33 kg/cm
2 2
7.- Peralte

641,749.33
= () = ((14.08)(100))= 21.34 + 7 de recubrimiento = 28.34 cm = 30 cm

8.- rea de acero

641,749.33 kg/cm
= ()()() = (2500)(0.91)(21.34 ) = 13.21 cm2

9.- Propuesta de varilla Separacin

13.21
No.6 = = 4.60 = 5 No. 6 100/5 = 20 cm
2.87

10.- Comprobacin por cortante

Cortante unitaria
=
=
=12,834.98 x 1
=12,834.98

Cortante mxima Cortante lmite


11,804.13
= = = 4.27 Vlim= 0.5Fc = 0.5250= 7.9
(100)(30)

Zapata Colindancia
Zapata de colindancia Z-4

1.- Determinar el elemento ms fatigado

Columna 50 m2

2.- Bajada de cargas

Planta Baja
Losa de azotea= 50 m2 x 545.04 = 27,252
Pp Columna= 0.55 x 0.3 x 4.73 x 2400 kg/m3 = 1,873.08
Pp de trabe= 0.8 x 0.30 x 15 x 2400= 8,640

P = 37,765.08 kg

Peso de cimentacin 15%


P = 37,765.08 kg
X 1.15__
43,429.84 kg
3.- rea de cimentacin

43,429.84
= = = 2.89 m2
15000

50m2 = 100% X = 2.89 x 100 / 50= 1.44 % = Cim. Mamposteria


2.89 m2 = X

NOTA: Por criterio constructivo y debido a los grandes claros del proyecto, se opta
por una cimentacin a base de zapatas aisladas, reduciendo costos en
excavacin, acarreo y materiales.
4.- Calcular el lado de la zapata

A= L2 1.70 m
L= A
L= 2.89 m2 1.70 m
L= 1.70 m

5.-Reaccin Neta

15% 37,765.08
= = = 4,521.62 kg/m2
2 2.892

6.- Momento

X=L- 0.30= 1.7-0.30= 1.40

2 13,023.08 kg/m2) (1.40)2


= = =12,762.61 x 100 = 1,276,261.84
2 2

7.- Peralte

1,276,261.84
= () = ((14.08)(100))= 30.10 + 7 de recubrimiento = 37.10 cm = 40 cm

8.- rea de acero

1,276,261.84 kg/cm
= ()()() = (2500)(0.91)(30.10 )
= 18.63 cm2
9.- Propuesta de varilla Separacin

18.63
No.6 (1) = = 6.49 = 7 No. 6 100/7 = 14.28 = 15 cm
2.87

10.- Comprobacin por cortante

Cortante unitaria
=
=
=4,521.62 kg/m2 x 1.40
=6,330.26

Cortante mxima Cortante lmite


6,330.26
= = (100)(40)= 1.58 Vlim= 0.5Fc = 0.5250= 7.90

Zapata Esquina Z-5

1.- Determinar el elemento ms fatigado

Columna 25 m2

2.- Bajada de cargas

2.- Bajada de cargas

Planta Baja
Losa de azotea= 25 m2 x 545.04 = 13,626
Pp Columna= 0.55 x 0.3 x 4.73 x 2400 kg/m3 = 1,873.08
Pp de trabe= 0.8 x 0.30 x 10 x 2400= 5760

P = 21,269.08 kg

Peso de cimentacin 15%


P = 21,269.08
X 1.15__
24,447.94

3.- rea de cimentacin

24,447.94
= = = 1.62
15,000

25m2 = 100% X = 1.62 x 100 / 25 = 0.40 % = Zapata aislada


1.62 m2 = X
NOTA: Por criterio constructivo y debido a los grandes claros del proyecto, se opta
por una cimentacin a base de zapatas aisladas, reduciendo costos en
excavacin, acarreo y materiales

4.- Calcular el lado de la zapata

A= L2 1.30 m
L= A
L= 1.62 m2 1.30 m
L= 1.27 = 1.30 m

5.-Reaccin Neta

15% 21,269.08
= = = 8,104.35 kg/m2
2 1.622

6.- Momento

X=L- 0.30= 1.3-0.30= 1.00

2 8,104.35 kg/m2) (1)2


= = =4,052.17 x 100 = 405,217.95
2 2

7.- Peralte

405,217.95
= () = ((14.08)(100))= 16.96 + 7 de recubrimiento = 23.96 cm = 25 cm
8.- rea de acero

405,217.95 kg/cm
= ()()() = (2500)(0.91)(16.96 ) = 10.50 cm2

9.- Propuesta de varilla Separacin

10.50
No.5 = = 5.27 = 6 No. 5 100/6 = 16.66 = 15 cm
1.99

10.- Comprobacin por cortante

Cortante unitaria
=
=
= 8,104.35 /m2 x 1.00 m
=8,104.35

Cortante mxima Cortante lmite


8,104.35
= = (100)(25)= 3.24 Vlim= 0.5Fc = 0.5250= 7.90

Contratrabe

1.- Determinar la Contratrabe ms fatigada


10m de longitud

2.- Carga uniforme


W= 15,000/10= 1,500 kg/ml

3.- Momentos

2 1,500 kg/ml (10)2


1 = = = 12,500 x 100 = 1,250,000 kg/cm
12 12

2 1,500 kg/ml (10)2


2 = = = 6,250 x 100 = 625,000 kg/cm
24 24

4.- Peralte

1,250,000
= () = ((14.08)(30))= 54.39 + 4 de recubrimiento = 58.39 cm = 60 cm

5.- rea de acero

Acero por tensin


1 1,250,000 kg/cm
() = = = 10.10 cm2
()()() (2500)(0.91)(54.39 )

Acero por compresin


2 650,000 kg/cm
(+) = ()()() = (2500)(0.91)(60 ) = 4.76 cm2
6.- Propuesta de varilla

10.10
As tensin = 10.10 cm2 No.8 (5/8) = = 1.99 = 2 No. 8
5.07

4.76
As compresin = 4.76 cm2 No.5 (1/2) = 1.99 = 2.09 =2 No. 4

7.- Clculo de estribos


1 10
5 5
No. = +1= = 13.33 = 14 + 1 = 15
0.15 0.15

Separacin de estribos
X= coef. tabla 4 x 1/5L x 100 = Xcm

X1= 0.017 x 2.00 x 100 = 3.4 = 5cm


X2= 0.03 x 2.00 x 100 = 6 = 5cm
X3= 0.03 x 2.00 x 100 = 6 = 5cm
X4= 0.04 x 2.00 x 100 = 8 = 10cm
X5= 0.04 x 2.00 x 100 = 8 = 10cm
X6= 0.04 x 2.00 x 100 = 8 = 10cm
X7= 0.04 x 2.00 x 100 = 8 = 10cm
X8= 0.04 x 2.00 x 100 = 8 = 10cm
X9= 0.06 x 2.00 x 100 = 12 = 15cm
X10= 0.06 x 2.00 x 100 = 12 = 15cm
X11= 0.06 x 2.00 x 100 = 12 = 15cm
X12= 0.06 x 2.00 x 100 = 12 = 15cm
X13= 0.09 x 2.00 x 100 = 18 = 20cm
X14= 0.09 x 2.00 x 100 = 18 = 20cm
X15= 0.14 x 2.00 x 100 = 28 = 30cm
8.- Comprobacin por cortante
Cortante unitaria
(1500 kg)(10)
= = = 7,500
2 2

Cortante mxima Cortante lmite


7500
= = (30)(60)= 4.16 Vlim= 0.5Fc = 0.5250= 7.90

S-ar putea să vă placă și