Documente Academic
Documente Profesional
Documente Cultură
1 Safety Precautions 1
3 Cabinet Installation 3
6.2 Layout of the Alarm Cable for the Head of Row Caabinet 9
9.1 Checking the Connection and Layout of the Wires and Cables 16
Warning
High optical power can cause bodily harm, especially to t eyes. Never look directly into the end of
the optical transmitter fiber jumper or the end of its acttive connector.
Caution
Do not touch any component or wires on cards, or metal conductors in sockets. ESD protection
measures should be taken if it is necessary to touch the card during maintenance.
Caution
Carpets or other materials that easily generate static electricity
e should not be used on the floor of
equipment room.
Warning
Optical communication equipment must be protected from
f electrical surges, thunder and lightning.
Caution
Exercise care if you must bend fibers. If bends are neccessary, the fiber bending radius should
never be less than 38mm.
Caution
Installers should bind all wires and cables used in onsite installation. Each cable type should be
bound separately. For example, power cables, alarm cables
c and optical fibers should be laid out
independently and bound separately. Note that optical fibers cannot be bound with typical wire
binder.
Caution
Do not open the active fiber connector unnecessarily. If it is necessary to open it for equipment
maintenance, protection measures should be taken to avoid contaminating the end face of
connector.
Caution
The network management system requires a dedicated computer. Use of unidentified memory
devices should be prohibited so as to avoid computer viruses.
Caution
When maintaining or testing the equipment, use a cab
ble to connect the instrument earth ground with
The equipment (or the cabinet where the equipment iss installed) earth ground properly.
1
2 Introduction to Installation Tools
Crimping and peeling pliers Sharp nose pliers Diagonal pliers Wire stripper
2
3 Cabinet Installation
Instruction
The CiTRANS 660 is installed in the 21-inch cabinet with front vertical mounting flanges. Refer to Quick Installation
Guide for the 21-inch Cabinet (300mm-deep) for detaile
ed installation method.
Instruction
Generally,y the subracks have been alreadyy installed in the cabinet and the cards, the fan units, and anti-dust screens
have been installed in the subrack before delivery and the onsite installation and removal of the components
mentioned above are not required. But these operation ns may be required during the expansion or maintenance after
installation.
Note
Unit: mm
Frame head
PDP
75
Empty
Fiber guide unit
50
Empty
Fram
me head
P
PDP
Minimum
m reserved Frame head
125
sp
pace
PDP
CiTRANS 660
Minimum reserved
125
subrack
space
2600
Empty
75
50
Empty
50
Empty
2200
2000
125
125
3
a Installing slide rails
1 2
b S
Securing
i a subrack
b k
1 Carry the subrack to the slide rails, and push it in slowly unntil
the panel screws on the subrack are aligned with the floating
nuts installed in the square mounting holes of the cabinet.
2
2 Use the screwdriver to tighten the panel screws on the
mounting ears with flat washers in a clockwise
direction, so as to secure the subrack.
Caution
Always use care when handling
cards.
1 Align the upper and lower edges of
the card with the inner slide rails of
the corresponding slot inside the
subrack (keep its component side to
the right) and push it along the slide
rails slowly.
4
5 Connection and Layout of Internal Cables
Note
Before laying out cables, remove the PDP front panel and pull down the baffle on the fiber passage area.
Then restore them to the original positions after the layout of cables is completed.
Remove the PDP Front Panel Pull Down the Baffle on the Fiber Passage Area
Instruction
The internal cables are the wires and cables that are connected
c inside the cabinet; these are usually connected
before delivery. Installers should check the connection
n of the internal cables on site. The items to check include
whether the cable distribution is reasonable, whether the
t wires and cables are neatly arranged and clean, whether
the connection plugs are connected firmly, whether inccorrect insertion or poor insertion occurs, and whether any
part is missing.
1 Unscrew the bolts of the connector below the PE of XS4 on o the PDP; and then insert the bare wire end of the
cabinet protection earth cable into the connection hole on the right side of the connector and tighten the bolt.
3
2 Lay the cable along the wiring channel at the right side of
the cabinet and through the cabinet-top wiring hole to the
earth ground point at the cabinet top.
5
5.2 Layout of the Subrack Power Cable
1 Make sure that the power control switch of the correspondding subrack on the PDP is placed in the OFF position.
3
3 Route the other end of the subrack power cable
through the fiber guide unit. And then route the cable
up to the PDP along the wiring channel on the right
side of the cabinet, passing through the wiring hole on
the right side of the PDP.
Instruction
-48V
The -48V signal cable of the active power supply is
XP5, XP7 usually connected to any idle ACB among the K1-1,
K1-2 and K1-3.
The -48V signal cable of the standby power supply is
usually connected to any idle ACB among the K2-1,
K2-2 and K2-3.
GND/E The brown fully-insulated female push-on terminal is
4 connected to any idle terminal among XP1 to XP4 on
XP1 to XP4
the PDP.
The black fully-insulated female push-on terminal is
connected to any idle terminal among XP5 and XP7
on the PDP.
0V
6
5.3 Layout of the Subrack Protection Earth Ground
G Cable
2
1 Press one uninsulated ring tongue
crimped terminal of the subrack
protection earth ground cable close to
the earth ground hole on the subrack,
and choose a panel screw with a
washer from the accessories to secure
this terminal of the cable.
The subrack alarm cable is used to connect the subrackk with the PDP for outputting the subrack alarm to the PDP.
2 Route the subrack alarm cable up, passing through the fiberr
guide unit.
7
6 Connection and Layout of Externa
al Cables
Note
Select either the top access or the floor access wiring
mode for the layout of external cables according to the
onsite condition of the equipment room.
Instruction
The CiTRANS 660 PDPs power ground (GND) and pro
otection earth ground (PE) should be connected with the GND
and PE in equipment room respectively.
1 Route the cabinet power cable through the wiring holee on the cabinet top and route it along the wiring channel on
the side of the cabinet to the PDP, passing through the
e wiring hole on the right side of the PDP.
2 At the PDP side, loosen the bolt of the connector, inse ert the plug of the power wire into the hole
at the right side of the connector and tighten the bolt.
8
Top Access Wiring Mode Floor Access Wiring
of the Power Cable Mode of the Power Cable
6.2 Layout of the Alarm Cable for the Head off Row Cabinet
Instruction
The code of the alarm cable for the head of row cabinet is WKE3.695.135. It is used to connect the PDP with the head of
row cabinet, for outputting the cabinet alarm signals from the
t cabinet to the head of row cabinet.
Installers need make plugs for the head of row cabinet by themselves according to the situation of the head of row cabinet
in the equipment room.
Keep certain space between the power cable and the alarrm cable for the head of row cabinet during the layout according
to the onsite condition. Please refer to the cabinet power cable
c for the layout of the alarm cable for the head of row cabinet.
9
6.3 Layout of the E1 Cable
Instruction
nd 120 (code: 3.695.432).
The E1 cable has two types: 75 (code: 3.695.431) an
Note
The E1 cable is arranged along the left side of the cab
binet.
1 Route the E1 cable through the wiring hole at the cabinet bottom (or top) and route it along the wiring
brack.
channel of the cabinet to the fiber guide unit of the sub
2 Route the E1 cable through the fiber guide unit to the E1J2 card of the subrack.
3 Insert the E1 cable plug into the E1 interface of the E11J2 card and tighten the stop screw.
Top Access Wiring Mode of the E1 Cable Floor Access Wiring Mode of the E1 Cable
10
6.4 Layout of the Clock Cable
Instruction
The external clock cable has two types: 75 (code: 3.6
695.206) and 120 (code: 3.695.207).
1 Route the clock cable through the wiring hole at the caabinet bottom (or top) and route it along the wiring
channel of the cabinet.
2 Route the clock cable through the fiber guide unit to thhe AIFJ1 / AIFJ2 card of the subrack.
3 Insert the DE-9 connector into the CKIO1 or CKIO2 interface, and then fasten the screws.
Top Access Wiring Mode of the Clock Cable Floor Access Wiring Mode of the Clock Cable
4 Arrange the clock cable, binding the cables on the sidee of the cabinet onto the vertical mounting flange of
the same side.
11
6.5 Layout of the Network Management Moniitor Cable
Instruction
The network management cable attached to the CiTRANS 660 is the general network cable, including two types:
e cable are installed with the RJ-45 plugs (crystal heads).
straight-through and crossover cables. Both ends of the
Note
When the network management computer connects witth the F1 or F2 interface of the AIFJ1 / AIFJ2 card directly,
the crossover cable is used.
When the network management computer connects witth the F1 or F2 interface of the AIFJ1 / AIFJ2 card via Hub,
two straight-through cables are used: one is used to co
onnect the network management computer with the Hub and
the other to connect the Hub with the CiTRANS 660.
1 Route the network management cable through the wirring hole at the cabinet bottom (or top) and route it along
the wiring channel at the left side of the cabinet to the AIFJ1 / AIFJ2 card at the fiber guide unit of the
corresponding subrack.
subrack
2 Route the network management cable through the fibeer guide unit to the AIFJ1 / AIFJ2 card of the subrack.
3 Insert one end ot the network management cable into the F1 or F2 interface of the AIFJ1 / AIFJ2 card.
Top Access Wiring Mode of the Network Floor Access Wiring Mode of the Network
Management Monitor Cable Management Monitor Cable
4 Arrange the network management monitor cable, binding the cables on the side of the cabinet onto the vertical
mounting flange of the same side.
12
6.6 Layout of the Ethernet Cable
Instruction
The Ethernet cable attached to the CiTRANS 660 is the general network cable, including two types: straight-through
alled with the RJ-45 plugs (crystal heads).
and crossover cables. Both ends of the cable are insta
1 Lead the Ethernet cable through the wiring hole at the cabinet bottom (or top), and route it upward (or downward)
along the wiring channel on the side of the cabinet to the
t Ethernet interface card.
3 Insert one end of the Ethernet cable into the Ethernet interface of the card.
Top Access Wiring Mode of the Ethernet Cable Floor Access Wiring Mode of the Ethernet Cable
4 Arrange the Ethernet cable, binding the cables onto thhe vertical mounting flange at the right side of the cabinet
with the tape.
5 Connect the other end of the Ethernet cable with the RJ-45
R interface of the Ethernet data service device.
13
7 Connection and Layout of the Optical Fiber Jumper
Instruction
The type of the optical fiber jumper is determined by the types
t of the optical interfaces on the devices at both
local and far ends. All optical interfaces on the CiTRANS 660 side are LC/PC type.
Instruction
According to the type of the optical interface on the ODF, generally the internal optical fiber jumper uses the
FC/PC type or the SC/PC type (ODF side).
Instruction
Before layout, users need to complete the following pre
eparation works:
Make and attach temporary labels on both sides of the optical fiber jumper, put them in order and lay them straight.
1 Please note that the fibers should be arranged in pairs foor transmitting and receiving.
2 Cut out an appropriate length of protection casing accordding to the length of optical fiber. The fiber between the
cabinet on the local end and the cabinet / ODF on the far end should be protected by the protection casing.
3 Adjust the length of the optical fiber outside the protection casing: for fibers at the client and line sides, if there is a
redundant length of the fibers, installers should reserve the fibers redundant parts at the ODF side, so as to
nd line sides without redundancy.
ensure that the fibers enter the cabinet from the client an
4 Route the optical fiber sheathed with the protection casinng from other cabinet or ODF to the cabinet
through the upper support channel, and route the fiber into the cabinet via the wiring hole.
Caution
Installers should bind all wires and cables used in onsite
e installation
installation. Each cable type should be bound separately
separately. For
example, power cables, alarm cables and optical fibers should
s be laid out independently and bound separately. Note
that optical fibers cannot be bound with typical wire bind
der.
1 Lead the optical fiber through the wiring hole at the cabine
et top (or bottom), and route it downward along the wiring channel
on the side of the cabinet to the Ethernet interface card.
3 Connect the optical fiber connector with the optical interfacce of the corresponding card.
14
Top Access Wiring Mode of the Optical Fiber Floor Access Wiring Mode of the Optical Fiber
1 After the connection of the optical fibers is completed, installers should bind the optical fibers at the entrance of
the cabinet and near the fiber passage area with sofft plastic binders to secure them.
Note
The inter
interval
al bet
between
een binders sho
should
ld be 3 to 4 tim
mes the length of fiber b
bundle
ndle diameter and the binders sho
should
ld
be bound uniformly.
2 Connect the optical fibers on the ODF side.
3 Make and attach labels on both ends of the optical fiber.
f
Instruction
After completing the installation of the equipment, insta
allers should install the doors. Refer to Quick Installation Guide
for the 21-inch Cabinet (300mm-deep) for detailed insta allation method.
15
9 Post-installation Inspection
9.1 Checking the Connection and Layout of Wires
W and Cables
Caution
When the connection and layout of the cables and wires
w is completed, installers should conduct the connectivity
test and ensure that the signals are transmitted effecctively.
No. Items to be Checked Method
When cables are arranged up along the cabinet to the cabling rack, the distance between them and the
Visual
3 ventilation hole on the cabinet top should be no less than 10cm.
1 If the distance between the cabling rack
inspection
and the cabinet is larger than 0.8m, installers should set up
p a cabling ladder.
When the cables are arranged under the floor, the height of
o the cable bundles should be no more than 3/4
Visual
4 of the net height from the ground to the ESD protection raised floor or the ventilation and air cooling may
inspection
be hindered.
8. Plug in the fan unit first. The fan unit will start running as soon as it is plugged and air movement will
begin.
9. Plug the cards into the subrack in sequence and
a cards will be electrified normally after two or three
minutes.
Instruction
The power-off procedures for the CiTRANS 660 are
a in reverse order of the power-on.
16