5 Boiler #1, #2 and boiler #3 carbon cleaning Cover removal Tube cleaning Tube cleaning Test run Roll y, 5 prod ucti on o perato r
6 Removal of Veripack overhead conveyor Removin g of bracket, con necti ng Continue conveyor removal Ruel, Ch owdhur ry and Two cont ractor
rod s
Water draini ng, removed th e
Co ntherm u sing rope sl ing and
Conti nue w orking o n repl aci ng all Conti nue workin g o n replacing Fixing
P.M and Corrective Maintenance work of forkli ft, i nsert plasti c ji gs i nsid e low Co ntherm
7 er s eals ass embl y, reference Upper seals ass embly. vertically usi ng rope Arnold, Allan and Sameer
Contherm Scraped- Surface Heat Exchanger the Conth erm and s lowl y laid machi ne manuals Referen ce machine manuals sl ings and for kl ift
do wn the con therm to avoid mis -
al ligned blades
HVAC Work FFF1, Cleaning of Ducting Glaze Fixin g on B lower fan FFF1, Cleani ng of AC ducting Recombined Cleani ng o f AC ducti ng UHT Cl eaning o f AC ducting
10 line, Recombined, UHT line, Butter, Cheese Cl eaning of AC ducting MESOMA li ne andCl eaning of AC Du cti ng and B utter Li ne Bakery an d Chocolate Lito and HVAC group
Factory, Chocolate and Bakery and OPEM Glaze Lin e l ine
Existi ng paint removal u sing pai nt Exi stin g paint remo val usi ng pain t App lication of metal p rimer Final pai nting s pray
11 Painting of SOS Machine removers up to metal stri ps removers up to metal strip s paints us ing s pray paint Retouching using polytop appl icati on usi ng the Contractor
same col or Bi ege
14 Piping work on cooker #3 to Sausage Clipping Piping work Piping work Arnol d, Tetra Tech Weld er
Machine for Cheddar Sausage Product
Note : All H ighlighted in RED color needs outside and inside res ources like our production operator and approve d contract pe rs onnel
Total manpower 12
CIVIL WORK
S.NO. AREA JOB TYPE CONTRACTOR TARGET DATE
CHEESE PLANT
Whi te area staircase and i ts pl at
White area toilets
1 f orm to be paint ed
F loor t o be painted including
Production office
2 cubicles wall also
Cooking area stair case t o be
3 paint ed
Cook Room
Cooking area floor to be painted
4
P aint ing of t he ent ire cheese plant
5 f loor t o be done
S team l ine near the cheese
production entrance t o be paint ed
Cheese production hall
6 as i t is peeling off
BUTTER PLANT
1 CIPROOM Floor to be repainted DAY 3
CHOCOLATE FACTOR
F loor paint ing i n production and
1 cartoning area
Com pound f illing weighing
m achi ne stand and i nside cooling
2 t unnel f or repaint ing
LABORATORY
E poxy floor repainting complet e
CHEESE LABORATORY
1 cheese lab
BUTTER PLANT
Ti les to be changed due t o yellow
DEBOXING
1 colour
Ti les to be changed due t o yellow
2 UHTNear Land Line
colour
3 Production Hall Entrence Door (Right side) Damaged tiles to be changed
SARWAN
CHOCOLATE
FACTORY
Hole provi sion for ext ruder
m achi ne of chocodri nk for proper
f inish. (Need t iles inst allati on of
1 palst ic curtain)
DAY 4
Dust mast er and exhaust pipelines
2 t o be removed
LABORATORY
Holes on wall lef t due t o AC unit
1 relocati on t o be fil led
GOPAL
SHREDDING LINE 1&2
DAY 1
3 S hreding l ine 02 side wall one
perforated area t hat need t o close.
CHOCOLATE FACTORY
S ound absorber t o be repl aced in
1 charging room
F inished goods ram p raili ng t o be
DAY 2
2 changed
A ll roll up door t o be fabricate or
3 change
GOPAL
LABORATORIES
V ert ical sm all wi ndow door t oward
processing hall to be repair for
1 spring cord breakage
Weighi ng scale hood cover
2 P LAS TI C A CRY LIC