1.Poverty Reduction
2.Community Driven Development
3.Community Management / Ownership
4.Gender Equality and Social Inclusion
5.Transparency
6.Accountability
7.Participatory Learning
Socialization
Election
Transfer Operational Grant
Training
Priority Setting
Prepare & verify proposal
Prepare detailed plan (BoQ) PNDS
Transfer Infra Grant tranche 1 and
commence construction Cycle
Accountability Meeting 1
Transfer final Infra Grant tranche
Finalize construction / Final
Accountability Meeting
Operations & Maintenance
PNDS Projects in 442 villages (cycle 1 & 2)
The results from cycle 1 & 2 show that the people of Timor, through
PNDS, can directly respond the governments budget priorities of:
Road / Drain
$15,285
Size:
width :3m
length : 3 km
Rural Road
$26,614
Size:
width : 3.5 m
length : 1 km
Water tank
$23,908
Size:
2 x 2 x 1.5
Concrete Bridge
$48,750
Size
6 x 14m
Irrigation Channel
$18,424
Size
537 m
School Extension
$24,319