Sunteți pe pagina 1din 6

Project Defect List

STUDENT VILLAGE PACKAGE: ZONE 1 / ZONE 2 / ZONE 3


Work in Date of
Zone Unit: Site Visit Sample
Progress Issuance
Final
Block Level: Material Specification Mock-Up Originator
Inspection
Inspection Date
Location
Referance Day
Item Description of Defect Remark
Specification Month
Description Year
1. Flexible Pipe And All Accessories

3. 1x36w T8 Fluo Ftg Bare Channel

4. Light Switch And All Accessories

5. 13A SSO Flush / Wall Mounted

6. Finishing / Clean

TOILET

Consultant Contractor TUNAS SELATAN PROPERTY

Name

Signature

Date
# Note:- A = Accepted B = Accepted with Comment C= Unacceptable
Project Defect List
STUDENT VILLAGE PACKAGE: ZONE 1 / ZONE 2 / ZONE 3
Work in Date of
Zone Unit: Site Visit Sample
Progress Issuance
Final
Block Level: Material Specification Mock-Up Originator
Inspection
Inspection Date
Location
Referance Day
Item Description of Defect Remark
Specification Month
Description Year
1. Distribution Board

2. 1x36w T8 Fluo Ftg Bare Channel

3. Light Switch And All Accessories

4. 13A SSO Flush / Wall Mounted

5. Finishing / Clean

PANTRY

Consultant Contractor TUNAS SELATAN PROPERTY

Name

Signature

Date

# Note:- A = Accepted B = Accepted with Comment C= Unacceptable


Project Defect List
STUDENT VILLAGE PACKAGE: ZONE 1 / ZONE 2 / ZONE 3
Work in Date of
Zone Unit: Site Visit Sample
Progress Issuance
Final
Block Level: Material Specification Mock-Up Originator
Inspection
Inspection Date
Location
Referance Day
Item Description of Defect Remark
Specification Month
Description Year
1. 1x36w T8 Fluo Ftg Bare Channel

2. 1x18w T8 Fluo Ftg Bare Channel

3. Light Switch And All Accessories

4. 13A SSO Flush / Wall Mounted

BED 5. Ceiling Fan C/W Hook Accessories

6. Fan Regulator

ROOM 7. Finishing / Clean

Consultant Contractor TUNAS SELATAN PROPERTY


Name

Signature

Date

# Note:- A = Accepted B = Accepted with Comment C= Unacceptable


Project Defect List
STUDENT VILLAGE PACKAGE: ZONE 1 / ZONE 2 / ZONE 3
Work in Date of
Zone Unit: Site Visit Sample
Progress Issuance
Final
Block Level: Material Specification Mock-Up Originator
Inspection
Inspection Date
Location
Referance Day
Item Description of Defect Remark
Specification Month
Description Year
1. 1x36w T8 Fluo Ftg Bare Channel

2. 1x18w T8 Fluo Ftg Bare Channel

3. Light Switch And All Accessories

4. 13A SSO Flush / Wall Mounted

5. Ceiling Fan C/W Hook Accessories

BED 6. Fan Regulator

ROOM 7. Finishing / Clean

Consultant Contractor TUNAS SELATAN PROPERTY

Name

Signature

Date

# Note:- A = Accepted B = Accepted with Comment C= Unacceptable


Project Defect List
STUDENT VILLAGE PACKAGE: ZONE 1 / ZONE 2 / ZONE 3
Work in Date of
Zone Unit: Site Visit Sample
Progress Issuance
Final
Block Level: Material Specification Mock-Up Originator
Inspection
Inspection Date
Location
Referance Day
Item Description of Defect Remark
Specification Month
Description Year
1. 1x36w T8 Fluo Ftg Bare Channel

2. 1x18w T8 Fluo Ftg Bare Channel

3. Light Switch And All Accessories

4. 13A SSO Flush / Wall Mounted

5. Ceiling Fan C/W Hook Accessories

BED 6. Fan Regulator

ROOM 7. Finishing / Clean

Consultant Contractor TUNAS SELATAN PROPERTY

Name

Signature

Date

# Note:- A = Accepted B = Accepted with Comment C= Unacceptable


Project Defect List
STUDENT VILLAGE PACKAGE: ZONE 1 / ZONE 2 / ZONE 3
Work in Date of
Zone Unit: Site Visit Sample
Progress Issuance
Final
Block Level: Material Specification Mock-Up Originator
Inspection
Inspection Date
Location
Referance Day
Item Description of Defect Remark
Specification Month
Description Year
1. 1x36w T8 Fluo Ftg Bare Channel

2. 1x18w T8 Fluo Ftg Bare Channel

3. Light Switch And All Accessories

4. 13A SSO Flush / Wall Mounted

5. Ceiling Fan C/W Hook Accessories

BED 6. Fan Regulator

7. Finishing / Clean

ROOM
4

Consultant Contractor TUNAS SELATAN PROPERTY

Name

Signature

Date

# Note:- A = Accepted B = Accepted with Comment C= Unacceptable