Sunteți pe pagina 1din 7

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( PAVED SHOULDER )
AREA COMPUTATION AREA COMPUTATION
STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

100+574.890 2.000 2.000 4.00 100+980.000 2.000 2.000 4.00


25.11 100.44 31.78 127.12
100+600.000 2.000 2.000 4.00 101+011.780 2.000 2.000 4.00
20.00 80.00
100+620.000 2.000 2.000 4.00
20.00 80.00
100+640.000 2.000 2.000 4.00
20.00 80.00
100+660.000 2.000 2.000 4.00
20.00 80.00
100+680.000 2.000 2.000 4.00
20.00 80.00
100+700.000 2.000 2.000 4.00
20.00 80.00
100+720.000 2.000 2.000 4.00
20.00 80.00
100+740.000 2.000 2.000 4.00
20.00 80.00
100+760.000 2.000 2.000 4.00
20.00 80.00
100+780.000 2.000 2.000 4.00
20.00 80.00
100+800.000 2.000 2.000 4.00
20.00 80.00
100+820.000 2.000 2.000 4.00
20.00 80.00
100+840.000 2.000 2.000 4.00
20.00 80.00
100+860.000 2.000 2.000 4.00
20.00 80.00
100+880.000 2.000 2.000 4.00
20.00 80.00
100+900.000 2.000 2.000 4.00
20.00 80.00
100+920.000 2.000 2.000 4.00
20.00 80.00
100+940.000 2.000 2.000 4.00
20.00 80.00
100+960.000 2.000 2.000 4.00
20.00 80.00
100+980.000 2.000 2.000 4.00
Sub - total 1620.44 Sub - total 127.12

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( PAVED SHOULDER )
AREA COMPUTATION AREA COMPUTATION
STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

101+011.780 2.000 2.000 4.00


8.22 32.88
101+020.000 2.000 2.000 4.00
20.00 80.00
101+040.000 2.000 2.000 4.00
20.00 80.00
101+060.000 2.000 2.000 4.00
20.00 80.00
101+080.000 2.000 2.000 4.00
20.00 80.00
101+100.000 2.000 2.000 4.00
20.00 80.00
101+120.000 2.000 2.000 4.00
20.00 80.00
101+140.000 2.000 2.000 4.00
20.00 80.00
101+160.000 2.000 2.000 4.00
20.00 80.00
101+180.000 2.000 2.000 4.00
20.00 80.00
101+200.000 2.000 2.000 4.00
20.00 0.00
101+220.000 0.00
20.00 0.00
101+240.000 0.00
20.00 0.00
101+260.000 0.00
20.00 0.00
101+280.000 0.00
20.00 0.00
101+300.000 0.00
20.00 0.00
101+320.000 0.00
20.00 0.00
101+340.000 0.00
20.00 0.00
101+360.000 0.00
20.00 0.00
101+380.000 0.00
20.00 0.00
101+400.000 0.00
Sub - total 752.88 Sub - total 0.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( PAVED SHOULDER )
AREA COMPUTATION AREA COMPUTATION
STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

127+000.000 2.000 2.000 4.00 127+400.000 2.000 2.000 4.00


20.00 80.00 20.00 80.00
127+020.000 2.000 2.000 4.00 127+420.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+040.000 2.000 2.000 4.00 127+440.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+060.000 2.000 2.000 4.00 127+460.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+080.000 2.000 2.000 4.00 127+480.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+100.000 2.000 2.000 4.00 127+500.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+120.000 2.000 2.000 4.00 127+520.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+140.000 2.000 2.000 4.00 127+540.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+160.000 2.000 2.000 4.00 127+560.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+180.000 2.000 2.000 4.00 127+580.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+200.000 2.000 2.000 4.00 127+600.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+220.000 2.000 2.000 4.00 127+620.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+240.000 2.000 2.000 4.00 127+640.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+260.000 2.000 2.000 4.00 127+660.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+280.000 2.000 2.000 4.00 127+680.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+300.000 2.000 2.000 4.00 127+700.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+320.000 2.000 2.000 4.00 127+720.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+340.000 2.000 2.000 4.00 127+740.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+360.000 2.000 2.000 4.00 127+760.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+380.000 2.000 2.000 4.00 127+780.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+400.000 2.000 2.000 4.00 127+800.000 2.000 2.000 4.00
Sub - total 1600.00 Sub - total 1600.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( PAVED SHOULDER )

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

127+800.000 2.000 2.000 4.00 128+200.000 2.000 2.000 4.00


20.00 80.00 20.00 80.00
127+820.000 2.000 2.000 4.00 128+220.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+840.000 2.000 2.000 4.00 128+240.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+860.000 2.000 2.000 4.00 128+260.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+880.000 2.000 2.000 4.00 128+280.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+900.000 2.000 2.000 4.00 128+300.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+920.000 2.000 2.000 4.00 128+320.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+940.000 2.000 2.000 4.00 128+340.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+960.000 2.000 2.000 4.00 128+360.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
127+980.000 2.000 2.000 4.00 128+380.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+000.000 2.000 2.000 4.00 128+400.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+020.000 2.000 2.000 4.00 128+420.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+040.000 2.000 2.000 4.00 128+440.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+060.000 2.000 2.000 4.00 128+460.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+080.000 2.000 2.000 4.00 128+480.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+100.000 2.000 2.000 4.00 128+500.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+120.000 2.000 2.000 4.00 128+520.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+140.000 2.000 2.000 4.00 128+540.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+160.000 2.000 2.000 4.00 128+560.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+180.000 2.000 2.000 4.00 128+580.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+200.000 2.000 2.000 4.00 128+600.000 2.000 2.000 4.00
Sub - total 1600.00 Sub - total 1600.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( PAVED SHOULDER )

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

128+600.000 2.000 2.000 4.00 129+000.000 2.000 2.000 4.00


20.00 80.00 20.00 80.00
128+620.000 2.000 2.000 4.00 129+020.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+640.000 2.000 2.000 4.00 129+040.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+660.000 2.000 2.000 4.00 129+060.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+680.000 2.000 2.000 4.00 129+080.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+700.000 2.000 2.000 4.00 129+100.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+720.000 2.000 2.000 4.00 129+120.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+740.000 2.000 2.000 4.00 129+140.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+760.000 2.000 2.000 4.00 129+160.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+780.000 2.000 2.000 4.00 129+180.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+800.000 2.000 2.000 4.00 129+200.000 2.000 2.000 4.00
20.00 80.00 20.00 80.00
128+820.000 2.000 2.000 4.00 129+220.000 2.000 2.000 4.00
20.00 80.00 20.00 57.00
128+840.000 2.000 2.000 4.00 129+240.000 0.650 1.050 1.70
20.00 80.00 20.00 39.00
128+860.000 2.000 2.000 4.00 129+260.000 0.950 1.250 2.20
20.00 80.00 20.00 44.00
128+880.000 2.000 2.000 4.00 129+280.000 0.950 1.250 2.20
20.00 80.00 20.00 42.00
128+900.000 2.000 2.000 4.00 129+300.000 0.750 1.250 2.00
20.00 80.00 20.00 38.00
128+920.000 2.000 2.000 4.00 129+320.000 0.650 1.150 1.80
20.00 80.00 20.00 32.00
128+940.000 2.000 2.000 4.00 129+340.000 0.850 0.550 1.40
20.00 80.00 20.00 32.00
128+960.000 2.000 2.000 4.00 129+360.000 1.350 0.450 1.80
20.00 80.00 20.00 33.00
128+980.000 2.000 2.000 4.00 129+380.000 1.050 0.450 1.50
20.00 80.00 20.00 37.00
129+000.000 2.000 2.000 4.00 129+400.000 1.750 0.450 2.20
Sub - total 1600.00 Sub - total 1234.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( PAVED SHOULDER )

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

129+400.000 1.750 0.450 2.20 129+800.000 0.000 0.750 0.75


20.00 41.00 20.00 20.50
129+420.000 1.450 0.450 1.90 129+820.000 0.850 0.450 1.30
20.00 38.00 20.00 26.00
129+440.000 1.450 0.450 1.90 129+840.000 0.850 0.450 1.30
20.00 36.00 20.00 20.00
129+460.000 1.250 0.450 1.70 129+860.000 0.550 0.150 0.70
20.00 36.00 20.00 31.00
129+480.000 1.250 0.650 1.90 129+880.000 1.850 0.550 2.40
20.00 41.00 20.00 43.00
129+500.000 1.250 0.950 2.20 129+900.000 1.150 0.750 1.90
20.00 41.00 20.00 31.50
129+520.000 1.050 0.850 1.90 129+920.000 0.850 0.400 1.25
20.00 33.00 20.00 20.50
129+540.000 0.650 0.750 1.40 129+940.000 0.450 0.350 0.80
20.00 34.00 20.00 15.20
129+560.000 1.250 0.750 2.00 129+960.000 0.420 0.300 0.72
20.00 37.00 20.00 16.20
129+580.000 0.850 0.850 1.70 129+980.000 0.450 0.450 0.90
20.00 34.00 20.00 19.50
129+600.000 0.850 0.850 1.70 130+000.000 1.050 0.000 1.05
20.00 36.00
129+620.000 0.950 0.950 1.90
20.00 38.00
129+640.000 0.850 1.050 1.90
20.00 37.00
129+660.000 0.950 0.850 1.80
20.00 32.00
129+680.000 0.750 0.650 1.40
20.00 26.00
129+700.000 0.550 0.650 1.20
20.00 25.00
129+720.000 0.650 0.650 1.30
20.00 27.00
129+740.000 0.750 0.650 1.40
20.00 29.00
129+760.000 0.750 0.750 1.50
20.00 29.00
129+780.000 0.650 0.750 1.40
20.00 21.50
129+800.000 0.000 0.750 0.75
Sub - total 671.50 Sub - total 243.40

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B - Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with

ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION (ACCOMPLISHMENT)

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT ( SHOULDER )

SHEET NO. STATION AREA REMARKS

1 100+574.89 to 100+980.00 1,620.44


100+980.00 to 101+011.79 127.12
2 101+011.79 to 101+400.00 752.88
-
3 127+000.00 to 127+400.00 1,600.00
127+400.00 to 127+800.00 1,600.00
4 127+800.00 to 128+200.00 1,600.00
128+200.00 to 128+600.00 1,600.00
5 128+600.00 to 129+000.00 1,600.00
129+000.00 to 129+400.00 1,234.00
6 129+400.00 to 129+800.00 671.50
129+800.00 to 130+000.00 243.40

TOTAL FOR SELECTED SHOULDER SECTIONS 12,649.34 SQ. M.

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Project Manager Deputy Project Manager
CONSULTANT CONSULTANT