Sunteți pe pagina 1din 3

Points for Updating report

A Executive summary giving in brief location, need of the project , data &
methodology used for computing flood level likely to occur in 100 year
return period flood with results may be added.
it is also desirable to give one page preface signed by wapcos state center
head.

DESIGN COVER PAGE- TAKE GUIDANCE FROM WEBSITES


PAGE 10 :- Figure 1: Location Map of Lothal :- location is not clear write
name on figure.
PAGE 11 PARA 1 :- FILL IN THE BLANK
PAGE 11 FIGURE location is not clear write name on figure. SEA
ROUTE to khambhat ETC.

EXAMPLE:-
PAGE 13 :- FILL IN THE BLANK
Page 15 ADD LOCATION PLAN OF AREA ADJACENT TO TRIBUTARY
of half page showing land tributary, main river and sea
PAGE 16, ADD Figure showing Drainage Pattern of the LAND OF
proposed Maritime Heritage Complex BASED ON SURVEY
Fig 19 and 20 may be given on full page for clarity
Chapter of actual Field Survey may be added .
WORK STILL TO BE DONE AND ADDED IN REPORT
Evaluating flood inundation boundaries for various expected level of flood stages
under different scenarios.
Study the drainage pattern of the proposed maritime heritage site and its
surrounding area and to suggest suitable scheme for diversion of existing water
courses, streams, nalla etc., falling within the site, including discharge of surface
run-off from the site.
Preparation of preliminary design & cost estimate

Methodology
1. Send me setup of MIKE11 as discussed
2. Fill the missing RF data by weighted average method using data of
nearby station for whole area(Annexure VIII) and discard the erroneous
data
3. Show basin/sub basin Boundary in Annexure ix
4. For highest discharge years of Limdi(1997) and Surendranagar(1994)
calibrate MIKE11 for this sub catchment. The information of historical
recorded level at Bridges can also be used.
5. Show computed unit hydrograph in Annexure XI
6. The CA area of Local drain adjacent to proposed site is 63.775 sq km or
125 sq km.?
7. Computation for 100 year return period flood may also be done in
Annexure XII
8. Running MIKE 11 for historical flood year and highest Tide level
Tabulate levels Adjacent to project site Say U/S Point and D/S POINT
TO KNOW AVERAGE.
9. Separately compute Highest Level when only Local river is in flood and
highest Tide level
10. Maximum Of 9 and 10 to be compared with Levels of Local
enquiry and suggest a level for 50 year and 100 year return period flood.