Project Number: 160214

Original: September 28, 2016


Revision: May 23, 2017

Prepared for CIP Construction Company

Military Cutoff Mixed Use Site


Wilmington, NC
Military Cutoff Mixed Use Site Transportation Impact Analysis
Wilmington, NC
Prepared for CIP Construction Company
Revised May 23, 2017

Executive Summary

The Military Cutoff Mixed Use Site is proposed to be located on the east side of Military
Cutoff Road, between Station Road / McCumber Station Road and Town Center Drive /
Cayman Court, in Wilmington, North Carolina. As currently planned, the site will consist
of a supermarket, hotel, retail, restaurants, apartments, and office.

A TIA was originally prepared and dated September 28, 2016. This TIA was updated on
December 2, 2016 to include two additional analysis scenarios, as well as modifications
to the Synchro analysis model settings. The TIA was updated February 1, 2017 to
address review comments and updated distributions. This revision provides analysis of
the modified site access as proposed.

DAVENPORT was retained to determine the potential traffic impacts of


the development. The following intersections were included in the study:
Military Cutoff Road at Covil Farm Road
Military Cutoff Road at Arboretum Drive
Military Cutoff Road at Station Road / Site Access 1
Military Cutoff Road at Site Access 2
Military Cutoff Road at Site Access 3
Military Cutoff Road at Town Center Drive / Cayman Court

Based on coordination with the WMPO and NCDOT, the sites proposed access was
modified. The following is proposed:

Full movement signalized Main Site Access (Site Access 3)


Entry only at Station Road
Southbound left at Station Road not allowed
Reduced signal phases at Station Road
Northbound u-turn at Station Road not allowed, provided at Site Access 3
Right-in and right-out at Site Access 2 with median island between through and
left lanes
Addition of continuous northbound through-right lane to Covil Farm Road

The above-mentioned intersections were analyzed for the following conditions:

2016 Existing Conditions


2020 Future No Build Conditions
2020 Future Build with Improvements

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis i
The build-out analysis year for this project was assumed to be 2020. The AM (7-9
am), PM (4-6 pm), and Saturday mid-day peaks were studied. The WMPO and NCDOT
were contacted to obtain background information and to ascertain the elements to be
covered in this Transportation Impact Analysis (TIA). Information regarding the property
was provided by CIP Construction Company.

Military Cutoff Road at Station Road / Site Access 1, Northbound Facing North

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis ii
Level of Service Results

The results of the study are summarized below.

Military Cutoff Road at Covil Farm Road


This signalized intersection currently operates at LOS C during the AM and PM peaks,
and LOS B during the Saturday midday peak. In future no build conditions, LOS C/D/B
is expected in the AM/PM/Sat peaks. After the addition of project traffic, the LOS is
expected to remain unchanged. No improvements are recommended. Level of service
results are shown in Table A.

Table A - Military Cutoff Road at Covil Farm Road


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E E E D B A B B
B (17)
Existing C (24.9) (67.6) (69.5) (70.4) (38.4) (14.2) (4.5) (10.2) (14.9)
E (67.6) E (64.5) B (15.8) B (14.8)
E E E D A A A B
E (80)
Future No Build C (24) (67.7) (70.5) (71.3) (37.6) (8.2) (8.9) (1.1) (15.9)
E (67.7) E (65.1) A (8.2) B (17.8)
D E C B A E
Future Build with E (65) B (11) B (18)
C (23.3) (54.8) (66.3) (31.5) (10.2) (1.7) (61.6)
Improvements
D (54.8) E (60) A (9.4) B (19.1)
PM Peak Hour
E E E D C A E A
A (6) ()
Existing C (25.1) (71.1) (76.6) (76.7) (39.2) (27.7) (3.2) (64.1) (7.2)
E (71.1) E (68.7) C (23.5) B (15.4)
E E E D E A F A
() () A (9) ()
Future No Build D (45.6) (71.1) (76.2) (76.3) (40.1) (68.3) (2.9) (95.2) (6.9)
E (71.1) E (68.5) E (57.3) B (19.3)
E E D A D F A
Future Build with () E (70) () A (2) ()
D (41.3) (72.9) (72.9) (43.9) (2.2) (52.4) (185.6) (8.7)
Improvements
E (70) E (67.2) D (44.1) C (30.1)
Saturday Peak Hour
D D D C A A A A
() () A (7.1) ()
Existing B (11.2) (49.5) (52.7) (53.5) (29.7) (4.6) (4.9) (1.1) (8.8)
D (49.5) D (48.8) A (4.3) A (8.7)
D E C A A A E A
() () E (57) ()
Future No Build B (13) (49.5) (56.2) (29.5) (6.2) (6.1) (1.5) (61.3) (8.6)
D (49.5) D (51.6) A (5.3) B (11.1)
D E E D B A E B
Future Build with () () A (1) ()
B (15.9) (54.8) (70.2) (69.4) (36.3) (10.8) (6.7) (69.8) (12.8)
Improvements
D (54.8) E (64.4) A (5.9) B (15)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis iii
Military Cutoff Road at Arboretum Drive
LOS B/B/A is currently experienced at this intersection during the AM/PM/Sat peaks. In
future no build conditions, LOS B/C/A is anticipated for the AM/PM/Sat peaks. With the
addition of project traffic, LOS B/B/A is expected. Level of service results are shown in
Table B.

The following improvements are recommended in build conditions:


Restripe northbound right turn lane to a continuous northbound through-right lane
to Covil Farm Road
Signal modification

Table B - Military Cutoff Road at Arboretum Drive


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
D E D B B B A A
() () () ()
Existing B (12.2) (50.8) (76.5) (44.4) (17.8) (15.5) (13) (3.2) (5.3)
D (50.8) E (63.1) B (15.2) A (5.2)
D E D B B B E A
() () () ()
Future No Build B (14.8) (51.5) (79.1) (37.8) (14.6) (13.1) (11.2) (77.7) (6.4)
D (51.5) E (62) B (13) B (10.7)
D E C A
Future Build with () () () A (9) () () () ()
B (12.1) (43.6) (69.5) (31.3) (6.7)
Improvements
D (43.6) D (53.6) () ()
PM Peak Hour
E F D C A A
() () () A (4) () ()
Existing B (18.7) (58.9) (87.8) (53.2) (22.8) (3.6) (4.2)
E (58.9) E (69.3) C (21.8) ()
E F E A C A A
() () () () ()
Future No Build C (23) (65.1) (132.2) (60.6) (1.7) (24.9) (1.9) (5.9)
E (65.1) F (94) C (23.8) ()
E F D A A A
Future Build with () () () () () ()
B (10.2) (57.7) (87.6) (50.5) (4.2) (6.3) (5.4)
Improvements
E (57.7) E (67.8) A (6.3) ()
Saturday Peak Hour
D E D A B A
() () () A (4) () ()
Existing A (8.8) (44.2) (58.6) (37.9) (3.4) (10.1) (4.4)
D (44.3) D (46.3) A (9.6) ()
D D A A A A
() () () E (59) () ()
Future No Build A (8.9) (44.1) (36.8) (7.2) (9.7) (5.7) (3.2)
D (44.1) D (45.7) A (9.5) ()
D D A A A
Future Build with () () () E (70) () () ()
A (7.6) (50.1) (44.7) (8.5) (6.5) (3.1)
Improvements
D (50.1) D (54.9) A (6.5) ()

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis iv
Military Cutoff Road at Station Road / Site Access 1

This signalized intersection currently operates at LOS A/B/A during the AM, PM, and
Saturday peaks. In future no build conditions, LOS B/C/B is expected during the
AM/PM/Sat peaks. In future build conditions, LOS B/B/B is expected. Table C shows the
LOS results.

The following improvements are recommended:


Prohibit westbound traffic, northbound u-turns, and southbound left turns
Provide southbound u-turn lane with 215 feet of storage
Modify eastbound approach to a left turn lane with 50 feet of storage, continuous
through lane, and a right turn lane with 125 feet of storage
Construct northbound though-right lane with full storage
Modify northbound left turn lane to 575 feet of storage plus appropriate taper
Signal modification

Table C - Military Cutoff Road at Station Road / Site Access 1


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E E E B A A A A
() () () ()
Existing A (8.8) (76.9) (66.6) (63.4) (16.9) (1.9) (1.7) (5.5) (1.6)
E (68.5) E (63.4) A (3.4) A (5.4)
F E E F A B A
B () () () () A (5)
Future No Build (93.3) (55.5) (60.5) (83.1) (2.5) (10.3) (5.1)
(15.4)
E (66) E (60.5) B (12.1) B (10.2)
Future Build E E E A A B A
B () () () () ()
with (71.9) (56.8) (60.1) (1.5) (5.2) (10.4) (4.6)
(13.6)
Improvements E (62.6) () () ()
PM Peak Hour
F E E B A A A
B () () () () ()
Existing (113.4) (60.9) (65.5) (14.7) (5.9) (6.7) (5.2)
(10.6)
() () () ()
F E F A C C A
C () D (40) () () ()
Future No Build (97.6) (57.5) (90.4) (5.5) (22.9) (23.3) (9.9)
(20.2)
E (65.1) E (57.5) B (12.8) C (22.8)
Future Build F E D F A C A
() () () () ()
with B (17) (91.9) (63.2) (44.1) (92.1) (2.1) (20.9) (7.1)
Improvements () () A (8.9) C (20.5)
Saturday Peak Hour
E D D A A A A
() () () () A (3)
Existing A (5.5) (55.2) (43.4) (46.8) (7.6) (2.5) (3.5) (4.2)
D (46.7) D (46.8) A (2.8) A (4.2)
E D E A A B A
B () D (37) () () ()
Future No Build (68.9) (45.2) (60.8) (3.9) (7.8) (10.4) (6.5)
(12.3)
D (48.4) D (45.2) A (9) B (10.3)
Future Build E E D A B A
B () () () () () ()
with (73.5) (60.5) (45.7) (1.7) (14.3) (6.8)
(13.6)
Improvements E (56.3) () () ()

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis v
Military Cutoff Road at Site Access 2

This site access is proposed to have a right-in right-out configuration. In future build
conditions, LOS A/B/B is anticipated for the AM/PM/Sat peaks. Table D shows the LOS
results.

The following improvement is recommended:

Construct additional northbound though lane


Construct a northbound right turn lane with 150 feet of storage plus appropriate
taper
Median island between through and left lanes

Table D - Military Cutoff Road at Site Access 2


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
A A A A
Future Build with (9.0) (0.0) (0.0) (0.0)
N/A
Improvements
A (9.0) A (0.0) A (0.0)
PM Peak Hour
B A A A
Future Build with (13.6) (0.0) (0.0) (0.0)
N/A
Improvements
B (13.6) A (0.0) A (0.0)
Saturday Peak Hour
B A A A
Future Build with (10.7) (0.0) (0.0) (0.0)
N/A
Improvements
B (10.7) A (0.0) A (0.0)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis vi
Military Cutoff Road at Site Access 3

This full site access is proposed to be signalized. In future build conditions, LOS B/C/C
is anticipated. Level of service results are shown in Table E.

The following improvements are recommended:


Signalize
Construct two (2) southbound left turn lanes with 350 feet of storage plus
appropriate taper
Construct additional northbound through lane
Construct a northbound u-turn lane with 350 feet of storage plus appropriate
taper
Construct a northbound right turn lane with 180 feet of storage plus appropriate
taper
On the westbound exiting approach, provide two (2) left turn lanes and two (2)
right turn lanes from the site

Table E -Military Cutoff Road at Site Access 3


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E D F A A E A
Future Build with () () () () ()
B (14.4) (65.4) (35.3) (81) (6.3) (1.7) (65.1) (6.3)
Improvements
() E (56) A (7.9) B (12.2)
PM Peak Hour
E D F C A F A
Future Build with () () () () ()
C (25.8) (73.4) (37) (80.8) (20.2) (1.3) (82.5) (9.7)
Improvements
() E (61.7) B (19.2) C (22.7)
Saturday Peak Hour
E C E C A E
Future Build with () () () () A (9) ()
C (23) (58.2) (22.1) (74.3) (20.5) (4.8) (60)
Improvements
() D (46.7) B (18.3) B (19)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis vii
Military Cutoff Road at Town Center Drive / Cayman Court

In existing conditions, this signalized intersection operates at LOS B during the AM, PM,
and Saturday peaks. In future no build conditions, LOS A/B/A is anticipated for the
AM/PM/Sat peaks. After the addition of project traffic, LOS A/B/B is expected during the
AM/PM/Sat peaks. Level of service results are shown in Table F.

It is recommended to:
Restripe northbound right turn lane to a continuous northbound through-right lane
to Covil Farm Road
Signal modification

Table F - Military Cutoff Road at Town Center Drive / Cayman Court


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E D E D A C A
() () A (5) () ()
Existing B (16.9) (74.4) (51.6) (67.5) (50.2) (4.4) (20.6) (5.8)
E (64.3) E (60.7) () ()
E D E D A A A
() () A (4) () ()
Future No Build A (6.6) (78.5) (52.6) (69.4) (51.2) (4.9) (3.1) (1.7)
E (67.3) E (62.1) () ()
E D E D A A A
Future Build with () () () () ()
A (9.4) (63.1) (42.3) (56.7) (40.5) (4.5) (9.4) (4.1)
Improvements
D (54.1) D (50.2) () ()
PM Peak Hour
F D E A B A C A A
() () ()
Existing B (14.3) (106.1) (52.2) (66.2) (3.2) (16.6) (4.9) (22.5) (4.4) (3.1)
F (94.5) () B (16.3) A (4.8)
F D E D B A A A
() () () ()
Future No Build B (18.4) (116.3) (53.2) (68.5) (52) (19.3) (4.6) (8.5) (6.3)
F (102.6) E (62.5) () ()
F D E D B B A
Future Build with () () () () ()
B (15.7) (91.2) (48.6) (61.9) (47.4) (13.3) (12.5) (5.7)
Improvements
F (82) E (56.6) () ()
Saturday Peak Hour
E C D C A A C B
() () A (8) A (5)
Existing B (17.6) (57.3) (33.3) (44.3) (31.4) (3.6) (6.2) (23.3) (10.4)
D (49) D (40.2) A (7.9) C (22.9)
E D D C D A A E A A
() ()
Future No Build A (7.4) (65.3) (35.5) (47.9) (33.8) (51.7) (7.5) (5.2) (59.8) (3.2) (1.9)
D (55) D (44.2) A (8.2) A (4)
F D E D E A D B A
Future Build with () () ()
B (12) (83.6) (41.3) (55.3) (39.4) (65.3) (6.2) (51.1) (13.1) (4.4)
Improvements
E (69) D (51.2) A (6.9) B (13.4)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis viii
Summary and Conclusion
The Military Cutoff Mixed Use Site is proposed to be located on the east side of Military
Cutoff Road, between Station Road / McCumber Station Road and Town Center Drive /
Cayman Court, in Wilmington, North Carolina. As currently planned, the site will consist
of a supermarket, hotel, retail, restaurants, apartments, and office.

A TIA was originally prepared and dated September 28, 2016. This TIA was updated on
December 2, 2016 to include two additional analysis scenarios, as well as modifications
to the Synchro analysis model settings. The TIA was updated February 1, 2017 to
address review comments and updated distributions. This revision provides analysis of
the modified site access as proposed.

Based on coordination with the WMPO and NCDOT, the sites proposed access was
modified. The following is proposed:

Full movement signalized Main Site Access (Site Access 3)


Entry only at Station Road
Southbound left at Station Road not allowed
Reduced signal phases at Station Road
Northbound u-turn at Station Road not allowed, provided at Site Access 3
Right-in and right-out at Site Access 2 with median island between through and
left lanes
Addition of continuous northbound through-right lane to Covil Farm Road

Acceptable level of service is anticipated at the study intersections in future build


conditions with the recommended improvements in place. The additional northbound
through lane will extend approximately one-half mile along Military Cutoff Road and will
help to accommodate the heavy northbound through traffic volume (about 2,600 during
the PM peak hour). The proposed T-intersection at Station Road will decrease the
number of phases at the signal, thus improving delay and queueing. As a result, the
same or improved delay and queueing is anticipated at the study intersections
compared to future no build conditions.

In conclusion, this analysis has been conducted based on NCDOT guidelines and has
determined the potential traffic impacts of this development. Site accesses should be
designed according to NCDOT and City of Wilmington standards, as appropriate.

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis ix
Military Cutoff Mixed Use Site Transportation Impact Analysis
Wilmington, NC
Prepared for CIP Construction Company
Revised May 23, 2017

Table of Contents

1.0 Introduction............................................................................................................. 3
Figure 1 Site Sketch Plan ......................................................................................... 4
Figure 2A Site Location Map .................................................................................... 6
Figure 2B Vicinity Map ............................................................................................... 7
2.0 Existing Conditions ................................................................................................ 8
2.1 Inventory ................................................................................................................ 8
2.1 Existing Traffic Volumes ........................................................................................ 8
Figure 3 Existing Lane Geometry ............................................................................. 9
Figure 4 2016 Existing Traffic Volumes .................................................................. 10
3.0 Approved Developments and Committed Improvements ................................. 11
3.1 Approved Developments...................................................................................... 11
3.2 Committed Improvements .................................................................................... 11
4.0 Methodology ......................................................................................................... 11
4.1 Base Assumptions and Standards ....................................................................... 11
4.2 Analysis Modifications.......................................................................................... 11
4.3 Trip Generation .................................................................................................... 12
4.4 Trip Distribution .................................................................................................... 13
4.5 Future No Build Traffic ......................................................................................... 13
4.6 Total Traffic .......................................................................................................... 13
Figure 5A Primary Trip Distribution ......................................................................... 14
Figure 5B Pass-by Trip Distribution ........................................................................ 15
Figure 6 2020 Future No Build Volumes ................................................................. 16
Figure 7A Primary Site Trips ................................................................................... 17
Figure 7B Pass-by Site Trips .................................................................................. 18
Figure 8 2020 Future Build Volumes ...................................................................... 19
5.0 Capacity Analysis ................................................................................................. 20
5.1 Level of Service Evaluation Criteria ..................................................................... 20
5.2 Discussion of Results........................................................................................... 21
5.2.1 Military Cutoff Road at Covil Farm Road....................................................... 21
5.2.2 Military Cutoff Road at Arboretum Drive ....................................................... 21
5.2.3 Military Cutoff Road at Station Road / Site Access 1 .................................... 23
5.2.4 Military Cutoff Road at Site Access 2 ............................................................ 24
5.2.5 Military Cutoff Road at Site Access 3 ............................................................ 25
5.2.6 Military Cutoff Road at Town Center Drive / Cayman Court .......................... 26
Figure 9 Recommended Improvements .................................................................. 27
6.0 Summary and Conclusion ................................................................................... 28
Appendix ...................................................................................................................... 29
Level of Service Analysis ....................................................................................... 30
Military Cutoff Road at Covil Farm Road ................................................................ 31

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 1
Military Cutoff Road at Arboretum Drive ................................................................. 32
Military Cutoff Road at Station Road / Site Access 1 ............................................. 33
Military Cutoff Road at Town Center Drive / Cayman Court ................................... 34
Military Cutoff Road at Site Access 2 ..................................................................... 35
Military Cutoff Road at Site Access 3 ..................................................................... 36
Trip Generation ...................................................................................................... 37
Approved Developments ........................................................................................ 38
Traffic Volume Data ............................................................................................... 39
Supporting Documentation ..................................................................................... 40

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 2
Military Cutoff Mixed Use Site Transportation Impact Analysis
Wilmington, NC
Prepared for CIP Construction Company
Revised May 23, 2017

1.0 Introduction
The Military Cutoff Mixed Use Site is proposed to be located on the east side of Military
Cutoff Road, between Station Road / McCumber Station Road and Town Center Drive /
Cayman Court, in Wilmington, North Carolina. As currently planned, the site will consist
of a supermarket, hotel, retail, restaurants, apartments, and office. Figure 1 presents a
sketch plan. Figures 2A and 2B show the site location and vicinity maps, respectively.

A TIA was originally prepared and dated September 28, 2016. This TIA was updated on
December 2, 2016 to include two additional analysis scenarios, as well as modifications
to the Synchro analysis model settings. The TIA was updated February 1, 2017 to
address review comments and updated distributions. This revision provides analysis of
the modified site access as proposed.

DAVENPORT was retained to determine the potential traffic impacts of


the development. The following intersections were included in the study:
Military Cutoff Road at Covil Farm Road
Military Cutoff Road at Arboretum Drive
Military Cutoff Road at Station Road / Site Access 1
Military Cutoff Road at Site Access 2
Military Cutoff Road at Site Access 3
Military Cutoff Road at Town Center Drive / Cayman Court

Based on coordination with the WMPO and NCDOT, the sites proposed access was
modified. The following is proposed:

Full movement signalized Main Site Access (Site Access 3)


Entry only at Station Road
Southbound left at Station Road not allowed
Reduced signal phases at Station Road
Northbound u-turn at Station Road not allowed, provided at Site Access 3
Right-in and right-out at Site Access 2 with median island between through and
left lanes
Addition of continuous northbound through-right lane to Covil Farm Road

The above-mentioned intersections were analyzed for the following conditions:

2016 Existing Conditions


2020 Future No Build Conditions
2020 Future Build Conditions with Improvements

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 3
The build-out analysis year for this project was assumed to be 2020. The AM (7-9
am), PM (4-6 pm), and Saturday mid-day peaks were studied. The WMPO and NCDOT
were contacted to obtain background information and to ascertain the elements to be
covered in this Transportation Impact Analysis (TIA). Information regarding the property
was provided by CIP Construction Company.

Military Cutoff Road at Station Road / Site Access 1, Northbound Facing North

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 4
FIGURE 1
SITE PLAN
FIGURE 2A
SITE LOCATION MAP SITE INDICATOR
FIGURE 2B STUDY INTERSECTIONS
VICINITY MAP EXISTING
PROPOSED
2.0 Existing Conditions

2.1 Inventory

A field investigation was conducted by DAVENPORT staff to determine the existing


roadway conditions in the study area. Table 2.1 presents a summary of this review.
Figure 3 illustrates the existing lane geometry.

Table 2.1 - Street Inventory


Pavement Speed
Facility Name Route # Typical Cross Section Maintained by
Width Limit
Military Cutoff Approx. 70
SR 1409 4-lane divided (Varies) 45 MPH NCDOT
Road (Varies)
Covil Farm Road SR 1940 2-lane undivided Approx. 22 35 MPH NCDOT
City of
Arboretum Drive N/A 2-lane undivided Approx. 25 35 MPH
Wilmington
City of
Station Road N/A 2-lane undivided Approx. 21 35 MPH
Wilmington
Town Center 3-lane undivided with TWLTL City of
N/A Approx. 35 25 MPH
Drive (Varies) Wilmington
City of
Cayman Court N/A 2-lane undivided Approx. 25 35 MPH
Wilmington

2.1 Existing Traffic Volumes

Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2
below contains the dates these counts were conducted. Traffic counts were taken in
fifteen (15) minute intervals. Counts taken in year 2015 were projected to year 2016 by
applying a 1% annual growth rate. Figure 4 presents existing peak hour volumes for
the weekday AM, weekday PM and Saturday midday peak hours. The full reports for
these volumes can be found in the appendix. Existing traffic volumes were balanced
between intersections in order to provide a conservative analysis.

Table 2.2 - Traffic Volume Data

Count Location Date Taken By


03/29/2016
Military Cutoff Road at Covil Farm Road DAVENPORT
08/20/2016
03/29/2016
Military Cutoff Road at Arboretum Drive DAVENPORT
08/20/2016
06/18/2015
Military Cutoff Road at Station Road DAVENPORT
08/20/2016
Military Cutoff Road at Site Access 3 08/20/2016 DAVENPORT
06/23/2015
Military Cutoff Road at Town Center Drive / Cayman Court DAVENPORT
08/20/2016

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 8
SPEED
LIMIT
LEGEND
45 SIGNALIZED
INTERSECTION
N 25,000 AADT UNSIGNALIZED
INTERSECTION
RIGHT IN /
RIGHT OUT

175'
185'
185' ROADWAY
SPEED FULL SPEED
LIMIT Church Covil Farm LIMIT
TRAFFIC MOVEMENT
25 Driveway Road 35
BLACK = EXISTING
GREY = UNANALYZED

FULL

FULL
BLUE = PROPOSED
~500'

FULL

150'
SPEED SPEED
LIMIT Arboretum LIMIT
25 Drive 35
200'

FULL
~675'

225'
120'

SPEED SPEED
LIMIT Station McCumber LIMIT

35 Road Station Road 25


50'
575'
Military Cutoff Road
~1,675'

215'
285'

130'
FIGURE 3
SPEED
EXISTING LANE
Town Cayman SPEED
LIMIT
TWLTL LIMIT GEOMETRY
25 Center Drive Court
50'
35
MILITARY CUTOFF MIXED USE SITE
150'
200'

W ILMINGTON, NC

PROJECT NUMBER 160214


This document, together with the concepts and designs presented herein, is
intended only for the specific purpose and client for which it was prepared.
Reuse of, or improper reliance on, this document by others without written
authorization and adaptation by DAVENPORT shall be without liability to
DAVENPORT and shall be a violation of the agreement between
*** NOT TO SCALE *** DAVENPORT and the client.
1370 / 1078 / 1313
LEGEND

39 / 183 / 65
SIGNALIZED
INTERSECTION

4/1/2
0/0/4
N 94 / 76 / 57 UNSIGNALIZED
0/1/0 INTERSECTION
448 / 279 / 249
Church Covil Farm RIGHT IN /
Driveway Road RIGHT OUT
0/3/0
0/0/0 ROADWAY

3 / 1 / 16
0/3/1
768 / 1824 / 1021
79 / 375 / 208
0/2/4
TRAFFIC MOVEMENT

1704 / 1288 / 1538


BLACK = EXISTING

111 / 71 / 44
GREY = UNANALYZED
BLUE = PROPOSED
1/0/0
5/1/0

79 / 106 / 92 AM/PM/SAT PEAKS


0/0/0
108 / 89 / 59
Arboretum

0/2/0
0/0/0
0/3/6
2/0/2
770 / 2095 / 1154
1/2/1 87 / 104 / 82
1750 / 1358 / 1570
36 / 40 / 33

3/1/1
4/6/0

1/4/2
0/2/0
Station Road 0 / 10 / 0 McCumber
StationRoad
0/1/0
32 / 92 / 32
59 / 122 / 56
37 / 36 / 24

0/3/2
841 / 2097 / 1210

2/1/0
144 / 130 / 93
Military Cutoff
Road
1870 / 1478 / 1637

22 / 28 / 16
31 / 20 / 26

8/8/8

12 / 10 / 5
2/3/0
16 / 13 / 12
0/1/0
Cayman
Town Center FIGURE 4
Drive Court
31 / 86 / 59 2016 EXISTING
1/2/2
TRAFFIC VOLUMES
0/0/2

829 / 2090 / 1212


14 / 28 / 19

5 / 18 / 13

25 / 24 / 32

MILITARY CUTOFF MIXED USE SITE


W ILMINGTON, NC

PROJECT NUMBER 160214


This document, together with the concepts and designs presented herein, is
intended only for the specific purpose and client for which it was prepared.
Reuse of, or improper reliance on, this document by others without written
authorization and adaptation by DAVENPORT shall be without liability to
DAVENPORT and shall be a violation of the agreement between
*** NOT TO SCALE *** DAVENPORT and the client.
3.0 Approved Developments and Committed Improvements

3.1 Approved Developments

Approved developments are developments that have been recently approved in


the area, but not yet constructed. Per the WMPO, there is one approved development
to consider - Arboretum West.

Arboretum West is a proposed mixed use development proposed to be constructed


along W. Westwood Road. The site is planned to consist of a 240 dwelling unit
apartment complex as well as 15,600 square feet of retail space. A TIA was completed
by DAVENPORT for this project in July 2015. Future traffic associated with the site
was incorporated into this analysis. Additional information can be found in the
Appendix.

3.2 Committed Improvements

Committed Improvements are improvements that are planned by NCDOT, a local


municipality, or a developer in the area, but not yet constructed. Per the WMPO, there
are no committed improvements within the study area.

4.0 Methodology

4.1 Base Assumptions and Standards


In general, the analysis for this project was conducted utilizing commonly accepted
NCDOT standards. The following table contains a summary of the base assumptions:

Table 4.1 - Assumptions


Peak Hour Factor 0.90
Background Traffic Annual Growth Rate 1.0% per year for all roadways
Analysis Software Synchro/SimTraffic Version 9.0
Lane widths 12-feet
Truck percentages 2%

4.2 Analysis Modifications


Per the City of Wilmington, the following settings were applied in Synchro:
Existing signal phasing was utilized, including permitted + overlapped minor
street right turns, and permitted + protected major street left turns. Per the City,
the phasing was utilized regardless of conflicting u-turning movements.
Lead/lag left turn phasing was eliminated, except if existing in the field.
Existing detector settings were utilized instead of default settings. New or
modified signals were set to 40-foot stopbar detectors.

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 11
4.3 Trip Generation

Trip generation for this development was estimated using TripGen 2013 software,
based on the 9th Edition of the ITE Trip Generation Manual. Table 4.2 presents the
results.

Table 4.2 - ITE Trip Generation, 9th Ed.


24 Hour Saturday
AM Peak PM Peak
Average Weekday Driveway Volumes Midday Peak
Two-Way Hour Hour
Hour
ITE
Land Use Land Size Volume Enter Exit Enter Exit Enter Exit
Code
Dwelling
Apartments 220 521 3281 52 207 198 106 116 117
Units

Hotel 310 237 Rooms 1,936 74 52 73 70 96 75

Th.Sq.Ft.
General Office 710 146.1 1,751 228 31 41 201 34 29
GFA
Th.Sq.Ft.
Shopping Center 820 109.1 7,187 102 62 305 330 481 444
GFA
Th.Sq.Ft.
Supermarket 850 35.5 3,630 75 46 172 165 193 185
GLA
High Turnover
Th.Sq.Ft.
Sit-Down 932 27.9 3,547 197 175 279 237 208 184
GLA
Restaurant
Total Unadjusted Trips 21,332 728 573 1,068 1,109 1,128 1,034
Internal Capture Overall % -14% -26% -26% -9%
Total Internal Trips Reduction 3,012 168 166 284 284 102 102
Total External Trips 18,320 560 407 784 825 1,026 932
Shopping Center (34% PM/26% SAT) -838 0 0 -79 -86 -119 -107
Supermarket (36% PM) -423 0 0 -47 -45 0 0
High Turnover Sit-Down Restaurant (43% PM) -684 0 0 -78 -48 0 0
Total Pass-by Reduction -1,945 0 0 -204 -180 -119 -107
Limited to 10% of Adjacent Street Traffic - - - -150 -150 - -
Total Adjusted (Primary) Trips 16,375 560 407 634 675 907 825

Note: Internal Capture for the AM and PM peaks was estimated utilizing the methods prescribed in the ITE Trip Generation
Handbook, 3rd Edition. Since Internal Capture information is not available for the Daily and Saturday peaks in the ITE Trip
Generation Handbook, 3rd Edition, the methods prescribed in the ITE Trip Generation Handbook, 2nd Edition was utilized for those
peaks.

Mixed-use developments of this type are designed to combine a number of uses into
one site, allowing people to live, work and shop in the same area and without
dependence on a vehicle. This proposed development meets the criteria as defined in
the ITE Trip Generation Handbook for a multi-use development. Therefore, the trips
for this development were reduced using the method described in the ITE Handbook.

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 12
Internal Capture for the AM and PM peaks was estimated utilizing the methods
prescribed in the ITE Trip Generation Handbook, 3rd Edition. Since Internal Capture
information is not available for the Daily and Saturday peaks in the ITE Trip Generation
Handbook, 3rd Edition, the ITE Trip Generation Handbook, 2nd Edition was utilized for
those peaks. The worksheets for the internal capture are shown in the supporting
documentation of the Appendix.

Developments of this type also generate what are called pass-by trips. The ITE Trip
Generation Manual defines pass-by trips as trips that are generated by the
development, but are already on the adjacent roadway. These trips are not new trips,
but are a part of the existing background traffic. Pass-by reduction was applied to the
retail land uses during the PM and/or Saturday peak hour per NCDOT standards.

4.4 Trip Distribution

Site trips for this proposed expansion were distributed based on the existing traffic
patterns and engineering judgment. The directional distributions for the new site trips
are as follows:
55% to and from the south on Military Cutoff Road
35% to and from the north on Military Cutoff Road
5% to and from the east on Covil Farm Road
5% to and from the west on the Station Road

The pass-by trips were generated as follows: 50% to and from the south on Military
Cutoff Road, and 50% to and from the north on Military Cutoff Road.

The directional distributions for the primary and pass-by trips are provided in Figures
5A-5F.

4.5 Future No Build Traffic

The 2020 future no build traffic volumes were computed by applying a 1.0%
compounded annual growth rate to the 2016 existing traffic volumes, and adding
traffic from approved developments. Figure 6 shows the 2020 future no build traffic
volumes for AM, PM, and Saturday peaks.

4.6 Total Traffic

The 2020 build-out traffic volumes were obtained by summing 2020 future no build
volumes and the generated site trips from the proposed development. Generated
primary and pass-by site trips are shown in Figures 7A and 7B, respectively. The
resulting build volume totals for AM, PM, and Saturday peaks are shown in Figure 8.
More information can be found in the Traffic Volume Data section of the appendix.

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 13
LEGEND
35%
SIGNALIZED
INTERSECTION

35% IN
N UNSIGNALIZED
INTERSECTION
5% IN
Church Driveway Covil Farm Road RIGHT IN /
5% RIGHT OUT
ROADWAY

35% OUT
5% OUT
TRAFFIC MOVEMENT

40% IN
BLACK = EXISTING
GREY = UNANALYZED
Arboretum Drive BLUE = PROPOSED

DESTINATION
%

40% OUT
NODE
40% IN

Station Road Site Access 1


5%
5% IN
40% OUT
5% OUT

5% IN
40% IN

20% OUT
Site Access 2
5% IN +

15% IN
25% OUT
40% IN

25% OUT
55% OUT
Site Access 3
55% OUT

20% IN
35% IN

Town Center Drive Cayman Court FIGURE 5A


PRIMARY TRIP
DISTRIBUTION
Cutoff Road

55% IN
Military

MILITARY CUTOFF MIXED USE SITE


W ILMINGTON, NC
55%
PROJECT NUMBER 160214
This document, together with the concepts and designs presented herein, is
intended only for the specific purpose and client for which it was prepared.
Reuse of, or improper reliance on, this document by others without written
authorization and adaptation by DAVENPORT shall be without liability to
DAVENPORT and shall be a violation of the agreement between
*** NOT TO SCALE *** DAVENPORT and the client.
LEGEND
50%
SIGNALIZED
INTERSECTION
N UNSIGNALIZED
INTERSECTION
Church Driveway Covil Farm Road RIGHT IN /
RIGHT OUT
ROADWAY

TRAFFIC MOVEMENT

BLACK = EXISTING
GREY = UNANALYZED
Arboretum Drive BLUE = PROPOSED

DESTINATION
% NODE

Station Road Site Access 1

20% OUT
Site Access 2
20% IN
-20% IN
-50%IN
50% IN

30% OUT
50% OUT
Site Access 3
30% IN
-30% IN

Town Center Drive Cayman Court FIGURE 5B


PASS-BY TRIP
DISTRIBUTION
Cutoff Road
Military

MILITARY CUTOFF MIXED USE SITE


W ILMINGTON, NC
50%
PROJECT NUMBER 160214
This document, together with the concepts and designs presented herein, is
intended only for the specific purpose and client for which it was prepared.
Reuse of, or improper reliance on, this document by others without written
authorization and adaptation by DAVENPORT shall be without liability to
DAVENPORT and shall be a violation of the agreement between
*** NOT TO SCALE *** DAVENPORT and the client.
1443 / 1163 / 1407
LEGEND

41 / 190 / 68
SIGNALIZED
INTERSECTION

4/1/2
0/0/4
N 98 / 79 / 59 UNSIGNALIZED
0/1/0 INTERSECTION
466 / 290 / 259
Church Covil Farm RIGHT IN /
Driveway Road RIGHT OUT
0/3/0
0/0/0 ROADWAY

3 / 1 / 17
0/3/1
834 / 1928 / 1101
82 / 390 / 216
0/2/4
TRAFFIC MOVEMENT

1790 / 1381 / 1641


BLACK = EXISTING

116 / 74 / 46
GREY = UNANALYZED
BLUE = PROPOSED
1/0/0
5/1/0

82 / 110 / 96 AM/PM/SAT PEAKS


0/0/0
112 / 93 / 61
Arboretum

0/2/0
0/0/0
0/3/6
2/0/2
836 / 2210 / 1240
1/2/1 91 / 108 / 85
1844 / 1433 / 1660
41 / 49 / 41

3/1/1
4/6/0

1/4/2
0/2/0
Station Road 0 / 10 / 0 McCumber
StationRoad
0/1/0
69 / 126 / 72
78 / 168 / 99
39 / 38 / 25

0/3/2
875 / 2182 / 1259

2/1/0
185 / 165 / 136
Military Cutoff
Road
2004 / 1588 / 1768

23 / 29 / 17
33 / 21 / 27

8/8/8

13 / 10 / 5
2/3/0
17 / 14 / 12
0/0/0
Cayman
Town Center FIGURE 6
Drive Court
33 / 89 / 61 2020 FUTURE NO
1/2/2
BUILD VOLUMES
0/0/2

880 / 2216 / 1302


15 / 29 / 20

5 / 19 / 14

26 / 25 / 33

MILITARY CUTOFF MIXED USE SITE


W ILMINGTON, NC

PROJECT NUMBER 160214


This document, together with the concepts and designs presented herein, is
intended only for the specific purpose and client for which it was prepared.
Reuse of, or improper reliance on, this document by others without written
authorization and adaptation by DAVENPORT shall be without liability to
DAVENPORT and shall be a violation of the agreement between
*** NOT TO SCALE *** DAVENPORT and the client.
LEGEND

196 / 222 / 318


SIGNALIZED

0/0/0
0/0/0
0/0/0
0/0/0 INTERSECTION
N 0/0/0
28 / 32 / 45 UNSIGNALIZED
Church Covil Farm INTERSECTION
Driveway 0/0/0 Road
RIGHT IN /
0/0/0
RIGHT OUT

0/0/0
0/0/0
142 / 236 / 289
20 / 34 / 41
0/0/0
ROADWAY

224 / 254 / 363


TRAFFIC MOVEMENT

0/0/0
0/0/0
0/0/0
0/0/0 BLACK = EXISTING
0/0/0 GREY = UNANALYZED
0/0/0
Arboretum BLUE = PROPOSED
Drive AM/PM/SAT PEAKS
0/0/0
0/0/0

0/0/0

0/0/0

0/0/0
163 / 270 / 330
0/0/0
224 / 254 / 363
0/0/0
0/0/0

Station Road Site


Access 1
0/0/0
20 / 34 / 41

0/0/0
28 / 32 / 45
163 / 270 / 330

28 / 32 / 45
0/0/0
224 / 254 / 363

81 / 135 / 165
Site
Access 2
84 / 95 / 136
130 / 200 / 252
Cutoff Road
Military
224 / 254 / 363
0/0/0

0/0/0

102 / 169 / 206


224 / 371 / 454
Site
Access 3
112 / 127 / 181
0/0/0

196 / 222 / 318

FIGURE 7A
PRIMARY SITE TRIPS
224 / 371 / 454
0/0/0

0/0/0
0/0/0
0/0/0

0/0/0
0/0/0 MILITARY CUTOFF MIXED USE SITE
0/0/0
Town Center Drive Cayman W ILMINGTON, NC
Court
This document, together with the concepts and designs presented
0/0/0
herein, is intended only for the specific purpose and client for which it PROJECT NUMBER 160214
0/0/0

308 / 349 / 499


0/0/0

0/0/0

was prepared. Reuse of, or improper reliance on, this document by 0/0/0
others without written authorization and adaptation by DAVENPORT 0/0/0
shall be without liability to DAVENPORT and shall be a violation of the
agreement between DAVENPORT and the client.

*** NOT TO SCALE ***


LEGEND
SIGNALIZED

0/0/0
0/0/0
0/0/0
0/0/0
0/0/0 INTERSECTION
N 0/0/0
0/0/0 UNSIGNALIZED
Church Covil Farm INTERSECTION
Driveway 0/0/0 Road
RIGHT IN /
0/0/0
RIGHT OUT

0/0/0
0/0/0
0/0/0
0/0/0
0/0/0
ROADWAY

TRAFFIC MOVEMENT

0/0/0
0/0/0
0/0/0
0/0/0
0/0/0 BLACK = EXISTING
0/0/0 GREY = UNANALYZED
0/0/0
Arboretum BLUE = PROPOSED
Drive AM/PM/SAT PEAKS
0/0/0
0/0/0

0/0/0

0/0/0

0/0/0
0/0/0
0/0/0

0/0/0
0/0/0
0/0/0

Station Road Site


Access 1
0/0/0
0/0/0

0/0/0
0/0/0
0/0/0

0/0/0
0/0/0
0/0/0

0 / 30 / 21
Site
Access 2
0 / 30 / 24
0 / -30 / -24
Cutoff Road
Military
0 / -75 / -59
0 / 75 / 59
0/0/0

0 / 45 / 32
0 / 75 / 54
Site
Access 3
0 / -45 / -36
0/0/0

0 / 45 / 36

FIGURE 7B
PASS-BY SITE TRIPS
0/0/0

0/0/0
0/0/0
0/0/0
0/0/0

0/0/0
0/0/0 MILITARY CUTOFF MIXED USE SITE
0/0/0
Town Center Drive Cayman W ILMINGTON, NC
Court
This document, together with the concepts and designs presented
0/0/0
herein, is intended only for the specific purpose and client for which it PROJECT NUMBER 160214
0/0/0

0/0/0
0/0/0

0/0/0

was prepared. Reuse of, or improper reliance on, this document by 0/0/0
others without written authorization and adaptation by DAVENPORT 0/0/0
shall be without liability to DAVENPORT and shall be a violation of the
agreement between DAVENPORT and the client.

*** NOT TO SCALE ***


1639 / 1385 / 1725
LEGEND

41 / 190 / 68
SIGNALIZED

4/1/2
0/0/4
98 / 79 / 59 INTERSECTION
N 0/1/0
494 / 322 / 304 UNSIGNALIZED
Church Covil Farm INTERSECTION
Driveway 0/3/0 Road
RIGHT IN /
0/0/0
RIGHT OUT

3 / 1 / 17
0/3/1
976 / 2164 / 1390
102 / 424 / 257
0/2/4

2014 / 1635 / 2004


ROADWAY

116 / 74 / 46
TRAFFIC MOVEMENT

1/0/0
5/1/0
82 / 110 / 96 BLACK = EXISTING
0/0/0 GREY = UNANALYZED
112 / 93 / 61
Arboretum BLUE = PROPOSED
Drive AM/PM/SAT PEAKS
0/2/0
0/0/0

0/3/6

2/0/2

91 / 108 / 85
999 / 2480 / 1570
1/2/1
2071 / 1688 / 2024
41 / 49 / 41

4/6/0

Station Road Site


Access 1
0/1/0
98 / 204 / 140

69 / 126 / 72
28 / 35 / 47
1039 / 2456 / 1591

30 / 33 / 45
185 / 165 / 136
2256 / 1854 / 2159

82 / 169 / 188
Site
Access 2
84 / 125 / 160
1083 / 2525 / 1591
Cutoff Road
2029 / 1524 / 1736

Military
227 / 330 / 423
0/0/0

102 / 216 / 238


224 / 456 / 508
Site
Access 3
1065 / 2435 / 1508
39 / 38 / 25

196 / 267 / 354

FIGURE 8
2228 / 1959 / 2222

2020 SCENARIO A
FUTURE BUILD
23 / 29 / 17
33 / 21 / 27

8/8/8

13 / 10 / 5
2/3/0
17 / 14 / 12 MILITARY CUTOFF MIXED USE SITE
0/0/0
Town Center Drive Cayman W ILMINGTON, NC
Court
This document, together with the concepts and designs presented
33 / 89 / 61
herein, is intended only for the specific purpose and client for which it PROJECT NUMBER 160214
0/0/2

1188 / 2565 / 1801


15 / 29 / 20

5 / 19 / 14

was prepared. Reuse of, or improper reliance on, this document by 1/2/2
others without written authorization and adaptation by DAVENPORT 26 / 25 / 33
shall be without liability to DAVENPORT and shall be a violation of the
agreement between DAVENPORT and the client.

*** NOT TO SCALE ***


5.0 Capacity Analysis

5.1 Level of Service Evaluation Criteria


The Transportation Research Boards Highway Capacity Manual (HCM) utilizes a term
level of service to measure how traffic operates in intersections and on roadway
segments. There are currently six levels of service ranging from A to F. Level of
service A represents the best conditions and Level of Service F represents the worst.
Synchro Traffic Modeling software was used to determine the level of service for studied
intersections. Note for unsignalized intersection analysis, the level of service noted is
for the worst approach of the intersection. This is typically the left turn movement for
the side street approach, due to the number of opposing movements. All worksheet
reports from the analyses can be found in the Appendix.

Table 5.1 Highway Capacity Manual

Levels of Service and Control Delay Criteria

Signalized Intersection Unsignalized Intersection

Control Delay Per Delay Range


Level of Service Level of Service
vehicle (sec) (sec)

A 10 A 10

B 10 and 20 B 10 and 15

C 20 and 35 C 15 and 25

D 35 and 55 D 25 and 35

E 55 and 80 E 35 and 50

F 80 F 50

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 20
5.2 Discussion of Results

The results of the study are summarized below.

5.2.1 Military Cutoff Road at Covil Farm Road


This signalized intersection currently operates at LOS C during the AM and PM peaks,
and LOS B during the Saturday midday peak. In future no build conditions, LOS C/D/B
is expected in the AM/PM/Sat peaks. After the addition of project traffic, the LOS is
expected to remain unchanged. No improvements are recommended. Level of service
results are shown in Table 5.2.

Table 5.2 - Military Cutoff Road at Covil Farm Road


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E E E D B A B B
B (17)
Existing C (24.9) (67.6) (69.5) (70.4) (38.4) (14.2) (4.5) (10.2) (14.9)
E (67.6) E (64.5) B (15.8) B (14.8)
E E E D A A A B
E (80)
Future No Build C (24) (67.7) (70.5) (71.3) (37.6) (8.2) (8.9) (1.1) (15.9)
E (67.7) E (65.1) A (8.2) B (17.8)
D E C B A E
Future Build with E (65) B (11) B (18)
C (23.3) (54.8) (66.3) (31.5) (10.2) (1.7) (61.6)
Improvements
D (54.8) E (60) A (9.4) B (19.1)
PM Peak Hour
E E E D C A E A
A (6) ()
Existing C (25.1) (71.1) (76.6) (76.7) (39.2) (27.7) (3.2) (64.1) (7.2)
E (71.1) E (68.7) C (23.5) B (15.4)
E E E D E A F A
() () A (9) ()
Future No Build D (45.6) (71.1) (76.2) (76.3) (40.1) (68.3) (2.9) (95.2) (6.9)
E (71.1) E (68.5) E (57.3) B (19.3)
E E D A D F A
Future Build with () E (70) () A (2) ()
D (41.3) (72.9) (72.9) (43.9) (2.2) (52.4) (185.6) (8.7)
Improvements
E (70) E (67.2) D (44.1) C (30.1)
Saturday Peak Hour
D D D C A A A A
() () A (7.1) ()
Existing B (11.2) (49.5) (52.7) (53.5) (29.7) (4.6) (4.9) (1.1) (8.8)
D (49.5) D (48.8) A (4.3) A (8.7)
D E C A A A E A
() () E (57) ()
Future No Build B (13) (49.5) (56.2) (29.5) (6.2) (6.1) (1.5) (61.3) (8.6)
D (49.5) D (51.6) A (5.3) B (11.1)
D E E D B A E B
Future Build with () () A (1) ()
B (15.9) (54.8) (70.2) (69.4) (36.3) (10.8) (6.7) (69.8) (12.8)
Improvements
D (54.8) E (64.4) A (5.9) B (15)

5.2.2 Military Cutoff Road at Arboretum Drive

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 21
LOS B/B/A is currently experienced at this intersection during the AM/PM/Sat peaks. In
future no build conditions, LOS B/C/A is anticipated for the AM/PM/Sat peaks. With the
addition of project traffic, LOS B/B/A is expected. Level of service results are shown in
Table 5.3.

The following improvements are recommended in build conditions:


Restripe northbound right turn lane to a continuous northbound through-right lane
to Covil Farm Road
Signal modification

Table 5.3 - Military Cutoff Road at Arboretum Drive


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
D E D B B B A A
() () () ()
Existing B (12.2) (50.8) (76.5) (44.4) (17.8) (15.5) (13) (3.2) (5.3)
D (50.8) E (63.1) B (15.2) A (5.2)
D E D B B B E A
() () () ()
Future No Build B (14.8) (51.5) (79.1) (37.8) (14.6) (13.1) (11.2) (77.7) (6.4)
D (51.5) E (62) B (13) B (10.7)
D E C A
Future Build with () () () A (9) () () () ()
B (12.1) (43.6) (69.5) (31.3) (6.7)
Improvements
D (43.6) D (53.6) () ()
PM Peak Hour
E F D C A A
() () () A (4) () ()
Existing B (18.7) (58.9) (87.8) (53.2) (22.8) (3.6) (4.2)
E (58.9) E (69.3) C (21.8) ()
E F E A C A A
() () () () ()
Future No Build C (23) (65.1) (132.2) (60.6) (1.7) (24.9) (1.9) (5.9)
E (65.1) F (94) C (23.8) ()
E F D A A A
Future Build with () () () () () ()
B (10.2) (57.7) (87.6) (50.5) (4.2) (6.3) (5.4)
Improvements
E (57.7) E (67.8) A (6.3) ()
Saturday Peak Hour
D E D A B A
() () () A (4) () ()
Existing A (8.8) (44.2) (58.6) (37.9) (3.4) (10.1) (4.4)
D (44.3) D (46.3) A (9.6) ()
D D A A A A
() () () E (59) () ()
Future No Build A (8.9) (44.1) (36.8) (7.2) (9.7) (5.7) (3.2)
D (44.1) D (45.7) A (9.5) ()
D D A A A
Future Build with () () () E (70) () () ()
A (7.6) (50.1) (44.7) (8.5) (6.5) (3.1)
Improvements
D (50.1) D (54.9) A (6.5) ()

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 22
5.2.3 Military Cutoff Road at Station Road / Site Access 1

This signalized intersection currently operates at LOS A/B/A during the AM, PM, and
Saturday peaks. In future no build conditions, LOS B/C/B is expected during the
AM/PM/Sat peaks. In future build conditions, LOS B/B/B is expected. Table 5.4 shows
the LOS results.

The following improvements are recommended:


Prohibit westbound traffic, northbound u-turns, and southbound left turns
Provide southbound u-turn lane with 215 feet of storage
Modify eastbound approach to a left turn lane with 50 feet of storage, continuous
through lane, and a right turn lane with 125 feet of storage
Construct northbound though-right lane with full storage
Modify northbound left turn lane to 575 feet of storage plus appropriate taper
Signal modification

Table 5.4 - Military Cutoff Road at Station Road / Site Access 1


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E E E B A A A A
() () () ()
Existing A (8.8) (76.9) (66.6) (63.4) (16.9) (1.9) (1.7) (5.5) (1.6)
E (68.5) E (63.4) A (3.4) A (5.4)
F E E F A B A
B () () () () A (5)
Future No Build (93.3) (55.5) (60.5) (83.1) (2.5) (10.3) (5.1)
(15.4)
E (66) E (60.5) B (12.1) B (10.2)
Future Build E E E A A B A
B () () () () ()
with (71.9) (56.8) (60.1) (1.5) (5.2) (10.4) (4.6)
(13.6)
Improvements E (62.6) () () ()
PM Peak Hour
F E E B A A A
B () () () () ()
Existing (113.4) (60.9) (65.5) (14.7) (5.9) (6.7) (5.2)
(10.6)
() () () ()
F E F A C C A
C () D (40) () () ()
Future No Build (97.6) (57.5) (90.4) (5.5) (22.9) (23.3) (9.9)
(20.2)
E (65.1) E (57.5) B (12.8) C (22.8)
Future Build F E D F A C A
() () () () ()
with B (17) (91.9) (63.2) (44.1) (92.1) (2.1) (20.9) (7.1)
Improvements () () A (8.9) C (20.5)
Saturday Peak Hour
E D D A A A A
() () () () A (3)
Existing A (5.5) (55.2) (43.4) (46.8) (7.6) (2.5) (3.5) (4.2)
D (46.7) D (46.8) A (2.8) A (4.2)
E D E A A B A
B () D (37) () () ()
Future No Build (68.9) (45.2) (60.8) (3.9) (7.8) (10.4) (6.5)
(12.3)
D (48.4) D (45.2) A (9) B (10.3)
Future Build E E D A B A
B () () () () () ()
with (73.5) (60.5) (45.7) (1.7) (14.3) (6.8)
(13.6)
Improvements E (56.3) () () ()

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 23
5.2.4 Military Cutoff Road at Site Access 2

This site access is proposed to have a right-in right-out configuration. In future build
conditions, LOS A/B/B is anticipated for the AM/PM/Sat peaks. Table 5.5 shows the
LOS results.

The following improvement is recommended:

Construct additional northbound though lane


Construct a northbound right turn lane with 150 feet of storage plus appropriate
taper
Median island between through and left lanes

Table 5.5 - Military Cutoff Road at Site Access 2


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
A A A A
Future Build with (9.0) (0.0) (0.0) (0.0)
N/A
Improvements
A (9.0) A (0.0) A (0.0)
PM Peak Hour
B A A A
Future Build with (13.6) (0.0) (0.0) (0.0)
N/A
Improvements
B (13.6) A (0.0) A (0.0)
Saturday Peak Hour
B A A A
Future Build with (10.7) (0.0) (0.0) (0.0)
N/A
Improvements
B (10.7) A (0.0) A (0.0)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 24
5.2.5 Military Cutoff Road at Site Access 3

This full site access is proposed to be signalized. In future build conditions, LOS B/C/C
is anticipated. Level of service results are shown in Table 5.6.

The following improvements are recommended:


Signalize
Construct two (2) southbound left turn lanes with 350 feet of storage plus
appropriate taper
Construct additional northbound through lane
Construct a northbound u-turn lane with 350 feet of storage plus appropriate
taper
Construct a northbound right turn lane with 180 feet of storage plus appropriate
taper
On the westbound exiting approach, provide two (2) left turn lanes and two (2)
right turn lanes from the site

Table 5.6 -Military Cutoff Road at Site Access 3


Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E D F A A E A
Future Build with () () () () ()
B (14.4) (65.4) (35.3) (81) (6.3) (1.7) (65.1) (6.3)
Improvements
() E (56) A (7.9) B (12.2)
PM Peak Hour
E D F C A F A
Future Build with () () () () ()
C (25.8) (73.4) (37) (80.8) (20.2) (1.3) (82.5) (9.7)
Improvements
() E (61.7) B (19.2) C (22.7)
Saturday Peak Hour
E C E C A E
Future Build with () () () () A (9) ()
C (23) (58.2) (22.1) (74.3) (20.5) (4.8) (60)
Improvements
() D (46.7) B (18.3) B (19)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 25
5.2.6 Military Cutoff Road at Town Center Drive / Cayman Court

In existing conditions, this signalized intersection operates at LOS B during the AM, PM,
and Saturday peaks. In future no build conditions, LOS A/B/A is anticipated for the
AM/PM/Sat peaks. After the addition of project traffic, LOS A/B/B is expected during the
AM/PM/Sat peaks. Level of service results are shown in Table 5.7.

It is recommended to:
Restripe northbound right turn lane to a continuous northbound through-right lane
to Covil Farm Road
Signal modification

Table 5.7 - Military Cutoff Road at Town Center Drive / Cayman Court
Level of Service per Movement by Approach
Overall (Delay in sec/veh)
Scenario
LOS Eastbound Westbound Northbound Southbound
LT TH RT LT TH RT LT TH RT LT TH RT
AM Peak Hour
E D E D A C A
() () A (5) () ()
Existing B (16.9) (74.4) (51.6) (67.5) (50.2) (4.4) (20.6) (5.8)
E (64.3) E (60.7) () ()
E D E D A A A
() () A (4) () ()
Future No Build A (6.6) (78.5) (52.6) (69.4) (51.2) (4.9) (3.1) (1.7)
E (67.3) E (62.1) () ()
E D E D A A A
Future Build with () () () () ()
A (9.4) (63.1) (42.3) (56.7) (40.5) (4.5) (9.4) (4.1)
Improvements
D (54.1) D (50.2) () ()
PM Peak Hour
F D E A B A C A A
() () ()
Existing B (14.3) (106.1) (52.2) (66.2) (3.2) (16.6) (4.9) (22.5) (4.4) (3.1)
F (94.5) () B (16.3) A (4.8)
F D E D B A A A
() () () ()
Future No Build B (18.4) (116.3) (53.2) (68.5) (52) (19.3) (4.6) (8.5) (6.3)
F (102.6) E (62.5) () ()
F D E D B B A
Future Build with () () () () ()
B (15.7) (91.2) (48.6) (61.9) (47.4) (13.3) (12.5) (5.7)
Improvements
F (82) E (56.6) () ()
Saturday Peak Hour
E C D C A A C B
() () A (8) A (5)
Existing B (17.6) (57.3) (33.3) (44.3) (31.4) (3.6) (6.2) (23.3) (10.4)
D (49) D (40.2) A (7.9) C (22.9)
E D D C D A A E A A
() ()
Future No Build A (7.4) (65.3) (35.5) (47.9) (33.8) (51.7) (7.5) (5.2) (59.8) (3.2) (1.9)
D (55) D (44.2) A (8.2) A (4)
F D E D E A D B A
Future Build with () () ()
B (12) (83.6) (41.3) (55.3) (39.4) (65.3) (6.2) (51.1) (13.1) (4.4)
Improvements
E (69) D (51.2) A (6.9) B (13.4)

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 26
LEGEND

175'
185' SIGNALIZED
185' INTERSECTION
N Church
FULL
Covil Farm UNSIGNALIZED
Driveway Road INTERSECTION
RIGHT IN /

FULL

FULL
RIGHT OUT
~500'

ROADWAY

FULL
TRAFFIC MOVEMENT
125'

Arboretum BLACK = EXISTING


GREY = UNANALYZED
Drive
BLUE = PROPOSED

200'

FULL
~675'

215'
120'

Station Site
Road Access 1
50'
575'

125'
FULL
~375'

Site
Access 2
150'
~400'

350'
350'

Site
Access 3
350'

180'
Cutoff Road
Military
~900'

FIGURE 9
215'
285'

RECOMMENDED
130' IMPROVEMENTS
Town Cayman
TWLTL
Center Drive Court MILITARY CUTOFF MIXED USE SITE
50' W ILMINGTON, NC
200'

150'

PROJECT NUMBER 160214


This document, together with the concepts and designs presented herein, is
intended only for the specific purpose and client for which it was prepared.
Reuse of, or improper reliance on, this document by others without written
authorization and adaptation by DAVENPORT shall be without liability to
DAVENPORT and shall be a violation of the agreement between
*** NOT TO SCALE *** DAVENPORT and the client.
6.0 Summary and Conclusion

The Military Cutoff Mixed Use Site is proposed to be located on the east side of Military
Cutoff Road, between Station Road / McCumber Station Road and Town Center Drive /
Cayman Court, in Wilmington, North Carolina. As currently planned, the site will consist
of a supermarket, hotel, retail, restaurants, apartments, and office.

A TIA was originally prepared and dated September 28, 2016. This TIA was updated on
December 2, 2016 to include two additional analysis scenarios, as well as modifications
to the Synchro analysis model settings. The TIA was updated February 1, 2017 to
address review comments and updated distributions. This revision provides analysis of
the modified site access as proposed.

Based on coordination with the WMPO and NCDOT, the sites proposed access was
modified. The following is proposed:

Full movement signalized Main Site Access (Site Access 3)


Entry only at Station Road
Southbound left at Station Road not allowed
Reduced signal phases at Station Road
Northbound u-turn at Station Road not allowed, provided at Site Access 3
Right-in and right-out at Site Access 2 with median island between through and
left lanes
Addition of continuous northbound through-right lane to Covil Farm Road

Acceptable level of service is anticipated at the study intersections in future build


conditions with the recommended improvements in place. The additional northbound
through lane will extend approximately one-half mile along Military Cutoff Road and will
help to accommodate the heavy northbound through traffic volume (about 2,600 during
the PM peak hour). The proposed T-intersection at Station Road will decrease the
number of phases at the signal, thus improving delay and queueing. As a result, the
same or improved delay and queueing is anticipated at the study intersections
compared to future no build conditions.

In conclusion, this analysis has been conducted based on NCDOT guidelines and has
determined the potential traffic impacts of this development. Site accesses should be
designed according to NCDOT and City of Wilmington standards, as appropriate.

5/23/2017 160214 Military Cutoff Mixed Use Site Transportation Impact Analysis 28