Sunteți pe pagina 1din 188

UA5000 Universal Access Unit

V100R019C02

Commissioning Guide-PVM CLI

Issue 01
Date 2011-07-30

HUAWEI TECHNOLOGIES CO., LTD.


Copyright Huawei Technologies Co., Ltd. 2011. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: http://www.huawei.com
Email: support@huawei.com

Issue 01 (2011-07-30) Huawei Proprietary and Confidential i


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI About This Document

About This Document

Intended Audience
This document describes how to commission and verify the basic functions of the UA5000 from
the aspects of hardware, software, interconnection, and maintenance and management. This
ensures that the device runs stably and reliably on the network.

This document also provides the flow and method of commissioning the UA5000.

This document is intended for:

The installation and commissioning engineers

Symbol Conventions
The following symbols may be found in this document. They are defined as follows

Symbol Description

Indicates a hazard with a high level of risk which, if not


avoided, will result in death or serious injury.

Indicates a hazard with a medium or low level of risk which,


if not avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation that, if not


avoided, could cause equipment damage, data loss, and
performance degradation, or unexpected results.

Indicates a tip that may help you solve a problem or save


your time.

Provides additional information to emphasize or


supplement important points of the main text.

Command Conventions
Convention Description

Boldface The keywords of a command line are in boldface.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential ii


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI About This Document

Convention Description

Italic Command arguments are in italics.

[] Items (keywords or arguments) in square brackets [ ] are


optional.

{ x | y | ... } Alternative items are grouped in braces and separated by


vertical bars. One is selected.

[ x | y | ... ] Optional alternative items are grouped in square brackets


and separated by vertical bars. One or none is selected.

{ x | y | ... } * Alternative items are grouped in braces and separated by


vertical bars. A minimum of one or a maximum of all can
be selected.

GUI Conventions
Convention Description

Boldface Buttons, menus, parameters, tabs, window, and dialog titles


are in boldface. For example, click OK.

> Multi-level menus are in boldface and separated by the ">"


signs. For example, choose File > Create > Folder.

Update History
Updates between document versions are cumulative. Therefore, the latest document version
contains all the updates made to previous versions.

Issue 01 (2011-07-30)
Compared with issue 02 (2011-03-25) of V100R019C01, V100R019C02 has the following
changes:
Modified: 3.16.3 Configuring the Environment Monitoring Through the ESCM (for M200
Cabinet)
Add: 3.16.4 Configuring the Monitoring Through the ESCM (for F02AF Cabinet)

Issue 01 (2011-07-30) Huawei Proprietary and Confidential iii


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI Contents

Contents

About This Document.....................................................................................................................ii


1 Commissioning Description.......................................................................................................1
1.1 Definition............................................................................................................................................................2
1.2 Commissioning Flow..........................................................................................................................................2

2 Commissioning Preparations......................................................................................................4
2.1 Hardware Check.................................................................................................................................................5
2.2 Software Requirements.......................................................................................................................................5
2.3 Tool Requirements.............................................................................................................................................6
2.4 Data Requirements.............................................................................................................................................7

3 Stand-Alone Commissioning......................................................................................................9
3.1 Checking the Settings of Jumpers and DIP Switches.......................................................................................11
3.1.1 Checking the Settings of DIP Switches and Jumpers of Environment Monitoring Boards....................11
3.1.2 Checking the DIP Settings on the Monitoring Board of the Fan.............................................................17
3.2 Powering On the Indoor Device.......................................................................................................................21
3.3 Powering On the Outdoor Device....................................................................................................................22
3.4 Commissioning the Power System...................................................................................................................23
3.4.1 Checking the Power Supply of DC PDU.................................................................................................23
3.4.2 Checking the Power Supply of AC Power Module.................................................................................23
3.4.3 Configuring the Battery and Checking the Power Supply of the Battery................................................24
3.4.4 Checking the Power Supply of the Power Board ...................................................................................25
3.4.5 Checking the Power Supply of the Heat Exchanger................................................................................26
3.5 Logging in to the System..................................................................................................................................27
3.5.1 Login in the Local Serial Port Mode.......................................................................................................27
3.5.2 Login in the Telnet Mode (Inband Management)....................................................................................32
3.5.3 Login in the Telnet Mode (Outband Management).................................................................................35
3.5.4 Login in the SSH Mode (Inband Management)......................................................................................38
3.5.5 Login in the SSH Mode (Outband Management)....................................................................................48
3.6 Checking the Software Version........................................................................................................................58
3.7 Adding the Shelf...............................................................................................................................................59
3.8 Configuring the Board......................................................................................................................................60
3.9 Loading the Script............................................................................................................................................60
3.10 Configuring the Networking Mode of the System.........................................................................................61

Issue 01 (2011-07-30) Huawei Proprietary and Confidential iv


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI Contents

3.11 Detecting the Power on the Optical Port........................................................................................................61


3.11.1 Detecting the Average Transmit Power of the Two-Fiber Bidirectional Optical Port..........................61
3.11.2 Detecting the Actual Input Power of the Two-Fiber Bidirectional Optical Port...................................65
3.11.3 Detecting the Average Transmit Optical Power of the Single-Fiber Bidirectional Optical Port..........69
3.11.4 Detecting the Actual Input Power of the Single-Fiber Bidirectional Optical Port................................74
3.12 Checking the Status of the Uplink Port..........................................................................................................78
3.13 Changing the System Name...........................................................................................................................79
3.14 Configuring the System User.........................................................................................................................79
3.14.1 Modifying the System User Attributes..................................................................................................79
3.14.2 Modifying the System User Attributes..................................................................................................82
3.15 Checking the System Time.............................................................................................................................84
3.16 Configuring Environment Monitoring............................................................................................................85
3.16.1 Configuring the Monitoring Through the H303ESC.............................................................................85
3.16.2 Configuring the Monitoring Through the H304ESC.............................................................................95
3.16.3 Configuring the Environment Monitoring Through the ESCM (for M200 Cabinet)..........................103
3.16.4 Configuring the Monitoring Through the ESCM (for F02AF Cabinet)..............................................108
3.16.5 Configuring the Environment Monitoring Through the EPS30-4815AF............................................115
3.16.6 Configuring the Environment Monitoring Through the EPS75-4815AF............................................124
3.16.7 Configuring the Monitoring Through the Fan Tray............................................................................137
3.17 Checking the Auto-Save Settings.................................................................................................................140
3.18 Saving the Data.............................................................................................................................................141
3.19 Backing Up the System File.........................................................................................................................141

4 Commissioning the Interconnection.....................................................................................145


4.1 Commissioning the U2000 Interconnection...................................................................................................146
4.1.1 Commissioning the U2000 in Outband Mode.......................................................................................146
4.1.2 Commissioning the U2000 in Inband Mode..........................................................................................148
4.2 Commissioning the MG Interface Interconnection........................................................................................151
4.2.1 Commissioning the MG Interface Interconnection (Through H.248)...................................................151
4.2.2 Commissioning the MG Interface Interconnection (Through MGCP)..................................................153
4.3 Commissioning the SIP Interface Interconnection.........................................................................................155
4.4 Commissioning the Interconnection Between the Device and the Router.....................................................158

5 Maintenance and Management Commissioning................................................................160


5.1 Checking the Alarm Function and the Event Function..................................................................................161
5.1.1 Verifying the Alarm Function and the Event Function.........................................................................161
5.1.2 Querying Alarms and Events.................................................................................................................163
5.2 Checking the Log............................................................................................................................................164

A Additional Information...........................................................................................................166
A.1 Configuring the Maintenance Terminal.........................................................................................................167
A.2 Making a Script..............................................................................................................................................168
A.3 Operation Guide on Battery Supplementary Charge.....................................................................................169
A.3.1 Preparing Tools.....................................................................................................................................170

Issue 01 (2011-07-30) Huawei Proprietary and Confidential v


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI Contents

A.3.2 Precautions............................................................................................................................................170
A.3.3 Operation Process.................................................................................................................................171
A.4 Settings of the Software Package..................................................................................................................172
A.4.1 Settings of the Default System Parameters...........................................................................................172
A.4.2 Settings of the Default Overseas Parameters........................................................................................173
A.4.3 Settings of the Default Parameters of the EMU...................................................................................177
A.5 Acronyms and Abbreviations........................................................................................................................178

Issue 01 (2011-07-30) Huawei Proprietary and Confidential vi


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 1 Commissioning Description

1 Commissioning Description

About This Chapter

This topic describes the definition, prerequisites, and flow of the commissioning.

1.1 Definition
Commissioning refers to the process of verifying the running of the device, the communication
of the device with the NMS and other interconnected devices, and ensuring that the device can
be used as required.
1.2 Commissioning Flow
This topic provides the prerequisites and basic flow for commissioning the device.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 1


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 1 Commissioning Description

1.1 Definition
Commissioning refers to the process of verifying the running of the device, the communication
of the device with the NMS and other interconnected devices, and ensuring that the device can
be used as required.

1.2 Commissioning Flow


This topic provides the prerequisites and basic flow for commissioning the device.
NOTE

This flow is for the commissioning procedures in newly-created offices. For the existing offices, adjust the
commissioning procedures and contents according to the actual situation.

Prerequisites
The hardware installation personnel must have installed and checked the UA5000 hardware.

Flowchart
This document describes how to commission the UA5000 in the following steps.
Figure 1-1 provides the commissioning flowchart.

Figure 1-1 Commissioning flowchart

Start

Commissioing
preparations

Stand-alone
commissioning

Interconnection
Commissioning

Maintenance and management


commissioning

End

The following topics provide a brief description about the contents of each chapter:

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 2


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 1 Commissioning Description

1. Commissioning Preparations
This topic describes how to prepare hardware, software, tools, and data properly to ensure
that the commissioning is implemented normally.
2. Stand-Alone Commissioning
This topic describes how to commission the stand-alone UA5000 after the hardware
installation so that the stand-alone UA5000 can work in the normal state.
3. Interconnection Commissioning
The administrator can maintain and manage the UA5000 in inband network management
or outband network management mode. This topic describes how to commission the
interconnection by considering the "iManager U2000 unified network management
system" (iManager U2000) as an example.
4. Maintenance and Management Commissioning
This topic describes how to verify the reliability of the device after commissioning the basic
functions and services of the device to ensure the performance reliability of the UA5000.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 3


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 2 Commissioning Preparations

2 Commissioning Preparations

About This Chapter

This topic describes how to prepare hardware, software, tools, and data properly to ensure that
the commissioning is implemented normally.

2.1 Hardware Check


This topic describes how to check the hardware before the commissioning. Make sure that the
hardware is available and check the hardware before the commissioning to facilitate the
subsequent operations.
2.2 Software Requirements
This topic describes the software requirements for the commissioning. You need to prepare the
commissioning software before the commissioning to facilitate the subsequent operations.
2.3 Tool Requirements
This topic describes the tools required for the commissioning. You need to prepare and check
the required tools before the commissioning to facilitate the subsequent operations.
2.4 Data Requirements
This topic describes the data requirements for the commissioning. The information about
hardware configuration, networking, and data plan must be available for data configuration.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 4


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 2 Commissioning Preparations

2.1 Hardware Check


This topic describes how to check the hardware before the commissioning. Make sure that the
hardware is available and check the hardware before the commissioning to facilitate the
subsequent operations.

Checklist
Table 2-1 provides the checklist for checking the hardware before the commissioning.

Table 2-1 Hardware checklist


No. Item Description

1 Power and l Ensure that the power cable and the ground cable are properly
grounding connected.
l Ensure that the power cable, ground cable, and power
distribution switch are labeled correctly, clearly and orderly.
l Ensure that the connectors of external ground cables and
protection ground cables of the cabinet are properly
connected, and they are not damaged.
l Ensure that the power supply of the device is in the normal
state.

2 Cables and l Ensure that the cable connectors are tight and firm.
connectors l Ensure that the cable jacket is intact.
l Ensure that the cable labels are clear and neat.
l Ensure that cables are bundled reliably.

3 Upper layer l Check the physical position of the interconnection port on the
device upper layer device.
l Ensure that the upper layer device works in the normal state
and can be used for commissioning.

NOTE

The hardware installation personnel must check the device according to items "Power and grounding" and
"Cables and connectors" in Table 2-1 when performing the installation check. The commissioning
personnel can check these two items again to ensure that the hardware connection is reliable during the
commissioning.

2.2 Software Requirements


This topic describes the software requirements for the commissioning. You need to prepare the
commissioning software before the commissioning to facilitate the subsequent operations.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 5


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 2 Commissioning Preparations

Checklist
Table 2-2 provides the checklist for checking the required software before the commissioning.

Table 2-2 Software checklist

No. Item Description

1 Software Check whether the software package for the commissioning is


package complete and the version is correct.

2 Software Check whether the required software commissioning tools are


commissioning available. The commonly used commissioning tools are as
tools follows:
l HyperTerminal: Used for logging in to the UA5000
through the CLI. The tool is embedded in Windows.
l TFTP and FTP: Used for loading software, which can be
downloaded from http://support.huawei.com.
l Toolbox: Used for tracing signals. It is released with the
version.

2.3 Tool Requirements


This topic describes the tools required for the commissioning. You need to prepare and check
the required tools before the commissioning to facilitate the subsequent operations.

Checklist
Table 2-3 provides the checklist for checking the required tools before the commissioning.

Table 2-3 Tool checklist

No. Item Description Remarks

1 Cables RS-232 serial port cable: Used for connecting the


l One end is an RJ-45 connector, commissioning terminal to the
used for connecting to the UA5000 in the case of maintenance
control board of the device. through the serial port.
l The other end is a DB-9 or
DB-25 female connector, used
for connecting to the
commissioning terminal. When
the maintenance terminal is a
PC, use the DB-9 female
connector.

Crossover cable Used for connecting the


commissioning terminal to the
UA5000 in the case of maintenance
in the Telnet mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 6


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 2 Commissioning Preparations

No. Item Description Remarks

Straight through cable Used for commissioning the


services.

Tail fiber Used for detecting the optical


power and optical sensitivity, and
transmitting the service upstream.

2 Maintain (Generally) Portable computer with Used for logging in to the


ing HyperTerminal application UA5000 to commission the
terminal UA5000.

3 Auxiliar Optical power meter Used for the following tests on the
y device optical port: actual receive optical
and power test, receive sensitivity test,
meter and overload optical power test.

Adjustable optical attenuator Used on the optical signal receive


port for attenuating the received
optical signal during the device
commissioning to protect the
optical port from being damaged by
strong optical power.

Multimeter Used for measuring the voltage,


resistance, and current intensity
during the power commissioning.

2.4 Data Requirements


This topic describes the data requirements for the commissioning. The information about
hardware configuration, networking, and data plan must be available for data configuration.

Checklist
Before the commissioning, collect the information about the hardware configuration,
networking, and data plan based on the engineering documents such as the project division layout
and network design. Table 2-4 provides the data requirement checklist.

Table 2-4 Checklist


No. Item Description

1 Hardware It includes but is not limited to:


configuration l The type of the control board and other boards, and the
slot layout.
l The type of the uplink port and service port, and their
physical locations.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 7


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 2 Commissioning Preparations

No. Item Description

2 Networking and data It includes but is not limited to:


plan l Network topology
l IP address allocation
l VLAN plan
l Service type and data plan

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 8


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3 Stand-Alone Commissioning

About This Chapter

This topic describes how to commission the stand-alone UA5000 after the hardware installation
so that the stand-alone UA5000 can work in the normal state.

1. 3.1 Checking the Settings of Jumpers and DIP Switches


This topic describes how to check the settings of the environment supervision circuit (ESC)
board, fan EMU jumpers and dual-in-line package (DIP) switches so that the settings
conform to the actual application.
2. 3.2 Powering On the Indoor Device
This topic describes how to power on the indoor device to ensure that each board is supplied
with power in the normal state.
3. 3.3 Powering On the Outdoor Device
This topic describes how to power on the outdoor device to ensure that each board is
supplied with power in the normal state.
4. 3.4 Commissioning the Power System
This topic describes how to commission the reliability of the power supply system so that
the system can supply the power to the device in the normal state.
5. 3.5 Logging in to the System
This topic describes how to log in to theUA5000 and then commission the UA5000 through
the maintenance terminal.
6. 3.6 Checking the Software Version
This topic describes how to check whether the version of the running software meets the
requirements for office deployment.
7. 3.7 Adding the Shelf
This topic describes how to add a shelf (including the master shelf and the slave shelf) to
ensure the normal running of the shelf.
8. 3.8 Configuring the Board
This topic describes how to check whether the inserted board is the same as the board
required in the data plan and check whether the board runs in the normal state.
9. 3.9 Loading the Script
This topic describes how to load the script file to configure the basic data of the device,
which is a preparation for the commissioning of the basic functions of the device.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 9


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

10. 3.10 Configuring the Networking Mode of the System


When the networking modes of the UA5000 are different, perform the operation to
configure the networking mode of the system to independent networking or integrated
access networking.
11. 3.11 Detecting the Power on the Optical Port
This topic describes how to detect the mean launched optical power and the actual input
optical power to check whether the transmit optical transceiver and the receive optical
transceiver are in the normal state.
12. 3.12 Checking the Status of the Uplink Port
This topic describes how to check the status of the uplink port to ensure that the
interconnection between the UA5000 and the upper layer device is in the normal state, thus
ensuring the normal communication.
13. 3.13 Changing the System Name
This topic describes how to customize the useful system name to differentiate UA5000s.
This facilitates the management of the UA5000.
14. 3.14 Configuring the System User
When accessing, configuring, and managing the UA5000, you need to add the system
operation users with different attributes. This topic describes how to add system operation
users and modify the attributes of the system operation users.
15. 3.15 Checking the System Time
This topic describes how to check whether the system time, time zone, time stamp, and
start and end Daylight Saving Time (DST) of the UA5000 are consistent with the actual
conditions.
16. 3.16 Configuring Environment Monitoring
The UA5000 provides the function of monitoring various environment parameters (such
as the temperature, humidity, and power voltage) so that the device runs in the stable
environment. This topic describes how to commission the environment monitoring unit
(EMU).
17. 3.17 Checking the Auto-Save Settings
This topic describes how to check the settings of the auto-save function to prevent data loss
due to reboots.
18. 3.18 Saving the Data
This topic describes how to save the data into the flash memory to prevent data loss due to
reboots.
19. 3.19 Backing Up the System File
This topic describes how to back up the system file to prevent permanent data loss due to
the system failure. At the first office deployment or when the upgrade is complete, you
need to back up the database file and the configuration file to restore the system in the case
of the system failure.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 10


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.1 Checking the Settings of Jumpers and DIP Switches


This topic describes how to check the settings of the environment supervision circuit (ESC)
board, fan EMU jumpers and dual-in-line package (DIP) switches so that the settings conform
to the actual application.

3.1.1 Checking the Settings of DIP Switches and Jumpers of


Environment Monitoring Boards
This topic describes how to check the settings of the jumpers on the ESC board and the dual-in-
line package (DIP) switches. This ensures that the settings conform to the actual application.

Prerequisite
The UA5000 must be disconnected from the power supply.

Jumpers and DIP Switches of H303ESC


The H303ESC board is located on the right side of the environment monitoring unit (EMU).
The H303ESC board provides six jumpers, namely the S1, S2, S3, S8, S10, and S11, and two
DIP switches S6 and S7. The S5 is the shielding switch of the board alarm buzzer, which is
enabled by default, as shown in Figure 3-1.

Figure 3-1 Layout of jumpers on the H303ESC board and DIP switches

H303ESC
S6
1234 5678

S5

ON OFF

S7
1234

S11
123

ON OFF
D1
S1
S2
S10
S3
S8

Jumpers S1, S2, S3, S8 and S10 are used to set the type of the serial port. Table 3-1 provides
their meanings and settings.

Table 3-1 Meanings and settings of the H303ESC S1, S2, S3, S8, and S10

Jumper Settings Meanings Default Settings

S1 1-2 connected The serial port SIO1 is 2-3 connected


RS-232.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 11


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Jumper Settings Meanings Default Settings

2-3 connected The serial port SIO1 is


RS-422.

S2 1-2 connected The serial port SIO2 is 2-3 connected


RS-232.

2-3 connected The serial port SIO2 is


RS-422.

S3, S8, 1-2 of S3, S8, and S10 The serial port SIO3 is 1-2 of all jumpers
and S10 connected RS-232. connected

2-3 of S2 connected; 1-2 of The serial port SIO3 is


S8 and S10 connected RS-422.

2-3 of S8 and S10 connected, The serial port SIO3 is


S3 connected unlimited RS-485.

S11 is used to check whether the running LED on the front panel is valid. Table 3-2 provides
the meanings and settings of S11.

Table 3-2 Meanings and settings of the H303ESC S11

Jumper Settings Meanings Default


Settings

S11 1-2 connected The running LED on the board 1-2 connected
is valid.

2-3 connected The running LED on the board


is invalid.

DIP switch S6 is used to set the type of external analog sensors. Table 3-3 provides the meanings
and settings of S6.

Table 3-3 Meanings and settings of the H303ESC S6

DIP Switch Settings Meanings Default


Settings

S6-1 to S6-6 ON The external analog sensor is of the ON


current type.

OFF The external analog sensor is of the


voltage type.

S6-7 to S6-8 Reserved - -

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 12


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

DIP switch S7 is used to set the reporting mode and ratio. Table 3-4 provides the meanings and
settings of S7.

Table 3-4 Meanings and settings of the H303ESC S7

DIP Switch Settings Meanings Default


Settings

S7-1 ON The H303ESC board is used in the ON


access network.

OFF The H303ESC board is used in the


Local Exchange.

S7-2 ON The H303ESC board uses one serial ON


port for reporting.

OFF The H303ESC board uses two serial


ports for reporting.

S7-3 Reserved - ON

S7-4 ON The reporting ratio of the serial port ON


is 19200 bit/s.

OFF The reporting ratio of the serial port


is 9600 bit/s.

Jumpers and DIP Switches of H304ESC


The H304ESC board provides two DIP switches, S2 and S3, and five jumpers S4-S8. The S9 is
the shielding switch for the alarm buzzer of the board, which is enabled by default. Figure
3-2 shows the layout of the jumpers and DIP switches on the H304ESC board.

Figure 3-2 Layout of the jumpers and DIP switches on the H304ESC board

H3 0 4 E S C

S9
12 3 4

OFF S2 O N

S4
12345678

S5
S6
S7
S8 D6
12 3 O N S3 OFF

Jumpers S4-S8 are used to set the serial port type. Table 3-5 provides the meanings and settings
of S4-S8.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 13


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-5 Meanings and settings of the H304ESC S4-S8

Jumper Settings Meanings Default


Settings

S4 1-2 connected The serial port SIO1 is 1-2 connected


RS-232.

2-3 connected The serial port SIO1 is


RS-422.

S5 1-2 connected The serial port SIO2 is 1-2 connected


RS-232.

2-3 connected The serial port SIO2 is


RS-422.

S6-S8 2-3 of S7 connected; 1-2 of S6 The serial port SIO3 is 2-3 of S7


and S8 connected RS-232. connected; 1-2
of S6 and S8
2-3 of S7 and S8 connected; 1-2 The serial port SIO3 is connected
of S6 connected RS-422.

DIP switch S2 is used to set the type of external analog sensors. Table 3-6 provides the meanings
and settings of S2.

Table 3-6 Meanings and settings of the H304ESC S2

DIP Settings Meanings Default Settings


Switch

S2-1 ON The external sensor of JTA1 is of the current OFF


type.

OFF The external sensor of JTA1 is of the


voltage type.

S2-2 ON The external sensor of JTA2 is of the current OFF


type.

OFF The external sensor of JTA2 is of the


voltage type.

S2-3 ON The external sensor of JTA3 is of the current OFF


type.

OFF The external sensor of JTA3 is of the


voltage type.

S2-4 Reserved - -

DIP switch S3 is used to set the reporting mode and ratio. Table 3-7 provides the meanings and
settings of S3.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 14


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-7 Meanings and settings of the H304ESC S3

DIP Switch Settings Meanings Default


Settings

S3-1 ON The H304ESC board is used in the access ON


network.

OFF The H304ESC board is used on the Local


Exchange.

S3-2 ON The H304ESC board uses one serial port OFF


for reporting.

OFF The H304ESC board uses two serial


ports for reporting.

S3-3 Reserved - -

S3-4 ON The reporting rate of the serial port is OFF


19200 bit/s.

OFF The reporting rate of the serial port is


9600 bit/s.

S3-5 to S3-8 Reserved - -

ESCM DIP Switch


The ESCM environment monitoring box provides a DIP switch S1. Figure 3-3 shows the layout
of the DIP switch of the ESCM environment monitoring box.

Figure 3-3 Layout of DIP switch of ESCM environment monitoring box

LED

COM1
COM2
DIP switch

Terminal block for


environment parameter
Power socket

ON

1 2 3 4 5 6 7 8

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 15


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

The available dialing digits of the DIP switch S1 are 8. Table 3-8 provides the meanings and
settings of S1.

Table 3-8 Meanings and settings of the DIP switch S1


DIP Settings Meanings Default Settings
Switch

S1-1 to S1-5 unsupported - S1-1: ON


S1-2: ON
S1-3: OFF
S1-4: OFF
S1-5: ON

S1-6 ON The reporting rate of OFF


the serial port is
19200 bit/s

OFF The reporting rate of


the serial port is 9600
bit/s.

S1-7 ON The external sensor ON


of JTA1 is of the
current type.

OFF The external sensor


of JTA1 is of the
voltage type.

S1-8 ON The external sensor ON


of JTA2 is of the
current type.

OFF The external sensor


of JTA2 is of the
voltage type.

Procedure
Step 1 Disconnect the cable connector if the ESC board is connected to the environment monitoring
cable.
Step 2 Use the flathead screwdriver to unfasten the screws on the ESC board anticlockwise, as shown
in (1) of Figure 3-4.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 16


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-4 Removing and inserting the ESC board

Step 3 Hold the handlebar firmly on the front panel and pull out the ESC board from the PDU.

Step 4 Check whether the settings of the jumpers and DIP switches on the ESC board are practical in
application. If not, proceed as follows:
l For H303ESC, refer to Table 3-1 and Table 3-2 to set the jumpers; refer to Table 3-3 and
Table 3-4 to set the DIP switches.
l For H304ESC, refer to Table 3-5 to set the jumpers; refer to Table 3-6 and Table 3-7 to set
the DIP switches.
l For ESCM, refer to Table 3-8 to set the DIP switches.

Step 5 Insert the ESC board into the PDU, as shown in (2) of Figure 3-4.

Step 6 Use the flathead screwdriver to fasten the screws clockwise on the ESC panel, insert the cable
connector, and resume the monitoring cable connection of the ESC board.

----End

3.1.2 Checking the DIP Settings on the Monitoring Board of the Fan
This topic describes how to check the DIP settings on monitoring board of the fan. This ensures
that the settings conform to the actual application.

Context
There are two types of fan monitoring boards: FCBA and FCBB, which are used as follows:

l The FCBA board is used in the rear access fan tray.


l The FCBB board is used in the front access fan tray.

DIP Switch Description


Figure 3-5 shows the layout of the DIP switches on the FCBA board. The DIP switches in the
layout adopt the default settings.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 17


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-5 Layout of the DIP switches on the FCBA board

SW101 ON H531FCBA
SW102

12345678
OFF1 2 3 4

ON OFF

Figure 3-6 shows the layout of the DIP switches on the H801FCBB board, and Figure 3-6 shows
the layout of the DIP switches on the H511FCBB board. The DIP switches in the layout adopt
the default settings.

Figure 3-6 Layout of the DIP switches on the H801FCBB board

H801FCBB
12345678

SW2

ON

Figure 3-7 Layout of the DIP switches on the H511FCBB board

ON H511FCBB
SW101
SW201
1234 5678

OFF 1234

ON OFF

NOTE

The following table considers the H801FCBB board as an example to describe the meanings of the DIP switches,
and the relation between the DIP switch, sub-node, fan quantity, and fan speed adjustment mode.

Table 3-9 lists the DIP switches on the H801FCBB board.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 18


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-9 Description of the DIP switches on the H801FCBB board


DIP Description Defaults

SW2-1 Set the mapping sub-node addresses of ON


data configuration.
SW2-2 OFF
l ON corresponds to address bit 0.
SW2-3 l OFF corresponds to address bit 1. OFF

SW2-4 ON indicates that the baud rate of the OFF


communication between the fan tray and
the control board is 19200 bit/s.

OFF indicates that the baud rate of the OFF


communication between the fan tray and
the control board is 9600 bit/s.

SW2-5 Set the number of fans. OFF

SW2-6 ON

SW2-7 Set the speed adjustment modes of fans. OFF

SW2-8 ON

Table 3-10 provides the relation between the DIP switches and the sub-node addresses.

Table 3-10 Relation between the DIP switches and the sub-node addresses
SW2-3 SW2-2 SW2-1 Sub-Node Addresses

ON ON ON 000 (0)

ON ON OFF 001 (1)

ON OFF ON 002 (2)

ON OFF OFF 003 (3)

OFF ON ON 004 (4)

OFF ON OFF 005 (5)

OFF OFF ON 006 (6)

OFF OFF OFF 007 (7)

Table 3-11 provides the relation between the settings of the DIP switches and the number of
fans.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 19


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-11 Relation between the DIP switch settings and the fan quantity
SW2-6 SW2-5 Fan Quantity

ON ON 6

ON OFF 8

OFF ON 4

OFF OFF 10

Table 3-12 provides the relation between the settings of the DIP switches and the speed
adjustment mode of the fans.

Table 3-12 Relation between the DIP switch settings and the speed adjustment mode
SW2-8 SW2-7 Speed Adjustment Mode Speed Adjustment
Scheme

ON ON Measure the temperature on the Scheme 1


air intake vent

ON OFF Measure the temperature on the Scheme 2


air exhaust vent

OFF ON Reserved Scheme 3

OFF OFF Stop the fan and measure the Scheme 4


temperature on the air intake
vent

Prerequisites
The device must be powered off.

Procedure
Step 1 Use a screwdriver to unfasten the screws anticlockwise on the front panel of the fan tray, as
shown in (1) of Figure 3-8.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 20


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-8 Removing/Inserting the fan tray

Step 2 Remove the fan tray from the service shelf, as shown in (2) of Figure 3-8.

Step 3 Check whether the DIP switch settings on the fan monitoring and control board are consistent
with the actual application. If not, configure the DIP switches again according to Table 3-9.

Step 4 Insert the fan tray into the corresponding slot, as shown in (3) of Figure 3-8.

Step 5 Use the screwdriver to fasten the screws clockwise on the front panel of the fan tray, as shown
in (4) of Figure 3-8.

----End

3.2 Powering On the Indoor Device


This topic describes how to power on the indoor device to ensure that each board is supplied
with power in the normal state.

Prerequisite
l The installation check and the power-on check must be performed on the device.
l All the input power and the output control switches of the DC PDU must be turned off.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 21


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Procedure
Step 1 Turn on the input power of the DC PDU.
Step 2 Turn on the output control switches of the DC PDU.

----End

Result
The LED of the control board blinks 1s on and 1s off repeatedly.

3.3 Powering On the Outdoor Device


This topic describes how to power on the outdoor device to ensure that each board is supplied
with power in the normal state.

Prerequisite
l The installation check and the power-on check must be performed on the device.
l The power switch of the lightning arrester, the input/output switches of the GEPS4860, and
the power switch of the heating panel must be turned off.

Procedure
Step 1 Turn off the AC power input switch to power on the lightning arrester.
Step 2 Turn off the MCB "AC POWER" to power on the GEPS4860.
Step 3 When the device temperature is lower than -25C, turn on the miniature circuit breaker (MCB)
of the heating panel to heat the device components until the device temperature is higher than
-25C. When the device temperature is higher than -25C, skip this step.
NOTE

When the device starts at the temperature lower than -25C, use the heating panel to heat all the components
to -25C above, and then the device can be powered on.

Step 4 Turn on the AC input MCB on the GEPS4860 (set the MCB upward). In the normal state, after
a short delay, the RUN LEDs on the front panels of all the rectifier units are green after the
rectifiers units are started. The RUN LED on the monitoring unit blinks slowly in green, and the
ALM LED is on.
Step 5 Turn on all the load MCBs on the GEPS4860 (set the MCBs upward). In the normal state, the
ALM LED on the front panel of the monitoring unit is off.
Step 6 Turn on (set the switch upward) the power switch on the GEPS4860 to supply power for the
heat exchanger.
Step 7 Turn on (set the MCB upward) the MCB "BATT" on the GEPS4860 to supply power for
batteries.

----End

Result
The RUN LED on the control board blinks 1s on and 1s off repeatedly.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 22


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.4 Commissioning the Power System


This topic describes how to commission the reliability of the power supply system so that the
system can supply the power to the device in the normal state.

3.4.1 Checking the Power Supply of DC PDU


This topic describes how to check whether each power input which supports mutual backup can
supply power to the cabinet independently through the two or four power inputs.

Prerequisite
The two or four power inputs of the DC PDU supply power to the cabinet at the same time

Procedure
l Please implement the following steps when the two independent power supplies works in
the normal state for the cabinet:
1. Disconnect power input A of the DC PDU and check the power supply of the cabinet.
2. Restore the power supply of power input A to the cabinet.
3. Disconnect power input B of the DC PDU and check the power supply of the cabinet.
4. Restore the power supply of power input B to the cabinet.
l When the four power inputs supply power to the cabinet in the normal state, usually adopt
the mutual backup. That is, A and B mutually backup for each other, C and D mutually
backup for each other, please implement the following steps:
1. Disconnect the power supply of power input A and C of the DC PDU and check the
power supply of the cabinet.
2. Restore the power supply of power input A and C to the cabinet.
3. Disconnect power input B and D of the DC PDU and check the power supply of the
cabinet.
4. Restore the power supply of power input B and D to the cabinet.

----End

Result
After disconnecting the backup power supply of any power input, the power supply and the
service of the device board stay unaffected.

3.4.2 Checking the Power Supply of AC Power Module


This topic describes how to check whether other rectifier units can supply power to the cabinet
in the normal state when the rectifier unit of the AC power is configured redundantly and one
rectifier unit is faulty.

Prerequisite
The AC mode is used in the cabinet for power supply.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 23


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Procedure
Step 1 Remove a rectifier unit and check the power supply of the cabinet.

Step 2 Insert the rectifier unit back into the cabinet.


NOTE

Repeat step 1 and step 2 to verify one by one whether other redundant rectifier units are normal.

----End

Result
After removing any rectifier unit, the power supply and the service of the device board stay
unaffected.

3.4.3 Configuring the Battery and Checking the Power Supply of


the Battery
This topic describes how to configure the battery and verify whether the backup power supplied
by the battery to the AC power system is in the normal state.

Prerequisite
The cabinet must adopt the AC power supply and must be configured with the battery.

Context
l Currently, the encapsulated valve regulated lead acid (VRLA) batteries used in the
communication industry are all produced in full loading state, that is, the battery has been
charged with electricity fully.
l Based on the battery features, automatic discharge will occur due to chemical reaction
during the delivery and storage process. In this case, the battery capacity and the open
circuit voltage decrease. We refer to this phenomenon as the automatic charge of the battery.
In a certain period, if you use appropriate methods, the voltage and the capacity of the
battery can be restored completely.
l To make up the automatic discharge during the idle period, you need to perform the
supplementary charge for the battery in long idleness periodically. For this type of situation,
refer to "Operation Guide on Battery Supplementary Charge" to complete the
supplementary charge of the battery first, and then perform the following commissioning
procedures.

Procedure
Step 1 In global config mode, run the emu add command to add the EMU of the power system.

Step 2 In global config mode, run the display emu command to query whether the status of the power
system shows normal.

Step 3 Run the interface emu command to enter the EMU mode to configure the battery parameters.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 24


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

CAUTION
The battery capacity parameters corresponding with different cabinets are different. You need
to configure in correct way. Otherwise, you may damage the battery.

Step 4 In the corresponding power mode, run the power battery command to configure the battery
parameters.
Table 3-13 lists the battery capacity of the different cabinets in the UA5000.

Table 3-13 Battery capacity of different cabinets

Cabinet Type Battery Capacity

ONU-F01E200 (Outdoor) 50 AH

ONU-F01E400 (Outdoor) 75 AH

ONU-F01D200 (Outdoor) 80 AH

ONU-F01D500 (Outdoor) 150 AH/184 AH

ONU-F01D1000 (Outdoor) 184 AH

ONU-F02A (Indoor) 100 AH

Step 5 In the corresponding power mode, run the power battery-test command to configure the battery
discharging parameters.

Step 6 In privilege mode, run the save command to save the related configuration. When the monitoring
module and the UA5000 device communicate with each other in the normal state, the configured
data take effect automatically.

Step 7 Disconnect the mains supply, and check whether the cabinet power system can switch to the
battery supply mode.

Step 8 Restore the mains supply, and check whether the cabinet power system can switch to the mains
supply mode.

----End

Result
l After the mains supply is disconnected, the cabinet power system switches to the battery
supply mode and the power supply is in the normal state.
l After the mains supply is restored, the cabinet power system switches to the mains supply
mode and the power supply is in the normal state.

3.4.4 Checking the Power Supply of the Power Board


This topic describes how to check whether the redundancy backup function of the PWX board
is in the normal state.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 25


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Prerequisite
The two configured PWX boards must work in the normal state.

Precaution
l Wear the ESD wrist strap during the operation.
l When one PWX board is faulty, replace it in time. Ensure that the shelf does not work for
long with only one power board.

Procedure
Step 1 Turn off the power switch on the front panel of one PWX board, and check the power supply of
the narrowband service board.

Step 2 Turn on the power switch that is turned off in Step 1.

----End

Result
After the power switch of one PWX board is turned off, the narrowband service boards in the
shelf work in the normal state.
NOTE

In the normal state, the two PWX boards work in the load sharing mode and supply power for the
narrowband service boards in the shelf. When one PWX board becomes faulty, the other PWX board
supplies power for the narrowband service boards in the shelf.

3.4.5 Checking the Power Supply of the Heat Exchanger


This topic describes how to check whether two power supplies can supply power to the heat
exchanger in the normal state.

Context
l The outdoor cabinet with large capacity usually houses a heat exchanger for the cabinet
temperature controlling.
l There are two power supplies for the heat exchanger when the device works in the normal
state. One is DC power, provided by the power module. The other is AC power, controlled
by the miniature circuit breaker (MCB) on the panel of the cabinet.
l The outdoor cabinet with small capacity is not configured with the heat exchanger.

Procedure
Step 1 Disconnect the first power supply (DC power) of the heat exchanger and check the alarm LED
on the heat exchanger panel.

Step 2 Restore the first power supply (DC power) of the heat exchanger and check the alarm LED on
the heat exchanger panel.

Step 3 Disconnect the second power supply (AC power) of the heat exchanger and check the alarm
LED on the heat exchanger panel.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 26


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 4 Restore the second power supply (AC power) of the heat exchanger and check the alarm LED
on the heat exchanger panel.

----End

Result
l After any input of the power supply is disconnected, the heat exchanger finishes reset self-
check and the alarm LED turns on, but the heat exchanger works in the normal state.
l After the power is restored, the alarm LED of the heat exchanger turns off, and the system
recovers.

3.5 Logging in to the System


This topic describes how to log in to theUA5000 and then commission the UA5000 through the
maintenance terminal.

3.5.1 Login in the Local Serial Port Mode


Generally, when you need to maintain, manage, and operate the device at the local end, you can
log in to the system through the serial port.

Prerequisite
l A commissioning terminal, generally a portable computer with a HyperTerminal
application and that can be connected to the UA5000 through the serial port cable must be
available.
l An RS-232 serial port cable (one end with an RJ-45 connector and the other end with a
DB-9 or DB-25 female connector) must be available.

Networking
Figure 3-9 shows the example network of the login to the UA5000 in the local serial port mode

Figure 3-9 Example network for the login to the UA5000 in the local serial port mode

ETH0
RS-232 ETH1
Serial port cable
COM

PVMB UA5000

Serial port
PC

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 27


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Flowchart
Figure 3-10 shows the flowchart for logging in to the UA5000 in the local serial port mode

Figure 3-10 Flowchart for logging into the UA5000 in the local serial port mode

Procedure
Step 1 Use a standard RS-232 serial port cable to connect the serial port on the PC to the COM port on
the PVMB control board, as shown in Figure 3-9.
Step 2 Configure the HyperTerminal communication parameters.
NOTE

The following considers the typical mode in Windows as an example to describe how to log in to the system
in the local serial port mode. Other modes are not described here.
1. Set up a connection.
Choose Start > Programs > Accessories > Communications > HyperTerminal on the
PC to display the Connection Description dialog box. Enter the connection name, and
then click OK, as shown in the following figure.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 28


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

2. Select the serial port.


Select the serial port on the PC, for example, COM2, that is connected to the UA5000, and
then click OK, as shown in the following figure.

3. Set the HyperTerminal communication parameters. For details, see the following figure.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 29


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

NOTE

l The baud rate of the HyperTerminal must be the same as the baud rate of the serial port on the
UA5000. By default, the baud rate of the serial port on the UA5000 is 9600 bit/s.
l If illegal characters are displayed on the HyperTerminal interface after you log in to the system,
it indicates that the baud rate of the HyperTerminal is different from the baud rate of the serial
port on the UA5000. In this case, you can modify the baud rate of the HyperTerminal and then
log in to the system again. The system supports the following baud rates: 9600bit/s, 19200bit/s,
38400bit/s, 57600bit/s, and 115200bit/s.
4. Click OK to display the HyperTerminal interface.
Step 3 Set the properties of the HyperTerminal.
1. Set the emulation type of the HyperTerminal.
Choose File > huawei Properties from the main menu on the HyperTerminal interface.
On the Settings tab page in the dialog box that is displayed, select VT100 or Auto
Detect as Emulation, as shown in the following figure. By default, Auto Detect is selected.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 30


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

2. Set the line delay and the character delay of the ASCII code.
Click ASCII Setup. In the dialog box that is displayed, set Line delay to 200 and
Character delay to 200, and then click OK, as shown in the following figure. By default,
Line delay is set to 0 and Character delay to 0.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 31


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

NOTE

When the text is copied to the HyperTerminal, the Character delay parameter controls the speed at
which each character is sent. The Line delay parameter controls the interval between lines. If the
delay is too short, certain characters are omitted. If certain characters are omitted when the text is
copied to the HyperTerminal, modify the delay.

Step 4 On the interface of the HyperTerminal, press Enter to display the user name prompt character.
Enter the user name and the password for registration according to the prompt (by default, the
user name is root and the password is admin) until the command line prompt character is
displayed. For the basic information on how to use the CLI, see CLI Operation Characteristics.
If the login fails, click on the operation interface and then click . If the login still fails,
go to Step 1 to check the parameter settings or the physical connection are normal. If the
parameter settings and the physical connection are normal, log in again.

Step 5 To configure the IP address of the ETH1 port, do as follows:


1. In global config mode, run the interface eth command to enter the eth mode.
2. In ETH mode, run the ip address command to configure the IP address, the subnet mask
and the gateway of the ETH1 port.
3. Run the display ip address command to query the IP address and the subnet mask.
4. Run the sysman mode command to configure the network management mode.

Step 6 To configure the IP address of the ETH0 port, do as follows:


1. Run the mac outband add command to add the MAC address of the outband management.
2. In global config mode, run the interface outband command to enter the outband mode.
3. In outband mode, run the ip address command to configure the IP address, the subnet mask
and the gateway of the ETH0 port.
4. Run the display ip address command to query the IP address, the subnet mask and the
gateway.
5. Run the sysman mode command to configure the network management mode.

----End

Result
You can maintain and manage the device after logging in to the device through the serial port.

3.5.2 Login in the Telnet Mode (Inband Management)


This topic describes how to log in to the UA5000 through the uplink port (inband management
port) in telnet mode to maintain and manage the UA5000.

Prerequisite
l You must log in to the UA5000 through the local serial port and the IP address and the
subnet mask must be configured for the UA5000. For detailed configuration, see 3.5.1
Login in the Local Serial Port Mode.
l The IP address of the maintenance terminal has been correctly configured. For the process
of configuring the IP address for the maintenance terminal, see Configuring the
Maintenance Terminal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 32


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

NOTE

In the following operations, the configuration of the UA5000 must be performed through the local serial
port.

Networking LAN
Figure 3-11 shows the example network for inband management through telnet in a LAN.

Figure 3-11 Example network for inband management over a LAN in telnet mode

LAN
PC1

PC2
ETH0 0/4/0
ETH1

COM
PC3

PVMB UA5000

Networking WAN
Figure 3-12 shows the example network for inband management over a LAN in telnet mode.

Figure 3-12 Example network for inband management over a WAN in telnet mode

Router
PC

ETH0 0/4/0
ETH1

COM

PVMB UA5000

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 33


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Configuration Flowchart
Figure 3-13 shows the flowchart for logging in to and configuring the system through the inband
management port in telnet mode.

Figure 3-13 Flowchart for logging in to and configuring the system through the inband
management port in telnet mode

Start

Set up configuration
environment

Configure IP address of
service network port

Run the telnet


program

Log in to the system

End

Procedure
Step 1 Set up the configuration environment.

l If you log in to the UA5000 in the LAN inband management mode through telnet, set up a
network environment according to the networking shown in Figure 3-11.
l If you log in to the UA5000 in the WAN inband management mode through telnet, set up a
network environment according to the networking shown in Figure 3-12.

Step 2 Configure the IP addresses of the service network port.


In ETH mode, you can run the ip address command to configure the IP address of the service
network port.
huawei(config)#interface eth
huawei(config-if-eth)#ip address 10.10.20.10 255.255.255.0 10.10.20.1 vlan_tag 1
huawei(config-if-eth)#quit

Step 3 Run the telnet application.

Choose Start > Run from the main menu on the maintenance terminal. On the Open address
bar of the Run interface, enter telnet X.X.X.X (X.X.X.X indicates the IP address of the ETH1
port on the UA5000), as shown in Figure 3-14 (Windows is considered as an example), and
then click OK to display the remote login dialog box.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 34


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-14 Interface of running the telnet application

Step 4 Log in to the system.


In the remote login dialog box, enter the user name and the password. By default, the user name
is root and the password is admin. After you log in to the system successfully, a message is
displayed indicating that the login is successful, as show in the following message.
>>User name:root
>>User password:
Huawei HONET UA5000 Universal Access Unit.
Copyright(C) Huawei Technologies Co., Ltd. 1998-2010. All rights reserved.

----End

Result
After logging to the system, you can maintain and manage the UA5000. For the basic information
on how to use the CLI, see CLI Operation Characteristics.

3.5.3 Login in the Telnet Mode (Outband Management)


This topic describes how to log in to the UA5000 through the maintenance network port (outband
management port) in telnet mode to maintain and manage the UA5000.

Prerequisite
l You must log in to the UA5000 through the local serial port and the IP address and the
subnet mask must be configured for the UA5000. For detailed configuration, see 3.5.1
Login in the Local Serial Port Mode.
l The IP address of the maintenance terminal has been correctly configured. For the process
of configuring the IP address for the maintenance terminal, see Configuring the
Maintenance Terminal.

NOTE

In the following operations, the configuration of the UA5000 must be performed through the local serial
port.

Networking LAN
Figure 3-15 shows the example network for configuring the Networking through the outband
management port over a LAN in telnet mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 35


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-15 Example network for outband management over a LAN in telnet mode

LAN
PC1

0/4/0 PC2
ETH0
ETH1

COM
PC3

PVMD UA5000

Networking WAN
Figure 3-16 shows the example network for configuring the Networking through the outband
management port over a WAN in telnet mode.

Figure 3-16 Example network for configuring the outband management over a WAN in telnet
mode

Router
PC
10.10.1.0/24

10.10.20.10/24
0/4/0
ETH0
ETH1

COM

PVMD UA5000

Configuration Flowchart
Figure 3-17 shows the flowchart for logging in to and configuring the system through the
outband management port in telnet mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 36


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-17 Flowchart for logging in to and configuring the UA5000 through the outband
management port in telnet mode

Start

Set up configuration
environment

Configure IP address of
maintenance network port

Run the telnet program

Log in to the system

End

Procedure
Step 1 Set up the configuration environment.
l If you log in to the UA5000 in the LAN outband management mode through telnet, set up a
network environment according to the networking shown in Figure 3-15.
l If you log in to the UA5000 in the WAN outband management mode through telnet, set up
a network environment according to the networking shown in Figure 3-16.
Step 2 Configure the IP addresses of the maintenance network port.
In outband mode, you can run the ip address command to configure the IP address of the
maintenance network port.
NOTE

The default IP address of the maintenance Ethernet port is 172.20.1.2, and the subnet mask is 255.255.255.0.
You can configure the IP address of the maintenance Ethernet port based on the actual network plan.
huawei(config)#interface outband
huawei(interface-outband)#ip address 10.10.20.10 255.255.255.0 10.10.20.1 vlan_tag
1
huawei(interface-outband)#quit

Step 3 Configure an outband route.


In the case that PVMD functions as the control board, if the IP address of the maintenance
terminal and that of the maintenance network port on the UA5000 are not in the same network
segment, run the outband route add command in diagnose mode to create an outband route
from the UA5000 to the maintenance terminal.

NOTE

Skip this step when PVMB functions as the control board.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 37


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

huawei(config)#diagnose
huawei(diagnose)%%outband route add 10.10.1.0 255.255.255.0
huawei(diagnose)%%config

Step 4 Run the telnet application.

Choose Start > Run from the main menu on the maintenance terminal. On the Open address
bar of the Run interface, enter telnet X.X.X.X (X.X.X.X indicates the IP address of the ETH0
port on the UA5000), as shown in Figure 3-18 (Windows is considered as an example), and
then click OK to display the remote login dialog box.

Figure 3-18 Interface of running the telnet application

Step 5 Log in to the system.

In the remote login dialog box, enter the user name and the password. By default, the user name
is root and the password is admin. After you log in to the system successfully, a message is
displayed indicating that the login is successful, as show in the following message.
>>User name:root
>>User password:
Huawei HONET UA5000 Universal Access Unit.
Copyright(C) Huawei Technologies Co., Ltd. 1998-2010. All rights reserved.

----End

Result
After logging to the system, you can maintain and manage the UA5000. For the basic information
on how to use the CLI, see CLI Operation Characteristics.

3.5.4 Login in the SSH Mode (Inband Management)


This topic describes how to log in to the UA5000 in secure shell (SSH) mode through the uplink
port (inband management port) and then maintain and manage the UA5000. In SSH mode, the
authentication, encryption, and authorization are provided to ensure the security of network
communications. When you remotely log in to the UA5000 through the network whose security
cannot be ensured, the secure information and the powerful authentication function can be
provided in SSH mode so that the UA5000 is protected from IP address-spoofing or plain text
password interception attack.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 38


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Prerequisite
l You must log in to the UA5000 through the local serial port and the IP address and the
subnet mask must be configured for the UA5000. For detailed configuration, see 3.5.1
Login in the Local Serial Port Mode.
l The IP address of the maintenance terminal has been correctly configured. For the process
of configuring the IP address for the maintenance terminal, see Configuring the
Maintenance Terminal.

NOTE

In the following operations, the configuration of the UA5000 must be performed through the local serial
port.

Networking Inband Management over a LAN


Figure 3-19 shows the example network for configuring the inband management over a LAN
in SSH mode.

Figure 3-19 Example network for configuring the inband management over a LAN in SSH mode

LAN
PC1

PC2
ETH0 0/4/0
ETH1

COM
PC3

PVMB UA5000

Networking Inband Management over a WAN


Figure 3-20 shows the example network for configuring the inband management over a WAN
in SSH mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 39


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-20 Example network for configuring the inband management over a WAN in SSH
mode

Router
PC

ETH0 0/4/0
ETH1

COM

PVMB UA5000

Data Plan SSH Mode


Table 3-14 provides the data plan for configuring the inband management over a LAN or WAN
in SSH mode.

Table 3-14 Data plan for configuring the inband management over a LAN or WAN in SSH
mode

Item Data

UA5000 User name: huawei


User authentication mode: RSA public key
authentication

Maintenance terminal IP address: 10.10.21.1/24


Client software: PuTTY
Password convertors: PuTTY.exe,
PuTTYGen.exe, and sshkey.exe

Router IP address of the router connected to the


UA5000: 10.10.20.254/24
NOTE
Only the WAN requires the router.

Configuration Flowchart
Figure 3-21 shows the flowchart for logging in to and configuring the system through the inband
management port in SSH mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 40


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-21 Flowchart for logging in to and configuring the system in SSH mode

Start

Set up configuration

environment

Configure IP address of
port
service network

Create a user

Create the local key


pair in SSH mode

Password-Authentication
Set the SSH user mode
authentication mode

rsa, all, and password-


publickey authentication
mode
Generate the RSA
public key

Generate the SSH user


public key

Assign the public key to


the SSH user

Log in to the system in SSH


mode

End

Procedure
Step 1 Set up the configuration environment.

l If you log in to the UA5000 through the inband management over a LAN in SSH mode, set
up a network environment according to the networking shown in Figure 3-19.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 41


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

l If you log in to the UA5000 through the inband management over a WAN in SSH mode, set
up a network environment according to the networking shown in Figure 3-20.

Step 2 Configure the IP addresses of the service network port.


In ETH mode, you can run the ip address command to configure the IP address of the service
network port.
huawei(config)#interface eth
huawei(config-if-eth)#ip address 10.10.20.10 255.255.255.0 10.10.20.1 vlan_tag 1
huawei(config-if-eth)#quit

Step 3 Create a user.

Add a user. The profile is operator, the user name and the password are huawei1, the level is
operator, and the number of times for login is 4.
huawei(config)#terminal user name
User Name(length<6,15>):huawei1
User Password(length<6,15>):
Confirm Password
(length<6,15>):
User profile name(<=15 chars)[root]:operator
User's Level:
1. Common User 2. Operator 3. Administrator:2
Permitted Reenter Number(0--4):4
User's Appended Info(<=30 chars):
Adding user succeeds
Repeat this operation? (y/n)[n]:n

Step 4 Create the local RSA key pair.

Run the rsa local-key-pair create command to create the local RSA key pair.

CAUTION
To log in to the system in SSH mode successfully, you need to configure and create the local
RSA key pair first. Before performing other configurations in SSH mode, create the local key
pair in SSH mode.

huawei(config)#rsa local-key-pair create


The key name will be: Host
% RSA keys defined for Host already exist.
Confirm to replace them? [y/n]:y
The range of public key size is (512 ~ 2048).
NOTES: If the key modulus is greater than 512,
It will take a few minutes.
Input the bits in the modulus[default = 512]:
Generating keys...
.....++++++++++++
....++++++++++++
.......................++++++++
........++++++++

Step 5 Set the SSH user authentication mode.

Run the ssh user authentication-type rsa command to select the SSH user authentication mode.

The SSH user authentication mode is classified into the following four types and the rsa
authentication mode is considered as an example here.
l password: The common password is used for authentication.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 42


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

l rsa: The RSA public key is used for authentication.


l all: The password or RSA key is used for authentication. It indicates that an SSH user can
log in to the device after the user has passed the password or RSA authentication.
l password-publickey: The password and public key are used for authentication. It indicates
that an SSH user can log in to the device only after the user has passed both the password
and RSA authentication.
huawei(config)#ssh user huawei authentication-type rsa

Step 6 Generate the RSA public key.


1. Run the key generator (considering the PuTTY as an example).
Run the key generator PUTTYGEN.EXE.Figure 3-22 shows the interface of the key
generator.

Figure 3-22 Interface of the key generator

2. Generate the client key.


Select SSH-2 RSA as the key type in the Parameters area, click Generate, and move the
cursor according to the prompt to generate the client key.Figure 3-23 shows the interface
of the key generator.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 43


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-23 Interface of the key generator

After generating the key, click Save public key and Save private key to save the public
key and the private key.Figure 3-24 shows the interface of saving the public key and the
private key.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 44


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-24 Interface of saving the public key and the private key

3. Generate the RSA public key.


Start sshkey.exe, the password convertor on the client, click Browse, select the public key
file that is saved, and then click Convert to convert the client public key to the RSA public
key.Figure 3-25 shows the interface of converting the client public key to the RSA public
key.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 45


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-25 Interface of converting the client public key to the RSA public key

Step 7 Generate the public key for the SSH user.


Create the RSA public key and copy the RSA public key to the server in the config-rsa-key-code
mode.
huawei(config)#rsa peer-public-key key
huawei(config-rsa-public-key)#public-key-code begin
Enter "RSA key code" view, return last view with "public-key-code end".
huawei(config-rsa-key-code)#30818602 81805A01 625279EF 5E4CD503 916C9DB5 0233CF58
huawei(config-rsa-key-code)#C901D4CA 207C77D3 4EF25B04 9897BD24 997BF61B DFB9A73C
huawei(config-rsa-key-code)#F82B6F06 55ACCDB9 F7DC1474 9E6518EE B1A543FF 9147150B
huawei(config-rsa-key-code)#111BD11C 683A023B A4295550 DA13F6BE 3190A2A8 3BFCB158
huawei(config-rsa-key-code)#4FBAA365 F6E796A0 B02CB6F9 8491A373 9B4A0876 4B3189B4
huawei(config-rsa-key-code)#BBA2C7BA E1974104 AD165E98 18CF0201 25
huawei(config-rsa-key-code)#public-key-code end
huawei(config-rsa-public-key)#peer-public-key end

Step 8 Assign the public key to the SSH user.


Run the ssh user assign rsa-key command to assign the public key to user huawei.
huawei(config)#ssh user huawei assign rsa-key key

Step 9 Log in to the system.


1. Run the client software.
Start the putty.exe, the SSH client tool. Choose SSH > Auth from the navigation tree to
specify the RSA private key file, as shown in Figure 3-26. Then, click Browse to display
the file selecting dialog box. In the dialog box, select the private key file and click OK.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 46


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-26 Interface of the SSH client software

2. Log in to the system.


Choose Session from the navigation tree, and then enter the IP address of the UA5000 in
the Host Name (or IP address) text box, as shown in Figure 3-27. Then, click Open to
log in to the system.

Figure 3-27 Interface of logging in to the system through the SSH client software

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 47


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

The user authentication mode is set to RSA. Therefore, the system displays a message, as
shown in Figure 3-28. After entering the corresponding user name (huawei), you can log
in to the system.

Figure 3-28 Interface of logging in to the system through the SSH client software

----End

Result
After logging to the system, you can maintain and manage the UA5000. For the basic information
on how to use the CLI, see CLI Operation Characteristics.

3.5.5 Login in the SSH Mode (Outband Management)


This topic describes how to log in to the UA5000 in secure shell (SSH) mode through the
maintenance network port (outband management port) and then maintain and manage the
UA5000. In SSH mode, the authentication, encryption, and authorization are provided to ensure
the security of network communications. When you remotely log in to the UA5000 through the
network whose security cannot be ensured, the secure information and the powerful
authentication function can be provided in SSH mode so that the UA5000 is protected from IP
address-spoofing or plain text password interception attack.

Prerequisite
l You must log in to the UA5000 through the local serial port and the IP address and the
subnet mask must be configured for the UA5000. For detailed configuration, see 3.5.1
Login in the Local Serial Port Mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 48


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

l The IP address of the maintenance terminal has been correctly configured. For the process
of configuring the IP address for the maintenance terminal, see Configuring the
Maintenance Terminal.

NOTE

In the following operations, the configuration of the UA5000 must be performed through the local serial
port.

Networking Outband Management Interface over a Local Area Network


Figure 3-29 shows the example network for configuring the outband management over a LAN
in SSH mode.

Figure 3-29 Example network for configuring the outband management over a LAN in SSH
mode

LAN
PC1

0/4/0 PC2
ETH0
ETH1

COM
PC3

PVMD UA5000

Networking Outband Management over a Wide Area Network (WAN)


Figure 3-30 shows the example network for configuring the outband management over a WAN
in SSH mode.

Figure 3-30 Example network for outband management over a WAN in SSH mode

Router
PC
10.10.1.0/24

10.10.20.10/24
0/4/0
ETH0
ETH1

COM

PVMD UA5000

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 49


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Data Plan SSH Mode


Table 3-15 provides the data plan for configuring the outband management over a LAN or WAN
in SSH mode.

Table 3-15 Data plan for configuring the outband management over a LAN or WAN in SSH
mode
Item Data

UA5000 User name: huawei


User authentication mode: RSA public key
authentication

Maintenance terminal IP address: 10.10.21.1/24


Client software: PuTTY
Password convertors: PuTTY.exe,
PuTTYGen.exe, and sshkey.exe

Router IP address of the router connected to the


UA5000: 10.10.20.254/24
NOTE
Only the WAN requires the router.

Configuration Flowchart
Figure 3-31 shows the flowchart for logging in to and configuring the system through the
outband management interface in SSH mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 50


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-31 Flowchart for logging in to and configuring the system in SSH mode

Start

Set up configuration

environment

Configure IP address of
maintenancenetwork port

Create a user

Create the local key


pair in SSH mode

Password-Authentication
Set the SSH user mode
authentication mode

rsa, all, and password-


publickey authentication
mode
Generate the RSA
public key

Generate the SSH user


public key

Assign the public key to


the SSH user

Log in to the system in SSH


mode

End

Procedure
Step 1 Set up the configuration environment.

l If you log in to the UA5000 through the outband management over a LAN in SSH mode, set
up a network environment according to the networking shown in Figure 3-29.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 51


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

l If you log in to the UA5000 through the outband management over a WAN in SSH mode,
set up a network environment according to the networking shown in Figure 3-30.

Step 2 Configure the IP addresses of the maintenance network port.


In outband mode, you can run the ip address command to configure the IP address of the
maintenance network port.
NOTE

The default IP address of the maintenance Ethernet port is 172.20.1.2, and the subnet mask is 255.255.255.0.
You can configure the IP address of the maintenance Ethernet port based on the actual network plan.
huawei(config)#interface outband
huawei(interface-outband)#ip address 10.10.20.10 255.255.255.0 10.10.20.1 vlan_tag
1
huawei(interface-outband)#quit

Step 3 Create a user.

Add a user. The profile is operator, the user name and the password are huawei1, the level is
operator, and the number of times for login is 4.
huawei(config)#terminal user name
User Name(length<6,15>):huawei1
User Password(length<6,15>):
Confirm Password
(length<6,15>):
User profile name(<=15 chars)[root]:operator
User's Level:
1. Common User 2. Operator 3. Administrator:2
Permitted Reenter Number(0--4):4
User's Appended Info(<=30 chars):
Adding user succeeds
Repeat this operation? (y/n)[n]:n

Step 4 Create the local RSA key pair.

Run the rsa local-key-pair create command to create the local RSA key pair.

CAUTION
To log in to the system in SSH mode successfully, you need to configure and create the local
RSA key pair first. Before performing other configurations in SSH mode, create the local key
pair in SSH mode.

huawei(config)#rsa local-key-pair create


The key name will be: Host
% RSA keys defined for Host already exist.
Confirm to replace them? [y/n]:y
The range of public key size is (512 ~ 2048).
NOTES: If the key modulus is greater than 512,
It will take a few minutes.
Input the bits in the modulus[default = 512]:
Generating keys...
.....++++++++++++
....++++++++++++
.......................++++++++
........++++++++

Step 5 Set the SSH user authentication mode.

Run the ssh user authentication-type rsa command to select the SSH user authentication mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 52


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

The SSH user authentication mode is classified into the following four types and the rsa
authentication mode is considered as an example here.
l password: The common password is used for authentication.
l rsa: The RSA public key is used for authentication.
l all: The password or RSA key is used for authentication. It indicates that an SSH user can
log in to the device after the user has passed the password or RSA authentication.
l password-publickey: The password and public key are used for authentication. It indicates
that an SSH user can log in to the device only after the user has passed both the password
and RSA authentication.
huawei(config)#ssh user huawei authentication-type rsa

Step 6 Generate the RSA public key.


1. Run the key generator (considering the PuTTY as an example).
Run the key generator PUTTYGEN.EXE.Figure 3-32 shows the interface of the key
generator.

Figure 3-32 Interface of the key generator

2. Generate the client key.


Select SSH-2 RSA as the key type in the Parameters area, click Generate, and move the
cursor according to the prompt to generate the client key.Figure 3-33 shows the interface
of the key generator.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 53


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-33 Interface of the key generator

After generating the key, click Save public key and Save private key to save the public
key and the private key.Figure 3-34 shows the interface of saving the public key and the
private key.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 54


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-34 Interface of saving the public key and the private key

3. Generate the RSA public key.


Start sshkey.exe, the password convertor on the client, click Browse, select the public key
file that is saved, and then click Convert to convert the client public key to the RSA public
key.Figure 3-35 shows the interface of converting the client public key to the RSA public
key.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 55


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-35 Interface of converting the client public key to the RSA public key

Step 7 Generate the public key for the SSH user.


Create the RSA public key and copy the RSA public key to the server in the config-rsa-key-code
mode.
huawei(config)#rsa peer-public-key key
huawei(config-rsa-public-key)#public-key-code begin
Enter "RSA key code" view, return last view with "public-key-code end".
huawei(config-rsa-key-code)#30818602 81805A01 625279EF 5E4CD503 916C9DB5 0233CF58
huawei(config-rsa-key-code)#C901D4CA 207C77D3 4EF25B04 9897BD24 997BF61B DFB9A73C
huawei(config-rsa-key-code)#F82B6F06 55ACCDB9 F7DC1474 9E6518EE B1A543FF 9147150B
huawei(config-rsa-key-code)#111BD11C 683A023B A4295550 DA13F6BE 3190A2A8 3BFCB158
huawei(config-rsa-key-code)#4FBAA365 F6E796A0 B02CB6F9 8491A373 9B4A0876 4B3189B4
huawei(config-rsa-key-code)#BBA2C7BA E1974104 AD165E98 18CF0201 25
huawei(config-rsa-key-code)#public-key-code end
huawei(config-rsa-public-key)#peer-public-key end

Step 8 Assign the public key to the SSH user.


Run the ssh user assign rsa-key command to assign the public key to user huawei.
huawei(config)#ssh user huawei assign rsa-key key

Step 9 Log in to the system.


1. Run the client software.
Start the putty.exe, the SSH client tool. Choose SSH > Auth from the navigation tree to
specify the RSA private key file, as shown in Figure 3-36. Then, click Browse to display
the file selecting dialog box. In the dialog box, select the private key file and click OK.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 56


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-36 Interface of the SSH client software

2. Log in to the system.


Choose Session from the navigation tree, and then enter the IP address of the UA5000 in
the Host Name (or IP address) text box, as shown in Figure 3-37. Then, click Open to
log in to the system.

Figure 3-37 Interface of logging in to the system through the SSH client software

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 57


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

The user authentication mode is set to RSA. Therefore, the system displays a message, as
shown in Figure 3-38. After entering the corresponding user name (huawei), you can log
in to the system.

Figure 3-38 Interface of logging in to the system through the SSH client software

----End

Result
After logging to the system, you can maintain and manage the UA5000. For the basic information
on how to use the CLI, see CLI Operation Characteristics.

3.6 Checking the Software Version


This topic describes how to check whether the version of the running software meets the
requirements for office deployment.

Prerequisite
You must log in successfully to the UA5000. For the detailed procedure, refer to "3.5 Logging
in to the System."

Procedure
Step 1 In common user mode, run the display language command to check whether the version of the
host software meets the deployment requirement.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 58


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 2 In common user mode, run the display version command to check whether the version of the
board software meets the deployment requirement.

----End

Result
l The version of the host software and the version of the board software meet the deployment
requirement.
l If there is an inconsistency, contact the Huawei customer service center, or upgrade the
host software, if necessary. For details about the upgrade procedure, refer to the UA5000
Upgrade Guide.

3.7 Adding the Shelf


This topic describes how to add a shelf (including the master shelf and the slave shelf) to ensure
the normal running of the shelf.

Prerequisite
The subtending cables between shelves must be properly connected.

Precaution
When adding a master shelf through Telnet, ensure that the network cable is connected to the
network port on the active control board correctly.

NOTE

When adding a master shelf, the UA5000 adds the active/standby boards automatically. To prevent data
inconsistency, the standby control board will be reset when adding a master shelf, which is in the normal
state. When adding a master shelf, if the network cable is inserted on the standby control board, the standby
control board rebooting will interrupt the Telnet connection. Therefore, to add a master shelf through Telnet,
ensure that the network cable is connected to the network port on the active control board correctly.

Procedure
Step 1 In the global config mode, run the frame add 0 command to add a master shelf.

Step 2 In the global config mode, run the frame add 1 command to add a slave shelf.

Step 3 In the global config mode, run the frame connect 0 1 command to create the links between
shelves.

----End

Result
Run the display frame info command to query the shelf information and check whether the
master shelf and the slave shelf are normal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 59


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.8 Configuring the Board


This topic describes how to check whether the inserted board is the same as the board required
in the data plan and check whether the board runs in the normal state.

Procedure
Step 1 Run the display board command to check whether the board meets the data plan requirement
(that is, check whether the board name and the ID of the slot housing the board are the same as
the data plan) and check the status of all the boards.
l If no board is lost and all the boards are normal, the operation is complete.
l If one or more boards are lost, insert the lost boards. Run the board add command to add
the boards to be inserted. Note that the types of the configured boards must be consistent
with the types of the actually-inserted boards. Run the board confirm command to confirm
the boards. Then, run the display board command to query the status of all the boards.

----End

Result
The status of all the boards is displayed as "Normal".

3.9 Loading the Script


This topic describes how to load the script file to configure the basic data of the device, which
is a preparation for the commissioning of the basic functions of the device.

Prerequisite
l The script file must be available. For the information on how to make a script, see A.2
Making a Script.
l The hardware must be installed and checked.
l The commissioning terminal must log in to the UA5000 successfully.

Precaution
Each command in the script file must end with an Enter character.

Procedure
Step 1 Open the script file and copy the commands in the file into the maintenance command line
interface (CLI).

----End

Result
All the commands in the script are automatically executed successfully.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 60


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.10 Configuring the Networking Mode of the System


When the networking modes of the UA5000 are different, perform the operation to configure
the networking mode of the system to independent networking or integrated access networking.

Precaution
The system networking mode that is configured must be consistent with the actual networking
mode.

Procedure
l When the PVM board is used for independent upstream transmission, run the working
mode command to configure the networking mode of the system to independent
networking. The voice service is transmitted upstream through the ETH1 service port on
the PVM board.
l In the case of the integrated upstream transmission, run the working mode command to
configure the networking mode of the system to integrated access networking and then run
the fe mode command to configure the working mode of the uplink port to Inner_FE1 (in
the case of the PVMB control board), or Inner_FE0 and Inner_FE1 (in the case of the
PVMD control board). The narrowband control board PVM and the broadband control
board IPM construct the network and provide the voice service and the broadband service
together. The voice service is transmitted to the IPM board through the internal IP channel
and then is transmitted to the upper layer network through the uplink port on the IPM board.

----End

Result
Run the display working mode command to check whether the current system networking mode
is consistent with the configured system networking mode.

3.11 Detecting the Power on the Optical Port


This topic describes how to detect the mean launched optical power and the actual input optical
power to check whether the transmit optical transceiver and the receive optical transceiver are
in the normal state.

3.11.1 Detecting the Average Transmit Power of the Two-Fiber


Bidirectional Optical Port
This topic describes how to detect the average transmit optical power of a two-fiber bidirectional
optical port to ensure that the average transmit optical power of the optical port is in the normal
range.

Prerequisite
A calibrated optical power meter, the patch cords with different splices, and an optical connector
must be available.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 61


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Precautions

DANGER
Do not look into the Tx laser port and the fiber connector on the optical interface board without
eye protection.

l Use the unit dBm of the optical power meter for the detection.
l Use the single-mode optical fiber for the single-mode optical module and the multi-mode
optical fiber for the multi-mode optical module.
l The fiber interface and the optical connector on the optical interface board must be clean
and connected properly.
l The length of the patch cord used for the detection is 2-5 m generally. It is recommended
that you use the new patch cord.

Procedure
Step 1 Connect one end of the patch cord of the optical power meter to the Tx connector of the detected
port, and the other end to the optical power meter, as shown in Figure 3-39.

Figure 3-39 Detecting the transmit optical power of an optical port

T
Tx
x

R
Rx
x

Optical port
/
Optical power meter
UA5000

Step 2 Set the detecting wavelength of the optical power meter based on the working wavelength of
the detected port.

Step 3 Use the optical power meter for the detection. After the value displayed on the optical power
meter stops changing rapidly and turns stable gradually, record the optical power value.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 62


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 4 Repeat the preceding steps three times, and then check whether the detected value of the optical
power meets technical requirements (determined by the specifications of different optical
modules).

Step 5 If the detected optical power value does not meet the technical requirements (see the following
table for the detailed technical specifications), check whether the detecting wavelength set by
the optical power meter is consistent with the transmit wavelength of the optical module. In
addition, check whether the connection point of the optical port is loose.

Step 6 After the detected optical power value meets the technical requirements, resume the fiber
connection of the detected port.

----End

Result

The transmit optical power of the measured port complies with the technical specifications.

The technical specifications for the optical power are as follows:

1000Base-Lx

Table 3-16 Technical specifications of the 1000base-Lx port

Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 10

Central wavelength (nm) 1310

Mean transmit power (dBm) -11 to -3

Extinction ratio (dB) 8.2

Receiver sensitivity (dBm) < -19

Receiver overload power (dBm) -3

Standards compliance IEEE 802.3z

1000Base-Zx

Table 3-17 Technical specifications of the 1000Base-Zx port

Parameter Specification

Transmission rate 1000 Mbit/s

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 63


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Parameter Specification

Interface type LC

Interface mode Single mode

Transmission distance (km) 40 80

Operating wavelength (nm) 1550 1550

Mean transmit power (dBm) -5 to 0 -3 to +2

Extinction ratio (dB) 9.0 9.0

Receiver sensitivity (dBm) < -21 < -23

Receiver overload power (dBm) -3 -3

Standards compliance IEEE 802.3z

100Base-Fx

Table 3-18 Technical specifications of the 100Base-Fx port

Parameter Specification

Transmission rate 100 Mbit/s

Interface type Lucent connector (LC)

Interface mode Multi-mode Single mode Single mode

Transmission distance (km) 2 15 40

Central wavelength (nm) 1310 1310 1310

Mean transmit power (dBm) -19 to -14 -15 to -8 -5 to 0

Extinction ratio (dB) 10 8.2 8.2

Receiver sensitivity (dBm) < -30 < -31 < -36

Receiver overload power (dBm) -14 -8 -8

Standards compliance IEEE 802.3u

1000Base-Sx

Table 3-19 Technical specifications of the 100Base-Sx port

Parameter Specification

Transmission rate 1000 Mbit/s

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 64


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Parameter Specification

Interface type LC

Interface mode Multi-mode

Transmission distance (m) 500

Mean transmit power (dBm) -9.5 to -4

Central wavelength (nm) 850

Extinction ratio (dB) 9

Receiver sensitivity (dBm) < -17

Receiver overload power (dBm) 0

Standards compliance IEEE 802.3z

3.11.2 Detecting the Actual Input Power of the Two-Fiber


Bidirectional Optical Port
This topic describes how to detect the actual input optical power of a two-fiber bidirectional
optical port to ensure that the actual input optical power of the optical port is in the normal range.

Prerequisite
A calibrated optical attenuator, an optical power meter, the patch cords with different splices,
and an optical connector must be available.

Precautions

DANGER
Do not look into the Tx laser port and the fiber connector on the optical interface board without
eye protection.

l Use the unit dBm of the optical power meter for the detecion.
l Use the single-mode optical fiber for the single-mode optical module and the multi-mode
optical fiber for the multi-mode optical module.
l The fiber interface and the optical connector on the front panel of the optical interface board
must be clean and connected properly.
l The length of the patch cord used for the detection is 2-5 m generally. It is recommended
that you use the new patch cord.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 65


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Procedure
Step 1 Connect the device properly as shown in Figure 3-40.

Figure 3-40 Detecting the input optical power of an optical port

Tx
TX Tx
ODF ODF

Detected port

Rx Rx

/
Optical port Optical port

UA5000 Peer device


Optical power meter

Step 2 Set the detecting wavelength of the optical power meter based on the working wavelength of
the detected port.

Step 3 On the UA5000, configure a channel from an uplink port to the detected port.

Step 4 Increase the optical attenuation gradually. When a small number of packets are lost, decrease
the optical attenuation gradually until no packet is lost in a short period (method: ping the peer
device on the UA5000 to check the packet loss condition). Then, stop adjustment the optical
attenuation. (Note: Adjust the attenuation slowly and stably as much as possibly.)

Step 5 Unplug the RX patch cord of the detected port, connect the unplugged RX patch cord to the
optical power meter, and record the input optical power of this point through the optical power
meter.

Step 6 If the detected optical power value does not meet the technical requirements (see the following
table for the detailed technical specifications), check whether the detecting wavelength set by
the optical power meter is consistent with the transmit wavelength of the optical module. In
addition, check whether the connection point of the optical port is loose.

Step 7 After the detected optical power value meets the technical requirements, resume the fiber
connection of the detected port.

----End

Result
The input optical power of the measured port complies with the technical specifications.

The technical specifications for the optical power are as follows:

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 66


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

1000Base-Lx

Table 3-20 Technical specifications of the 1000base-Lx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 10

Central wavelength (nm) 1310

Mean transmit power (dBm) -11 to -3

Extinction ratio (dB) 8.2

Receiver sensitivity (dBm) < -19

Receiver overload power (dBm) -3

Standards compliance IEEE 802.3z

1000Base-Zx

Table 3-21 Technical specifications of the 1000Base-Zx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 40 80

Operating wavelength (nm) 1550 1550

Mean transmit power (dBm) -5 to 0 -3 to +2

Extinction ratio (dB) 9.0 9.0

Receiver sensitivity (dBm) < -21 < -23

Receiver overload power (dBm) -3 -3

Standards compliance IEEE 802.3z

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 67


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

100Base-Fx

Table 3-22 Technical specifications of the 100Base-Fx port


Parameter Specification

Transmission rate 100 Mbit/s

Interface type Lucent connector (LC)

Interface mode Multi-mode Single mode Single mode

Transmission distance (km) 2 15 40

Central wavelength (nm) 1310 1310 1310

Mean transmit power (dBm) -19 to -14 -15 to -8 -5 to 0

Extinction ratio (dB) 10 8.2 8.2

Receiver sensitivity (dBm) < -30 < -31 < -36

Receiver overload power (dBm) -14 -8 -8

Standards compliance IEEE 802.3u

1000Base-Sx

Table 3-23 Technical specifications of the 100Base-Sx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Multi-mode

Transmission distance (m) 500

Mean transmit power (dBm) -9.5 to -4

Central wavelength (nm) 850

Extinction ratio (dB) 9

Receiver sensitivity (dBm) < -17

Receiver overload power (dBm) 0

Standards compliance IEEE 802.3z

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 68


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.11.3 Detecting the Average Transmit Optical Power of the Single-


Fiber Bidirectional Optical Port
This topic describes how to detect the average transmit power of a single-fiber bidirectional
optical port from the local end to ensure that the average transmit optical power of the optical
port is in the normal state.

Prerequisite
Prepare properly a calibrated optical power meter and the patch cords with different splices.

Precautions

DANGER
Pay attention to personal safety. Do not look at the laser transmit port and the optical fiber
interface on the optical interface board.

l Select the dBm unit of the optical power meter for the detection.
l Use the single-mode optical fiber for the single-mode optical module and the multi-mode
optical fiber for the multi-mode optical module.
l The fiber interface and the optical connector on the front panel of the optical interface board
must be clean and be connected properly.
l The length of the patch cord used for the detection is 2-5 m generally. It is recommended
that you use the new patch cord.

Procedure
Step 1 Unplug the fiber of the detected port. Connect one end of the detected patch cord to the detected
port, and the other end to the optical power meter, as shown in Figure 1.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 69


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-41 Detecting the transmit optical power of a single-fiber bidirectional optical port

T
Rxx/Tx Detected port

R
x

Optical
/port

UA5000
Optical power meter

NOTE

Select the proper patch codes with different splices because the optical power meter may have different
interfaces.

Step 2 Set the detecting wavelength of the optical power meter based on the working wavelength of
the detected port.
Step 3 Observe the reading on the optical power meter, and then record the value of the optical power
after the reading is stable. This value of the optical power is the actual average transmit optical
power of the port.
Step 4 Repeat the preceding steps for three times, and then check whether the detected value of the
optical power meets the technical requirements.
Step 5 If the detected optical power value does not meet the technical requirement, check whether the
detecting wavelength set by the optical power meter is consistent with the sent wavelength of
the optical module. In addition, check whether the optical port connection is loose.
Step 6 After the detected optical power value meets the technical requirement, resume the fiber
connection of the detected port.

----End

Result
The transmit optical power of the detected port meets the technical requirements.
Technical specifications of the optical fiber port:

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 70


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

1000Base-Lx

Table 3-24 Technical specifications of the 1000base-Lx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 10

Central wavelength (nm) 1310

Mean transmit power (dBm) 11 to 3

Extinction ratio (dB) 8.2

Receiver sensitivity (dBm) <19

Receiver overload power (dBm) -3

Standards compliance IEEE 802.3z

1000Base-Zx

Table 3-25 Technical specifications of the 1000Base-Zx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 40 80

Operating wavelength (nm) 1550 1550

Mean transmit power (dBm) -5 to 0 -3 to +2

Extinction ratio (dB) 9.0 9.0

Receiver sensitivity (dBm) <-21 <-23

Receiver overload power (dBm) -3 -3

Standards compliance IEEE 802.3z

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 71


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

100Base-Fx

Table 3-26 Technical specifications of the 100Base-Fx port


Parameter Specification

Transmission rate 100 Mbit/s

Interface type Lucent connector (LC)

Interface mode Multi-mode Single mode Single mode

Transmission distance (km) 2 15 40

Central wavelength (nm) 1310 1310 1310

Mean transmit power (dBm) -19 to -14 -15 to -8 -5 to 0

Extinction ratio (dB) 10 8.2 8.2

Receiver sensitivity (dBm) <-30 <-31 <-36

Receiver overload power (dBm) -14 -8 -8

Standards compliance IEEE 802.3u

1000Base-Sx

Table 3-27 Technical specifications of the 100Base-Sx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Multi-mode

Transmission distance (m) 500

Mean transmit power (dBm) -9.5 to -4

Central wavelength (nm) 850

Extinction ratio (dB) 9

Receiver sensitivity (dBm) < -17

Receiver overload power (dBm) 0

Standards compliance IEEE 802.3z

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 72


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

GPON

Table 3-28 Specifications of the GPON port


Parameter Description

Transmission rate Receive: 1.25 Gbit/s


Transmit: 2.5 Gbit/s

Interface type SC/PC

Maximum transmission distance 20 km

Standards compliance ITUT G984.2 CLASS B+

Central wavelength Transmit: 1490 nm


Receive: 1310 nm

Transmit optical power 1.5-5.0 dBm

Extinction ratio 10 dB

Maximum receive sensitivity -28 dBm

Overload optical power -8 dBm

EPON

Table 3-29 Specifications of the EPON port


Parameter Description

Transmission rate 1.25 Gbit/s

Interface type SC/PC

Maximum transmission 20 km
distance

Central wavelength Transmit: 1490 nm


Receive: 1310 nm

Transmit optical power 2-7 dBm

Maximum receive -27 dBm


sensitivity

Overload optical power -6 dBm

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 73


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.11.4 Detecting the Actual Input Power of the Single-Fiber


Bidirectional Optical Port
This topic describes how to detect the actual input optical power of a single-fiber bidirectional
optical port to ensure that the actual input optical power of the optical port is in the normal range.

Prerequisite
Prepare properly a calibrated attenuator and an optical power meter.

Precautions

DANGER
Pay attention to personal safety. Do not look at the laser transmit port and the optical fiber
interface on the optical interface board.

l Select the dBm unit of the optical power meter for the detection.
l The single-fiber bidirectional optical module is multimode. Use the multimode fiber.
l The fiber interface and the optical connector on the front panel of the optical interface board
must be clean and properly connected.
l The length of the patch cord used for the detection is 2-5 m generally. It is recommended
that you use the new patch cord.

Procedure
Step 1 Connect the device properly based on Figure 1.

Figure 3-42 Diagram of detecting the input optical power of the single-fiber bidirectional optical
port

Tx
TX Tx
Rx/Tx
Rx/Tx
ODF ODF
Detected port

Rx Rx

Optical port
/ Optical
port

UA5000 Peer device


Optical power meter

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 74


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 2 Set the detecting wavelength of the optical power meter based on the working wavelength of
the detected port.

Step 3 On the UA5000, configure the channel from an uplink port to the detected port.

Step 4 Increase the value of the optical attenuation gradually. When a small number of packets are lost,
decrease the value of the optical attenuation gradually. Stop adjusting the optical attenuation
until no packets are lost in a short period (you can ping the peer device on the UA5000 to check
the packet loss). Note that the adjusting process should be performed stably and slowly.

Step 5 Unplug the patch cord of the detected port, connect the unplugged patch cord to the optical power
meter, and record the input optical power of this point through the optical power meter.

Step 6 If the detected optical power does not meet the technical requirement (for detailed technical
specifications, see the following table), check whether the detecting wavelength set for the
optical power meter is consistent with the working wavelength input by the detected power. In
addition, check whether the optical port is connected tightly.

Step 7 If the detected value meets the technical standard, resume the fiber connection of the detected
port.

----End

Result
The input optical power of the detected port meets the technical requirements.

Technical specifications of the optical fiber port:

1000Base-Lx

Table 3-30 Technical specifications of the 1000base-Lx port

Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 10

Central wavelength (nm) 1310

Mean transmit power (dBm) -11 to -3

Extinction ratio (dB) 8.2

Receiver sensitivity (dBm) < -19

Receiver overload power (dBm) -3

Standards compliance IEEE 802.3z

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 75


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

1000Base-Zx

Table 3-31 Technical specifications of the 1000Base-Zx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Single mode

Transmission distance (km) 40 80

Operating wavelength (nm) 1550 1550

Mean transmit power (dBm) -5 to 0 -3 to +2

Extinction ratio (dB) 9.0 9.0

Receiver sensitivity (dBm) < -21 < -23

Receiver overload power (dBm) -3 -3

Standards compliance IEEE 802.3z

100Base-Fx

Table 3-32 Technical specifications of the 100Base-Fx port


Parameter Specification

Transmission rate 100 Mbit/s

Interface type Lucent connector (LC)

Interface mode Multi-mode Single mode Single mode

Transmission distance (km) 2 15 40

Central wavelength (nm) 1310 1310 1310

Mean transmit power (dBm) -19 to -14 -15 to -8 -5 to 0

Extinction ratio (dB) 10 8.2 8.2

Receiver sensitivity (dBm) <-30 <-31 <-36

Receiver overload power (dBm) -14 -8 -8

Standards compliance IEEE 802.3u

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 76


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

1000Base-Sx

Table 3-33 Technical specifications of the 100Base-Sx port


Parameter Specification

Transmission rate 1000 Mbit/s

Interface type LC

Interface mode Multi-mode

Transmission distance (m) 500

Mean transmit power (dBm) -9.5 to -4

Central wavelength (nm) 850

Extinction ratio (dB) 9

Receiver sensitivity (dBm) < -17

Receiver overload power (dBm) 0

Standards compliance IEEE 802.3z

GPON

Table 3-34 Specifications of the GPON port


Parameter Description

Transmission rate Receive: 1.25 Gbit/s


Transmit: 2.5 Gbit/s

Interface type SC/PC

Maximum transmission distance 20 km

Standards compliance ITUT G984.2 CLASS B+

Central wavelength Transmit: 1490 nm


Receive: 1310 nm

Transmit optical power 1.5-5.0 dBm

Extinction ratio 10 dB

Maximum receive sensitivity -28 dBm

Overload optical power -8 dBm

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 77


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

EPON

Table 3-35 Specifications of the EPON port


Parameter Description

Transmission rate 1.25 Gbit/s

Interface type SC/PC

Maximum transmission 20 km
distance

Central wavelength Transmit: 1490 nm


Receive: 1310 nm

Transmit optical power 2-7 dBm

Maximum receive -27 dBm


sensitivity

Overload optical power -6 dBm

3.12 Checking the Status of the Uplink Port


This topic describes how to check the status of the uplink port to ensure that the interconnection
between the UA5000 and the upper layer device is in the normal state, thus ensuring the normal
communication.

Prerequisite
l The UA5000 must be powered on and must start working.
l The uplink port must be connected to the related upstream device, and the connection line
and the upstream device must work in the normal state.

Procedure
l When the independent upstream mode is used, proceed as follows:
If the control board is PVMB, run the display fe command to check whether the service
uplink port (ETH1 port) on PVMB is in the normal state.
If the control board is PVMD, run the display up-linkport workmode command to
check the type of the upstream service port, and then run the display fe command to
check whether the service uplink port on PVMD is in the normal state.
l In the integrated upstream mode, when checking the status of the internal communication
port, proceed as follows:
If the control board is PVMB, and the upstream IPMB board is in slot 2, run the
display fe active ETH0 command to check whether the internal communication port
(port ETH0) between PVMB and IPMB is in the normal state.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 78


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

If the control board is PVMB, and the upstream IPMB board is in slot 3, run the
display fe active inner_FE1 command to check whether the internal communication
port (inner_FE1 port) between PVMB and IPMB is in the normal state.
If the control board is PVMD, and the upstream IPMB board is in slot 2, run the
display fe active inner_FE0 command to check whether the internal communication
port (inner_FE0 port) between PVMD and IPMB is in the normal state.
If the control board is PVMD, and the upstream IPMB board is in slot 3, run the
display fe active inner_FE1 command to check whether the internal communication
port (inner_FE1 port) between PVMD and IPMB is in the normal state.
----End

Result
Run the display fe command to check the working status of the uplink port. The system displays
the communication mode of the port.

3.13 Changing the System Name


This topic describes how to customize the useful system name to differentiate UA5000s. This
facilitates the management of the UA5000.

Context
l By default, the system name is UA5000.
l The system name takes effect immediately after it is changed.
l After the system name is changed, the CLI prompt character changes to the new name
accordingly.

Procedure
Step 1 Run the sysname command to change the system name.

----End

Result
The CLI prompt character changes to the system name that is set after the command is executed
successfully.

3.14 Configuring the System User


When accessing, configuring, and managing the UA5000, you need to add the system operation
users with different attributes. This topic describes how to add system operation users and modify
the attributes of the system operation users.

3.14.1 Modifying the System User Attributes


When accessing and configuring the UA5000, you need to add the system users with different
attributes to facilitate management.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 79


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Prerequisite
You must have the administrator right or higher right.

Context
l The super user and the administrator have the right to add a user at a lower level, that is:
The super user can add an administrator, an operator, or a common user.
The administrator can add only an operator or a common user.
l The user name must be unique, and cannot be online.
l The super user and the administrator can add multiple users consecutively. Up to 127 (total
128 including the root user) users can be added to the system.
l The system supports up to 6 concurrently online terminal users (4 Telnet users and 2 other
users).
When adding a system user, you must configure the user attributes, including the account,
password, rights profile, right, permitted reenter number, and appended information, as shown
in Table 3-36.

Table 3-36 User attributes


User Attribute Description

Account Also named user name, which consists of 6-15 printable characters and
is unique in a system. An account cannot contain any space and it is case
insensitive.

Password Also named password, which consists of 6-15 characters. A password


contains at least one number and one letter and it is case sensitive.

User profile The name of a user profile consists of 1-15 printable characters. A user
profile includes the validity period of the user name, validity period of
the password, login time, and logout time.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 80


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

User Attribute Description

Authority Users are classified into three levels: common user, operator, and
administrator.
NOTE
The assigned operation rights are different. Therefore, UA5000 divides the user
operation rights into the following levels: common user, operator, administrator,
and super user. The users of each level can add only lower-level users. The user
operation rights are as follows.
l Common users can perform basic system operations and simple query
operations.
l Operators can configure the device and the services.
l For the administrator and the super user, they have the following similarities
and differences:
l Similarities:
l Perform all configurations.
l Maintain and manage the device, user account, and user right.
l Differences:
l Only one super user exists in the system; however, multiple
administrators can coexist in the system.
l The super user can add an administrator, but an administrator has no
right to add the super user.

Permitted reenter The permitted reenter number determines whether a user name can be
number used to log in to the system from several terminals at the same time. The
permitted reenter number ranges from 0 to 4, and is generally set to 1.

Appended Appended information is a type of additional information about the user.


information It consists of a string of 0-30 characters. It can be the telephone number
or the address of a user.

Procedure
Step 1 Run the terminal user name command to add a user that is consistent with the actual data plan.
Step 2 Run the display terminal user command to query the user information.

----End

Result
The queried user information is the same as the actual data plan.

Example
Example: Under the administrator level, to add a system user with the account of huawei,
password of test01, and level of common user, permitted reenter number of 3, and appended
information of user, do as follows:
huawei(config)#terminal user name
User Name(length<6,15>):huawei
User Password(length<6,15>):test01//It is not displayed on the maintenance
terminal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 81


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Confirm Password(length<6,15>):test01//It is not displayed on the maintenance


terminal.
User profile name(<=15 chars)[root]:
User's Level:
1. Common User 2. Operator:1
Permitted Reenter Number(0--4):3
User's Appended Info(<=30 chars):user
Adding user succeeds
Repeat this operation? (y/n)[n]:n
huawei(config)#display terminal user name huawei
----------------------------------------------------------------------------
Name Level Status Reenter Profile Append
Num Info
---------------------------------------------------------------------------
huawei User Offline 3 root user
----------------------------------------------------------------------------

3.14.2 Modifying the System User Attributes


When the system user attributes do not comply with the current data plan, the system user
attributes including the password, rights, permitted reenter number, and appended information
need to be modified.

Prerequisite
For details about the user right, see the information listed in "Context".

Context
Table 3-37 lists the user attributes that can be modified and the related restrictions.

Table 3-37 Modifying the user attributes

User Attribute Description

Password l The super user and the administrator can change their own passwords
and the passwords of users at lower levels. When changing the
password of a user at a lower level, the super user and the
administrator need not enter the old password.
l The common user and the operator can change only their own
passwords, but they must enter their old passwords for this purpose.

User profile l The super user and the administrator can modify the profiles bound
to them and the profiles bound to users at lower levels.
l The user name and the password must meet the specifications
described in the user profile to be bound. Otherwise, the binding
operation fails.

Authority The super user and the administrator can modify the rights of users at
lower levels. In addition, the super user and the administrator can modify
the user right only to a level lower than them.

Permitted reenter l The super user and the administrator can change the permitted
number reenter number of a user at a lower level.
l The permitted reenter number of the super user cannot be changed.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 82


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

User Attribute Description

Appended l The super user and the administrator can modify their own appended
information information and the appended information about users at lower
levels.
l The common user and the operator can modify only their own
appended information.

Procedure
Step 1 Modify the system user attributes.
NOTE
Before modifying the user attributes, run the display terminal user command to query the user attributes
to be modified.
l Run the terminal user password command to change the password of a user.
The password of a user consists of 6-15 characters, in which at least one digit and one letter
must be contained. The password is case sensitive.
l Run the terminal user user-profile command to modify the bound profile of a user.
l Run the terminal user level command to modify the right of a user.
l Run the terminal user reenter command to change the permitted reenter number of a user.
l Run the terminal user apdinfo command to modify the appended information about a
user.
When the system is faulty, you can contact the user by querying the appended information
of the user. It is recommended that you modify the appended information of the user to the
contact information or the address of the user.
Step 2 Query the user information.
Run the display terminal user command to query the user information.
l

----End

Result
The queried user information is consistent with the user attributes that are modified, and login
to the UA5000 by using the original user name and password is successful.

Example
To modify the attributes of user huawei, password to test02, bound profile to operator, right to
operator, permitted reenter number to 4, and appended information to operator, do as follows:
huawei(config)#terminal user password
User Name(<=15 chars):huawei
New Password(length<6,15>):test02//It is not displayed on the console.

Confirm Password(length<6,15>):test02//It is not displayed on the console.

Information takes effect


Repeat this operation? (y/n)[n]:n

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 83


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

huawei(config)#terminal user user-profile


User Name(<=15 chars):huawei
Permitted user-profile[root]:operator
Confirm user-profile:operator
Configuration will take effect when the user logs on next time.
Repeat this operation? (y/n)[n]:n

huawei(config)#terminal user level


User Name(<=15 chars):huawei
1. Common User 2. Operator:
User's Level:2
Confirm Level:2
Information will take effect when this user logs on next time
Repeat this operation? (y/n)[n]:n

huawei(config)#terminal user reenter


User Name(<=15 chars):huawei
Permitted Reenter Number(0--4):4
Confirm Reenter Number(0--4):4
Information will take effect when this user logs on next time
Repeat this operation? (y/n)[n]:n

huawei(config)#terminal user apdinfo


User Name(<=15 chars):huawei
User's Appended Info(<=30 chars):operator
Information takes effect
Repeat this operation? (y/n)[n]:n
huawei(config)#display terminal user name huawei
----------------------------------------------------------------------------
Name Level Status Reenter Profile Append
Num Info
---------------------------------------------------------------------------
huawei Operator Offline 4 operator operator
----------------------------------------------------------------------------

3.15 Checking the System Time


This topic describes how to check whether the system time, time zone, time stamp, and start and
end Daylight Saving Time (DST) of the UA5000 are consistent with the actual conditions.

Procedure
Step 1 Check the system time.
1. Run the display time command to check the current system time. If the current system time
is consistent with the local standard time, there is no need to modify the current system
time. If the current system time is inconsistent with the local standard time, perform the
following step b.
2. Run the time command to modify the system time.

Step 2 Check the system time zone.


1. Run the display timezone command to check the current system time zone. If the current
system time zone is consistent with the local standard time zone, there is no need to modify
the current system time zone. If the current system time zone is inconsistent with the local
standard time zone, perform the following step b.
2. Run the timezone command to modify the system time zone.

Step 3 Check the time stamp.


1. Run the display time time-stamp command to check the current system time stamp. If the
current system time stamp is consistent with the actual data plan, there is no need to modify

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 84


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

the current system time stamp. If the current system time stamp is inconsistent with the
actual data plan, perform the following step b.
NOTE
The format of the time on the SNMP interface between the NMS and the NE is classified into the
following two types: UTC time and local NE time. By default, the format of the time on the interface
between the NMS and the NE is the local NE time.
2. Run the time time-stamp command to modify the system time stamp.
Step 4 Check the start time and the end time of the Daylight Saving Time (DST).
1. Run the display time dst command to check the start time and the end time of the current
system DST. If the start time and the end time of the current system DST are consistent
with the actual ones, there is no need to modify the start time and the end time of the current
system DST. If the start time and the end time of the current system DST are inconsistent
with the actual ones, perform the following step b.
2. Run the time dst command to modify the start time and the end time of the system DST.

----End

Result
The system time, time zone, time stamp, and start and end DST are consistent with the actual
conditions.

3.16 Configuring Environment Monitoring


The UA5000 provides the function of monitoring various environment parameters (such as the
temperature, humidity, and power voltage) so that the device runs in the stable environment.
This topic describes how to commission the environment monitoring unit (EMU).

3.16.1 Configuring the Monitoring Through the H303ESC


This topic describes how to configure the H303ESC environment monitoring unit (EMU) to
monitor the environment where the device is installed.

Prerequisite
The EMU must be properly connected to the host through environment monitoring cables.

Precaution
l The sub-node number of H303ESC is 30.
l The sub-node addresses must be set consistently with the DIP switches on the ESC. See
Checking the Settings of DIP Switches and Jumpers of Environment Monitoring Boards
for the settings of the DIP switches.
l If the system has multiple EMUs, make sure that all the sub-nodes do not conflict with each
other.

Mapping Between Monitoring Parameters and Device Ports


Table 3-38 describes the mapping between the monitoring parameters displayed on the host and
the ports on the H303ESC.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 85


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-38 Mapping between the monitoring parameters displayed on the host and the ports on
the H303ESC
Monitoring Device Port F02A Cabinet F02A Cabinet Equipped
Parameter Equipped with J1- with J2-Type PDU
on Host Type PDU

Analog 0 Temperature Temperature Temperature

Analog 1 Humidity Humidity Humidity

Analog 2 JTA1 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring analog monitoring analog parameter
parameter

Analog 3 JTA2 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring analog monitoring analog parameter
parameter

Analog 4 JTA3 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring analog monitoring analog parameter
parameter

Analog 5 JTA4 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring analog monitoring analog parameter
parameter

Analog 6 JTA5 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring analog monitoring analog parameter
parameter

Analog 7 JTA6 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring analog monitoring analog parameter
parameter

Digital 0 JTP1 (MDF) Not connected by default, Not connected by default, used
used to add a user-defined to add a user-defined
monitoring digital monitoring digital parameter
parameter

Digital 1 JTM1 (door Door status sensor Door status sensor


status)

Digital 2 JTD1 Fans of the upper HABA Protection


shelf

Digital 3 JTD2 Fans of the upper HABA Power input


shelf

Digital 4 JTD3 Fans of the lower HABA Output control function SW1
shelf

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 86


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Monitoring Device Port F02A Cabinet F02A Cabinet Equipped


Parameter Equipped with J1- with J2-Type PDU
on Host Type PDU

Digital 5 JTD4 Fans of the lower HABA Output control function SW2
shelf

Digital 6 JTD5 Not connected by default, Output control function SW3


used to add a user-defined
monitoring digital
parameter

Digital 7 JTD6 Not connected by default, Output control function SW4


used to add a user-defined
monitoring digital
parameter

Digital 8 JTD7 Not connected by default, Fans of the upper HABA shelf
used to add a user-defined
monitoring digital
parameter

Digital 9 JTD8 Not connected by default, Fans of the upper HABA shelf
used to add a user-defined
monitoring digital
parameter

Digital 10 JTD9 Not connected by default, Fans of the lower HABA shelf
used to add a user-defined
monitoring digital
parameter

Digital 11 JTD10 Not connected by default, Fans of the lower HABA shelf
used to add a user-defined
monitoring digital
parameter

Digital 12 JTD11 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring digital monitoring digital parameter
parameter

Digital 13 JTD12 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring digital monitoring digital parameter
parameter

Digital 14 JTD13 Not connected by default, Not connected by default, used


used to add a user-defined to add a user-defined
monitoring digital monitoring digital parameter
parameter

Digital 15 Reserved Unavailable Unavailable

Digital 16 Reserved Unavailable Unavailable

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 87


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Monitoring Device Port F02A Cabinet F02A Cabinet Equipped


Parameter Equipped with J1- with J2-Type PDU
on Host Type PDU

Digital 17 Reserved Unavailable Unavailable

Digital 18 Reserved Unavailable Unavailable

Digital 19 Reserved Unavailable Unavailable

Digital 20 Reserved Unavailable Unavailable

Digital 21 Reserved Unavailable Unavailable

Digital 22 Reserved Unavailable Unavailable

NOTE

Before adding a user-defined monitoring analog or digital parameter, make sure that the port corresponding
to this parameter is properly connected to an environment monitoring cable.

Data Plan
Table 3-39 describes the data plan for configuring the H303ESC in the F02A cabinet equipped
with J2-type PDU.

Table 3-39 Data plan for configuring the H303ESC

Item Data Remarks

EMU Type: H303ESC H303ESC is displayed as H303ESC on the


CLI.

SN: 0 -

Subnode ID: 30 The serial port of the H303ESC is an RS232


serial port, and the subnode ID must be set to
30.

Analog Analog parameter ID: 0 This analog parameter is set according to the
parameters actual requirements. The built-in analog
parameter is set here to monitor the ambient
temperature of the device.

Upper alarm threshold of When the ambient temperature of the device


analog parameter 0: 50 is equal to or higher than 50C, the host
reports an alarm.
Default: 55C.

Lower alarm threshold of When the ambient temperature of the device


analog parameter 0: 10 is equal to or lower than 10C, the host
reports an alarm.
Default: 5C.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 88


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Analog parameter ID: 1 This analog parameter is set according to the


actual requirements. The built-in analog
parameter is set here to monitor the humidity
of the device.

Upper alarm threshold of When the humidity of the device is equal to


analog parameter 1: 80% or higher than 80% RH, the host reports an
RH alarm.
Default: 80% RH.

Lower alarm threshold of When the humidity of the device is equal to


analog parameter 1: 5% RH or lower than 5% RH, the host reports an
alarm.
Default: 0% RH.

Analog parameter ID: 4 The user-defined voltage monitoring analog


parameter is added to monitor the voltage of
the device.

Upper alarm threshold of When the voltage of the device is equal to or


analog parameter 4: 75 V higher than -75 V, the host reports an alarm.

Lower alarm threshold of When the voltage of the device is equal to or


analog parameter 4: 45 V lower than -45 V, the host reports an alarm.

Name of analog parameter -


4: Supply_Voltage

Alarm ID of analog The user-defined voltage alarm of the system


parameter 4: 3 is used.

Unit of analog parameter 4: -


volt

Sensor type of analog -


parameter 4: voltage type

Digital Digital parameter ID: 0 The monitoring digital parameter of the


parameters MDF sensor is set here to monitor the MDF
status. When the MDF is faulty, the host
reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the high level represents the valid
parameter 0: high level level, the host does not report an alarm in the
case of high level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 89


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Digital parameter ID: 1 The monitoring digital parameter of the door


status sensor is set here to monitor the door
status. When the cabinet door is opened, the
host reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the low level represents the valid level,
parameter 1: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 2 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set here to
monitor the status of the fan tray. When the
fan tray is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 2: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 3 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set here to
monitor the status of the fan tray. When the
fan tray is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 3: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 4 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set here to
monitor the status of the fan tray. When the
fan tray is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 4: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 5 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set here to
monitor the status of the fan tray. When the
fan tray is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 5: low level the host does not report an alarm in the case
of low level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 90


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Digital parameter ID: 6 This digital parameter of the output control


function SW3 is set to monitor the status of
the output control function SW3. When the
function is disabled, the host reports an
alarm.

Valid level of digital When the low level represents the valid level,
parameter 6: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 7 This digital parameter of the output control


function SW4 is set to monitor the status of
the output control function SW4. When the
function is disabled, the host reports an
alarm.

Valid level of digital When the low level represents the valid level,
parameter 7: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 8 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set to monitor the
status of the fan tray. When the fan tray is
faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 8: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 9 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set to monitor the
status of the fan tray. When the fan tray is
faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 9: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 10 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set to monitor the
status of the fan tray. When the fan tray is
faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 10: low level the host does not report an alarm in the case
of low level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 91


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Digital parameter ID: 11 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set to monitor the
status of the fan tray. When the fan tray is
faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 11: low level the host does not report an alarm in the case
of low level.

NOTE

The preceding data is configured according to the actual requirements. When the actually planned value
of a parameter is the same as the default value, it is not necessary to configure the parameter.

Configuration Process
The monitoring parameters can be reported to the control board and the service processing board
only when the data of the H303ESC is correctly configured in the system. Figure 3-43 shows
the configuration process.

Figure 3-43 Configuration process of the H303ESC


Start

Add the EMU

Query the EMU status

Query the default monitoring


information

configure the environment


monitoring parameters

Query the environment


information

Confirm the environment


information

End

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 92


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Procedure
Step 1 Run the emu add command to add an EMU after logging in to the UA5000 through the
maintenance terminal.
huawei(config)#emu add 0 H303ESC 0 30 rs232 H303ESC

Step 2 Run the display emu command to query the status of the H303ESC.
huawei(config)#display emu 0
EMU ID: 0
----------------------------------------------------------------------------
EMU name : H303ESC
EMU type : H303ESC
Used or not : Used
EMU state : Normal
Frame ID : 0
Subnode : 30
COM port : RS232
----------------------------------------------------------------------------

Step 3 Access the environment monitoring configuration mode of the H303ESC, and then run the
display esc system parameter command to query the default configuration information about
analog and digital parameters.
huawei(config)#interface emu 0
huawei(config-if-h303esc-0)#display esc system parameter

EMU ID: 0 ESC system parameter


----------------------------------------------------------------------------
FAN run mode: Auto Auto open temperature: 45 C Auto close temperature: 30 C
AnalogID Name AlmUpper AlmLower TestUpper TestLower Unit Type
0 Temperature 55 5 100 -27 C Voltage
1 Humidity 80 0 100 0 %R.H. Voltage
2 - 127 -128 127 -128 - Voltage
3 - 127 -128 127 -128 - Voltage
4 - 127 -128 127 -128 - Voltage
5 - 127 -128 127 -128 - Voltage
6 - 127 -128 127 -128 - Voltage
7 - 127 -128 127 -128 - Voltage
----------------------------------------------------------------------------
DigitalID Name Level |DigitalID Name Level
0 Wiring 1 | 1 Door0 0
2 - 1 | 3 - 1
4 - 1 | 5 - 1
6 - 1 | 7 - 1
8 - 1 | 9 - 1
10 - 1 | 11 - 1
12 - 1 | 13 - 1
14 - 1 | 15 - 1
16 - 1 | 17 - 1
18 - 1 | 19 - 1
20 - 1 | 21 - 1
----------------------------------------------------------------------------
COM ID Command BaudRate DataLength StopLength ParityType
0 - - - - -
1 - - - - -
PowerNumber : 0 PowerType : -
----------------------------------------------------------------------------

The results show that certain monitoring parameters, such as temperature, humidity, door status,
and MDF, have been configured automatically in the system. Other monitoring parameters,
however, need to be configured manually.

Step 4 Run the esc analog command to set analog parameters.


huawei(config-if-h303esc-0)#esc analog 0 alarm-upper-limit 50 alarm-lower-limit 10
huawei(config-if-h303esc-0)#esc analog 1 alarm-upper-limit 80 alarm-lower-limit 5

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 93


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 5 Run the esc digital command to set digital parameters.


huawei(config-if-h303esc-0)#esc digital 2 available-level low-level digital-alarm
20 name SPD
huawei(config-if-h303esc-0)#esc digital 3 available-level low-level digital-alarm
5 name supply
huawei(config-if-h303esc-0)#esc digital 4 available-level low-level digital-alarm
5 name SW1
huawei(config-if-h303esc-0)#esc digital 5 available-level low-level digital-alarm
5 name SW2
huawei(config-if-h303esc-0)#esc digital 6 available-level low-level digital-alarm
5 name SW3
huawei(config-if-h303esc-0)#esc digital 7 available-level low-level digital-alarm
5 name SW4
huawei(config-if-h303esc-0)#esc digital 8 available-level low-level digital-alarm
13 name fan1
huawei(config-if-h303esc-0)#esc digital 9 available-level low-level digital-alarm
13 name fan2
huawei(config-if-h303esc-0)#esc digital 10 available-level low-level digital-alarm
13 name fan3
huawei(config-if-h303esc-0)#esc digital 11 available-level low-level digital-alarm
13 name fan4

Step 6 Run the save command to save data.


huawei(config-if-h303esc-0)#quit
huawei(config)#save

----End

Result
1. Run the display esc environment info command to query the environment information.
Ensure that the current environment monitoring function is normal and that no alarm is
generated for monitoring parameters except the door status parameter.
huawei(config-if-h303esc-0)#display esc environment info
EMU ID: 0 ESC environment state
FAN control mode :Auto FAN run state: Open
---------------------------Analog environment info--------------------------
ID Name State Value AlmUpper AlmLower Unit
0 Temperature Normal 29.00 50 10 C
1 Humidity Normal 30.98 80 5 %R.H.
2 - Normal -128.00 127 -128 -
3 - Normal -128.00 127 -128 -
4 - Normal -128.00 127 -128 -
5 - Normal -128.00 127 -128 -
6 - Normal -128.00 127 -128 -
7 - Normal -128.00 127 -128 -
---------------------------Digital environment
info---------------------------
ID Name State Value |ID Name State Value
0 Wiring Normal 1 |1 Door0 Alarm 1
2 spd Normal 0 |3 supply Normal 0
4 SW1 Normal 0 |5 SW2 Normal 0
6 SW3 Normal 0 |7 SW4 Normal 0
8 fan1 Normal 0 |9 fan2 Normal 0
10 fan3 Normal 0 |11 fan4 Normal 0
12 - Normal 1 |13 - Normal 1
14 - Normal 1 |15 - Normal 1
16 - Normal 1 |17 - Normal 1
18 - Normal 1 |19 - Normal 1
20 - Normal 1 |21 - Normal 1
----------------------------------------------------------------------------

NOTE

Door status alarm "Door0" is generated because the door is open. At this time, if you turn on the
buzzer on the front panel of the H303ESC board, the buzzer generates a buzzing tone.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 94


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

2. Close the cabinet door, and use the display alarm history command to query alarms.
Ensure that no alarm about all the monitoring parameters is generated.

3.16.2 Configuring the Monitoring Through the H304ESC


This topic describes how to configure the environment monitoring parameters of the H304ESC
board through the CLI.

Prerequisite
The EMU must be properly connected to the host through environment monitoring cables.

Precaution
l The sub-node number of the H304ESC is 30.
l The sub-node addresses must be set consistently with the DIP switches on the ESC. See
Checking the Settings of DIP Switches and Jumpers of Environment Monitoring Boards
for the settings of the DIP switches.
l If the system has multiple EMUs, make sure that all the sub-nodes do not conflict with each
other.

Mapping Between Monitoring Parameters and Device Ports


Table 3-40 describes the mapping between the monitoring parameters displayed on the host and
the ports on the H304ESC.

Table 3-40 Mapping between the monitoring parameters displayed on the host and the ports on
the H304ESC

Monitoring Device Port Application in F02AF Application in F02AF


Parameter on Cabinet (Configured Cabinet (Configured
Host with C-Type PDU) with H-Type PDU)

Analog 0 Temperature Temperature Temperature

Analog 1 Reserved Unavailable Unavailable

Analog 2 Reserved Unavailable Unavailable

Analog 3 Reserved Unavailable Unavailable

Analog 4 Power Power supply voltage Power supply voltage


supply
voltage

Analog 5 JTA1 Not connected by default, Not connected by default,


used to add a user-defined used to add a user-defined
monitoring analog monitoring analog
parameter parameter

Analog 6 JTA2 Not connected by default, Not connected by default,


used to add a user-defined used to add a user-defined
monitoring analog monitoring analog
parameter parameter

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 95


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Monitoring Device Port Application in F02AF Application in F02AF


Parameter on Cabinet (Configured Cabinet (Configured
Host with C-Type PDU) with H-Type PDU)

Analog 7 JTA3 Not connected by default, Not connected by default,


used to add a user-defined used to add a user-defined
monitoring analog monitoring analog
parameter parameter

Digital 0 JTP1 (MDF) Not connected by default, Not connected by default,


used to add a user-defined used to add a user-defined
monitoring digital monitoring digital
parameter parameter

Digital 1 JTM1 (door Door status sensor Door status sensor


status)

Digital 2 JTD1 Surge protection circuit of Fans of the HABF shelf


the first DC input of the C- connected to the subtended
type PDU HABD shelf

Digital 3 JTD2 Surge protection circuit of Switch 1 input of the H-type


the second DC input of the PDU
C-type PDU

Digital 4 JTD3 First output control switch Switch 2 input of the H-type
SW1 of the C-type PDU PDU

Digital 5 JTD4 Second output control Switch 3 input of the H-type


switch SW2 of the C-type PDU
PDU

Digital 6 JTD5 Third output control switch Switch 4 input of the H-type
SW3 of the C-type PDU PDU

Digital 7 JTD6 Monitoring alarm of the C- Input tributary 1 detection of


type PDU the H-type PDU

Digital 8 JTD7 Fans of the master HABD Input tributary 2 detection of


shelf the H-type PDU

Digital 9 JTD8 Fans of the HABF shelf Input tributary 3 detection of


connected to the master the H-type PDU
HABD shelf

Digital 10 JTD9 Fans of the HABD shelf Input tributary 4 detection of


subtended to the master the H-type PDU
HABD shelf

Digital 11 JTD10 Fans of the HABF shelf Fans of the master HABD
connected to the subtended shelf
HABD shelf

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 96


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Monitoring Device Port Application in F02AF Application in F02AF


Parameter on Cabinet (Configured Cabinet (Configured
Host with C-Type PDU) with H-Type PDU)

Digital 12 JTD11 Not connected by default, Fans of the HABF shelf


used to add a user-defined connected to the master
monitoring digital HABD shelf
parameter.

Digital 13 JTD12 Not connected by default, Fans of the HABD shelf


used to add a user-defined subtended to the master
monitoring digital HABD shelf
parameter.

Digital 14 Reserved Unavailable Unavailable

Digital 15 Reserved Unavailable Unavailable

Digital 16 Reserved Unavailable Unavailable

Digital 17 Reserved Unavailable Unavailable

Digital 18 Reserved Unavailable Unavailable

Digital 19 Reserved Unavailable Unavailable

Digital 20 Reserved Unavailable Unavailable

Digital 21 Reserved Unavailable Unavailable

Digital 22 Reserved Unavailable Unavailable

NOTE

Before adding a user-defined analog or monitoring digital parameter, make sure that the port corresponding
to this parameter is connected with an environment monitoring cable.

Data Plan
NOTE

l The preceding data is configured according to the actual requirements. When the actually planned value
of a parameter is the same as the default value, it is not necessary to configure the parameter.
l The configuration of the monitoring parameters in the F02AF cabinet configured with the C-type PDU
is basically the same as that in the F02AF cabinet configured with the H-type PDU. The only difference
lies in the definition of the PDU monitoring parameter, but the valid levels for these two PDUs are
both set to low level.

Table 3-41 provides the data plan for configuring the H304ESC. In this topic, the application
in the F02AF cabinet with the C-type PDU is considered as an example.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 97


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-41 Data plan for configuring the H304ESC


Item Data Remarks

EMU Type: H304ESC H304ESC is displayed as H304ESC on the


CLI.

SN: 0 -

Subnode ID: 30 The serial port of the H304ESC is an RS-232


serial port, and the subnode ID must be set to
30.

Analog Analog parameter ID: 0 This analog parameter is set according to the
parameters actual requirements. The built-in analog
parameter is set here to monitor the ambient
temperature of the device.

Upper alarm threshold of When the ambient temperature of the device


analog parameter 0: 50 is equal to or higher than 50C, the host
reports an alarm.
Default: 55C.

Lower alarm threshold of When the ambient temperature of the device


analog parameter 0: 5 is equal to or lower than 5C, the host reports
an alarm.
Default: 5C.

Analog parameter ID: 4 This analog parameter is set according to the


actual requirements. The built-in analog
parameter is set here to monitor the voltage
of the device.

Upper alarm threshold of When the voltage of the device is equal to or


analog parameter 4: 75 V higher than -75 V, the host reports an alarm.
Default: 75 V.

Lower alarm threshold of When the voltage of the device is equal to or


analog parameter 4: 45 V lower than -45 V, the host reports an alarm.
Default: 45 V.

Analog parameter ID: 5 The user-defined humidity monitoring


analog parameter is added to monitor the
humidity of the device.

Upper alarm threshold of When the humidity of the device is equal to


analog parameter 5: 80 or higher than 80% RH, the host reports an
alarm.

Lower alarm threshold of When the humidity of the device is equal to


analog parameter 5: 0 or lower than 0% RH, the host reports an
alarm.

Name of analog parameter -


5: Humidity

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 98


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Alarm ID of analog The user-defined humidity alarm of the


parameter 5: 2 system is used.

Unit of analog parameter 5: -


% RH

Sensor type of analog -


parameter 5: voltage type

Digital Digital parameter ID: 0 The monitoring digital parameter of the


parameters MDF sensor is set here to monitor the MDF
status. When the MDF is faulty, the host
reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the high level represents the valid
parameter 0: high level level, the host does not report an alarm in the
case of high level.

Digital parameter ID: 1 The monitoring digital parameter of the door


status sensor is set here to monitor the door
status. When the cabinet door is opened, the
host reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the low level represents the valid level,
parameter 1: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 2 The monitoring digital parameter of the


surge protection circuit of the first DC input
is set here to monitor the status of the
protection circuit. When the protection
circuit fails, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 2: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 3 The monitoring digital parameter of the


surge protection circuit of the second DC
input is set here to monitor the status of the
protection circuit. When the protection
circuit fails, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 3: low level the host does not report an alarm in the case
of low level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 99


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Digital parameter ID: 4 The monitoring digital parameter of SW1 is


set here to monitor the status of SW1. When
SW1 is turned off, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 4: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 5 The monitoring digital parameter of SW2 is


set here to monitor the status of SW2. When
SW2 is turned off, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 5: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 6 The monitoring digital parameter of SW3 is


set here to monitor the status of SW3. When
SW3 is turned off, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 6: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 8 The monitoring digital parameter of the fans


of the master HABD shelf is set here to
monitor the status of the fans of the master
HABD shelf. When the fan tray is faulty, the
host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 8: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 9 The monitoring digital parameter of the fans


of the HABF shelf connected to the master
HABD shelf is set here to monitor the status
of the fans of the HABF shelf. When the fan
tray is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 9: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 10 The monitoring digital parameter of the fans


of the HABD shelf subtended to the master
HABD shelf is set here to monitor the status
of the fans of the HABD shelf. When the fan
tray is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level,
parameter 10: low level the host does not report an alarm in the case
of low level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 100


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Digital parameter ID: 11 The monitoring digital parameter of the fans


of the HABF shelf connected to the
subtended HABD shelf is set here to monitor
the status of the fans of the HABF shelf.
When the fan tray is faulty, the host reports
an alarm.

Valid level of digital When the low level represents the valid level,
parameter 11: low level the host does not report an alarm in the case
of low level.

Configuration Process
The monitoring parameters can be reported to the control board only when the data of the
H304ESC is correctly configured in the system. Figure 3-44 shows the configuration process.

Figure 3-44 Configuration process of the H304ESC


Start

Add the EMU

Query the EMU status

Query the default monitoring


information

configure the environment


monitoring parameters

Query the environment


information

Confirm the environment


information

End

Procedure
Step 1 Run the emu add command to add an EMU after logging in to the UA5000 through the
maintenance terminal.
huawei(config)#emu add 0 H304ESC 0 30 rs232 H304ESC

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 101


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 2 Run the display emu command to query the status of the H304ESC.
huawei(config)#display emu 0
EMU ID: 0
----------------------------------------------------------------------------
EMU name : H304ESC
EMU type : H304ESC
Used or not : Used
EMU state : Normal
Frame ID : 0
Subnode : 30
COM port : RS232
----------------------------------------------------------------------------

Step 3 Access the environment monitoring configuration mode of the H304ESC, and then run the
display esc system parameter command to query the default configuration information about
analog and digital parameters.
huawei(config)#interface emu 0
huawei(config-if-h304esc-0)#display esc system parameter
EMU ID: 0 ESC system parameter
----------------------------------------------------------------------------
FAN run mode: Auto Auto open temperature: 45 C Auto close temperature: 30 C
AnalogID Name AlmUpper AlmLower TestUpper TestLower Unit Type
0 Temperature 55 5 100 -27 C Voltage
1 - 127 -128 127 -128 - Voltage
2 - 127 -128 127 -128 - Voltage
3 - 127 -128 127 -128 - Voltage
4 Supply_Voltage 65 45 75 0 Volt Voltage
5 - 127 -128 127 -128 - Voltage
6 - 127 -128 127 -128 - Voltage
7 - 127 -128 127 -128 - Voltage
----------------------------------------------------------------------------
DigitalID Name Level |DigitalID Name Level
0 Wiring 1 | 1 Door0 0
2 - 1 | 3 - 1
4 - 1 | 5 - 1
6 - 1 | 7 - 1
8 - 1 | 9 - 1
10 - 1 | 11 - 1
12 - 1 | 13 - 1
14 - 1 | 15 - 1
16 - 1 | 17 - 1
18 - 1 | 19 - 1
20 - 1 | 21 - 1
----------------------------------------------------------------------------
COM ID Command BaudRate DataLength StopLength ParityType
0 - - - - -
1 - - - - -
PowerNumber : 0 PowerType : -
Battery off permission: Permit Battery off voltage: 43.2V
Battery0 capacity: 100A Battery1 capacity: 100A Equalizing time: 60days
----------------------------------------------------------------------------

The results show that certain monitoring parameters, such as temperature, voltage, door status,
and MDF, have been configured automatically in the system. Other monitoring parameters,
however, need to be configured manually.
Step 4 Run the esc analog command to set analog parameters.
huawei(config-if-h304esc-0)#esc analog 0 alarm-upper-limit 50 alarm-lower-limit 5
huawei(config-if-h304esc-0)#esc analog 5 alarm-upper-limit 80 alarm-lower-limit 0
name Humidity sensor-type 0:voltage analog-alarm 2 unit %RH

Step 5 Run the esc digital command to set digital parameters.


huawei(config-if-h304esc-0)#esc digital 2 available-level low-level name SPD1
huawei(config-if-h304esc-0)#esc digital 3 available-level low-level name SPD2
huawei(config-if-h304esc-0)#esc digital 4 available-level low-level name SW1
huawei(config-if-h304esc-0)#esc digital 5 available-level low-level name SW2
huawei(config-if-h304esc-0)#esc digital 6 available-level low-level name SW3

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 102


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

huawei(config-if-h304esc-0)#esc digital 8 available-level low-level name fan1


huawei(config-if-h304esc-0)#esc digital 9 available-level low-level name fan2
huawei(config-if-h304esc-0)#esc digital 10 available-level low-level name fan3
huawei(config-if-h304esc-0)#esc digital 11 available-level low-level name fan4

Step 6 Run the save command to save data.


huawei(config-if-h304esc-0)#quit
huawei(config)#save

----End

Result
1. Run the display esc environment info command to query the environment information.
Ensure that the current environment monitoring function is normal and that no alarm is
generated for monitoring parameters except the door status parameter.
huawei(config-if-h304esc-0)#display esc environment info
EMU ID: 0 ESC environment state
FAN control mode :Auto FAN run state: Close Battery charge state: Floating
---------------------------Analog environment info--------------------------
ID Name State Value AlmUpper AlmLower Unit
0 Temperature Normal 29.00 55 5 C
1 - Normal 0.00 127 -128 -
2 - Normal 0.00 127 -128 -
3 - Normal -128.00 127 -128 -
4 Supply_Voltage Normal 52.73 65 45 Volt
5 Humidity Normal 30.98 80 0 -
6 - Normal -128.00 127 -128 -
7 - Normal -128.00 127 -128 -
---------------------------Digital environment info
ID Name State Value |ID Name State Value
0 Wiring Normal 1 |1 Door0 Alarm 1
2 SPD1 Normal 0 |3 SPD2 Normal 0
4 SW1 Normal 0 |5 SW2 Normal 0
6 SW3 Normal 0 |7 - Normal 1
8 fan1 Normal 0 |9 fan2 Normal 0
10 fan3 Normal 0 |11 fan4 Normal 0
12 - Normal 1 |13 - Normal 1
14 - Normal 1 |15 - Normal 1
16 - Normal 1 |17 - Normal 1
18 - Normal 1 |19 - Normal 1
20 - Normal 1 |21 - Normal 1
----------------------------------------------------------------------------

NOTE

Door status alarm "Door0" is generated because the door is open. At this time, if you turn on the
buzzer on the front panel of the H304ESC board, the buzzer generates a buzzing tone.
2. Close the cabinet door, and use the display alarm history command to query alarms.
Ensure that no alarm about all the monitoring parameters is generated.

3.16.3 Configuring the Environment Monitoring Through the


ESCM (for M200 Cabinet)
This topic describes how to configure the temperature, door status, MDF and power supply
monitoring parameters of the ESCM.

Mapping Between Monitoring Parameters and Device Ports


Table 3-42 describes the mapping between the monitoring parameters displayed on the host and
the ports on the ESCM.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 103


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-42 Mapping between the monitoring parameters displayed on the host and the ports on
the ESCM
Monitoring Device Port Application in M200 Cabinet
Parameter on
Host

Temperature Temperature Temperature

Input_-48V_0 Voltage Voltage

Analog 3 JTA1 Humidity

Analog 4 JTA2 Not connected by default, used to add a user-


defined monitoring analog parameter

Wiring JTP1 (MDF) MDF

Door0 JTM1 (door status) Door status sensor

Digital 2 JTD1 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 3 JTD2 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 4 JTD3 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 5 JTD4 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 6 JTD5 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 7 JTD6 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 8 JTD7 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 9 JTS1 (water) Not connected by default, used to add a user-


defined monitoring digital parameter

NOTE

Before adding a user-defined analog or digital monitoring parameter, make sure that the port corresponding
to this analog or digital monitoring parameter is properly connected with an environment monitoring cable.

Data Plan
Table 3-43 provides the data plan for configuring the ESCM.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 104


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-43 Data plan for configuring the ESCM


Item Data Remarks

EMU Type: ESCM ESCM is displayed as MiniESC on the CLI.

SN: 0 -

Subnode ID: 30 The serial port of the ESCM is an RS232


serial port, and the subnode ID must be set to
30.

Analog Analog parameter ID: 0 This analog parameter is set according to the
parameters actual requirements. The built-in analog
parameter is set here to monitor the ambient
temperature of the device.

Upper alarm threshold of When the ambient temperature of the device


analog parameter 0: 50 is equal to or higher than 50C, the host
reports an alarm.
Default: 55C.

Lower alarm threshold of When the ambient temperature of the device


analog parameter 0: 10 is equal to or lower than 10C, the host
reports an alarm.
Default: 5C.

Analog parameter ID: 1 This analog parameter is set according to the


actual requirements. The built-in analog
parameter is set here to monitor the voltage
of the device.

Upper alarm threshold of When the voltage of the device is equal to or


analog parameter 1: 75 V lower than -75V, the host reports an alarm.
Default: -75V.

Lower alarm threshold of When the voltage of the device is equal to or


analog parameter 1: 45 V lower than -45 V, the host reports an alarm.
Default: -45 V.

Analog parameter ID: 2 The user-defined humidity monitoring


analog parameter is added to monitor the
humidity of the device.

Upper alarm threshold of When the humidity of the device is equal to


analog parameter 2: 80 or lower than 80% RH, the host reports an
alarm.

Lower alarm threshold of When the humidity of the device is equal to


analog parameter 2: 0 or lower than 0% RH, the host reports an
alarm.

Name of analog parameter -


2: Humidity

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 105


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Alarm ID of analog The user-defined humidity alarm of the


parameter 2: 2 system is used.

Unit of analog parameter 2: -


% RH

Sensor type of analog -


parameter 2: voltage type

Digital Digital parameter ID: 0 The monitoring digital parameter of the


parameters MDF sensor is set here to monitor the status
of the MDF. When the MDF is faulty, the
host reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the high level represents the valid
parameter 0: high level level, the host does not report an alarm in the
case of high level.

Digital parameter ID: 1 The monitoring digital parameter of the door


status sensor is set here to monitor the door
status. When the cabinet door is opened, the
host reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the low level represents the valid level,
parameter 1: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 9 The user-defined water monitoring analog


parameter is added.

Valid level of digital When the low level represents the valid level,
parameter 9: low level the host does not report an alarm in the case
of low level.

NOTE

The preceding data is configured according to the actual requirements. When the actually planned value
of a parameter is the same as the default value, it is not necessary to configure the parameter.

Configuration Process
The monitoring parameters can be reported to the control board only when the data of the ESCM
is correctly configured in the system. Figure 3-45 shows the configuration process.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 106


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-45 Configuration process of the ESCM


Start

Add the EMU

Query the EMU status

Query the default monitoring


information

configure the environment


monitoring parameters

Query the environment


information

Confirm the environment


information

End

Procedure
Step 1 Run the emu add command to add an EMU after logging in to the UA5000 through the
maintenance terminal.
huawei(config)#emu add 0 MiniESC 0 30 rs232 MiniESC

Step 2 Access the ESCM environment monitoring configuration mode, and then run the display emu
command to query the default configuration information about analog and digital parameters.
huawei(config)#display emu 0
EMU ID: 0
----------------------------------------------------------------------------
EMU name : MiniESC
EMU type : MiniESC
Used or not : Used
EMU state : Normal
Frame ID : 0
Subnode : 30
COM port : RS232

Step 3 Access the ESCM environment monitoring configuration mode, and then run the display esc
system parameter command to query the default configuration information about analog and
digital parameters.
huawei(config)#interface emu 0
huawei(config-if-MiniESC-0)#display esc system parameter

EMU ID: 0 ESC system parameter


----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestHigh TestLow Unit type
0 Temperature 55 5 100 -27 C Voltage
1 Input_-48V_0 72 38 75 0 volt Voltage
2 - 127 -128 127 -128 - Voltage

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 107


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3 - 127 -128 127 -128 - Voltage


----------------------------------------------------------------------------
DigitalID Name Available Level|DigitalID Name Available Level
0 Wiring 1 | 1 Door0 0
2 - 1 | 3 - 1
4 - 1 | 5 - 1
6 - 1 | 7 - 1
8 - 1 | 9 - 1
----------------------------------------------------------------------------

The results show that certain monitoring parameters, such as temperature, voltage, door status,
and MDF, have been configured automatically in the system. Other monitoring parameters,
however, need to be configured manually.
Step 4 Run the esc analog command to set analog parameters.
huawei(config-if-MiniESC-0)#esc analog 0 alarm-upper-limit 50 alarm-lower-limit 10
huawei(config-if-MiniESC-0)#esc analog 2 alarm-upper-limit 80 alarm-lower-limit 0
name Humidity sensor-type 0:voltage analog-alarm 2 unit %RH

Step 5 Run the esc digital command to set digital parameters.


huawei(config-if-MiniESC-0)#esc digital 9 available-level low-level name szl9
digital-alarm 7

Step 6 Run the save command to save data.


huawei(config-if-MiniESC-0)#quit
huawei(config)#save

----End

Result
1. Run the display esc environment info command to query the environment information.
Ensure that the current environment monitoring function is normal and that no alarm is
generated for monitoring parameters except the door status parameter.
huawei(config-if-MiniESC-0)#display esc environment info
EMU ID: 0 ESC environment state
FAN control mode :Auto FAN run state: Open
---------------------------Analog environment info--------------------------
ID Name State Value AlmUpper AlmLower Unit
0 Temperature Normal 29.00 50 10 C
1 Input_-48v_0 Normal 53.906 72 38 V
2 Humidity Normal -128.00 80 0 -
3 - Normal -128.00 127 -128 -
---------------------------Digital environment
info---------------------------
ID Name State Value |ID Name State Value
0 Wiring Normal 1 |1 Door0 Alarm 1
2 - Normal 1 |3 - Normal 1
4 - Normal 1 |5 - Normal 1
6 - Normal 1 |7 - Normal 1
8 - Normal 1 |9 szl9 Normal 0
----------------------------------------------------------------------------

NOTE

The door status alarm "Door0" is generated because the door is open.
2. Close the cabinet door, and use the display alarm history command to query alarms.
Ensure that no alarm about all the monitoring parameters is generated.

3.16.4 Configuring the Monitoring Through the ESCM (for F02AF


Cabinet)
This topic describes how to configure the temperature, door status, MDF and power supply
monitoring parameters of the ESCM.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 108


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Mapping Between Monitoring Parameters and Device Ports


The F02A cabinet is configured with two ESCM environment monitoring units (EMUs). This
is because when a large number of monitoring parameters are used, one ESCM EMU cannot
meet the requirements. Table 3-44 lists the mapping between monitoring parameters and ESCM
ports.

Table 3-44 Mapping between the monitoring parameters displayed on the host and the ports on
the ESCM
Monitoring Device Port Application in F02AF Cabinet
Parameter on
Host

Temperature Temperature Temperature

Input_-48V_0 Voltage Voltage

Analog 2 JTA1 Not connected by default, used to add a user-


defined monitoring analog parameter

Analog 3 JTA2 Not connected by default, used to add a user-


defined monitoring analog parameter

Wiring JTP1 (MDF) Not connected by default, only used to monitor


the MDF

Door0 JTM1 (door status) Connected by default, only used to monitor the
door status

Digital 2 JTD1 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 3 JTD2 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 4 JTD3 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 5 JTD4 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 6 JTD5 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 7 JTD6 Not connected by default, used to add a user-


defined monitoring digital parameter

Digital 8 JTD7 (smoke) Not connected by default, only used to monitor


fog and smoke

Digital 9 JTS1 (water) Not connected by default, only used to monitor


water

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 109


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

NOTE

Before adding a user-defined analog or digital monitoring parameter, make sure that the port corresponding
to this analog or digital monitoring parameter is properly connected to an environment monitoring cable.

Data Plan
Table 3-45 provides the data plan for configuring the ESCM.

Table 3-45 Data plan for configuring the ESCM


Item Data Remarks

EMU Type: ESCM ESCM is displayed as MiniESC on the CLI.

SN: 0 -

Subnode ID: 0 The DIP switch of the ESCM hardware is set


NOTE to 0.
When the second ESCM NOTE
EMU is added, the subnode When the second ESCM EMU is added, the DIP
must be set to 2. switch must be set to 2.

Serial port: RS485 -

Analog Analog parameter ID: 0 This analog parameter is set according to the
parameters actual requirements. The built-in analog
parameter is set here to monitor the ambient
temperature of the device.

Upper alarm threshold of When the ambient temperature of the device


analog parameter 0: 50 is equal to or higher than 50C, the host
reports an alarm.
Default: 55C.

Lower alarm threshold of When the ambient temperature of the device


analog parameter 0: 5 is equal to or lower than 5C, the host reports
an alarm.
Default: 5C.

Analog parameter ID: 1 This analog parameter is set according to the


actual requirements. The built-in analog
parameter is set here to monitor the input
voltage of the ESCM.

Upper alarm threshold of When the voltage of the device is equal to or


analog parameter 1: 75 V lower than -75V, the host reports an alarm.
Default: -72V.

Lower alarm threshold of When the voltage of the device is equal to or


analog parameter 1: 45 V lower than -45 V, the host reports an alarm.
Default: -38 V.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 110


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Remarks

Digital Digital parameter ID: 0 The monitoring digital parameter of the


parameters MDF sensor is set here to monitor the status
of the MDF. When the MDF is faulty, the
host reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the high level represents the valid
parameter 0: high level level, the host does not report an alarm in the
case of high level.

Digital parameter ID: 1 The monitoring digital parameter of the door


status sensor is set here to monitor the door
status. When the cabinet door is opened, the
host reports an alarm.
Allocated by default (unable to be changed
by the user).

Valid level of digital When the low level represents the valid level,
parameter 1: low level the host does not report an alarm in the case
of low level.

Digital parameter ID: 9 The monitoring digital parameter of the


water .

Valid level of digital When the low level represents the valid level,
parameter 9: high level the host does not report an alarm in the case
of low level.
Default: high level.

NOTE

The preceding data is configured according to the actual requirements. When the actually planned value
of a parameter is the same as the default value, it is not necessary to configure the parameter.

Configuration Process
The monitoring parameters can be reported to the control board only when the data of the ESCM
is correctly configured in the system. Figure 3-46 shows the configuration process.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 111


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-46 Configuration process of the ESCM


Start

Add the EMU

Query the EMU status

Query the default monitoring


information

configure the environment


monitoring parameters

Query the environment


information

Confirm the environment


information

End

Procedure
Step 1 Configure the first ESCM EMU.
1. Run the emu add command to add an EMU after logging in to the UA5000 through the
maintenance terminal.
huawei(config)#emu add 0 MiniESC 0 0 rs485 MiniESC-1

2. Run the display emu command to query the run state of the ESCM.
huawei(config)#display emu 0

EMU ID:
0

----------------------------------------------------------------------------
EMU name :
MiniESC-1
EMU type :
MiniESC
EMU state :
Normal
Frame ID :
0
Subnode :
0
COM Port :
RS485

----------------------------------------------------------------------------

3. Access the ESCM environment monitoring configuration mode, and then run the display
esc system parameter command to query the default configuration information about
analog and digital parameters.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 112


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

huawei(config)#interface emu 0
huawei(config-if-MiniESC-0)#display esc system parameter
EMU ID: 0 ESC system parameter

----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestHigh TestLow Unit
type
0 Temperature 55 5 100 -27 C
Voltage
1 Input_-48V_0 72 38 75 0 volt
Voltage
2 - 127 -128 127 -128 -
Voltage
3 - 127 -128 127 -128 -
Voltage

----------------------------------------------------------------------------
DigitalID Name Available Level|DigitalID Name Available
Level
0 Wiring 1 | 1 Door0
0
2 - 1 | 3 -
1
4 - 1 | 5 -
1
6 - 1 | 7 -
1
8 - 1 | 9 Water
1
----------------------------------------------------------------------------

NOTE

The query result indicates that the monitoring systems for temperature, voltage, door status, water, and
MDF are configured automatically. Check whether the configurations are the same as the data planning.
If they are different, configure the monitoring system according to the data planning.
4. Run the esc analog command to set analog parameters.
huawei(config-if-MiniESC-0)#esc analog 0 alarm-upper-limit 50
huawei(config-if-MiniESC-0)#esc analog 1 alarm-upper-limit 75 alarm-lower-
limit 45

5. Run the display esc system parameter command to query whether the configuration
information about analog and digital parameters is consistent with the data plan.
huawei(config-if-MiniESC-0)#display esc system parameter

EMU ID: 0 ESC system


parameter

----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestHigh TestLow Unit
type
0 Temperature 50 5 100 -27 C
Voltage
1 Input_-48V_0 75 45 75 0 volt
Voltage
2 - 127 -128 127 -128 -
Voltage
3 - 127 -128 127 -128 -
Voltage

----------------------------------------------------------------------------
DigitalID Name Available Level|DigitalID Name Available
Level
0 Wiring 1 | 1 Door0
0
2 - 1 | 3 -
1
4 - 1 | 5 -
1

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 113


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

6 - 1 | 7 -
1
8 - 1 | 9 Water
1

----------------------------------------------------------------------------

6. Run the save command to save data.


huawei(config-if-MiniESC-0)#quit
huawei(config)#save

Step 2 Configure the second ESCM EMU.


1. Run the emu add command to add an EMU after logging in to the UA5000 through the
maintenance terminal.
huawei(config)#emu add 1 MiniESC 0 2 rs485 MiniESC-2

2. The subsequent steps are the same as that in configuring the first ESCM EMU and therefore
are omitted here.

----End

Result
1. Run the display esc environment info command to query the environment information.
Ensure that the current environment monitoring function is normal and that no alarm is
generated for monitoring parameters except the door status parameter.
huawei(config-if-MiniESC-0)#display esc environment info
EMU ID: 0 ESC environment
state
FAN control mode :Auto FAN run state:
Open
---------------------------Analog environment
info--------------------------
ID Name State Value AlmUpper AlmLower
Unit
0 Temperature Normal 29.00 50 5
C
1 Input_-48v_0 Normal 53.906 75 45
V
2 - Normal -128.00 127 -128
-
3 - Normal -128.00 127 -128
-
---------------------------Digital environment
info---------------------------
ID Name State Value |ID Name State
Value
0 Wiring Normal 1 |1 Door0 Alarm
1
2 - Normal 1 |3 - Normal
1
4 - Normal 1 |5 - Normal
1
6 - Normal 1 |7 - Normal
1
8 - Normal 1 |9 Water Normal
1
----------------------------------------------------------------------------

2. Close the cabinet door, and use the display esc environment info command to query the
environment information, the door status normal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 114


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

3.16.5 Configuring the Environment Monitoring Through the


EPS30-4815AF
This topic provides the basic information about the EPS30-4815AF power system and describes
how to configure environment monitoring data. This power system functions to convert the input
AC power into DC power to provide DC power source for the device. The power system also
supports management of one set of batteries.

Mapping Between Monitoring Parameters and Device Ports


Table 3-46 describes the mapping between the monitoring parameters displayed on the host and
the ports on the sensor transfer box.

Table 3-46 Mapping between the monitoring parameters displayed on the host and the ports on
the sensor transfer box
Monitoring Device Application in Application in Application in
Parameter Port M200 Cabinet F01E200 Cabinet F01E400 Cabinet
on Host

Digital 0 JTD1 Not connected by Not connected by Not connected by


default, used to add default, used to add default, used to add
a user-defined a user-defined a user-defined
monitoring digital monitoring digital monitoring digital
parameter parameter parameter

Digital 1 JTD2 Not connected by Fan monitoring Fan monitoring


default, used to add board board
a user-defined
monitoring digital
parameter

Digital 2 JTD3 Not connected by Not connected by Not connected by


default, used to add default, used to add default, used to add
a user-defined a user-defined a user-defined
monitoring digital monitoring digital monitoring digital
parameter parameter parameter

Digital 3 JTD4 Not connected by Lightning arrester Lightning arrester


default, used to add
a user-defined
monitoring digital
parameter

Digital 4 JTD5 Not connected by Not connected by Not connected by


default, used to add default, used to add default, used to add
a user-defined a user-defined a user-defined
monitoring digital monitoring digital monitoring digital
parameter parameter parameter

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 115


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Monitoring Device Application in Application in Application in


Parameter Port M200 Cabinet F01E200 Cabinet F01E400 Cabinet
on Host

Digital 5 JTD6 Not connected by Not connected by Not connected by


default, used to add default, used to add default, used to add
a user-defined a user-defined a user-defined
monitoring digital monitoring digital monitoring digital
parameter parameter parameter

Digital 6 JTD7 Not connected by Not connected by Not connected by


default, used to add default, used to add default, used to add
a user-defined a user-defined a user-defined
monitoring digital monitoring digital monitoring digital
parameter parameter parameter

Door alarm JTM1 Door status sensor Door status sensor Door status sensor

Wiring alarm JTP1 MDF MDF MDF

Battery Tem BAT_W Not connected by Battery Battery


E default, used to add temperature sensor temperature sensor
a user-defined
monitoring digital
parameter

environment TEM-HU Temperature and Temperature and Temperature and


Tem/ humidity sensor humidity sensor humidity sensor
environment
Hum

NOTE

Before adding a user-defined analog or digital monitoring parameter, make sure that the port corresponding
to this analog or digital monitoring parameter is properly connected with an environment monitoring cable.

Data Plan
The data plan for configuring monitoring parameters of the EPS30-4815AF in the M200 cabinet
is the same that in the F01E200 and F01E400 cabinets. In this topic, the application in the
F01E400 cabinet is considered as an example. Table 3-47 provides the data plan for configuring
the monitoring parameters of the EPS30-4815AF.

Table 3-47 Data plan for configuring the monitoring parameters of the EPS30-4815AF

Item Data Plan for F01E400 Remarks


Cabinet

EMU Type: POWER4845 During the configuration of the EPS30-4815AF,


the type of the EPS30-4815AF is selected as
POWER4845.

SN: 0 -

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 116


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for F01E400 Remarks


Cabinet

Subnode ID: 0 The subnode ID must be the same as the subnode


setting of the corresponding DIP switch on the
EMU, but the subnode ID must be different from
IDs of the other subnodes on the same bus.

Charging Charging mode of the This parameter is set according to the actual
parameters battery: automatic requirements.
of the battery automatic: The power system automatically
adjusts the charging mode of the battery
according to the status of the battery set.
equalizing: The battery is charged forcibly so as
to quickly compensate for the lost capacity of the
battery.
floating: The battery adjusts charging/
discharging when it is in saturation.
Default: automatic.

Equalized charging This parameter is set according to the actual


voltage of the battery: requirements. When setting the equalized
56.5 V charging voltage of the battery, make sure that DC
overvoltage - 1 V > equalized charging voltage >
float charging voltage + 2 V, and that DC
undervoltage > load power-off voltage > battery
power-off voltage.
Default: 56.5 V.

Float charging voltage of This parameter is set according to the actual


the battery: 53.5 V requirements. When setting the float charging of
the battery, make sure that DC overvoltage - 1 V
> equalized charging voltage > float charging
voltage + 2 V, and that DC undervoltage > load
power-off voltage > battery power-off voltage.
Default: 53.5 V.

Battery Current-limiting This parameter is set according to the actual


management coefficient for battery requirements. In the normal state, the current of
parameters charging: 0.15 the power supply is not limited. The current-
limiting function is enabled when the charging
current of the battery set > current-limiting
coefficient x nominal capacity of the battery set.
Default value: 0.15.

Interval of battery This parameter is set according to the actual


equalized charging: 60 requirements. If the continuous float charging
days duration of the rectifier unit exceeds the preset
equalized charging interval, the battery enters the
equalized charging state.
Default: 60 days.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 117


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for F01E400 Remarks


Cabinet

Number of battery sets: 1 This parameter is set according to the actual


requirements. The number of battery sets can be
set to 0 or 1. That is, the system supports up to one
battery set.
Default: 1.

Capacity of the battery The battery capacity is configured according to


set: 75 AH the actual value. The F01E200 cabinet uses the 50
AH batteries, the F01E400 cabinet uses the 75 AH
batteries, and the M200 cabinet has no batteries.
Default: 130 AH.

Temperature Upper temperature This parameter is set according to the actual


compensatio threshold of the battery requirements.
n parameters set: 80C Default: 60C.
of the battery
Lower temperature This parameter is set according to the actual
threshold of the battery requirements.
set: -20C Default: -40C.

Temperature This parameter is set according to the actual


compensation requirements. The temperature compensation
coefficient of the battery coefficient refers to the variable of the float
set: 80 mV charging voltage of the battery set when the
temperature of the battery set changes by every 1
C.
Default: 100 mV.

Power Load power-off This parameter is set according to the actual


supply load permission status: forbid requirements.
power-off Default: permit.
and battery
set power-off Battery set power-off This parameter is set according to the actual
parameters permission status: permit requirements.
Default: permit.

Load power-off voltage: This parameter is set according to the actual


44 V requirements.
Default: 43.5 V.

Battery set power-off This parameter is set according to the actual


voltage: 43 V requirements.
Default: 43 V.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 118


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for F01E400 Remarks


Cabinet

Power AC overvoltage alarm This parameter is set according to the actual


distribution threshold of the power requirements. When the AC voltage exceeds the
parameters supply: 280 V preset overvoltage alarm threshold, the system
reports an AC overvoltage alarm. In this case, the
rectifier unit powers off automatically to protect
the system.
Default: 280 V.

AC undervoltage alarm This parameter is set according to the actual


threshold of the power requirements. When the AC voltage falls below
supply: 180 V the preset undervoltage alarm threshold, the
system reports an AC undervoltage alarm. In this
case, the rectifier unit powers off automatically to
protect the system.
Default: 180 V.

DC overvoltage alarm This parameter is set according to the actual


threshold of the power requirements. When the DC voltage exceeds the
supply: 58 V preset overvoltage alarm threshold, the system
reports a DC overvoltage alarm. In this case, the
rectifier unit powers off automatically to protect
the system.
Default: 58 V.

DC undervoltage alarm This parameter is set according to the actual


threshold of the power requirements. When the DC voltage falls below
supply: 45 V the preset undervoltage alarm threshold, the
system reports a DC undervoltage alarm. In this
case, the rectifier unit powers off automatically to
protect the system.
Default: 45 V.

Rectifier unit Number of rectifier This parameter is set according to the actual
parameter units: 2 requirements. The EPS30-4815AF supports up to
two rectifier units.
Default value: 3.

Load and Load high-temperature This parameter is set according to the actual
battery high- power-off permission requirements.
temperature status: forbid Default: permit.
power-off
parameters Battery high- This parameter is set according to the actual
temperature power-off requirements.
permission status: permit Default: permit.

Temperature for load This parameter is set according to the actual


high-temperature requirements.
power-off: 70C Default: 65C.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 119


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for F01E400 Remarks


Cabinet

Temperature for battery This parameter is set according to the actual


high-temperature requirements.
power-off: 53C Default: 50C.

Environment Upper alarm threshold of This parameter is set according to the actual
monitoring the temperature: 68C requirements. When the actual temperature
parameters reaches or is higher than the upper alarm
threshold, the system reports an alarm.
Default: 50C.

Lower alarm threshold This parameter is set according to the actual


of the temperature: -5C requirements. When the actual temperature is
equal to or lower than the lower alarm threshold,
the system reports an alarm.
Default: 0C.

Upper alarm threshold of This parameter is set according to the actual


the humidity: 80% RH requirements. When the actual humidity reaches
or is higher than the upper alarm threshold, the
system reports an alarm.
Default: 80% RH.

Lower alarm threshold This parameter is set according to the actual


of the humidity: 10% RH requirements. When the actual humidity is equal
to or lower than the lower alarm threshold, the
system reports an alarm.
Default: 10% RH.

External Digital parameter ID: 1 This digital parameter is set according to the
extended actual requirements. The monitoring digital
digital parameter of the fan tray is set here to monitor the
parameters fan tray. When the fan tray is faulty, the host
reports an alarm.

Valid level of digital When the low level represents the valid level, the
parameter 1: low level host does not report an alarm in the case of low
level.

Digital parameter ID: 3 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the lightning arrester is set here to
monitor the lightning arrester. When the lightning
arrester is faulty, the host reports an alarm.

Valid level of digital When the low level represents the valid level, the
parameter 2: low level host does not report an alarm in the case of low
level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 120


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

NOTE

The preceding data is configured according to the actual requirements. When the actually planned value
of a parameter is the same as the default value, it is not necessary to configure the parameter.

Configuration Process
The monitoring parameters can be reported to the control board and the service processing board
only when the data for the EPS30-4815AF is configured correctly in the system.
Figure 3-47 shows the configuration process.

Figure 3-47 Configuration process of the EPS30-4815AF

Start

Add an EMU

Configure the battery charging parameters

Configure the battery management


parameters

Configure the temperature compensation


coefficient of the battery

Configure the power supply load power-off


and battery set power-off parameters

Configure the power distribution parameters

Configure the rectifier unit parameter

Configure the load and battery high-


temperature power-off parameters

Configure the environment monitoring


parameters

Configure the external extended digital


parameters

End

Procedure
Step 1 Run the emu add command to add an environment monitoring unit (EMU) after logging in to
the UA5000 through the maintenance terminal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 121


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

huawei(config)#emu add 0 POWER4845 0 0 RS232 POWER4830

Step 2 Access the environment monitoring configuration mode, and then run the display power system
parameter command to query the default configuration information.
huawei(config)#interface emu 0
huawei(config-if-power4845-0)#display power system parameter
EMU ID: 0 Power system information
----------------------------------------------------------------------------
charge control state : automatic control
equalizing Voltage : 56.500V floating Voltage: 53.500V
charge lmt quotiety: 0.150 equalizing time : 60 days
battery number : 1
battery 0 capacity : 130 AH
battery Temperature Upper : 60 C battery Temperature Lower : -40 C
Temp redeem quotiety: 100mV
load off permit : permit load off voltage : 43.500V
battery off permit : permit battery off voltage : 43.000V
shunt quotiety : 100A
AC over alarm voltage : 280V AC lack alarm voltage : 180V
DC over alarm voltage : 58 V DC lack alarm voltage : 45V
power module number: 3
module 0 address : 1 module 0 control state: On
module 1 address : 2 module 1 control state: On
module 2 address : No Configured module 2 control state: -
Load high-temperature-off permit: permit
Load high-temperature-off temperature(C): 65
Battery high-temperature-off permit: permit
Battery high-temperature-off temperature(C): 50
----------------------------------------------------------------------------
huawei(config-if-power4845-0)#display power environment parameter

EMU ID: 0 power environment configuration parameter

----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestHigh TestLow Unit type
0 Temperature 50 0 55 -5 C Current
1 Humidity 80 10 100 0 %R.H. Current
----------------------------------------------------------------------------
DigitalID Name Available Level|DigitalID Name Available Level
0 - 1 | 1 - 1
2 - 1 | 3 - 1
4 - 1 | 5 - 1
6 - 1
----------------------------------------------------------------------------

The results show that the power, temperature, and humidity parameters have been configured
automatically in the system. Certain other parameters or extended monitoring parameters,
however, need to be modified or added.

Step 3 Run the power charge command to configure the charging parameters of the battery.
In this example, the query result is consistent with the data plan. Therefore, the charging
parameters need not be configured.

Step 4 Run the power battery parameter command to configure the management parameters of the
battery.
huawei(config-if-power4845-0)#power battery parameter 0.15 60 1 75

Step 5 Run the power battery temperature command to configure the temperature compensation
parameters of the battery.
huawei(config-if-power4845-0)#power battery temperature 80 -20 80

Step 6 Run the power off command to configure the load power-off parameters of the power system
and the power-off parameters of the battery set.
huawei(config-if-power4845-0)#power off load-off-state forbid load-off-voltage 44

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 122


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 7 Run the power supply-parameter command to configure the power distribution parameters of
the power system.
In this example, the query result is consistent with the data plan. Therefore, the power distribution
parameters need not be configured.
Step 8 Run the power module-num command to configure the parameters of the power rectifier
module.
huawei(config-if-power4845-0)#power module-num 2 1 2

Step 9 Run the power temperature-off command to configure the load and high temperature power-
off parameters of the battery.
huawei(config-if-power4845-0)#power temperature-off load-off-state forbid load-off-
temperature 70 battery-off-state permit battery-off-temperature 53

Step 10 Run the power environment command to configure the environment parameters.
l Configure the temperature parameters.
huawei(config-if-power4845-0)#power environment temperature 68 -5 80 -20

l Configure the humidity parameters.


If the query result is consistent with the planned data, the parameters need not be configured.
If the parameters need to be modified, run the power environment humidity command.
Step 11 Run the power outside_digital command to configure the extended digital monitoring
parameters.
huawei(config-if-power4845-0)#power outside_digital 1 available-level low-level
name Fan
huawei(config-if-power4845-0)#power outside_digital 3 available-level low-level
name SPD

Step 12 Save the data.


huawei(config-if-power4845-0)#quit
huawei(config)#save

----End

Result
1. The environment monitoring information queried through the display power system
parameter command is consistent with the configuration.
huawei(config-if-power4845-0)#display power system parameter
EMU ID: 0 Power system information
----------------------------------------------------------------------------
charge control state : automatic control
equalizing Voltage : 56.500V floating Voltage: 53.500V
charge lmt quotiety: 0.150 equalizing time : 60 days
battery number : 1
battery 0 capacity : 75 AH
battery Temperature Upper : 80 C battery Temperature Lower : -20 C
Temp redeem quotiety: 80mV
load off permit : forbid load off voltage : 44.000V
battery off permit : permit battery off voltage : 43.000V
shunt quotiety : 100A
AC over alarm voltage : 280V AC lack alarm voltage : 180V
DC over alarm voltage : 58 V DC lack alarm voltage : 45V
power module number: 2
module 0 address : 1 module 0 control state: On
module 1 address : 2 module 1 control state: On
Load high-temperature-off permit: forbid
Load high-temperature-off temperature(C): 70
Battery high-temperature-off permit: permit
Battery high-temperature-off temperature(C): 53
----------------------------------------------------------------------------

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 123


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

huawei(config-if-power4845-0)#display power environment parameter

EMU ID: 0 power environment configuration


parameter

----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestHigh TestLow Unit type
0 Temperature 68 -5 80 -20 C
Current
1 Humidity 80 10 100 0 %R.H.
Current
----------------------------------------------------------------------------
DigitalID Name Available Level|DigitalID Name Available Level
0 - 1 | 1 Fan 0
2 - 1 | 3 SPD 0
4 - 1 | 5 - 1
6 - 1
----------------------------------------------------------------------------

2. The queried alarm information shows that the door status alarm other than the alarms for
other monitoring parameters is generated.
huawei(config-if-power4845-0)#display power alarm
EMU ID: 0 Power alarm information
--------------------------------------------------------------------
mains supply yes : yes mains supply lack : normal
total vol lack : normal
load fuse 0 : connect second fuse : connect
load off : on battery off : on
battery 1 loop : connect
environment Temperature : Normal environment Humidity : Normal
door alarm : Alarm water alarm : Normal
fog alarm : Normal
module 0 : normal
module 1 : normal
Battery temperature off state : Normal Load temperature off state : Normal
-------------------------------------------------------------------
DigitalID Name Alarm State|DigitalID Name Alarm State
0 - Normal | 1 Fan Normal
2 - Normal | 3 SPD Normal
4 - Normal | 5 - Normal
6 - Normal
-------------------------------------------------------------------

NOTE

Two door status sensors of the device are in serial connection, and are monitored as one variable.
They are automatically configured by the system. The door alarm is generated because the cabinet
door is open.
3. Close all doors of the cabinet. Then, the queried alarm information shows that there is no
alarm for any monitoring parameter.

3.16.6 Configuring the Environment Monitoring Through the


EPS75-4815AF
This topic provides the basic information about the EPS75-4815AF power system and describes
how to configure environment monitoring data. This power system functions to convert the input
AC power into DC power to provide DC power source for the device. The power system also
supports management of one or two sets of batteries.

Mapping Between Monitoring Parameters and Device Ports


Table 3-48 describes the mapping between the monitoring parameters displayed on the sensor
transfer box.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 124


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-48 Mapping between the monitoring parameters displayed on the host and the ports on
the sensor transfer box
Monito Devic Applicatio Application Applicati Applicati Applicati
ring e Port n in F02A in F02AF on in on in on in
Parame Cabinet Cabinet F01D200 F01D500 F01D1000
ter on Cabinet Cabinet Cabinet
Host

Digital JTD1 Fan Fan Fan Fan Fan


0 monitoring monitoring monitoring monitoring monitoring
board of the board of the board of board of board of
HABA shelf HABD shelf the HABD the HABD the HABD
shelf shelf shelf

Digital JTD2 Fan Fan Not Fan Fan


1 monitoring monitoring connected monitoring monitoring
board of the board of the by default, board of board of
HABA shelf HABF shelf used to add the HABF the HABF
a user- shelf shelf
defined
monitoring
digital
parameter

Digital JTD3 Not Not Not Not Fan


2 connected by connected by connected connected monitoring
default, used default, used by default, by default, board of
to add a user- to add a user- used to add used to add the HABD
defined defined a user- a user- shelf in the
monitoring monitoring defined defined right
digital digital monitoring monitoring device
parameter parameter digital digital compartme
parameter parameter nt

Digital JTD4 Not Not Lightning Lightning Lightning


3 connected by connected by arrester arrester arrester
default, used default, used
to add a user- to add a user-
defined defined
monitoring monitoring
digital digital
parameter parameter

Digital JTD5 Not Not Smoke Smoke Smoke


4 connected by connected by sensor sensor sensor
default, used default, used
to add a user- to add a user-
defined defined
monitoring monitoring
digital digital
parameter parameter

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 125


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Monito Devic Applicatio Application Applicati Applicati Applicati


ring e Port n in F02A in F02AF on in on in on in
Parame Cabinet Cabinet F01D200 F01D500 F01D1000
ter on Cabinet Cabinet Cabinet
Host

Digital JTD6 Not Not Heat Heat Heat


5 connected by connected by exchanger exchanger exchanger
default, used default, used
to add a user- to add a user-
defined defined
monitoring monitoring
digital digital
parameter parameter

Digital JTD7 Not Not Door status Door status Door status
6 connected by connected by sensor of sensor of sensor of
default, used default, used the MDF the MDF the MDF
to add a user- to add a user- compartme compartme compartme
defined defined nt nt nt
monitoring monitoring
digital digital
parameter parameter

Door JTM1 Door status Door status Door status Door status Door status
alarm sensor sensor sensors of sensors of sensors of
the device the device the device
compartme compartme compartme
nt and heat nt and heat nt and heat
exchanger exchanger exchanger
compartme compartme compartme
nt nt nt

Wiring JTP1 MDF MDF MDF MDF MDF


alarm

Battery BAT_ Battery Battery Battery Battery Battery


Tem WE temperature temperature temperatur temperatur temperatur
sensor sensor e sensor e sensor e sensor

environ TEM- Not Not Temperatu Temperatu Temperatu


ment HU connected by connected by re and re and re and
Tem/ default. default. humidity humidity humidity
environ sensor sensor sensor
ment
Hum

NOTE

Before adding a user-defined analog or monitoring digital parameter, make sure that the port corresponding
to this parameter is properly connected to an environment monitoring cable.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 126


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Data Plan
The data plan of the EPS75-4815AF in the F01D500 cabinet is the same as that in F02A, F02AF,
F01D200, and F01D1000 cabinets. In this topic, the application in the F01D500 cabinet is
considered as an example. Table 3-49 provides the data plan for configuring the monitoring
parameters of the EPS75-4815AF.

Table 3-49 Data plan for configuring the monitoring parameters of the EPS75-4815AF
Item Data Plan for the Remarks
F01D500 Cabinet

EMU Type: POWER4875L During the configuration of the EPS75-4815AF,


the type of the EPS75-4815AF is selected as
POWER4875L.

SN: 0 -

Subnode ID: 0 The subnode ID must be the same as the subnode


setting of the corresponding DIP switches on the
EMU, but the subnode ID must be different from
IDs of the other subnodes on the same bus.

Charging Charging mode of the This parameter is set according to the actual
parameters battery: automatic requirements.
of the battery automatic: The power system automatically
adjusts the charging mode of batteries according
to the status of the battery set.
equalizing: The battery is charged forcibly so as
to quickly compensate for the lost capacity of the
battery.
floating: The battery adjusts charging/
discharging when it is in saturation.
Default: automatic.

Equalized charging This parameter is set according to the actual


voltage of the battery: requirements. When setting the equalized
56.5 V charging voltage of the battery, make sure that DC
overvoltage - 1 V > equalized charging voltage >
float charging voltage + 2 V, and that DC
undervoltage > load power-off voltage > battery
power-off voltage.
Default: 56.5 V.

Float charging voltage of This parameter is set according to the actual


the battery: 53.5 V requirements. When setting the float charging of
the battery, make sure that DC overvoltage - 1 V
> equalized charging voltage > float charging
voltage + 2 V, and that DC undervoltage > load
power-off voltage > battery power-off voltage.
Default: 53.5 V.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 127


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for the Remarks


F01D500 Cabinet

Battery Current-limiting This parameter is set according to the actual


management coefficient for battery requirements. In the normal state, the current of
parameters charging: 0.15 the power supply is not limited. The current-
limiting function is enabled when the charging
current of the battery set > current-limiting
coefficient x nominal capacity of the battery set.
Default value: 0.15.

Interval of battery This parameter is set according to the actual


equalized charging: 60 requirements. If the continuous float charging
days duration of the rectifier unit exceeds the preset
equalized charging interval, the battery enters the
equalized charging state.
Default: 60 days.

Number of battery sets: 1 This parameter is set according to the actual


requirements. The number of battery sets can be
set to 0 or 1. That is, the system supports up to one
battery set.
Default value: 1.

Capacity of the battery The battery capacity is configured according to


set: 75 AH the actual value. The F02A cabinet uses the 100
AH batteries, the F02AF cabinet uses different
external batteries according to the actual
conditions, the F01D200 cabinet uses the 80 AH
batteries, the F01D500 cabinet uses the 150 AH
or 194 AH batteries, and the F01D1000 cabinet
uses the 150 AH or 194 AH batteries.
Default: 65 AH.

Temperature Upper temperature This parameter is set according to the actual


compensatio threshold of the battery requirements.
n parameter set: 80C Default: 80C.
of the battery
Lower temperature This parameter is set according to the actual
threshold of the battery requirements.
set: -20C Default: -20C.

Temperature This parameter is set according to the actual


compensation requirements. The temperature compensation
coefficient of the battery coefficient refers to the variable of the float
set: 80 mV charging voltage of the battery set when the
temperature of the battery set changes by every 1
C.
Default: 80 mV.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 128


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for the Remarks


F01D500 Cabinet

Power Load power-off This parameter is set according to the actual


supply load permission status: forbid requirements.
power-off Default: forbid.
and battery
set power-off Battery set power-off This parameter is set according to the actual
parameters permission status: permit requirements.
Default: permit.

Load power-off voltage: This parameter is set according to the actual


44 V requirements.
Default: 44 V.

Battery set power-off This parameter is set according to the actual


voltage: 43 V requirements.
Default: 43 V.

Power AC overvoltage alarm This parameter is set according to the actual


distribution threshold of the power requirements. When the AC voltage exceeds the
parameters supply: 280 V preset overvoltage alarm threshold, the system
reports an AC overvoltage alarm. In this case, the
rectifier unit powers off automatically to protect
the system.
Default: 280 V.

AC undervoltage alarm This parameter is set according to the actual


threshold of the power requirements. When the AC voltage falls below
supply: 180 V the preset undervoltage alarm threshold, the
system reports an AC undervoltage alarm. In this
case, the rectifier unit powers off automatically to
protect the system.
Default: 180 V.

DC overvoltage alarm This parameter is set according to the actual


threshold of the power requirements. When the DC voltage exceeds the
supply: 58 V preset overvoltage alarm threshold, the system
reports a DC overvoltage alarm. In this case, the
rectifier unit powers off automatically to protect
the system.
Default: 58 V.

DC undervoltage alarm This parameter is set according to the actual


threshold of the power requirements. When the DC voltage falls below
supply: 45 V the preset undervoltage alarm threshold, the
system reports a DC undervoltage alarm. In this
case, the rectifier unit powers off automatically to
protect the system.
Default: 45 V.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 129


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for the Remarks


F01D500 Cabinet

Rectifier unit Number of rectifier This parameter is set according to the actual
parameter units: 2 requirements. The EPS75-4815AF supports up to
two rectifier units.
Default value: 5.

Load and Load high-temperature This parameter is set according to the actual
battery high- power-off permission requirements.
temperature status: forbid Default: forbid.
power-off
parameters Battery high- This parameter is set according to the actual
temperature power-off requirements.
permission status: permit Default: forbid.

Temperature for load This parameter is set according to the actual


high-temperature requirements.
power-off: 70C Default: 65C.

Temperature for battery This parameter is set according to the actual


high-temperature requirements.
power-off: 53C Default: 53C.

Environment Upper alarm threshold of This parameter is set according to the actual
monitoring the temperature: 68C requirements. When the actual temperature
parameters reaches or is higher than the upper alarm
threshold, the system reports an alarm.
Default: 50C.

Lower alarm threshold This parameter is set according to the actual


of the temperature: -5C requirements. When the actual temperature is
equal to or lower than the lower alarm threshold,
the system reports an alarm.
Default: 0C.

Upper alarm threshold of This parameter is set according to the actual


the humidity: 80% RH requirements. When the actual humidity reaches
or is higher than the upper alarm threshold, the
system reports an alarm.
Default: 80% RH.

Lower alarm threshold This parameter is set according to the actual


of the humidity: 10% RH requirements. When the actual humidity is equal
to or lower than the lower alarm threshold, the
system reports an alarm.
Default: 10% RH.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 130


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for the Remarks


F01D500 Cabinet

External Digital parameter ID: 0 This digital parameter is set according to the
extended actual requirements. The monitoring digital
digital parameter of the fan tray is set here to monitor the
parameters fan tray. When the fan tray is faulty, the host
reports an alarm.

Valid level of digital When the low level represents the valid level, the
parameter 0: low level host does not report an alarm in the case of low
level.

Digital parameter ID: 1 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the fan tray is set here to monitor the
fan tray. When the fan tray is faulty, the host
reports an alarm.

Valid level of digital When the low level represents the valid level, the
parameter 1: low level host does not report an alarm in the case of low
level.

Digital parameter ID: 3 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the lightning arrester is set here to
monitor the status of the lightning arrester. When
the lightning arrester is faulty, the host reports an
alarm.

Valid level of digital When the low level represents the valid level, the
parameter 3: low level host does not report an alarm in the case of low
level.

Digital parameter ID: 4 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the smoke sensor is set here to
monitor whether there is smoke in the actual
environment. When there is smoke, the host
reports an alarm.

Valid level of digital When the high level represents the valid level, the
parameter 4: high level host does not report an alarm in the case of high
level.

Digital parameter ID: 5 This digital parameter is set according to the


actual requirements. The monitoring digital
parameter of the heat exchanger is set here to
monitor the status of the heat exchanger. When
the heat exchanger is faulty, the host reports an
alarm.

Valid level of digital When the low level represents the valid level, the
parameter 5: low level host does not report an alarm in the case of low
level.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 131


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Item Data Plan for the Remarks


F01D500 Cabinet

Digital parameter ID: 6 This digital parameter is set according to the


actual requirements. The digital monitoring
parameter of the MDF door status sensor is set
here to monitor the MDF door status. When the
door of the MDF compartment is open, the host
reports an alarm.

Valid level of digital When the low level represents the valid level, the
parameter 6: low level host does not report an alarm in the case of low
level.

Configuration Process
The monitoring parameters can be reported to the control board and the service processing board
only when the data for the EPS75-4815AF is configured correctly in the system.
Figure 3-48 shows the configuration process.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 132


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-48 Configuration process of the EPS75-4815AF

Start

Add an EMU

Configure the battery charging parameters

Configure the battery management


parameters

Configure the temperature compensation


coefficient of the battery

Configure the power supply load power-off


and battery set power-off parameters

Configure the power distribution parameters

Configure the rectifier unit parameter

Configure the load and battery high-


temperature power-off parameters

Configure the environment monitoring


parameters

Configure the external extended digital


parameters

End

Procedure
Step 1 Run the emu add command to add an environment monitoring unit (EMU) after logging into
the PVM system through the maintenance terminal.
huawei(config)#emu add 0 POWER4875L 0 0 RS232 POWER4875L

Step 2 Run the display emu command to query the status of the EPS30-4815AF power system.
huawei(config)#display emu 0
--------------------------------------------------------------------
EMU name : POWER4875L
EMU type : Pwr4875L
EMU state : Normal
Frame ID : 0
Subnode : 0
COM Port : RS232
--------------------------------------------------------------------

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 133


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 3 Access the environment monitoring configuration mode, and then run the display power system
parameter command to query the default configuration information.
huawei(config)#interface emu 0
huawei(config-if-power4875l-0)#display power system parameter
EMU ID: 0 Power system information
----------------------------------------------------------------------------
charge control state : automatic control
equalizing Voltage : 56.500V floating Voltage: 53.500V
charge lmt quotiety: 0.150 equalizing time : 60 days
battery number : 1
battery 0 capacity : 65 AH
battery temperature test upper : 80C battery temperature test lower: -20C
temperature redeem quotiety : 80mV
battery temperature alarm upper: 50C battery temperature alarm lower: 0C
load off permit : forbid load off voltage : 44.000V
battery off permit : permit battery off voltage : 43.000V
AC over alarm voltage : 280V AC lack alarm voltage : 180V
DC over alarm voltage : 58 V DC lack alarm voltage : 45V
power module number: 5
module 0 address: 1 module 0 switch state : On
module 1 address: 2 module 1 switch state : On
module 2 address: 3 module 2 switch state : On
module 3 address: 4 module 3 switch state : On
module 4 address: 5 module 4 switch state : On
Load high-temperature-off permit: forbid
Load high-temperature-off temperature(C): 65
Battery high-temperature-off permit: forbid
Battery high-temperature-off temperature(C): 53
----------------------------------------------------------------------------
huawei(config-if-power4875l-0)#display power environment parameter
EMU ID: 2 Power environment configuration parameter
----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestUpper TestLower Unit Type
0 Temperature 50 0 80 -20 C Current
1 Humidity 80 10 100 0 %R.H. Current
----------------------------------------------------------------------------
DigitalID Name Level |DigitalID Name Level
0 - 1 | 1 - 1
2 - 1 | 3 - 1
4 - 1 | 5 - 1
6 - 1
----------------------------------------------------------------------------

The results show that the power, temperature, and humidity parameters have been configured
automatically in the system. Certain other parameters or extended monitoring parameters,
however, need to be modified or added.
Step 4 Run the power charge command to configure the charging parameters of the battery.
In this example, the query result is consistent with the data plan. Therefore, the charging
parameters need not be configured.
Step 5 Run the power battery parameter command to configure the management parameters of the
battery.
huawei(config-if-power4875l-0)#power battery parameter 1 0.15 60 150

Step 6 Run the power battery temperature command to configure the temperature compensation
parameters of the battery.
In this example, the query result is consistent with the data plan. Therefore, the temperature
compensation parameters need not be configured.
Step 7 Run the power off command to configure the load power-off parameters of the power system
and the power-off parameters of the battery set.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 134


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

In this example, the query result is consistent with the data plan. Therefore, the parameters need
not be configured.
Step 8 Run the power supply-parameter command to configure the power distribution parameters of
the power system.
In this example, the query result is consistent with the data plan. Therefore, the power distribution
parameters need not be configured. If you need to change the parameter values, run the
corresponding command.
Step 9 Run the power module-num command to configure the parameters of the power rectifier
module.
In this example, the query result is consistent with the data plan. Therefore, the parameters need
not be configured. If you need to change the parameter values, run the corresponding command.
Step 10 Run the power temperature-off command to configure the load and high temperature power-
off parameters of the battery.
huawei(config-if-power4875l-0)#power temperature-off load-off-state forbid load-
off-temperature 70 battery-off-state permit battery-off-temperature 53

Step 11 Run the power environment command to configure the environment parameters.
l Configure the temperature parameters.
huawei(config-if-power4875l-0)#power environment temperature 68 -5 80 -20

l Configure the humidity parameters.


If the query result is consistent with the planned data, the parameters need not be configured.
If the parameters need to be modified, run the power environment humidity command.
Step 12 Run the power outside_digital command to configure the extended digital monitoring
parameters.
huawei(config-if-power4875l-0)#power outside_digital 0 available-level low-level
name Fan
huawei(config-if-power4875l-0)#power outside_digital 1 available-level low-level
name HABF_FAN
huawei(config-if-power4875l-0)#power outside_digital 3 available-level low-level
name SPD
huawei(config-if-power4875l-0)#power outside_digital 4 available-level high-level
name Smoke
huawei(config-if-power4875l-0)#power outside_digital 5 available-level low-level
name HEX
huawei(config-if-power4875l-0)#power outside_digital 6 available-level low-level
name MDF-door

Step 13 Save the data.


huawei(config-if-power4875l-0)#quit
huawei(config)#save

----End

Result
1. The environment monitoring information queried through the display power system
parameter command is consistent with the configuration.
huawei(config)#interface emu 0
huawei(config-if-power4875l-0)#display power system parameter
EMU ID: 0 Power system information
----------------------------------------------------------------------------
charge control state : automatic control
equalizing Voltage : 56.500V floating Voltage: 53.500V
charge lmt quotiety: 0.150 equalizing time : 60 days
battery number : 1

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 135


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

battery 0 capacity : 150 AH


battery temperature test upper : 80C battery temperature test lower: -20C
temperature redeem quotiety : 80mV
battery temperature alarm upper: 50C battery temperature alarm lower: 0C
load off permit : forbid load off voltage : 44.000V
battery off permit : permit battery off voltage : 43.000V
AC over alarm voltage : 280V AC lack alarm voltage : 180V
DC over alarm voltage : 58 V DC lack alarm voltage : 45V
power module number: 5
module 0 address: 1 module 0 switch state : On
module 1 address: 2 module 1 switch state : On
module 2 address: 3 module 2 switch state : On
module 3 address: 4 module 3 switch state : On
module 4 address: 5 module 4 switch state : On
Load high-temperature-off permit: forbid
Load high-temperature-off temperature(C): 70
Battery high-temperature-off permit: permit
Battery high-temperature-off temperature(C): 53
----------------------------------------------------------------------------
huawei(config-if-power4875l-0)#display power environment parameter
EMU ID: 2 Power environment configuration
parameter

----------------------------------------------------------------------------
AnalogID Name AlmUpper AlmLower TestUpper TestLower Unit
Type
0 Temperature 68 -5 80 -20 C
Current
1 Humidity 80 10 100 0 %R.H.
Current

----------------------------------------------------------------------------
DigitalID Name Level |DigitalID Name
Level
0 Fan 0 | 1 HABF_FAN
0
2 - 0 | 3 SPD
0
4 Smoke 1 | 5 HEX
0
6 MDF-door
0
----------------------------------------------------------------------------
2. The queried alarm information shows that the door status alarm other than the alarms for
other monitoring parameters is generated.
huawei(config-if-power4875l-0)#display power alarm
EMU ID: 0 Power alarm information
----------------------------------------------------------------------------
Mains supply yes : Yes Mains supply lack : Normal
Total Vol lack : Normal
Load fuse 0 : Connect Second fuse : Connect
Load off : On Battery off : On
Battery 0 loop : Disconnect
Environment Temperature : Normal Environment Humidity : Normal
Door alarm : Alarm Water alarm : Normal
Fog alarm : Normal Wiring alarm : Normal
Module 0 : Normal
Module 1 : Normal
Module 2 : Normal
Battery temperature off state : Normal Load temperature off state : Normal
----------------------------------------------------------------------------
Name State |Name State
Spare Dig0(Fan) Normal|Spare(HABF_FAN)
Normal
Spare Dig2 Normal|Spare Dig3(SPD)
Normal
Spare Dig4(Smoke) Normal|Spare Dig5(HEX) Alarm
Spare Dig6(MDF-door) Alarm
----------------------------------------------------------------------------

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 136


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

NOTE

The door status sensors of the device compartment and the temperature control compartment are in
serial connection, and are monitored as a variable. These two door status sensors are automatically
configured by the system. The door status alarm is generated because the door is open.
3. Close all doors of the cabinet. Then, the queried alarm information shows that there is no
alarm for any monitoring parameter.

3.16.7 Configuring the Monitoring Through the Fan Tray


This topic describes how to configuring the fan environment monitoring unit (EMU) so that it
can monitor the running status of the device fan.

Prerequisite
l The setting of the DIP switches of the hardware must be consistent with the one of sub-
nodes.
l The device must work in the normal state.

The configuration of the fan tray varies with the type of the shelf. The details are as follows:
l The HABA shelf does not support the configuration of the fan tray. The fan monitoring
port is unavailable, and the fan can be controlled by only the dual in-line package (DIP)
switch.
l The HABD shelf supports the configuration of the fan tray through software.
l The fan tray can be added to the H602HABD, H612HABL, and H601HABM shelves and
can run in the normal state.
l The fan tray can be added to the H601HABD and H601HABA shelves but cannot run in
the normal state.

For the high density front access cabinet:

l When both the broadband and the narrowband control boards are installed, use the
broadband control board to configure the fan EMU.
l When only the narrowband control board is installed, use the narrowband control board to
configure the fan EMU.

Precaution
l The serial port type of the fan can only be RS-485.
l The sub-node of the fan is numbered from 0-7, and the default value is 0.
l The hardware settings of the DIP switches must be consistent with the settings on the sub-
node.
l When the system is configured with multiple EMUs, make sure that all the sub-nodes do
not conflict with each other.

Data Plan
Table 3-50 shows the data plan for configuring the fan.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 137


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Table 3-50 Fan configuration data plan


Configuration Data Remarks
Item

EMU Type: Fan -

Number: 1 -

Subnode ID: 6 The subnode ID must be the same as


the subnode setting of the
corresponding DIP switch on the fan
monitoring board, but the subnode
ID must be different from IDs of the
other subnodes on the same bus.

Serial port of environment The serial port of environment


monitoring communication: monitoring communication of the fan
RS485 tray must be set to RS485.

Name: Fan -

Fan speed Speed adjustment mode of the In the actual environment, when you
adjustment mode fan tray: automatic. need to set the fan speed adjustment
mode or adjust the fan speed level
manually so as to assure heat
dissipation of the device, run this
command

Alarm reporting Read temperature failure alarm: By default, the alarm reporting is
for the fans permit enabled.

Fan block alarm: permit

Temperature too high alarm:


permit

Power fault alarm: permit

NOTE

l The automatic fan speed adjustment mode, based on the temperature, is suggested. In level 5, if you
do not set the fan speed adjustment mode as automatic, the fan will have air redundancy.
l You can adjust the fan speed level only when the speed adjustment mode of the fan is set to manual.
l When the system is in the abnormal state or the fan is invalid, the fan rotates at a high speed to
compensate the air and meet the heat dissipation requirements.

Configuration Process
Figure 3-49 shows the configuration process.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 138


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-49 Configuration process of the fan

Start

Add an EMU

Configure the fan speed adjustment mode

Configure the alarm reporting for the fans

End

Procedure
Step 1 In global config mode, run the emu add command to add an EMU.
huawei(config)#emu add 1 FAN 0 6 rs485 Fan

Step 2 In the FAN mode, run the fan speed mode automatic command to configure the fan speed
adaptation mode.
huawei(config)#interface emu 1
huawei(config-if-fan-1)#fan speed mode automatic

NOTE

When the fan speed adaptation mode is manual, run the fan speed adjust command to set the fan speed.

Step 3 Run the fan_alarmset command to configure the alarm report function of the fan.
huawei(config-if-fan-1)#fan alarmset block permit
huawei(config-if-fan-1)#fan alarmset read-tem-fault permit
huawei(config-if-fan-1)#fan alarmset tem-high permit
huawei(config-if-fan-1)#fan alarmset fault permit

Step 4 In global config mode, run the save command to save the data.
huawei(config-if-fan-1)#quit
huawei(config)#save

----End

Result
l In the EMU FAN mode, run the display fan system parameter command to query whether
the parameters of the fan tray are the same as the configuration.
huawei(config-if-fan-1)#display fan system parameter

EMU ID: 1
FAN configration parameter:
------------------------------------------------------------------
FAN timing mode: Auto timing
------------------------------------------------------------------
Alarm_name Permit/Forbid
Read temperature sensor fault Permit
Fan block Permit
Temperature high Permit

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 139


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Board fault Permit


-------------------------------------------------------------------

l In the EMU FAN mode, run the display fan environment info command to query the fan
tray running information.
huawei(config-if-fan-1)#display fan environment
info

EMU ID:
1

----------------------------------------------------------------------------
fan run
information:

----------------------------------------------------------------------------
Fan Temperature:
37.0C
----------------------------------------------------------------------------

3.17 Checking the Auto-Save Settings


This topic describes how to check the settings of the auto-save function to prevent data loss due
to reboots.

Prerequisite
The system must work in the normal state.

Precaution
l The UA5000 supports the auto-save function in two modes. One is that the data is saved
according to the specified interval (autosave interval) and the other is that the data is saved
at the specified time point (autosave time). The two auto-save functions are incompatible.
It is recommended that you adopt the function of saving the data according to the specified
interval.
l Over-frequent data saving affects the system performance. The recommended saving
interval is 60 minutes or longer.
l Run the save command to save the configuration data no matter whether the auto-save
function is enabled.

Procedure
Step 1 In the common user mode, run the display autosave configuration command to query the status
of the auto-save function. If the system auto-save interval switch is off, proceed to step 2;
otherwise, go to step 3.
NOTE

Saving the data automatically according to the specified interval by the configuration system is considered
as an example in this topic.

Step 2 In privilege mode, run the autosave interval on command to enable the auto-save function of
the system.
NOTE

By default, the auto-save function is disabled.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 140


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Step 3 In privilege mode, run the autosave interval time command to set the auto-save interval of the
system.

----End

Result
The auto-save interval is the same as the configuration.

3.18 Saving the Data


This topic describes how to save the data into the flash memory to prevent data loss due to
reboots.

Precaution

WARNING
The system gives prompts during the command execution. Do not power off or reset the system
until the saving process reaches 100%. Otherwise, the data in the flash memory may get
damaged.

Over-frequent saving of the data has negative effect on the system performance.

Procedure
Step 1 In privilege mode, run the save command to save the configuration data of the system into the
flash memory.

----End

Result
l When the database file is saved successfully, the system displays the saving process.
l After the data is saved, the system displays a message 1[YYYY-MM-DD
HH:MM:SS]:PID_DB-4-DBINFO:The configuration data of X slot's main control
board is saved completed . In this message, YYYY-MM-DD HH:MM:SS indicates the
year-month-day hour: minute: second of the current time when the data is saved. X indicates
the slot ID of the control board whose data is saved.
l When no configuration data need to be saved, the system displays a message System
configuration data has been saved completely, no need saving again.

3.19 Backing Up the System File


This topic describes how to back up the system file to prevent permanent data loss due to the
system failure. At the first office deployment or when the upgrade is complete, you need to back
up the database file and the configuration file to restore the system in the case of the system
failure.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 141


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Prerequisite
l The network cable must be used to connect the network port of the commissioning terminal
to the maintenance network port of the UA5000.
l The commissioning terminal must be installed with the TFTP software.

Precaution
The UA5000 supports multiple types of backplanes. The backup databases of different control
boards that match different backplanes can not be interoperable, otherwise the data will be in
chaos.

Procedure
Step 1 Run the TFTP program on the commissioning terminal, and set the path for saving the backup
files.
Run the TFTP application, as shown in Figure 3-50.

Figure 3-50 Running the TFTP application

If the default path is not the path where the loaded file is saved, select Setting to set the file path,
as shown in Figure 3-51.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 142


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Figure 3-51 Setting the file path

Click OK after the settings.

Step 2 In privilege mode, run the backup data command in TETP mode to back up the files.

When running the backup command, enter the following information:

l Name of the backup file.


l Protocol for the backup.
NOTE
The system supports the system backup through either the serial port or the maintenance network port. The
serial port backup uses the Xmodem protocol; the network port backup uses TFTP or FTP.
For example, to back up the database file to TFTP server (IP: 10.10.1.2) through TFTP, and
specify the name of the file as 20050101.dat, proceed as follows:
huawei#backup data tftp 10.10.1.2 20050101.dat

Step 3 In privilege mode, run the backup configuration command to back up the configuration file.
Example: To back up the configuration file of the system to the TETP server through TETP, and
specify the name of the configuration file saved on the TFTP server (IP: 10.10.1.2) as
20050102.dat, do as follows:
huawei#backup configuration tftp 10.10.1.2 20050102.dat

----End

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 143


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 3 Stand-Alone Commissioning

Result
After backup, the file is backed up successfully in the preset path.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 144


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

4 Commissioning the Interconnection

About This Chapter

The UA5000 is interconnected with other devices to meet the requirements for various services.

4.1 Commissioning the U2000 Interconnection


The administrator can maintain and manage the UA5000 in inband network management or
outband network management mode. This topic describes how to commission the
interconnection by considering the "iManager U2000 unified network management
system" (iManager U2000) as an example.
4.2 Commissioning the MG Interface Interconnection
This topic describes how to commission the MG interface. The MG interface is an interface for
the communication between the UA5000 and the MGC. This interface can use the H.248 or
MGCP protocol. Before commissioning the service, you must commission the MG interface
successfully.
4.3 Commissioning the SIP Interface Interconnection
This topic describes how the UA5000 as the voice over IP gateway (VGW) communicates with
the IMS through the SIP interface.
4.4 Commissioning the Interconnection Between the Device and the Router
This topic describes how to check whether the UA5000 can normally communicate with the
router and whether the UA5000 can access the upper-layer device through the router.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 145


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

4.1 Commissioning the U2000 Interconnection


The administrator can maintain and manage the UA5000 in inband network management or
outband network management mode. This topic describes how to commission the
interconnection by considering the "iManager U2000 unified network management
system" (iManager U2000) as an example.

4.1.1 Commissioning the U2000 in Outband Mode


This topic describes how to verify that the UA5000 can support the outband NMS through the
local maintenance network port (the outband NMS interface), so that the iManager U2000 can
maintain the device through this management channel.

Networking
Figure 4-1 shows that the iManager U2000 connects to the outband NMS interface of the PVMB
control board in the UA5000 through the IP network.

Figure 4-1 Networking for the outband NMS

iManager U2000

Router

PVMB

ETH0
ETH1

COM

UA5000

NOTE

l When the control board is PVMB, the iManager U2000 connects to the ETH0 maintenance network
port of the PVMB control board through the IP network in the independent upstream mode. The
iManager U2000 connects to the ETH1 service network port of the PVMB control board through the
IP network in the integrated upstream mode.
l When the control board is PVMD, the iManager U2000 connects to the ETH maintenance network
port of the active PVMD control board through the IP network in the independent upstream or the
integrated upstream mode.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 146


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Data Plan
Table 4-1 provides the data plan of the outband NMS.

Table 4-1 Data plan for configuring the outband NMS


Device or Port Item Data

UA5000 outband IP address 10.20.1.2/24


NMS interface
Default gateway 10.20.1.1/24

MAC address of the 02-E0-FC-02-02-03


outband NMS

NMS name huawei

GET community public


name

SET community private


name

vlan_tag 1001

Trap destination host public


name

Trap sending public


parameter list name

Trap protocol SNMP V2C


version

Name of the host that public


generates the trap

iManager U2000 IP address 10.10.1.1/24

Default gateway 10.10.1.10/24

NMS name huawei

GET community public


name

SET community private


name

Procedure
l Configure the outband NMS on the UA5000 side.
1. Configure the MAC address of the outband NMS network port.
huawei(config)#mac outband add 02-E0-FC-02-02-03 active

2. Query the MAC address pool.


huawei(config)#display mac active

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 147


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

--------------------------------------------------
Index type MacAddress
--------------------------------------------------
0 Active 00-E0-FC-33-44-56
1 Active 02-E0-FC-02-02-03

3. Configure the IP address of the outband network port, gateway, and VLAN
information.
huawei(config)#interface outband
huawei(config-outband)#ip address 10.20.1.2 255.255.255.0 10.20.1.1
vlan_tag 1001

4. Configure the working mode.


huawei(interface-outband)#quit
huawei(config)#sysman mode outband

5. Configure the community name and the access authority.


huawei(config)#snmp-agent community read public
huawei(config)#snmp-agent community write private

6. Enable the trap sending.


huawei(config)#snmp-agent trap enable standard

7. Configure the trap destination host name, IP address, and trap sending parameter list
name.
huawei(config)#snmp-agent target-host trap-hostname public address
10.10.1.10 trap-paramsname public
huawei(config)#snmp-agent target-host trap-paramsname public v2c
securityname public

8. Save the data.


huawei(config)#save

l Configure the outband NMS on the iManager U2000 side.


1. Set the following parameters on the iManager U2000.
IP address: 10.10.1.1
GET community name: public
SET community name: private
2. Configure the route gateway to network section 10.20.1.0/24 as 10.10.1.10.
NOTE

When the IP address of the UA5000 outband NMS interface is not in the same subnet as the
IP address of the iManager U2000, you need to configure the route information to forward the
NMS packet.

----End

Result
You can maintain and manage the device through the iManager U2000.

4.1.2 Commissioning the U2000 in Inband Mode


This topic describes how to verify that the UA5000 can realize the inband management through
the uplink port (the inband management interface) so that the iManager U2000 can maintain the
device through this management channel.

Networking
In the independent upstream mode, the iManager U2000 connects to the inband NMS interface
ETH1 on the UA5000 through the IP network, as shown in Figure 4-2.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 148


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Figure 4-2 Networking for the inband NMS

iManager U2000

Router

PVMB

ETH0
ETH1

COM

UA5000

NOTE
In the integrated upstream mode, the iManager U2000 connects to the internal network port of the PVMB/
PVMD control board through the IP network, and manages the device through the upstream network port
of the IPMB/IPMD control board.

Data Plan
Table 4-2 provides the data plan for configuring the inband NMS.

Table 4-2 Data plan for configuring the inband NMS


Device or Port Item Data

NMS interface of the IP address 10.20.1.3/24


UA5000
Default gateway 10.20.1.1/24

NMS name huawei

GET community name public

SET community name private

vlan_tag 1001

Trap destination host name public

Trap sending parameter list name public

Trap protocol version SNMP V2C

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 149


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Device or Port Item Data

Name of the host that generates the public


trap

iManager U2000 IP address 10.10.1.1/24

Default gateway 10.10.1.10/24

NMS name huawei

GET community name public

SET community name private

Procedure
l Configure the inband NMS on the UA5000 side.
1. Configure the IP address of the inband NMS interface.
huawei(config)#interface eth
huawei(interface-eth)#ip address 10.20.1.3 255.255.255.0 10.20.1.1
vlan_tag 1001

2. Configure the community name and the access authority.


huawei(config))#snmp-agent community read public
huawei(config)#snmp-agent community write private

3. Enable the trap sending.


huawei(config)#snmp-agent trap enable standard

4. Configure the trap destination host name, IP address, and trap sending parameter list
name.
huawei(config)#snmp-agent target-host trap-hostname public address
10.10.1.10 trap-paramsname public
huawei(config)#snmp-agent target-host trap-paramsname public v2c
securityname public

5. Save the data.


huawei(config)#save

l Configure the inband NMS on the iManager U2000 side.


1. Set the following parameters on the iManager U2000.
IP address: 10.10.1.1.
GET community name: public
SET community name: private
2. Configure the route gateway to subnet 10.20.1.0/24 as 10.10.1.10.
NOTE

When the IP address of the inband NMS interface is not in the same subnet of the iManager
U2000, you need to configure the route for forwarding the IP packets.

----End

Result
You can maintain and manage the UA5000 through the iManager U2000.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 150


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

4.2 Commissioning the MG Interface Interconnection


This topic describes how to commission the MG interface. The MG interface is an interface for
the communication between the UA5000 and the MGC. This interface can use the H.248 or
MGCP protocol. Before commissioning the service, you must commission the MG interface
successfully.

4.2.1 Commissioning the MG Interface Interconnection (Through


H.248)
This topic describes how to commission the MG interface so that the MG interface can
communicate with the MGC through the H.248 protocol normally.

Prerequisite
l The UA5000 must work in the normal state.
l The IP address used in the example must be configured in the IP address pool through the
ip address command.
l The data on the MGC, that is, the data corresponding to the data on the MG, and the data
on the MG interface must be configured correctly.
l The system must be configured with the H.248 protocol.
l If the versions supported by the softswitch and the UA5000 are consistent, you need not
configure the negotiated version. If the versions supported by the softswitch and the
UA5000 are inconsistent, you need to run the if-h248 attribute command to configure the
H.248 protocol for the MG interface to negotiate the version.

Networking
Figure 4-3 shows the networking for commissioning the MG interface through the H.248
protocol.

Figure 4-3 Networking for commissioning the MG interface through the H.248 protocol

MGC
10.10.20.1/24
Router
10.10.10.1/24

H.248

0/11 0/12

P A A
V S S
M L L
B

UA5000

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 151


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

NOTE

The UA5000 supports the independent upstream transmission and the integrated upstream transmission
modes. This commissioning task uses the independent upstream transmission mode. To use the integrated
upstream transmission mode, run the working mode command to set the working mode of the PVMB
board as the integrated upstream transmission mode.

Data Plan
Table 4-3 provides the data plan for commissioning the MG interface through the H.248
protocol.

Table 4-3 Data plan for commissioning the MG interface through the H.248 protocol

Item Data

MG interface mgid 0

protocol H.248

code text

transfer UDP

port 2944

domainname ua5000.com

IP address IP address of MG0 on the 10.10.10.2/24


UA5000

Media IP address of MG0 on the 10.10.10.2/24


UA5000

Default gateway of MG0 on the 10.10.10.1/24


UA5000

MGC data IP address of the MGC 10.10.20.1/24

port 2944

protocol H.248

code text

transfer UDP

Procedure
Step 1 Add an MG interface.
huawei(config)#interface h248 0
Are you sure to add MG interface?(y/n)[n]:y

huawei(config-if-h248-0)#

Step 2 Configure the parameters of the MG interface.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 152


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

huawei(config-if-h248-0)#if-h248 attribute mgip 10.10.10.2 mgport 2944 code text


transfer udp domainName ua5000.com primary-mgc-ip1 10.10.20.1 primary-mgc-port
2944 mg-media-ip1 10.71.46.69

Step 3 Restart the MG interface.


huawei(config-if-h248-0)#reset coldstart
Command:
reset coldstart
Are you sure to reset MG interface?(y/n)[n]:y
huawei(config-if-h248-0)#quit

Step 4 Save the data.


huawei(config)#save

----End

Result
The MG and the MGC are connected successfully. Run the display if-h248 all command to
query the status of the MG interface. The query result shows that the MG interface is in the
normal state.

4.2.2 Commissioning the MG Interface Interconnection (Through


MGCP)
This topic describes how to verify that the MG interface connection can communicate with the
MGC successfully through the MGCP protocol.

Prerequisite
l The UA5000 must work normally.
l The ip address command must be executed to configure the IP address used in the example
in the IP address pool.
l The data on the MGC, that is, the data corresponding to the data on the MG, and the data
on the MG interface must be configured correctly.
l The protocol supported by the system must be configured to MGCP.
NOTE

You can run the display protocol support command to query the current voice protocol type. If the
current voice protocol type is not MGCP, run the protocol support command to switch the voice
protocol to MGCP.

Networking
Figure 4-4 shows the interconnection commissioning networking of the MG interface through
the MGCP protocol.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 153


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Figure 4-4 Interconnection commissioning networking of the MG interface (over MGCP)

MGC
10.10.20.1/24
Router
10.10.10.1/24

MGCP

0/11 0/12

P
UA5000 V A A
M S S
10.10.10.2/24
L L
B

NOTE

The UA5000 supports the independent upstream mode and the integrated upstream mode. In the
commissioning task, the independent upstream mode is used. In the case of the integrated upstream mode,
you need to run the working mode command to set the working mode of the PVMB to integrated upstream
mode.

Data Plan
Table 4-4 provides the data plan for the interconnection commissioning of the MG interface
over MGCP.

Table 4-4 Data plan for the interconnection commissioning of the MG interface (over MGCP)
Item Data

MG interface mgid 0

protocol MGCP

port MG: 2427


MGC: 2727

domainname ua5000.com

IP address IP address of MG0 on the 10.10.10.2/24


UA5000

IP address of the MGC 10.10.20.1/24

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 154


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Procedure
Step 1 Add an MG interface.
huawei(config)#interface mgcp 0
Are you sure you want to add MG interface?(y/n)[n]:y

huawei(config-if-mgcp-0)#

Step 2 Configure the parameters of the MG interface.


huawei(config-if-mgcp-0)#if-mgcp attribute mgip 10.10.10.2 mgport 2427 domainName
ua5000.com mgcip_1 10.10.20.1 mgcport_1 2727

Step 3 Restart the MG interface.


huawei(config-if-mgcp-0)#reset
Are you sure to reset MG interface?(y/n)[n]:y
huawei(config-if-mgcp-0)#quit

Step 4 Save the data.


huawei(config)#save

----End

Result
Run the display if-mgcp all command to query the status of the MG interface, and find that the
status is in the normal state.

4.3 Commissioning the SIP Interface Interconnection


This topic describes how the UA5000 as the voice over IP gateway (VGW) communicates with
the IMS through the SIP interface.

Prerequisite
l The voice protocol supported by the system must be configured to SIP.
NOTE

You can run the display protocol support command to query the current voice protocol type. If the
voice protocol is not SIP, do as follows:
l When the control board is PVMD, run the protocol support command to switch the voice
protocol to SIP.
l When the control board is PVMB, run the load program command and load data command to
re-load the host program and the database file (corresponding to the SIP protocol), and then run
the reboot command to restart the system to switch the voice protocol to SIP.
l The UA5000 must be in the normal state.
l The IP address (signaling IP address and media IP address) of the SIP interface must exist
in the corresponding IP address pool. You can run the ip address command to configure
the IP address of the SIP interface.
l After the configuration, you must run the reset(sip) command to reset the SIP interface to
make the configuration data take effect. Otherwise, the configuration data is stored only in
the database.

Networking
Figure 4-5 shows the example network for commissioning the interconnection with the SIP
interface.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 155


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Figure 4-5 Example network for commissioning the interconnection with the SIP interface

Router

SIP
0/11 0/12

P A A
V 3 3
M
2 2
D

UA5000

NOTE

The UA5000 supports the independent upstream mode and the integrated upstream mode. The
commissioning task uses the independent upstream mode. If the integrated upstream mode is used, you
need to run the working mode command to set the working mode of the PVMD board to integrated
upstream mode.

Data Plan
In the commissioning task:

l Use the same IP address for the media stream and the signaling flow. Transmit the media
stream and the signaling flow upstream through the same Ethernet port.
l Use the default QoS policy for the upstream transmission of the media stream and the
signaling flow.

Table 4-5 shows the data plan for commissioning the interconnection with the MG interface
through SIP.

Table 4-5 Data plan for commissioning the interconnection with the MG interface through SIP

Type Item Data

Parameters of Upstream interface of the media 0/4/0


the media stream and the signaling flow
stream and
signaling Upstream VLAN of the media VLAN ID: 1 (default)
stream stream and signaling stream

Media/signaling IP address pool 10.13.4.116

Parameters of The SIP interface ID 0


the basic

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 156


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Type Item Data

attributes of the Media/signaling IP address 10.13.4.116


SIP interface
Signaling port ID 5555

The transfer protocol UDP

IP address of the primary proxy 10.13.4.110


server

Port ID of the primary proxy server 5555

IP address of the secondary proxy 10.13.4.120


server

Port ID of the secondary proxy 5555


server

Home domain name UA5000.com

Profile Index 1

Parameters of Domain name of the SIP interface huawei.com


the optional
attributes of the Phone context +86755
SIP interface

Procedure
Step 1 Add an SIP interface.
huawei(config)#interface sip 0

Are you sure to add the SIP interface?(y/n)[n]:y

Step 2 Configure the basic attributes of the SIP interface.


huawei(config-if-sip-0)#if-sip attribute basic media-ip 10.13.4.116 signal-ip
10.13.4.116 signal-port 5555 transfer udp primary-proxy-ip1 10.13.4.110 primary-
proxy-port 5555
secondary-proxy-ip1 10.13.4.120 secondary-proxy-port 5555 home-domain UA5000.com
sipprofile-index 1

Step 3 Configure the optional attributes of the SIP interface.


huawei(config-if-sip-0)#if-sip attribute optional mg-domain huawei.com phone-
context +86755

Step 4 Query the configured attributes of the SIP interface.


huawei(config-if-sip-0)#display if-sip attribute config
------------------------------------------------------------
MGID 0
Signalling IP 10.13.4.116
Signalling Port 5555
Media IP 10.13.4.116
Transfer Mode UDP
Primary Proxy IP 1 10.13.4.110
Primary Proxy IP 2 -
Primary Proxy Port 5555
Secondary Proxy IP 1 10.13.4.120
Secondary Proxy IP 2 -

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 157


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Secondary Proxy Port 5555


Proxy address mode IP
SIPProfile Index 1:Default
Service logic Index 0:Default
Server Address DHCP Option 0:None
Primary Proxy Domain Name -
Secondary Proxy Domain Name -
Home Domain Name UA5000.com
Description -
MG Domain Name huawei.com
Phone Context +86755
Register URI -
Conference Factory URI -
------------------------------------------------------------

Step 5 Reset the SIP interface.


huawei(config-if-sip-0)#reset
huawei(config-if-sip-0)#quit

Step 6 Save the data.


huawei(config)#save

----End

Result
After the display if-sip attribute command is executed to query the current attributes of the SIP
interface, it is found that the attributes of the SIP interface are the same as the configured
attributes.

4.4 Commissioning the Interconnection Between the Device


and the Router
This topic describes how to check whether the UA5000 can normally communicate with the
router and whether the UA5000 can access the upper-layer device through the router.

Service Requirements
In the network as shown in Figure 4-6, the UA5000 uses the PVMB board for upstream
transmission.

NOTE
For details about how to configure a router, see the related configuration guide.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 158


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 4 Commissioning the Interconnection

Figure 4-6 Example network for commissioning the interconnection between the router and the
device

PC

Router LAN 10.10.1.0/24


10.50.1.1

PC PC

ETH0
ETH1

COM

PVMB UA5000

Procedure
Step 1 Configure the IP address of the uplink port.
Configure the IP address of the uplink port to 10.50.1.10/24. The IP address of the uplink port
and the IP address of the gateway (that is, the IP address of the router port that is connected to
the UA5000) must be in the same network segment.
huawei(config)#interface eth
huawei(config-if-eth)#ip address 10.50.1.10 255.255.255.0 10.50.1.1 vlan_tag 1
huawei(config-if-eth)#quit

Step 2 Save the data.


huawei(config)#save

----End

Result
After the UA5000 is interconnected with the router successfully, you can ping IP address
10.10.1.0/24 from the UA5000.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 159


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 5 Maintenance and Management Commissioning

5 Maintenance and Management


Commissioning

About This Chapter

This topic describes how to verify the reliability of the device after commissioning the basic
functions and services of the device to ensure the performance reliability of the UA5000.

5.1 Checking the Alarm Function and the Event Function


This topic describes how to check whether the alarm function and the event function of the
UA5000 are in the normal state after all the alarms and events are output to the command lines.
5.2 Checking the Log
This topic describes how to check the log through the commissioning terminal. When the device
is faulty, you can locate the problem by querying the log.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 160


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 5 Maintenance and Management Commissioning

5.1 Checking the Alarm Function and the Event Function


This topic describes how to check whether the alarm function and the event function of the
UA5000 are in the normal state after all the alarms and events are output to the command lines.

5.1.1 Verifying the Alarm Function and the Event Function


This topic describes how to check whether the alarm function and the event function of the device
are in the normal state by triggering various alarms or events through related operations.

Precaution
Refer to the Installation Guide for how to remove and insert boards and cables so as to avoid
mal-operation.

Verifying
Table 5-1 shows the verification of the alarm function and the event function.

Table 5-1 Verification of the alarm function and the event function
Operation Description

Remove/insert a service board. Check whether the alarm/event attributes including


the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Reset the board. Check whether the alarm/event attributes including


the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Remove/insert the optical fiber on an Check whether the alarm/event attributes including
optical port. the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Open/close the cabinet door. Check whether the alarm/event attributes including
the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 161


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 5 Maintenance and Management Commissioning

Operation Description

Set the upper temperature limit of the Check whether the alarm/event attributes including
EMU to a value lower than the ambient the alarm/event severity and the alarm/event
temperature. occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Restore the temperature threshold of Check whether the alarm/event attributes including
the EMU to the default value. the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Set the upper humidity limit of the Check whether the alarm/event attributes including
EMU to a value lower than the ambient the alarm/event severity and the alarm/event
temperature. occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Restore the humidity threshold of the Check whether the alarm/event attributes including
EMU to the default value. the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Remove/insert the fan tray. Check whether the alarm/event attributes including
the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Switch over the active and the standby Log in to the system again and run the display
control boards. alarm history command on the commissioning
terminal to check whether the active and standby
switchover alarm exists in the history alarms.
NOTE
The alarm for the active and standby switchover is
reported after the active and standby switchover occurs.

Remove/insert the cables of the Check whether the alarm/event attributes including
subtending slave shelf. the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Turn off/Turn on the switch of the Check whether the alarm/event attributes including
mains power supply. the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 162


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 5 Maintenance and Management Commissioning

Operation Description

Discharge the battery to the under- Check whether the alarm/event attributes including
voltage value. the alarm/event severity and the alarm/event
occurrence time are correct and check whether the
alarm/event on the NMS is consistent with the
alarm/event on the maintenance terminal.

5.1.2 Querying Alarms and Events


This topic describes how to query the history alarms and events through the maintenance
terminal.

Context
The system saves up to 1000 fault alarms and recovery alarms, and 900 event notifications in
its buffer. If the buffer is full, and there is a new alarm, the new alarm overwrites the oldest
record in the buffer. You can query the records that are already overwritten from the network
management database.
The system provides multiple ways to query the history alarms. For details, see Table 5-2.

Table 5-2 Commands for querying history alarms


To Use

Query alarms by alarm display alarm history alarmsn sn [ detail | list ]


serial number

Query alarms by alarm display alarm history alarmid id [ detail | list | start-number
ID number ]

Query alarms by alarm display alarm history alarmtype type [ detail | list | start-
type number number ]

Query alarms by alarm display alarm history alarmclass class [ detail | list | start-
class number number ]

Query alarms by alarm display alarm history alarmlevel level [ detail | list | start-
severity number number ]

Query alarms by display alarm history alarmtime start start-date start-time end
occurrence time end-date end-time [ start-number number ] [ detail | list | start-
number number ]

Query alarms by alarm display alarm history alarmparameter { frameid/slotid/portid |


parameters frameid/slotid | frameid | vlanif vlanif } [ detail | list ]

Query all the latest display alarm history all [ detail | list ]
alarms

The system provides multiple ways to query the history events. For details, see Table 5-3.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 163


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 5 Maintenance and Management Commissioning

Table 5-3 Commands for querying history events

To Use

Query events by event display event history eventsn sn [ detail | list ]


serial number

Query events by event display event history eventid id [ detail | list | start-number
ID number ]

Query events by event display event history eventtype type [ detail | list | start-number
type number ]

Query events by event display event history eventclass class [ detail | list | start-
class number number ]

Query events by event display event history eventlevel level [ detail | list | start-
severity number number ]

Query events by display event history eventtime start start-date start-time end end-
occurrence time date end-time [ start-number number ] [ detail | list | start-
number number ]

Query events by event display event history eventparameter { frameid/slotid/portid |


parameters frameid/slotid | frameid | vlanif vlanif } [ detail | list ]

Query all the latest display event history all [ detail | list ]
events

Procedure
Step 1 Perform certain operations that can generate alarms or events, such as removing and inserting a
board.

Step 2 Run the display alarm history command to query the history alarms.

Step 3 Run the display event history command to query the history events.

----End

Result
After the operations are performed, the corresponding alarms or events are generated.

5.2 Checking the Log


This topic describes how to check the log through the commissioning terminal. When the device
is faulty, you can locate the problem by querying the log.

Procedure
Step 1 You can perform some simple operations, such as adding an operation user, on the device through
the command lines.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 164


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI 5 Maintenance and Management Commissioning

Step 2 In the common user mode, run the display log command to query the records in the log.

----End

Result
The log records the operation information.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 165


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

A Additional Information

The additional information includes the FAQ, operation guide on supplementary charge of the
battery, commissioning record, software factory defaults, and acronyms and abbreviations.
A.1 Configuring the Maintenance Terminal
This topic describes how to configure the IP address of the maintenance terminal so that the
maintenance terminal can access the UA5000 normally in telnet mode or SSH mode.
A.2 Making a Script
This topic describes how to make a script according to the collected data plan.
A.3 Operation Guide on Battery Supplementary Charge
Based on the battery features, automatic discharge may occur due to chemical reactions during
the delivery and storage. In this case, the battery capacity and the open circuit voltage decrease.
To restore the voltage and capacity of the battery completely, perform the supplementary charge
before using the battery.
A.4 Settings of the Software Package
This topic describes the software package settings of the UA5000.
A.5 Acronyms and Abbreviations

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 166


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

A.1 Configuring the Maintenance Terminal


This topic describes how to configure the IP address of the maintenance terminal so that the
maintenance terminal can access the UA5000 normally in telnet mode or SSH mode.

Prerequisite
l The maintenance terminal must be connected and started.
l The IP address of the maintenance terminal and the IP address of the device must be at the
same network segment, so that the maintenance terminal can log in to the device to
commission.

Procedure
Step 1 Right-click My Network Places on the desktop, and then choose Properties to display the
Network Connections interface.
Step 2 Right-click Local Area Connection on the Network Connections interface, and then choose
Properties to display the Local Area Connection Properties dialog box.
Step 3 Select General. In the This connection uses the following items pane, select Internet Protocol
(TCP/IP).

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 167


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Step 4 Click Properties to display the Internet Protocol (TCP/IP) Properties dialog box.

Step 5 Select General and then select Use the following IP address to configure the IP address and
the subnet mask.

Step 6 Click OK to return to the Local Area Connection Properties dialog box.

Step 7 Click OK.

----End

Result
After query, it is found that the IP address of the maintenance terminal is consistent with the IP
address in the data plan.

A.2 Making a Script


This topic describes how to make a script according to the collected data plan.

Script Overview
Before commissioning, you can make the commissioning script according to the data plan
collected in Data Requirements, and then load the script to configure the basic data for the device
so that the device can run normally. In this case, you can test commission the basic functions
and the services of the device.

The basic configuration through the script includes but is not limited to the following items:
l Configuring the environment monitoring unit (including the FAN and the ESC)
l Configuring an MG Interface

NOTE

l For details about how to load the script, see Loading the Script.
l For the information on how to configure the MG interface, see Configuration Example of the MG
Interface (the H.248 Protocol).

Example Script
Table A-1 provides the data plan for configuring the example script. After the example script
is configured, the maintenance terminal in the management center can log in to the UA5000 to
commission the basic functions of the device.

Table A-1 Script data plan

Item Data

FAN EMU l SN: 1


l Sub-node: 6
l Name: FAN
l Fan speed adjustment mode: automatic

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 168


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Item Data

ESC l SN: 0
l Sub-node: 30
l Name: H303ESC

MG interface data l mgid: 0


l code: text
l transfer: udp
l protocol: H.248
l Port ID: MG; 2944; MGC: 2944
l domainname: UA5000.com
l Stand-alone digitap: 1234xxxx
l Escape bucket digitmap: 110|119|999

IP address l Media IP address of MG interface 0 of the UA5000: 10.10.10.2/24


l Signaling IP address of MG interface 0 of the UA5000:
10.10.10.4/24
l IP address of the MGC: 10.10.20.1/24

The following displays the commands that need to be included in the script according to the
preceding data plan.

CAUTION
Each command in the script must end with a carriage return (CR).

enable
config
emu add 1 fan 0 6 FAN
interface emu 1
fan speed mode automatic
quit
emu add 0 h303esc 0 30
interface h248 0 y
if-h248 attribute mgip 10.10.10.2 mgport 2944 code text
transfer udp domainName UA5000.com mgcip_1 10.10.20.1 mgcport_1 2944
mg-media-ip 10.10.10.4
digitmap set inner 1234xxxx emergency 110|119|999
reset coldstart y
quit
save

A.3 Operation Guide on Battery Supplementary Charge


Based on the battery features, automatic discharge may occur due to chemical reactions during
the delivery and storage. In this case, the battery capacity and the open circuit voltage decrease.
To restore the voltage and capacity of the battery completely, perform the supplementary charge
before using the battery.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 169


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

A.3.1 Preparing Tools


Before performing the supplementary charge for the battery, check and ensure that the tools that
facilitate the subsequent commissioning work are available.
Table 1 lists the check items for tools before the commissioning.

Table A-2 Charging devices and common tools

SN Item Description Purpose

1 Detection It is recommended that you use the Used for the battery
device for detection device for the battery supplementary charge and
battery charge/ charge/discharge. If you do not have the capacity detection.
discharge or the detection device, use the system
system power power compatible with the
communication device.

2 Multimeter 0.5 level, three and half bits meter Used for detecting the
voltage of the battery group
and the voltage of the single
battery.

3 Clamp meter Current precision 3% Used for detecting the


charge/discharge current of
the battery.

4 Adjustable - Used for tightening the


spanner screw.

5 Flathead - Used for unscrewing the


screwdriver battery covering piece.

A.3.2 Precautions
This topic describes the precautions to be taken during the battery supplementary charge.

Precautions
The precautions to be taken in the charge are as follows:
l For the battery supplementary charge, you need to use the dedicated device for the battery
charge/discharge. If the required condition is unavailable, you can also use simplified power
or directly use the system power of the offices. When using the simplified power or the
system power of the offices, you must properly set the charge/discharge parameters.
l The entire process of the battery supplementary charge needs to be monitored strictly.
Otherwise, abnormalities may occur.
l The connection point of the battery terminal should be clean, bright, and smooth. Before
connection, check and clean the terminal to reduce contact resistance and prevent
connection voltage drop from being too high.
l Prevent short circuit in the connection and insulate all the tools.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 170


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

l Do not connect the positive and negative polarities of the battery reversely.
l During the test, ensure that all the cables are connected reliably and tightly. Otherwise, the
circuit may catch fire or be overheated after the circuit is closed, which may burn the battery
and cause accidents when the problem reaches a serious extent.
l Do not over-charge the battery. Otherwise, the life span of the battery may be shortened.
When the constant voltage is 2.35 V/cell and the limited current is 0.15 C10A, the maximum
charge time cannot exceed 24 hours.

A.3.3 Operation Process


This topic describes how to perform the battery supplementary charge.

Context
The cable must be connected properly based on the requirements in "Precautions."

Procedure
Step 1 Connect the battery that needs the supplementary charge with the cable properly. Ensure that
the bolts of each connection point are tight, and then connect the positive and negative polarities
of the battery group respectively to the positive and negative polarities of the charge device.

CAUTION
This helps to prevent device faults or connection and setting errors from damaging the battery.
You should add an air circuit breaker in the serial connection mode between the battery and the
device loop. The capacity of the air circuit breaker should be designed 1.5 times as the maximum
current of the loop.

Step 2 Run the power charge command to set the battery charge mode, value of charge voltage, and
value of charge limited current.
NOTE

Each parameter of the battery is set as follows:


l The battery charge mode is equalized charge.
l The battery charge voltage is (2.350.02) V/cell. Where:
l For the -48 V power system, the charge voltage is 56.4 V.
l For the battery group that consists of 12 V single batteries, the charge voltage is 2.35 V/cell x 6 x
battery quantity.
l For the battery group that consists of 2 V single batteries, the charge voltage is 2.35 V/cell x battery
quantity.
l The limited current of the battery charge is 0.15 C10A.

Step 3 Close the loop air breaker, start the device, and charge up the battery.

Step 4 When the battery charge current is equal to or less than 0.005 C10A, prolong the charge for three
or 16 hours based on requirements.

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 171


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

NOTE

One hour before the battery charge is over, check the value of the battery voltage one by one. If the battery
voltage is equal to or less than 2.16 V/cell, discharge the battery that has completed charge at the constant
current of 0.25 C10A. Ensure that the discharge time is approximately three hours. Then, perform the charge
in the constant voltage and limited current mode based on the preceding procedures of the battery
supplementary charge.
If the battery capacity cannot be restored completely through this charge/discharge cyclic method either,
it indicates that the battery is invalid because it remained unused for a long time or is faulty. In this case,
the battery must be discarded as useless.

----End

A.4 Settings of the Software Package


This topic describes the software package settings of the UA5000.

A.4.1 Settings of the Default System Parameters


The default system parameter settings of the UA5000 are as follows:

Table A-3 System parameters

Parameter Meaning Default Setting


Index

0 Howler tone sending identifier. 0: not send; 1: send 1: send

1 Overseas version identifier. 0:China, 1:HongKong, 0:China


2:Brazil, 3:Egypt, 4: Singapore, 5:Thailand, 6:France,
7:Britain MSFUK, 8:Britain ETSI, 9:Bulgaria,
14:Turkey, 15:Syria

2 Consistency test identifier. 0: disable; 1: enable 0: disable

3 Stop the initial ringing identifier. 0: not issue; 1: issue 0: not issue

4 System self-check flag. 0: not implement; 1: reset ports 1: resets ports


selectively; 2: reset the idle PSTN port selectively.

5 CPU overload call restriction identifier (this parameter 0: Not restricted


is valid for only the V5 and the SPC). 0: not restricted;
1; restricted

6 Call waiting tone. 0: played by the MGC; 1: played by 0: played by the


the MG MGC

7 Message LED mode. 0: voltage ascending mode; 1: 0: voltage


send FSK and ring; 2: send FSK and not ring ascending mode

9 Reserved parameters 1

10 Whether to support the inconsistency of the IDs for the 0: not support
peer UDP transmitting and receiving ports. 0: not
support; 1: support

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 172


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Parameter Meaning Default Setting


Index

11 Medium stream forwarding mode inside a device. 0: 0: device internal


device internal forwarding; 1: device external forwarding
forwarding

12 Howler tone source. 0: FPGA; 1: DSP; 2: analog 0: FPGA


subscriber board; 3: customer test board

13 TEI check cycle 5 min

14 Whether to support the POTS GTC statistics. 0: not 1: support


support; 1: support

54 Power line alarm switch. 0: not support; 1: support 0: not support

55 Long-time call alarm duration. Multiple of 30 minutes. 0 min

60 ISDN timer value for periodic activation(min), Value: 0: Disable the


0~60(min) function of ISDN
periodic
activation

78 Whether allow the board autoload when the version of 1:allowable


board is higher than the version of system's packet,
0:unallowed, 1:allowable

A.4.2 Settings of the Default Overseas Parameters


The default overseas parameter settings of the UA5000 are as follows:

Table A-4 Overseas parameters


Parameter Meaning Default Setting
Index

0 Busy tone frequency configuration. 0: China (450 Hz); 0: China (450 Hz)
1: Hongkong (480 + 620 Hz); 2: Reserved value

1 Break duration of the busy tone (ms). Reference 350 ms


standard: China 350 ms; Hongkong: 500 ms

2 Ringing duration of the busy tone (ms). Reference 350 ms


standard: China 350 ms; Hongkong: 500 ms

3 Upper hooking threshold (ms). Reference standard: 300 ms


China: 300 ms; Hongkong: 800 ms

4 Lower hooking threshold (ms). Reference standard: 100 ms


China: 100 ms; Hongkong: 100 ms

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 173


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Parameter Meaning Default Setting


Index

5 Flag of sending pulse information signal or not after 1: send


processing the pulse signal from the switch. 0: not send
(Brazil standard); 1: send

6 Flag of switch sending initial ringing signals or not in 1: send


the calling line identification service. 0: not send (Brazil
standard); 1: send

7 Flag of whether access network (AN) using the pulse 0: not use
polarity reversal unit or not. 0: not use; 1: use (Brazil
standard)

8 Flag of whether AN using the resource unavailable unit 0: not use


or not. 0: not use; 1: use (Brazil standard)

9 Flag of AN sending LE off-hook signal or not in case 0: not send


of call conflict. 0: not send; 1: send (Brazil standard)

10 Flag of AN sending howler tone or not when the port is 1: send


busy or idle during the 112 howler tone test. 0: not send
(Hongkong standard); 1: send

11 Flag of AN conducting the dial tone test during the 0: not conduct
circuit test. 0: not conduct; 1: conduct (Hongkong
standard)

12 Width of the polarity reversed pulse 0

13 Delay in sending the Establish_Ack messages (ms) 0 ms

14 Delay in sending the called offhook messages (ms) 0 ms

15 Flag of sending the hotline phone busy tone. 0: send; 1: 0: Send


not send

16 Flag of AOCE. 0: Not stop the ringing; 1..20: duration 0: Not stop the
of stopping ringing (s) ringing

17 NEC-PCMMUX pulse protection timer duration (ms) 0 ms

18 NEC-PCMMUX pulse tail timer duration (ms) 0 ms

19 Call restriction flag. 0: not restrict; 1: restrict 0: not restrict

20 Transmission enable issue flag. 0: not issue; 1: issue 0: not issue

21 CDI loop line check cycle (40~960s) 240 s

22 Radius packet Rx and Tx direction control. 0: positive 0: positive


direction; 1: negative direction direction

23 CDI Z-extension first ring timer length (ms) 1000 ms

24 CDI Z-extension first ring break timer length (ms). 4000 ms

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 174


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Parameter Meaning Default Setting


Index

25 Flag of not processing ISDN deactive message from the 0: process


LE. 0: process; 1: not process

26 Flag of LE not sending reduce battery message. 0: send; 0: send


1: not send

27 Reserved parameters 65535

28 Hotline ring back tone parameters (0~15). For 15


configuring this parameter, refer to the user-defined
ringing types.

29 Hotline ringing parameters (0~255). For configuring 0


this parameter, refer to the initial and cadence ringing
types of the V5 interface.

30 Length of timer for line card send on-hook message 1000 ms


after howler tone (ms).

31 Reserved parameters 65535

32 Flag of checking V5 free timeslot when caller off-hook. 0: not check


0: not check; 1: check

33 Flag of DSL port sending deactive signal to LE after 0: not send


V5 switch-over. 0: not send; 1: send

34 Power of the comfortable noise. 0~90 correspond to 60


0~-90 db.

35 Flag of DSP chip working mode. 0: normal; 1: 0: normal


intelligent public telephone (IPT); 2: NLP enhanced; 3:
NLP decreased; 4: NLP closed; 5: DTMF EC

36 Flag of Z interface extension dynamic timeslot 0: Not


allocation. 0: Not dynamically allocate timeslot; 1: dynamically
Dynamically allocate timeslot allocate timeslot

37 Flag of whether the current is limited when the 0: not limited


subscriber port is locked. 0: not limited; 1: limited

38-39 Reserved parameters 65535

40 Short-circuit current protection threshold on the E1 1: 140 mA


port, which is valid for only the SA586 chip. 1: 140 mA;
2: 165 mA; 3: 190 mA; 4: 215 mA

41 Flag of the exchange re-assigning the timeslot when the 1: not re-assign
V5 PSTN is restarted. 0: re-assign; 1: not re-assign

42 Timeout time of PPP negotiation (0~300 s) 10 s

43 Flag of stop dialtone when pulse dial the first telephone 0: not stop
number. 0: not stop; 1: stop

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 175


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Parameter Meaning Default Setting


Index

44-47 Reserved parameters 65535

48 The time length of the meter test timer (10~65535 min) 65535 min

49 Flag of whether using user-defined ring 15 as default 65535


ring or not and flag of whether enable the optimization
of CC0SASL board name or not.
In the case of the binary system: From the lowest bit to
the highest bit, if the sixth bit is 0, it indicates that user-
specified ringing 15 is the default ringing; if the sixth
bit is 1, it indicates that user-specified ringing 15 is not
used. If the seventh bit is 0, it indicates that the
CC0SASL board name optimization function is
enabled; if the seventh bit is 1, it indicates that the
CC0SASL board name optimization function is
disabled.
If the two functions are both enabled, the value of this
parameter is 1111111100111111 in binary format and
is 65343 in decimal format.

50-51 Reserved parameters 65535

52 Flag of whether to allow deleting a user forcibly. 0: not 0: not allow


allow; 1: allow

53 Configuration for the DTMF signal detection. 0: Q.24; 0: Q.24


1: Russia

54-56 Reserved parameters 65535

57 Flag of enabling or disabling the board line exception 1: disable


report function. 0: enable; 1: disable

58-65 Reserved parameters 65535

66 Flag of whether to modify the TEI value when the 0: universal


softswitch is interconnected. 0: universal standard and standard and not
not modify; 1: set TEI to 1 modify

67-75 Reserved parameters 65535

Preamble letter used for selecting the calling number of


76 the DTMF to be issued. 12: A; 13: B; 14: C; 15: D. 15: D

77 Reserved parameters 65535

Flag of support R2 over analog line. 0: not support; 1:


78 support 0: not support

79-80 Reserved parameters 65535

81 Flag of the subscriber board supporting the low power 1


consumption. 0: not support; 1: support

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 176


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Parameter Meaning Default Setting


Index

82 Flag of reporting the out-of-service (OOS) of the user 0: not report


port when the LOS fault occurs on the U port. 0: not
report; 1: report.

83-127 Reserved parameters 65535

A.4.3 Settings of the Default Parameters of the EMU


Table A-5 and Table A-6 provide the parameter settings of the EMU on the UA5000.

Table A-5 Default parameter settings of the H303ESC and H304ESC


Parameter Default Setting

Sub-node 15

Analog parameters ESC analog parameter IDs


l 0: allocated to the temperature sensor by default (read-only).
l 1-4: allocated to the voltage sensor by default.
1 indicates -48 V input of channel 0.
2 indicates -48 V input of channel 1.
3 indicates -48 V input of channel 2.
4 indicates -48 V input of channel 3.
l 5-8 indicate user-defined analog parameters to be allocated to other
extended analog sensors, such as humidity sensor.

Upper and lower alarm thresholds


l Temperature: 5C to 55C
l Humidity: 0% RH to 80% RH

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 177


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

Parameter Default Setting

Digital parameters ESC digital parameter IDs


l Allocated by default (read-only)
0: MDF
1: door status sensor 0
9: water
10-13: lightning arresters 0-3
14-15: switches 11 and 12
16-17: switches 21 and 22
18-19: switches 31 and 32
20-21: switches 41 and 42
22: external sensor power
l User-defined IDs
2-8: allocated to other extended digital sensors.

Definition of user-defined alarm indexes


1: AC voltage; 2: AC switch; 3: battery voltage; 4: battery fuse; 5: load
fuse; 6: rectifier module; 7: secondary power supply; 8: door status of
the cabinet; 9: door status of the equipment room; 10: window; 11:
theft; 12: cable distribution frame; 13: fan; 14: fire; 15: smoke; 16:
water; 17: diesel; 18: abnormal smell 19: air conditioner; 20: lightning
arrester; 21-52: user-defined alarms 0-31 of digital parameters

Table A-6 Default Parameter Settings of the FAN EMU


Parameter Default Setting

Sub-node 1

Fan speed Automatic


adjustment mode

Whether to report Allowed


the fan alarm

A.5 Acronyms and Abbreviations


A
ADSL Asymmetric Digital Subscriber Line
ADSL2 Asymmetrical Digital Subscriber Line 2
ADSL2+ Asymmetrical Digital Subscriber Line 2 PLUS

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 178


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

AG Access Gateway

B
BRA Basic Rate Access
BRI Basic Rate Interface

C
CLI Command Line interface
CRC Cyclic Redundancy Check

D
DC Direct Current
DSL Digital Subscriber Line Board
DSP Digital Signal Processor
DTMF Dual-Tone Multifrequency

E
EMU Environment Monitor Unit
EPON Ethernet Passive Optical Network
ESC Environment Supervision Control

F
FAQ Frequently asked question
FE Fast Ethernet
FoIP Fax over IP
FSK Frequency Shift Keying
FTP File Transfer Protocol

G
GE Gigabit Ethernet
GND Ground
GPON Gigabit Passive Optical Network

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 179


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

I
ID Identity
IP Internet Protocol
ISDN Integrated Services Digital Network
IUA ISDN Q.921-User Adaptation Layer

L
LAN Local Area Network

M
MGC Media Gateway Controller
MGCP Media Gateway Control Protocol
MoIP Modem over IP

O
OLT Optical Line Terminal
ONU Optical Network Unit

P
PBX Private Branch Exchange
PCM Pulse Code Modulation
POTS Plain Old Telephone Service
PPP Peer-Peer Protocol
PRA Primary Rate Access
PRI Primary Rate Interface
PSTN Public Switched Telephone Network
PVM Packet Voice Module

R
RTP Real-time Transport Protocol

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 180


Copyright Huawei Technologies Co., Ltd.
UA5000 Universal Access Unit
Commissioning Guide-PVM CLI A Additional Information

S
SHDSL Single-line High Speed Digital Subscriber Line
SIGTRAN Signalling Transport
SP Service Provider

T
TA Terminal Adaptor
TCP Transport Control Protocol
TDM Time Division Multiplexing
TFTP Trivial File Transfer Protocol

U
UDP User Datagram Protocol

V
VAG Virtual Access Gateway
VLAN Virtual Local Area Network
VoIP Voice over IP

X
xDSL x Digital Subscriber Line

Issue 01 (2011-07-30) Huawei Proprietary and Confidential 181


Copyright Huawei Technologies Co., Ltd.

S-ar putea să vă placă și