ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

REVIEW COMMENTS ON:-


DOCUMENT TITLE: FUEL AND INSTRUMENT GAS SYSTEM

DOCUMENT NO: NTC-OB3-LOTA-X-DW-006 (A03)

S.N SHEET FRAZIMEX FRAZIMEX RESPONSE


ZEL COMMENTS ZEL COMMENTS
O. NUMBER RESPONSE

1- P&IDs reference of inlet lines 1. Implemented Kindly refer to attached ZEL Implemented.
to fuel and instrument gas comments mark-up sheets for
system are incorrect. Kindly review comments on the
correct. 2. Implemented submitted document.
2- Automatic BDV on line of Gas
from export distribution header
should be provided. 3. Implemented
3- Spec. break is showing after
10-PCV-821A. It should be
relocated to inlet of instrument
gas scrubber. 4. Implemented
1. 1 of 4
4- PSV should be provided after
valve 10-PCV-821B. 5. Implemented
5- PG and TG should be provided
after valve 10-PCV-821B. 6. Implemented
6- Review and correct the
operating temperature in
instrument gas scrubbers data 7. Implemented
panel. It shall be 20-30oC.
7- Kindly delete Sizing case
control valve failure from
PSV (10-PSV-802) of
instrument gas scrubber.

FILE: Document1 Dated: 21-April-2017 SHEET 1 OF 3


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

1. Implemented Kindly refer to attached ZEL Implemented.


comments mark-up sheets for
review comments on the
2. Implemented submitted document.

1- Review and correct line sizes


mentioned for inlet and outlet
lines of 10-PCV-921B.
2- Flow control valve should be 3. Implemented
provided on Instrument gas
line before dryers in order to
distribute require flow rate
between fuel gas and 4. Implemented
instrument gas.
3- Inlet and outlet filters should
2. 2 of 4 be provided for instrument gas 5. Drying cycle time
dryers. provided.
4- Both adsorption and
regeneration lines after dryers
are routing towards instrument 6. Fuel Gas
gas receiver. Regeneration gas Scrubber V-
should be recycled. 1020 has been
5- Drying cycle time should be expunged from the
provided in data panel of drawing, because
instrument gas dryers. the capacity of the
6- Review the requirement of fuel required for
Fuel gas scrubber. the generator is
very small
therefore it does
not warrant having
a Fuel Gas
scrubber V-1020

FILE: Document1 Dated: 21-April-2017 SHEET 2 OF 3


ZISHAN / HYPROPS OBIAFU/OBRIKOM-OBEN (OB3) GAS PIPELINE PROJECT (LOT A OB/OB CTMS TO UMUKWATA IPS)

1- Kindly review and correct


sheet numbers of all 1. Implemented Kindly refer to attached ZEL Implemented.
equipment. comments mark-up sheets for
2- Please provide the Pressure 2. Implemented review comments on the
3. 3&4 of 4
indicator (PI) on Instrument submitted document.
gas distribution header.
3- Detail of slug catcher (VC- 3. implemented
1002) is missing.

FILE: Document1 Dated: 21-April-2017 SHEET 3 OF 3