V. Inspectorate Team
Name of Inspector Position Signature
*Risk Level
High (H) - Will cause substantial delay on construction progress; has significant effect on construction quality
Medium (M)- Will cause minimal delay on construction progress; has minor effect on construction quality
Low (L) - Will not cause any delay on construction progress; has no effect on construction quality
Republic of the Philippines
THE INTERIOR AND LOCAL GOVERNMENT
LCOM Center, EDSA Corner Quezon Avenue, Quezon City
www.dilg.gov.ph
Thickness (mm)
Remarks
Recommendation/s
Advise PEO to produce monthly
accomp & materials report
Advise PEO to instruct contractor
to mobilize quality control
personnel as required in the
contract
Signature
Province: ______________________________________________________________________
Name of Project: _______________________________________________________________
Project Code: __________________________________________________________________
Description Requirement Compliance Status
I. Approved Plans & Bill of Quantities
1 Contract Plan (as bid) Check approval/ signatures/ completeness
5 Updated Straight Line Diagram Check consistency with plans and BOQ
IV. Materials Quality Control
1 Quality Control Plan Check completeness/ approval/
consistency with BOQ/ compliance with
specifications & standards
Province: ______________________________________________________________________
Name of Project: _______________________________________________________________
Project Code: __________________________________________________________________
Description Requirement Compliance Status
2 Approved Work Requests/Pouring Check availability of documentation
Permits
3 General Correspondence Check availability of documentation
VI. Progress Reporting
1 Weekly Progress Report Check availability of documentation
2 Monthly Progress Report Check availability of documentation
3 Progress Photographs Check availability of documentation
4 DILG Data Capture & Progress Check availability of documentation
Monitoring Report
VII. Contract Amendments/Variations
1 Approved Variation Orders Check completeness of documentation/
validity of justifications
2 Approved Time Extensions Check completeness of documentation/
validity of justifications
3 Approved Time Suspensions Check completeness of documentation/
validity of justifications
VIII. Meetings
1 Minutes Check availability of documentation
2 Attendance Sheets Check availability of documentation
Department of the Interior and Local Government
Office of Project Development Services
Konkreto at Ayos na Lansangan ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
Province: ______________________________________________________________________
Name of Project: _______________________________________________________________
Project Code: __________________________________________________________________
Description Requirement Compliance Status
IX. Environment, Health and Safety
1 Construction Safety and Health Check availability of documentation;
Program compliance with CSH standards of DOLE
2 First Aid Kit Check availability at project site
3 Presence of Safety Officer Verify presence at project site
4 Traffic Management Plan (signs, Check if appropriate traffic management
flagperson, etc) plan is being enforced
5 Warning signs Check adequacy of warning signs
6 Barricades(lighting fixtures, Check adequacy of barricades
reflectorized signages,cones, etc)
7 Protective Personal Equipment Check if contractor's personnel has
appropriate PPEs
X. Insurance/ Securities
1 Contractor's All Risks Insurance Check availability of documentation/ must
cover acts of nature and valid up to end of
DLP
Province: ______________________________________________________________________
Name of Project: _______________________________________________________________
Project Code: __________________________________________________________________
Description Requirement Compliance Status
4 Technical Specifications Check availability of documentation/ must
be based on DPWH Blue Book
5 Others Include contractor's original bid & other
contract documents
* Indicate whether:
Fully Complied
Partially Complied
Not Complied
No basis
ent of the Interior and Local Government
ce of Project Development Services
an ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
Remarks
ent of the Interior and Local Government
ce of Project Development Services
an ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
Remarks
ent of the Interior and Local Government
ce of Project Development Services
an ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
Remarks
ent of the Interior and Local Government
ce of Project Development Services
an ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
Remarks
Department of the Interior and Local Government
Konkreto at Ayos na Lansangan ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
QUALITY ASSURANCE REPORT No. ____
(Physical Works)
(Date of Visit)
Province:
Name of Project:
Project Code:
Province:
Name of Project:
Project Code:
Materials have passed liquid limit (35) and plasticity index (12)
Materials passing No. 10 sieve have passed LA Abrasion Tests (50)
Materials have passed density test (soaked CBR value>30%)
Existing surface has been graded and finished as provided under Item
105
Maximum layer of 150mm
Moisture content has been monitored (watering done as necessary)
Trial section (500sq.m) compliant with field density requirements
completed
Finished compacted surface does not exceed the allowable tolerances: (i)
thickness of layer +/-20mm, level of surface +10mm/-20mm, surface
irregularity 20mm, crossfall +/-0.3%, longitudinal grade +/-0.1%
Province:
Name of Project:
Project Code:
Province:
Name of Project:
Project Code:
Materials have passed liquid limit (<35) and plasticity index (4-9)
requirements (check test results)
Materials passing No. 10 sieve have passed LA Abrasion Tests (45)
Materials have achieved CBR value of not less than 80% (check test
results)
Materials have been placed and compacted in accordance with the
requirements of Item 201
Maximum layer of 150mm
Moisture content has been monitored (watering done as necessary)
Trial section (500sq.m) compliant with field density requirements
completed
Finished compacted surface does not exceed the allowable tolerances: (i)
thickness of layer +15/-5mm, level of surface +15mm/-5mm, surface
irregularity 5mm, crossfall +0.2%, longitudinal grade over 25m = +0.1%
Province:
Name of Project:
Project Code:
Province:
Name of Project:
Project Code:
Province:
Name of Project:
Project Code:
Province:
Name of Project:
Project Code:
TOTAL
Department of the Interior and Local Government
Konkreto at Ayos na Lansangan ang Daan Tungo sa Pangkalahatang Kaunlaran (KALSADA)
QUALITY ASSURANCE REPORT No. ____
(Physical Works)
(Date of Visit)
Province:
Name of Project:
Project Code:
* Indicate whether:
Fully Complied
Partially Complied
Not Complied
No basis
Comments / Suggestion for QA Form (Roads and Bridges):
- Suggestion: Protocol
- After inspection, conduct exit conference with LCE or LCE Representative (from DILG-RO)
- DILG will be the only signatory. DILG to formally transmit findings to LGU (from DILG-OPDS
-Sir Mike Gler)