Sunteți pe pagina 1din 8

PLANILLA DE METRADOS

PARTIDA DESCRIPCIN UNID. MEDIDAS


COEF. CANT.
ACERO LARGO ANCHO ALTO PARCIAL
01 CAPTACION
01.01 OBRAS DE CONCRETO SIMPLE
01.01.01 ENCOFRADO Y DESENCOFRADO NORMAL M2
CAMARA DE CAPTACIN A REFACCIONARSE (LLICCHIVILCA) 1.00 1.20 0.20 0.24
CAMARA DE CAPTACIN A REFACCIONARSE (OCRABAMBA) 1.00 0.50 0.45 0.23
LATERALES IZQ, DER. 2.00 1.50 1.00 3.00
FRONTALES 2.00 2.00 0.60 2.40

01.01.02 CONCRETO SIMPLE F'c=175 Kg/Cm2 M3


CAMARA DE CAPTACIN A REFACCIONARSE (LLICCHIVILCA) 10.00 1.20 0.10 0.50 0.60
CAMARA DE CAPTACIN A REFACCIONARSE (OCRABAMBA) 10.00 1.20 0.10 0.50 0.60
LATERALES IZQ, DER. 0.80 0.15 1.00 0.12
FRONTALES 1.60 0.15 1.00 0.24

01.02 REVESTIMIENTOS
01.02.01 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2
CAMARA DE CAPTACIN A REFACCIONARSE (LLICCHIVILCA) M2 4.00 0.30 0.45 0.54
CAMARA DE CAPTACIN A REFACCIONARSE (OCRABAMBA) M2 4.00 0.50 0.45 0.90
LATERALES IZQ, DER. M2 1.50 1.20 1.00 1.80
FRONTALES M2 1.20 1.20 1.00 1.44
CAMARA DE CAP. CRUZPATA M2 1.60 1.00 0.20 0.32
01.03 INSTALACION DE ACCESORIOS
01.03.01 VALVULAS DE COMPUERTA 2" Y ACCESORIOS UND 10.00

02 RESERVORIO
01.02 REVESTIMIENTOS
01.02.01 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2
RESERVORIO LLICCHIVILCA M2 7.00 0.60 0.50 2.10
CAJA DE VALVULA RES. LLICCHIVILA M2 7.00 0.50 0.30 1.05
CAJA DE VALVULA RES. PERRCCAHUATAY M2 4.30 0.50 0.30 0.65
RESERVORIO PERCCAHUATAY M2 4.00 1.50 0.20 1.20
02.01 INSTALACION DE ACCESORIOS
02.01.01 TUBERIA DE AGUA PVC SAP C-7.5 DE 2" M 11.00 5
02.01.02 INST. VALVULA DE CONTROL DE 1" UND 11.00 3
02.01.03 INST. VALVULA DE CONTROL DE 2" UND 11.00 1
02.01.04 INST. VALVULA DE CONTROL DE 1 1/2" UND 11.00 1
02.01.05 INST. VALVULA DE CONTROL DE 3/4" UND 11.00 1

03 CAMARA DE ROMPE PRESIN


03.01 REVESTIMIENTOS
03.01.00 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2
CAMARA DE ROMPE PRESIN OCRABAMBA M2 4.25 2.00 0.20 1.70
CAMARA DE ROMPE PRESIN LLICCHIVILCA M2 4.00 2.00 0.20 1.60
CAMARA DE ROMPE PRESIN SARCONTA M2 4.00 0.60 0.50 1.20
03.02.00 INSTALACION DE ACCESORIOS

03.02.01 INST. VALVULA FLOTADOR DE 1" (CON BOYA) OCRABAMBA UND 4.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) LLICCHIVILCA UND 3.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) PALPACACHI UND 8.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) LLAUQUI UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) LLAULLIPATA UND 4.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) CCAFIAMARCA UND 3.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) CRUZPATA UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) URIHUIRI UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) PERCCAHUATAY UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) SARCONTA UND 3.00 1
03.02.02 INST. VALVULA DE CONTROL DE 1" UND 25.00 1
CODO DE 2"X90 UND 5.00 1
CODO DE 1"X90 UND 6.00 1
03.02.03 SUMINISTRO E INST. DE TUBERIA PVC DE 1 1/2" C-7.5 M 11.00 2.5
03.02.04 SUMINISTRO E INST. DE TUBERIA PVC DE 1" C-7.5 M 11.00 2.5
03.02.05 SUMINISTRO E INST. DE TUBERIA PVC DE 3/4" C-7.5 M 11.00 2.5
03.02.06 TAPA METALICA DE 0,90 X 0,90 M UND 2.00 2.5

04 LINEA PRINCIPAL CONDUCCION


04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL M2 520.00 1.00 520.00
04.01.02 TRAZO Y REPLANTEO KM 5.20 5.20
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE TERRENO EN MATERIAL SATURADO M3 500.00 0.50 0.6 150.00
EXCAVACION M3 20.00 0.50 0.6 6.00
04.02.02 PREPARACIN DE CAMA DE APOYO M 520.00 520.00
04.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 520.00 0.50 0.6 156.00
04.03 SUMINISTRO E INST. DE TUBERIA Y ACCESORIOS
04.03.01 SUMINISTRO E INST. DE TUBERIA PVC DE 1 1/2" C-7.5 M 120.00 120.00
04.03.01 SUMINISTRO E INST. DE TUBERIA PVC DE 1" C-7.5 M 250.00 250.00
04.03.02 SUMINISTRO E INST. DE TUBERIA PVC DE 3/4" C-7.5 M 150.00 150.00
04.03.03 SUMNISTRO E INST. ACCESORIOS LINEA DE DISTRIBUCIN GBL 1.00 1.00

05 LINEA DE DISTRIBUCION
05.01 OBRAS PRELIMINARES
05.01.01 TRAZO NIVELACIN Y REPLANTEO m 300.00 300.00
05.01.02 LIMPIEZA DE TERRENO MANUAL m2 300.00 300.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION DE TERRENO EN MATERIAL SATURADO M3 300.00 0.50 0.6 90.00
05.02.02 PREPARACION DE CAMA DE APOYO M 300.00 300.00
05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 300.00 0.50 0.6 90.00
05.03 SUMINISTRO E INST. DE TUBERIA Y ACCESORIOS
05.03.01 SUMINISTRO E INST. TUBERIA PVC SAP DE 1/2" C-7.5 M 300.00 300.00
05.03.02 SUMINISTRO E INST. DE ACCESORIOS LINEA DE DISTRIBUCIN GBL 1.00 1.00

06 PRUEBA HIDRAULICA
06.01 PRUEBA HIDRAULICA+DESINFECCION TUB.1 1/2", 1", 3/4" M 520.00

06 ASISTENCIA TECNICA ENCAMPO


06.01 OPERACIN, MANTENIMIENTO Y CONSERVACIN DEL SISTEMA DE AGUA POT GLB 1 1.00

07 FLETES
07.01 TRANSPORTE DE MATERIALES TERRESTRE GLB 1.00
07.02 TRANSPORTE DE MATERIALES RURAL GLB 1.00
DE METRADOS
SUB TOTAL
TOTAL

5.87
0.24
0.23
3.00
2.40

1.56
0.60
0.60
0.12
0.24

5.00
0.54
0.90
1.80
1.44
0.32

10.00

5.00
2.10
1.05
0.65
1.20

55.00
33.00
11.00
11.00
11.00

4.50
1.70
1.60
1.20

33.00
4.00
3.00
8.00
2.00
4.00
3.00
2.00
2.00
2.00
3.00
25.00
5.00
6.00
27.50
27.50
27.50
5.00

520.00
5.20

156.00

520.00
156.00

120.00
250.00
150.00
1.00

300.00
300.00

90.00
300.00
90.00

300.00
1.00

520

1
1
PLANILLA DE METRADOS
PARTIDA DESCRIPCIN UNID. MEDIDAS
COEF. CANT.
ACERO LARGO ANCHO ALTO PARCIAL
01 CAPTACION
01.01 OBRAS DE CONCRETO SIMPLE
01.01.01 ENCOFRADO Y DESENCOFRADO NORMAL M2
CAMARA DE CAPTACIN A REFACCIONARSE (LLICCHIVILCA) 1.00 1.20 0.20 0.24
CAMARA DE CAPTACIN A REFACCIONARSE (OCRABAMBA) 1.00 0.50 0.45 0.23
LATERALES IZQ, DER. 2.00 1.50 1.00 3.00
FRONTALES 2.00 2.00 0.60 2.40

01.01.02 CONCRETO SIMPLE F'c=175 Kg/Cm2 M3


CAMARA DE CAPTACIN A REFACCIONARSE (LLICCHIVILCA) 10.00 1.20 0.10 0.50 0.60
CAMARA DE CAPTACIN A REFACCIONARSE (OCRABAMBA) 10.00 1.20 0.10 0.50 0.60
LATERALES IZQ, DER. 0.80 0.15 1.00 0.12
FRONTALES 1.60 0.15 1.00 0.24

01.02 REVESTIMIENTOS
01.02.01 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2
CAMARA DE CAPTACIN A REFACCIONARSE (LLICCHIVILCA) M2 4.00 0.30 0.45 0.54
CAMARA DE CAPTACIN A REFACCIONARSE (OCRABAMBA) M2 4.00 0.50 0.45 0.90
LATERALES IZQ, DER. M2 1.50 1.20 1.00 1.80
FRONTALES M2 1.20 1.20 1.00 1.44
CAMARA DE CAP. CRUZPATA M2 1.60 1.00 0.20 0.32
01.03 INSTALACION DE ACCESORIOS
01.03.01 VALVULAS DE COMPUERTA 2" Y ACCESORIOS UND 10.00

02 RESERVORIO
01.02 REVESTIMIENTOS
01.02.01 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2
RESERVORIO LLICCHIVILCA M2 7.00 0.60 0.50 2.10
CAJA DE VALVULA RES. LLICCHIVILA M2 7.00 0.50 0.30 1.05
CAJA DE VALVULA RES. PERRCCAHUATAY M2 4.30 0.50 0.30 0.65
M2 4.00 1.50 0.20 1.20
02.01 INSTALACION DE ACCESORIOS
02.01.01 TUBERIA DE AGUA PVC SAP C-7.5 DE 2" M 11.00 5
02.01.02 INST. VALVULA DE CONTROL DE 1" UND 11.00 3
02.01.03 INST. VALVULA DE CONTROL DE 2" UND 11.00 1
02.01.04 INST. VALVULA DE CONTROL DE 1 1/2" UND 11.00 1
02.01.05 INST. VALVULA DE CONTROL DE 3/4" UND 11.00 1

03 CAMARA DE ROMPE PRESIN


03.01 REVESTIMIENTOS
03.01.00 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA M2
M2 4.25 2.00 0.20 1.70
M2 4.00 2.00 0.20 1.60
M2 4.00 0.60 0.50 1.20
03.02.00 INSTALACION DE ACCESORIOS

03.02.01 INST. VALVULA FLOTADOR DE 1" (CON BOYA) OCRABAMBA UND 4.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) LLICCHIVILCA UND 3.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) PALPACACHI UND 8.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) LLAUQUI UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) LLAULLIPATA UND 4.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) CCAFIAMARCA UND 3.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) CRUZPATA UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) URIHUIRI UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) PERCCAHUATAY UND 2.00 1
INST. VALVULA FLOTADOR DE 1" (CON BOYA) SARCONTA UND 3.00 1
03.02.02 INST. VALVULA DE CONTROL DE 1" UND 25.00 1
CODO DE 2"X90 UND 5.00 1
CODO DE 1"X90 UND 6.00 1
03.02.03 SUMINISTRO E INST. DE TUBERIA PVC DE 1 1/2" C-7.5 M 11.00 2.5
03.02.04 SUMINISTRO E INST. DE TUBERIA PVC DE 1" C-7.5 M 11.00 2.5
03.02.05 SUMINISTRO E INST. DE TUBERIA PVC DE 3/4" C-7.5 M 11.00 2.5
03.02.06 TAPA METALICA DE 0,90 X 0,90 M UND 2.00 2.5

04 LINEA PRINCIPAL CONDUCCION


04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL M2 520.00 1.00 520.00
04.01.02 TRAZO Y REPLANTEO KM 5.20 5.20
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE TERRENO EN MATERIAL SATURADO M3 500.00 0.50 0.6 150.00
EXCAVACION M3 20.00 0.50 0.6 6.00
04.02.02 PREPARACIN DE CAMA DE APOYO M 520.00 520.00
04.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 520.00 0.50 0.6 156.00
04.03 SUMINISTRO E INST. DE TUBERIA Y ACCESORIOS
04.03.01 SUMINISTRO E INST. DE TUBERIA PVC DE 1 1/2" C-7.5 M 120.00 120.00
04.03.01 SUMINISTRO E INST. DE TUBERIA PVC DE 1" C-7.5 M 250.00 250.00
04.03.02 SUMINISTRO E INST. DE TUBERIA PVC DE 3/4" C-7.5 M 150.00 150.00
04.03.03 SUMNISTRO E INST. ACCESORIOS LINEA DE DISTRIBUCIN GBL 1.00 1.00

05 LINEA DE DISTRIBUCION
05.01 OBRAS PRELIMINARES
05.01.01 TRAZO NIVELACIN Y REPLANTEO m 300.00 300.00
05.01.02 LIMPIEZA DE TERRENO MANUAL m2 300.00 300.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION DE TERRENO EN MATERIAL SATURADO M3 300.00 0.50 0.6 90.00
05.02.02 PREPARACION DE CAMA DE APOYO M 300.00 300.00
05.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 300.00 0.50 0.6 90.00
05.03 SUMINISTRO E INST. DE TUBERIA Y ACCESORIOS
05.03.01 SUMINISTRO E INST. TUBERIA PVC SAP DE 1/2" C-7.5 M 300.00 300.00
05.03.02 SUMINISTRO E INST. DE ACCESORIOS LINEA DE DISTRIBUCIN GBL 1.00 1.00

06 PRUEBA HIDRAULICA
06.01 PRUEBA HIDRAULICA+DESINFECCION TUB.1 1/2", 1", 3/4" M 520.00

06 ASISTENCIA TECNICA ENCAMPO


06.01 OPERACIN, MANTENIMIENTO Y CONSERVACIN DEL SISTEMA DE AGUA POT GLB 1 1.00

07 FLETES
07.01 TRANSPORTE DE MATERIALES TERRESTRE GLB 1.00
07.02 TRANSPORTE DE MATERIALES RURAL GLB 1.00
DE METRADOS
SUB TOTAL
TOTAL

5.87
0.24
0.23
3.00
2.40

1.56
0.60
0.60
0.12
0.24

5.00
0.54
0.90
1.80
1.44
0.32

10.00

5.00
2.10
1.05
0.65
1.20

55.00
33.00
11.00
11.00
11.00

4.50
1.70
1.60
1.20

33.00
4.00
3.00
8.00
2.00
4.00
3.00
2.00
2.00
2.00
3.00
25.00
5.00
6.00
27.50
27.50
27.50
5.00

520.00
5.20

156.00

520.00
156.00

120.00
250.00
150.00
1.00

300.00
300.00

90.00
300.00
90.00

300.00
1.00

520

1
1

S-ar putea să vă placă și