Item No.
Specification Estimated
as per Estimated Rates in
MORTH Description of Item Quantity Unit Rs.
1
Marking out the center line of the Bridge
and various other component structures
and complete lining out and leveling with
Sec -100, 109 theodolite /total station, levels,including
constructing necessary masonory pillars
for lines and levels and establishing
nesessary bench marks etc. complete as
directed. 1 No
2 Sec- 300, 304
Excavation for foundations in sand,
gravel, clay, soft soils, murrum etc.
including shoring, strutting and
dewatering as necessary and depositing
of the excavated stuff as directed for all
lead, back filling the excavated pit by
approved excavated material etc.
complete as per specification. (A) Depth
upto 3.0M. Cu.m.
Total
Estimated Rates Amount
in words in Rs.