MANPOWER EQUIPMENT
Days CONSTRUCTION DURATION = 30 CD
ITEM SCOPE OF WORK SCHEDULE SCHEDULE
Skilled Laborer No. Description 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
#REF! #REF! ### #REF! ###
### #REF!
#REF! #REF! ### #REF! ###
### #REF!
#REF! #REF! ### #REF!
### #REF!
#REF! #REF! ### #REF! #REF! ###
### #REF!
#REF! #REF! ### #REF! #REF! ###
### #REF!
### #REF!
#REF! MASONRY WORKS (5",4" CHB, FENCE, EXTERIOR WALLS ### #REF! #REF! ###
OF MUSEUM, PLANTBOX,SIDINGS OF WATER CASCADE)
#REF! #REF! 18 #REF! #REF! ###
#REF! MOLDINGS (DECORATIVE COLUMN HEAD) ### #REF! #REF! ###
(CHB TOP MOLDING)
#REF! #REF! ### #REF! #REF!
### #REF!
#REF! #REF! ### #REF! #REF!
### #REF!
### #REF!
#REF! #REF! ### #REF! #REF!
### #REF!
### #REF!
#REF! #REF! 4 #REF! #REF! 4
#REF! #REF! 8 #REF! #REF!
### #REF! 8
SPL ITEM V: #REF! ### #REF! #REF!
SPL ITEM VI: #REF! ### #REF!
### #REF!
Architect
ROBERT F. CATBAGAN / Arch. MARY ANGELINE C. VINLUAN JANUARIO S. BORILLO JOHNNY A. DEGAY OSCAR V. FLORES
Draftsman III Draftsman III Engineer II Architect IV City Departemnt Head II
Head Planning,Design & Construction Division Building Official
CONSTRUCTION DURATION = 30 CD
105 110 115 120 125 130 135 138
###
###
###
138
Republic of the Philippines
CITY BUILDINGS AND ARCHITECTURE OFFICE
Baguio City
____________________________________________________________________________________________________________________________
2-Sep-13
Enclosed is city infrastructure project under CBAO and is requested to be included in the list of projects scheduled for publication and bidding, as follows:
Appropriation Supervision EQUIPMENT Source of
NO Project Title Location
ABC Requirement REQUIREMENT Fund
IMPROVEMENT OF Baguio City App: P16, 765,188.73 1 Foreman 1 unit Speed Cutter
BAGUIO Hall, ABC: P16,583,224.38 1 Architect 1 units Electric Drill
CITY HALL GROUNDS Baguio City 1 Engineering Aide1 unit One-bagger Conc.
( c/o CBAO ) Mixer
1 unit Concrete Vibrator
2 units Welding Machine
2 units Electric Grinder
1 unit Tamping Rammer
1 unit jackhammer
1 unit backhoe
1 unit fusion machine
1 unit dump truck
Thank you.
JOHNNY A. DEGAY
Acting Building Official
__________________________________________________________________________________________________________________________________
195 ITEM 101: REMOVAL OF EXISTING STRUCTURE AND OBSTRUCTION 1.00 lot
Calendar A. EXISTING FENCE FACING ABANAO STREET
Days B. EXISTING CONCRETE STAIRS
ITEM 103: STRUCTURE EXCAVATION 816.00 cu.m.
ITEM 104: EMBANKMENT 34.00 cu.m.
ITEM 404: REINFORCING STEEL BARS 32,613.54 kgs
ITEM405: STRUCTURAL CONCRETE 318.00 cu.m.
Footing = 45.00 m
Stairs/Slab = 80.00 m
Column = 50.00 m
Beam/Tie Beam = 26.00 m
Retaining Wall = 14.00 m
Cistern = 8.00 m
Wall Footing = 95.00 m
SPL.ITEM I: STEEL DECK 270.00 sq.m.
ITEM 704A: MASONRY WORKS 1,450.00 sq.m.
ITEM 1027A: CEMENT PLASTER FINISH
A.PLAIN CEMENT PLASTER 950.00 sq.m.
B. MOLDINGS 649.80 L.M.
C. ROUGH PLASTERED FINISH 563.00 sq.m.
SPL.ITEM II: ARCHITECTURAL FINISHING WORKS
SPL.ITEM IIA PAINTING WORKS 1,613.00 sq.m.
SPL.ITEM IIB TILE WORKS 139.50 sq.m.
SPL.ITEM III: IRON WORKS
SPL.ITEM IIIA A.FENCE GRATING 122.00 span
SPL.ITEM IIIB B.GATES 170.00 sq.m.
SPL.ITEM IV: ELECTRICAL WORKS (CONDUITS ONLY) 112.00 outlets
SPL.ITEM V: PLUMBING LAYOUT OF WATER CASCADE & MINI-MUSEUM 1.00 lot
SPL. ITEM VI WINDOWS OF MINI-MUSEUM 3.00 sets
SPL.ITEM VIII: DOORS OF MINI-MUSEUM 8.00 sets
SPL.ITEM VIII: FORMWORKS (LABOR ONLY) 1.00 lot
SPL.ITEM IX: CLEANING-UP AND CLEARING 1.00 lot
SPL.ITEM VIII: FORMWORKS (SEMI-EXPENDABLE) 1.00 lot
SPL.ITEM X MISCELLANEOUS ITEM 1.00 lot
(transferring of beneco post, fuel & elect. consumption)
(electrical connection permit, building permit, occupancy permit, water connection permit)
Item Scope of Work Qty.
MATERIAL COST
LABOR COST
EQUIPMENT RENTAL
DIRECT COST
10% VAT on L&E
1% QUALITY CONTROL
MARK UP
GRAND TOTAL
lot
#REF!
#REF!
kgs
m
#REF!
sq.m.
sq.m.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
lot
lot
lot
Republic of the Philippines
BUILDINGS AND ARCHITECTURE OFFICE
City Government of Baguio
Development of Baguio City Hall APPROPRIATION 1 Foreman 1 unit Speed Cutter Dev't. 90 CD ITEM 101: REMOVAL OF EXISTING STRUCTURE AND OBSTRUCTION 1.00 lot
Baguio City Hall Grounds Php #REF! 1 Architect 1 units Electric Drill Fund A. EXISTING FENCE FACING ABANAO STREET
(Phase I) 1 unit One-bagger Conc. 2011 B. EXISTING CONCRETE STAIRS
ABC 1 Engineering Mixer ITEM 103: STRUCTURE EXCAVATION 816.00 cu.m.
Php #REF! Aide 1 unit Concrete Vibrator ITEM 104: EMBANKMENT 34.00 cu.m.
2 units Welding Machine ITEM 404: REINFORCING STEEL BARS 32,613.54 kgs
2 units Electric Grinder ITEM405: STRUCTURAL CONCRETE 318.00 cu.m.
1 unit Tamping Rammer Footing = 45.00 m
1 unit jackhammer Stairs/Slab = 80.00 m
1 unit backhoe Column = 50.00 m
1 unit fusion machine Beam/Tie Beam = 26.00 m
1 unit dump truck Retaining Wall = 14.o0 m
Cistern = 8.00 m
Wall Footing = 95.00 m
SPL.ITEM I: STEEL DECK 270.00 sq.m.
ITEM 704A: MASONRY WORKS 1,450.00 sq.m.
ITEM 1027A: CEMENT PLASTER FINISH
A.PLAIN CEMENT PLASTER 950.00 sq.m.
B. MOLDINGS 649.80 L.M.
C. ROUGH PLASTERED FINISH 563.00 sq.m.
SPL.ITEM II: ARCHITECTURAL FINISHING WORKS
SPL.ITEM IIA PAINTING WORKS 1,613.00 sq.m.
SPL.ITEM IIB TILE WORKS 139.50 sq.m.
SPL.ITEM III: IRON WORKS
SPL.ITEM IIIA A.FENCE GRATING 122.00 span
SPL.ITEM IIIB B.GATES 170.00 sq.m.
SPL.ITEM IV: ELECTRICAL WORKS (CONDUITS ONLY) 112.00 outlets
SPL.ITEM V: PLUMBING LAYOUT OF WATER CASCADE & MINI-MUSEUM 1.00 lot
#REF! WINDOWS OF MINI-MUSEUM 3.00 sets
#REF! DOORS OF MINI MUSEUM 8.00 sets
SPL.ITEM VIII: FORMWORKS (LABOR ONLY) 1.00 lot
SPL.ITEM IX: CLEANING-UP AND CLEARING 1.00 lot
SPL.ITEM VIII: FORMWORKS (SEMI-EXPENDABLE) 1.00 lot
SPL.ITEM X MISCELLANEOUS ITEM (transferring of beneco post, fuel & elect. consumption) 1.00 lot
(electrical connection permit, building permit, occupancy permit, water connection permit)
Prepared & Project In-Charge: Check & Verified By: Approved By:
Project: FENCING OF CITY GOVERNMENT PROPERTIES AT GIBRALTAR, BUKANEG, AND MINES VIEW
Location: LUALHATI BARANGAY, BAGUIO CITY
Subject: DETAILED ESTIMATE
Appropriation: P 400,000
Date: SEPTEMBER. 2016
SPL.ITEM I. MOBILIZATION
LABOR:
1 Foreman @ 750.00 /day x 3 days 2,250.00
2 Carpenter @ 350.00 /day x 3 days 2,100.00
4 unskilled worker 280.00 /day x 3 days 3,360.00
Labor Cost 7,710.00
TOTAL ITEM COST 7,710.00
UNIT COST 7,710.00
/lot
ITEM 404: REINFORCING STEEL BARS
QTY: 0.00 kgs
MATERIALS:
114 pcs 16mm DFB G33 (grade beam, beam) 271.00 /pc 30,894.00
26 pcs 10mm DFB G33 (slab)
pcs 10mm DFB G33 (slab)
steel deck
56.00 pcs 10mm DFB G33 (stirrups) 106.00 /pc 5,936.00
25.00 kgs #16 Tie Wire 85.00 /kg 2,125.00
5.00 pcs Speed Cutter Disk 75.00 /pc 375.00
Material Cost 8,436.00
LABOR:
4 Steelman @ 400.00 /day x 7 days 11,200.00
4 unskilled worker 285.00 /day x 7 days 7,980.00
Labor Cost 19,180.00
EQUIPMENT OWNED:
1 unit Speed Cutter
TOTAL ITEM COST 27,616.00
UNIT COST 27,616.00
/KG
ITEM 405: STRUCTURAL CONCRETE
Grade Beam = 1.20 m
Beam = 5.00 m
Slab (grade) = 6.22 m
Slab Roof Deck = 5.57 m
17.99 m
QTY: 17.99 m ###
MATERIALS:
8.99 m Crush Sand @ 2,100.00 /m 18,887.51
17.99 m Gravel ( Concreting & Bedding ) 2,250.00 /m 40,473.23
161.89 bags Cement 223.00 /bag 36,102.12
40.00 drums Water 30.00 /drum 1,200.00
Material Cost 96,662.85
LABOR:
5 Skilled Laborer @ 400.00 /day x 5 days 10,000.00
8 unskilled worker 285.00 /day x 5 days 11,400.00
Labor Cost 21,400.00
LABOR:
3 Mason @ 350.00 /day x 5 days 5,250.00
4 Laborer 280.00 /day x 5 days 5,600.00
Labor Cost 10,850.00
TOTAL ITEM COST 23,910.96
UNIT COST 152.35
/sq.m.
SPL. ITEM IV. STONE DECO FINISH
exterior side : 7.04 m2
QTY: 7.04 sq.m.
MATERIALS:
7.04 m2 Stone Deco Finish P 1,800.00 /m P 12,670.20
11.00 m Fine Sand P 1,200.00 /m P 13,200.00
129.00 bags Cement P 240.00 /bag P 30,960.00
25.00 drums Water P 30.00 /drum P 750.00
Material Cost P 57,580.20
LABOR:
6 Mason @ 350.00 /day x 35 days 73,500.00
6 Laborer 280.00 /day x 35 days 58,800.00
Labor Cost 132,300.00
TOTAL ITEM COST 189,880.20
UNIT COST 26,975.45
/sq.m.
SPL. ITEM IV. TILEWORK
Floor Area : 53.72 m2
QTY: 53.72 sq.m.
MATERIALS:
149.00 pcs 60 x 60 Floor Tiles P 80.00 /pcs P 11,920.00
5.00 bags Cement Mortar P 1,200.00 /m P 6,000.00
3.00 kg White Cement Joint Filler P /bag P
6.00 bags Tile Adhesive P /bag P
Material Cost P 17,920.00
LABOR:
3 Tile Setter @ 500.00 /day x 4 days 6,000.00
2 Laborer 285.00 /day x 4 days 2,280.00
Labor Cost 8,280.00
TOTAL ITEM COST 26,200.00
UNIT COST 487.71
end /lot
SUMMARY