This information sheet aims to ensure that students able to understand and identify method
and inspection procedures for quality control.
NO KOD / CODE NO EE-021-3:2012/CU01/IS1 Muka: 2 Drp: 14
Intertek's Product Quality Inspections will help to protect your brand and your companys
reputation by minimizing defective merchandise, customer complaints, non-compliant
products, and late shipments.
It is imperative that manufacturers verify that the products manufactured, shipped and
distributed under their brand name meet industry, government regulations or their own
specific requirements. As an independent, third party inspection and testing company,
Intertek can conduct a variety of on-site inspections to ensure that your brand, reputation and
consumers are protected. Quality Inspections can help manufacturers:
Based on your specific needs throughout the manufacturing process, Intertek offers a wide
variety of quality inspection services.
Pre-Production Inspections
Intertek will inspect raw materials and components before production begins. After product
samples are provided, we will verify that the factory has ordered the correct materials,
components, and accessories. We will also randomly select and inspect a sample of partially
produced products for potential defects, then report our findings to you. If necessary, we can
provide the factory with the technical advice necessary to improve product quality and to
minimize the chance of defects during production.
During Production Inspections are ideal for shipments of substantial quantities; product lines
with continuous production; strict requirements for on-time shipments; and as a follow-up if
poor results were found during Pre-Production Inspection. Normally, During Production
Inspections are carried out when 10-15% of the merchandise is completed. Intertek will
inspect the production batch and examine products in the line for possible defects.
At this point we will identify deviations, if any, and offer advice on corrective measures that
will ensure uniformity of product and quality. We will also re-check any defects discovered
during Pre-Production Inspection and confirm that they have been rectified.
Final Random Inspections can begin only after production has been completed and all
merchandise is ready and packed for shipment. Through a statistical method set by industry
standards, we will sample products to verify product safety, quantity, workmanship, function,
color, size, packing, and more. This ensures that your product is consistent and compliant
with all country, industry, or otherwise-specified requirements and that no critical major or
minor defects appear.
NO KOD / CODE NO EE-021-3:2012/CU01/IS1 Muka: 3 Drp: 14
Loading Supervision
During Loading Supervision, an Intertek representative will closely monitor the loading
process, verify product quantity, and ensure proper handling of the cargo. Upon completion,
the container(s) will be sealed with Intertek tape as proof of compliance. This service
significantly reduces the risk associated with importing cargo.
On-Site Checking
On-Site Checking can vary depending on a products nature and function. The following
examinations, however, can be performed on-site during Pre-Production, During Production,
and Final Random Inspections:
Bar Code Check
Earth Continuity Check
Hi-Pot Check
Power Consumption Check
Power On Check
Rub Check by Water
Tape Check by 3M Tape
Transportation Drop Check
Intertek can monitor your entire manufacturing process from sourcing the right supplier
through final delivery of finished product. With auditors located around the world, with
particular concentration in Asia, were able to provide extensive coverage in China, Korea,
Malaysia, Thailand, Taiwan, and Vietnam. Our global locations and accreditations provide
you with peace of mind and assurance that your products are the quality you expect and
demand.
QUALITY INSPECTION
Definition
Quality inspection are measures aimed at checking, measuring, or testing of one or more
product characteristics and to relate the results to the requirements to confirm compliance.
This task is usually performed by specialized personnel and does not fall within the
responsibility of production workers. Products that don't comply with the specifications are
rejected or returned to improve.
Quality inspection is one of the first stages of evolution of management. The origins of the
quality inspection back to the late nineteenth and early twentieth century. In days of fast-
growing industry, FW Taylor developed the rules of scientific management. Quality wasn't up
to speed with rapidly increasing labor productivity. Often, the customer had to reckon with
defective products. To alleviate customer frustration, this problem was solved by replacing
the defective product with a new one. Conducting this type of procedure entailed generating
considerable cost. To reduce the excessive cost escalation manufacturers, introduced the
unknown to craft the position controller. The designated employee, through carried out
inspections, made sure that the greatest possible number of good products leave the gate of
the factory. This initial form of quality control based on the principle of quality by sorting.
NO KOD / CODE NO EE-021-3:2012/CU01/IS1 Muka: 4 Drp: 14
The key assumption relating to quality inspection is to adopt the principle that the ultimate
controller is a client. The optimum form of quality inspection is the man who's aim is the best
customer satisfaction. Quality inspection serves three main purposes:
At the beginningl, quality inspection mainly concerned on the control of postoperative or post-
production control of production processes. Considering the quality inspection in a broader
sense, one might say that it is perceived as an activity associated with a diagnosis of a
selected aspect of product quality which informs about the partial quality, obtained at a given
stage of the formation or operation of the device, and being compared with the declared
quality such as product characteristics. At various stages of formation of the product the
quality inspection takes different forms, and is implemented using different methods.
INSPECTION OF PACKING
This article on the inspection of packing will provide you with information about packing
inspection of industrial equipment that is ready for shipment.
Wooden cases, crates, skid bases or saddles, bundles, shrink packaging and drums are
widely used for packing of industrial goods.
The purchaser must provide the packing procedure to the equipment manufacturer, and the
manufacturer's quality control team must take care of packaging process.
Most of packing procedure are prepared based the BS 1133-8 requirements. The purchaser
inspector either second party or third party inspector must carefully inspect the packing
based the approved procedure.
When there is no procedure in place, the packing must be inspected directly based the
requirements of BS 1138-8 requirements.
For a sample packing procedure, please review the Seaworthy Packing Procedure article.
Most packing falls in two categories: the first one is that the nature of equipment is different
for each order and the equipment manufacturer needs to deliver drawings and other
information to the packing company for construction.
The other is that the equipment is in unique size and not dependent to the order. In this case,
the manufacturers will purchase cases or crates and will do the packing with their own
workers.
Correct application of bottom cleats and skid runners for easy handling by forklift
Ensuring application of two un-annealed steel straps in each of two right angled and
opposite directions, or where applicable wood re-enforces.
NO KOD / CODE NO EE-021-3:2012/CU01/IS1 Muka: 6 Drp: 14
BILL OF MATERIALS
A bill of materials (sometimes bill of material or BOM) is a list of the raw materials, sub-
assemblies, intermediate assemblies, sub-components, parts and the quantities of each
needed to manufacture an end product. No physical dimension is described in a BOM,
however the rough outline should include.
BOM Level
Part Number
Part Name
Phase
Description
Quantity
Unit of Measure
Procurement Type
Reference Designators
BOM Notes
When creating or using a BOM you should consider who will be using it. It may be used for
communication between manufacturing partners, or confined to a single manufacturing plant.
A BOM can define products as they are designed (engineering bill of materials), as they are
ordered (sales bill of materials), as they are built (manufacturing bill of materials), or as they
are maintained (service bill of materials). The different types of BOMs depend on the
business need and use for which they are intended. In process industries, the BOM is also
known as the formula, recipe, or ingredients list. In electronics, the BOM represents the list of
components used on the printed wiring board or printed circuit board. Once the design of the
circuit is completed, the BOM list is passed on to the PCB layout engineer as well as
component engineer who will procure the components required for the design.
BOMs are hierarchical in nature with the top level representing the finished product which
may be a sub-assembly or a completed item. BOMs that describe the sub-assemblies are
referred to as modular BOMs. An example of this is the NAAMS BOM that is used in the
automotive industry to list all the components in an assembly line. The structure of the
NAAMS BOM is System, Line, Tool, Unit and Detail.
The first hierarchical databases were developed for automating bills of materials for
manufacturing organizations in the early 1960s. At present this BOM is used as a data base
to identify the many parts and their codes in automobile manufacturing companies.
A bill of materials "implosion" links component pieces to a major assembly, while a bill of
materials "explosion" breaks apart each assembly or sub-assembly into its component parts.
NO KOD / CODE NO EE-021-3:2012/CU01/IS1 Muka: 11 Drp: 14
A single-level BOM that displays the assembly or sub-assembly with only one level of
children. Thus it displays the components directly needed to make the assembly or
sub-assembly.
An indented BOM that displays the highest-level item closest to the left margin and the
components used in that item indented more to the right.
Modular (planning) BOM
A BOM can also be visually represented by a product structure tree, although they are rarely
used in the workplace.
A BOM may be configurable, also called a super BOM, if the product is configurable, i.e., can
be produced in a large number of variations. In this case, the BOM lists all possible
components, only a subset of which will be used in a specific variation.
NO KOD / CODE NO EE-021-3:2012/CU01/IS1 Muka: 12 Drp: 14
QUESTION:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
REFERENCES :
1. Monk, Ellen; Wagner, Bret (2007). Concepts in Enterprise Resource Planning. Course Technology
Cengage Learning. pp. 9798. ISBN 1-4239-0179-7.
2. "Creating a Bill of Materials". Arena Solutions.
http://www.arenasolutions.com/resources/articles/creating-bill-of-materials. Retrieved January
16, 2013.
3. Reid, R. Dan; Sanders, Nada R. (2002). Operations Management. John Wiley & Sons. pp.
457458. ISBN 0-471-32011-0.