Documente Academic
Documente Profesional
Documente Cultură
[K2S-NG01007551-SOKG1-MX6180-00003]
Proprietary Information: This document contains proprietary information and may not be partly or wholly reproduced without prior written
permission from Shell Petroleum Development Company
The Process Manager for this procedure is the Major Projects General Manager, the Process Owner is the Major Projects Project Services
Manager
R01 14.01.2016 Issue for Internal Review FELIX ANYANELE T.S. PACURARIU IKENNA ONYEKONWU
ADDITIONAL AGREEMENT/APPROVAL RECORD
PARTY REF IND. NAME SIGN DATE
Revision Philosophy
All revisions for review will be issued at R01, with subsequent R02, R03, etc as required.
All revisions approved for issue or design will be issued at A01, with subsequent A02, A03, etc as required.
Documents approved for Construction will be issued at C01, C02, and C03 respectively.
Documents or drawings revised as As built will be issued as Z01, Z02 Z03 etc.
Narrative sections revised from previous approved issues are to be noted in the table below and/or highlighted in
the RH margin (using the appropriate revision status) thus: | A02
Previous revision highlighting to be removed at subsequent issues.
Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected areas and by
the use of a triangle containing the revision status.
Revision History
1. INTRODUCTION 4
2. SCOPE 4
3. REFERENCES 4
4. RESPONSIBILITIES 5
6. HSE REQUIREMENTS 7
7. PROCEDURE 7
8. ATTACHMENT 17
This method statement provides operational guidance and methods to be adopted in carrying out
Tie-in activities during shutdown for the EPC FOR KOLO CREEK TO SOKU GAS EXPORT
PIPELINE Project as per the technical specification and standards applying best industrial practice
and applicable technical specifications and standards.
2.0 SCOPE
The scope is to define the detailed activities for the identified tie-ins during plant shutdown of SOKU
Plant. This shall include the installation of connecting piping works for the shutdown.
3.0 REFERENCES
Approved WPS
CONSTRUCTION MANAGER
QA/QC MANAGER
Shall be responsible for:
Preparation of quality plans to ensure the required quality of WORK is attained in accordance
with applicable DEPs, and project specifications.
Verification of activities to ensure shutdown work is in compliance with the procedures or method
statement.
Liaison with COMPANY representative on all matters relating to the shutdown work and the
planned quality delivery.
QA/QC INSPECTOR
Shall be responsible for:
Reporting to the QA/QC Manager.
Carrying out all field inspections and checking as specified in the ITP in addition to
coordinating with the Company representative.
5.1 Personnel
S. NO. Personnel
3. Fitters
4. Welder Mates
5. HSE Officers
6. QC Inspectors
7. Hydrotest Team
8. Torquing Team
9. Scaffolders
S. NO. DESCRIPTION
1. Crane
2. Welding Machines
3. Baking Ovens
5. Loader Truck
6. Man Lift
Hydrotest equipment e.g. pressure pump,
7.
chart recorder, gauges, hose, manifold etc)
8. Torque Wrench
Prior to commencing the works a detailed Job Hazard Analysis shall be carried out. After all
known, suspected or potential hazards and risks have been identified, the work force shall be
informed of the hazard and control measures that must be put in place to eliminate or control the
hazard and potential risk.
All personnel involved in the shutdown activity shall receive safety training induction
All personnel to be engaged in this work shall be properly mobilized and inducted. This is to
enable them to appreciate the risk hazards involved in the operations.
All workers shall be medically fit to work.
The health, safety and environment of all personnel shall be safeguarded to avoid injuries and
illness.
There shall be a qualified first aider, fully equipped with first aid drugs required in the first aid
administration.
Dedicated site HSE officers shall man all work sites.
An authorized Gas Tester shall carry out Gas Monitoring tests before any isolation work is carried
out, and will then continuously monitor the work atmosphere, he shall ensure that gas monitoring
records are kept.
Warning signs and barriers shall be positioned around all work areas.
All personnel shall wear the appropriate PPE reference Job Specific JHA. All the work force shall
comply with the Contractors Health, Safety and Environment requirements as per the HSE plan.
Only authorized personnel shall be allowed into the work area. All necessary measures as per
Clients requirements or manufacturers recommendations shall be adhered to.
7.0 PROCEDURE
Before beginning any shutdown activities Client and Contractor shall agree the programme for the
shutdown work and all the Tie-in area has been verified and checked by the SPDC Operation
Representative.
The mode of operation for the above mentioned tie-in is as indicated in the below table:
The mode of operation for the above mentioned tie-in is as indicated in the below table:
The mode of operation for the above mentioned tie-in is as indicated in the below table:
The mode of operation for the above mentioned tie-in is as indicated in the below table:
The mode of operation for the above mentioned tie-in is as indicated in the below table:
The mode of operation for the above mentioned tie-in is as indicated in the below table:
The mode of operation for the above mentioned tie-in is as indicated in the below table:
7.2.2 Closed drain from NAG slug catcher & Pig receiver
The mode of operation for the above mentioned tie-in is as indicated in the below table:
7.2.3 Open drain from NAG slug catcher & Pig receiver
The mode of operation for the above mentioned tie-in is as indicated in the below table:
8.0 ATTACHMENT
a) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-001
b) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-005
c) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-006A
d) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-006B
e) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-015
f) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-017
g) K2S-NG01007551-SOKG1-MP2343-00002-001 TP-018
h) K2S-NG01007551-SOKG1-MP2343-00025-001 TP-016A/B
i) K2S-NG01007551-SOKG1-MP2343-00027-001 TP-015A/B