Sunteți pe pagina 1din 1

20250 AC0

21250 AC0
200500

206500

208500

210500
204500
1656500 1656500
NOTES:

UGU
1. ALL DIMENSIONS ARE IN MILLIMETERS.

AD
AMAD
I RO
VILLAGE

PATR
MMAL
2. DO NOT SCALE THE DRAWING. ONLY FIGURED

TADI
TO JA
DIMENSIONS SHALL BE FOLLOWED.

3. GRID LINES ARE DRAWN AT 2000M X 2000M

INTERVAL.

4. WATER TAPPING POINT SHALL BE PROVIDED AT

ONE POINT PER PLOT. INDIVIDUAL DEVELOPERS

SHALL MAKE NECESSARY ARRANGEMENTS FOR


1
1654500 1654500 STORAGE & DISTRIBUTION WITHIN THE PLOT.
1
5. SOLAR POWER DEVELOPERS SHALL NOT DISTURB

THE NATURAL STREAMS AND WATER BODIES

FLOWING THROUGH THE PLOTS.

6. 35M WIDE RIGHT OF WAY PROVIDED FOR


2 TRANSMISSION LINE.

165250 AC0 165250 AC0

PLOT ALLOCATION

P1 TO P2 BATTERY BACKUP (100 MW)

1650500 P3 TO P5 DCR (150MW)


GANGUNARAYANA PALLE

P6 TO P15 SECI (500 MW)

P16 TO P20 NTPC (250 MW)

200 MM WMM 150MM THK GSB 50MM THK BM


1500 7000 1500
SHOULDER SHOULDER
900 600
300
CATCH DRAIN
CATCH DRAIN
600
20.00 30.00
50.00

TYPICAL CROSS SECTION 1-1 : TRANSMISSION CUM UTILITY CORRIDOR

1648500 LEGEND :

1 M CONTOUR STREAMS

PLOT AREA PLOT BOUNDARY

PROPOSED ROAD POOLING STATION

LOCAL ROAD EXT. WATER TANK


Tender purpose only
200500 20250 AC0 204500 206500 208500 210500 GNSS SPOIL BANK

ANDHRA PRADESH SOLAR POWER


CORPORATION LIMITED
KADAPA ULTRA MEGA SOLAR PARK (1000 MW)
200 MM WMM 150MM THK GSB 50MM THK BM
PLOT PLAN
1500 7000 1500
SHOULDER SHOULDER Design Consultants
600
900
300
CATCH DRAIN
CATCH DRAIN 600

85.00
CONTEC DESIGN & ENGINEERING SOLUTIONS PVT LTD
TYPICAL CROSS SECTION 2-2 : TRANSMISSION CUM UTILITY CORRIDOR DRG NO. CT/CUMSP/PP/001/R0 DATE: 04 AUG 2016

S-ar putea să vă placă și