SUMMARY
CUMULATIVE
Sl. No Description Unit Qty
AMOUNT
CIVIL WORKS RO
07/24/2017 1
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
07/24/2017 2
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'A'
Building No 499
Way No 2307
FLAT 2/5/8/11/14/17
Tenant (2BHK)
Location MSQ
QUOTATION
Nos of
Sl. No Description Unit Qty Rate Amount Grand Total
Flats
CIVIL WORKS RO RO
07/24/2017 3
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
07/24/2017 4
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'A'
Building No 499
Way No 2307
FLAT 1/3/4/6/7/9/10/12/13/15/16/18
Tenant (3BHK)
Location MSQ
ESTIMATION
Nos of
Sl. No Description Unit Qty Rate Amount Grand Total
Flats
CIVIL WORKS RO
07/24/2017 5
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
07/24/2017 6
S.NO DESCRIPTION UNIT QTY MATERIAL
PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking,cartawa
1 CERAMIC FLOOR TILES, GLUE SQM 5 3.5 3 1 37.5 7.5 45 y & transport is
included
2 4MM THICK WATER PROOFING SQM 8 6 1 2 72 14.4 86.4
7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 6.6 39.6 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 4.8 28.8
BASIN MIXER
RAK KULDI BIDET SINGLE HOLE
9 ITEM 1 20 2 1 23 4.6 27.6
MIXER
10 RAK ORIENT BIDET ITEM 1 12 5 5 22 4.4 26.4
PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking is
1 CERAMIC FLOOR TILES, GLUE SQM 5 3.5 3 1 37.5 7.5 45
included
7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 6.6 39.6 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 4.8 28.8
BASIN MIXER
RAK KULDI BIDET SINGLE HOLE
9 ITEM 1 20 2 1 23 4.6 27.6
MIXER
10 RAK ORIENT BIDET ITEM 1 12 5 5 22 4.4 26.4
PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking is
1 CERAMIC FLOOR TILES, GLUE SQM 2.5 3.5 3 1 18.75 3.75 22.5
included
2 4MM THICK WATER PROOFING SQM 5 6 1 2 45 9 54
7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 6.6 39.6 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 4.8 28.8
BASIN MIXER
9 ITEM 1 10 1 1 12 2.4 14.4
8" EXHAUST FAN
10 ITEM 1 30.5 1 2 33.5 6.7 40.2
12GALLON WATER HEATER
PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking,cartawa
1 CERAMIC FLOOR TILES, GLUE SQM 15 3.5 3 1 112.5 22.5 135 y & transport is
included
2 4MM THICK WATER PROOFING SQM 18 6 1 2 162 32.4 194.4 Flat & upstand
TOTAL
PLANT/ OH &
LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
13 6 76 15.2 91.2
6 5 41 8.2 49.2
4 2 33 6.6 39.6
713
S.NO DESCRIPTION UNIT QTY RATE
2 2 GANG SWITCH 2 1
5 AC SWITCH 4 2.7
6 SINGLE SOCKET 10 1
11 3 PENDANT LIGHT 2 18
13 DOME LIGHT 7 6
15 BELL 1 2.5
TOTAL
TOTAL
TOTAL RO REMARKS
2.5
7.8
8.1
10.8
10
9.6
3.6
2.7
42.6
36
60
42
24
2.5
264.2
51
JOTUN
Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO
0.624
SAY 0.625
JOTUN
Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO
0.569
SAY 0.570
JOTUN
Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO
2 40 40 1 10 0.2
LABOUR
0.05
Tools
0.455
SUB TOTAL
0.546
ADD 20 % OH & PROFIT
SAY 0.6
Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO
0.205
SAY 0.345
Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO
0.336
SAY 0.340
JOTUN
Coverag
Avg. Material
ITEM e Total Area Nett Price Total
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/C M2 /pack RO cost RO
M2/Ltr/Coat RO
oat
0.530
SAY 0.550
JOTUN
Coverag
Avg. Material
ITEM e Total Area Nett Price Total
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/C M2 /pack RO cost RO
M2/Ltr/Coat RO
oat
0.740
SAY 0.750
JOTUN
Coverag
Avg. Material
ITEM e Total Area Nett Price Total
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/C M2 /pack RO cost RO
M2/Ltr/Coat RO
oat
0.490
SAY 0.500
JOTUN
S.NO DESCRIPTION UNIT QTY MATERIAL
5 5 60 9 69
Including spray
Including Bottle
5 5 33 4.95 37.95
trap, etc
2 1 24 3.6 27.6
2 1 23 3.45 26.45
5 5 22 3.3 25.3
20 5 75 11.25 86.25
2 1 46 6.9 52.9
1 1 12 1.8 13.8
891.825