Sunteți pe pagina 1din 50

HAY AL RAHBAH TRAD.

AND CONTRACTING LLC


Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
FLAT 50 NOS
Tenant (1BHK/2BHK/3BHK)
Location MSQ

SUMMARY

CUMULATIVE
Sl. No Description Unit Qty
AMOUNT
CIVIL WORKS RO

1 1BHK FLATS NOS 8 49,704

2 2BHK FLATS NOS 34 287,280

3 3BHK FLATS NOS 8 85,511

GRAND TOTAL 50 422,495

07/24/2017 1
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

07/24/2017 2
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
FLAT 109/110/209/210/309/310/409/410
Tenant (1BHK)
Location MSQ
ESTIMATION

Nos of
Sl. No Description Unit Qty Rate Amount Grand Total
Flats
CIVIL WORKS RO RO

1 INTERIOR PAINTING ITEM LS 110 8 880


PORCLEAIN FLOORING,SKIRTING IN BEDROOMS &
2
BALCONY (23 SQM)
ITEM LS 166 8 1325

PORCLEAIN FLOORING,SKIRTING IN LIVING ROOM &


3
PASSAGE (54 SQM)
ITEM LS 389 8 3110

4 RENOVATION OF GUEST TOILET ITEM LS 735 8 5880

5 RENOVATION OF M.BATHROOM ITEM LS 1,207 8 9653

KITCHEN ALUMINIUM CABINET BASE & WALL


6
INCLUDING GRANITE TOP,SINK & MIXER
ITEM LS 600 8 4800

RENOVATION OF KITCHEN,(FLOOR,WALL TILES,


7
PLUMBING LINE,W/P)
ITEM LS 826 8 6610

TEAK PLY DOORS , INCLUDING MIRANTI FRAMES ,


8
VARNISH & IRONMONGERY NOS 7 140 980 8 7840

9 ELECTRICAL LIGHTS, SWITCHES, SOCKETS,ETC ITEM LS 149 8 1191

10 LG SPLIT AC 2 TON ( 3NOS),INCLUDING REMOVAL ITEM 3 252 756 8 6048

TOTAL 5,917 47,337

ADD 5% CONTIGENCY 296 2367

GRAND TOTAL 6,213 49,704

07/24/2017 3
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

07/24/2017 4
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
1/2/101/102/103/104/105/106/107/108/201/202/203/204/205/20
6/207/208/301/302/303/304/305/306/307/308/401/402/403/404/
FLAT 405/406/407/408
Tenant (2BHK)
Location MSQ
QUOTATION

Sl. No Description Unit Qty Rate

CIVIL WORKS

1 INTERIOR PAINTING ITEM LS

PORCLEAIN FLOORING,SKIRTING IN BEDROOMS &


2 ITEM LS
BALCONY (60 SQM)
PORCLEAIN FLOORING,SKIRTING IN LIVING ROOM &
3 ITEM LS
PASSAGE (57 SQM)

4 RENOVATION OF GUEST TOILET ITEM LS

RENOVATION OF CHILDREN BATHROOM,WITH


5 ORIENT SANTARY FITTINGS & CERAMIC ITEM LS
ACCESSORIES

6 RENOVATION OF M.BATHROOM ITEM LS

KITCHEN ALUMINIUM CABINET BASE & WALL


7 ITEM LS
INCLUDING GRANITE TOP,SINK & MIXER

8 RENOVATION OF KITCHEN ITEM LS

TEAK PLY DOORS , INCLUDING MIRANTI FRAMES ,


9
VARNISH & IRONMONGERY
NOS 9 140

10 ELECTRICAL LIGHTS, SWITCHES, SOCKETS,ETC ITEM LS

11 LG SPLIT AC 2 TON ( 4NOS),INCLUDING REMOVAL ITEM 4 252

TOTAL

ADD 5% CONTIGENCY

07/24/2017 5
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
GRAND TOTAL

07/24/2017 6
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

Nos of
Amount Grand Total
Flats

RO RO

130 34 4420

432 34 14688

410 34 13953.6

644 34 21879

1,128 34 38341.8

1,128 34 38341.8

702 34 23859.84

1,014 34 34476

1260 34 42840

192 34 6528

1008 34 34272

8047.06 273,600

402.353 13,680

07/24/2017 7
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
8,449 287,280

07/24/2017 8
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
FLAT 3/4/5/6/111/211/311/411
Tenant (3BHK)
Location MSQ
ESTIMATION

Nos of
Sl. No Description Unit Qty Rate Amount Grand Total
Flats
CIVIL WORKS RO RO

1 INTERIOR PAINTING ITEM LS 160 8 1280

PORCLEAIN FLOORING,SKIRTING IN
2
BEDROOMS (77 SQM)
ITEM LS 554 8 4435.2

PORCLEAIN FLOORING,SKIRTING IN
3
LIVING ROOM & PASSAGE (55 SQM)
ITEM LS 396 8 3168

4 RENOVATION OF GUEST BATHROOM ITEM LS 654 8 5232

5 RENOVATION OF CHILDREN BATHROOM ITEM LS 1,075 8 8596.8

RENOVATION OF CHILDREN
6 BATHROOM,WITH ORIENT SANTARY ITEM LS 1,075 8 8596.8
FITTINGS & CERAMIC ACCESSORIES

7 RENOVATION OF M.BATHROOM ITEM LS 1,262 8 10094.4

KITCHEN ALUMINIUM CABINET BASE &


8 WALL INCLUDING GRANITE TOP,SINK & ITEM LS 702 8 5613.12
MIXER

RENOVATION OF KITCHEN
9 (FLOOR,WALL TILES,PLUMBING ITEM LS 1,226 8 9811.2
LINE,W/P)

TEAK PLY DOORS , INCLUDING


10 MIRANTI FRAMES , VARNISH & NOS 11 140 1540 8 12320
IRONMONGERY

ELECTRICAL LIGHTS, SWITCHES,


11
SOCKETS,ETC
ITEM LS 277 8 2212

LG SPLIT AC 2 TON ( 5NOS),INCLUDING


12
REMOVAL
ITEM 5 252 1260 8 10080

TOTAL 10,180 81,440

ADD 5% CONTIGENCY 509 4,072

GRAND TOTAL 10,689 85,511

07/24/2017 9
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

07/24/2017 10
S.NO DESCRIPTION UNIT QTY MATERIAL

PORCELAIN FLOOR TILES,


1 SQM 1 3.5
GLUE(60SQM)
PORCELAIN FLOOR TILES,
2 SQM 1 3.5
GLUE(57SQM)
3 SQM 1 3.5
CERAMIC WALL TILES
PLANT/ OH & REMARKS
LABOUR SUM MLP TOTAL RO
TOOLS PROFIT 20% RO

2 0.5 6 1.2 7.2 432

2 0.5 6 1.2 7.2 410.4

3 1 7.5 1.5 9 378


CHILDREN BATHROOM RATE ANALYSIS

PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking &
1 CERAMIC FLOOR TILES, GLUE SQM 5.5 3.5 3 1 41.25 8.25 49.5 transport is
included
2 4MM THICK WATER PROOFING SQM 10 6 1 2 90 18 108

3 DRAINAGE ITEM 1 5.5 5 5 15.5 3.1 18.6


Breaking &
4 CERAMIC WALL TILES, GLUE SQM 29 3.5 3 1 217.5 43.5 261 Transport is
included
5 ITEM 1 120 20 14 154 30.8 184.8 4 PIPES
YOKSHIRE 22 mm DIA COPPER PIPE
6 RAK ORIENT/LIWAN ITEM 1 50 5 5 60 12 72
Including spray

7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 6.6 39.6 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 4.8 28.8
BASIN MIXER
RAK KULDI BIDET SINGLE HOLE
9 ITEM 1 20 2 1 23 4.6 27.6
MIXER
10 RAK ORIENT BIDET ITEM 1 12 5 5 22 4.4 26.4

11 ARCYLIC 8 MM THICK BATHTUB ITEM 1 50 20 10 80 16 96

12 RAK KULDI TELEPHONE POLASIS ITEM 1 43 2 1 46 9.2 55.2


MIXER,ROD & HEAD
13 ITEM 1 10 1 1 12 2.4 14.4
8" EXHAUST FAN
14 ITEM 1 30.5 1 2 33.5 6.7 40.2
12GALLON WATER HEATER

15 ONDA PLUS CERAMIC ITEM 1 76 10 2 88 17.6 105.6


ACCESSOREIS
GRAND TOTAL 1,128
CHILDREN BATHROOM RATE ANALYSIS
MASTER
BATHROOM RATE ANALYSIS

PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking is
1 CERAMIC FLOOR TILES, GLUE SQM 5.5 3.5 3 1 41.25 8.25 49.5
included
2 4MM THICK WATER PROOFING SQM 10 6 1 2 90 18 108

3 DRAINAGE ITEM 1 5.5 5 5 15.5 3.1 18.6


Breaking is
4 CERAMIC WALL TILES, GLUE SQM 29 3.5 3 1 217.5 43.5 261
included
5 ITEM 1 120 20 14 154 30.8 184.8 4 PIPES
YOKSHIRE 22 mm DIA COPPER PIPE
6 RAK ORIENT/LIWAN ITEM 1 50 5 5 60 12 72
Including spray

7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 6.6 39.6 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 4.8 28.8
BASIN MIXER
RAK KULDI BIDET SINGLE HOLE
9 ITEM 1 20 2 1 23 4.6 27.6
MIXER
10 RAK ORIENT BIDET ITEM 1 12 5 5 22 4.4 26.4

11 ARCYLIC 8 MM THICK BATHTUB ITEM 1 50 20 10 80 16 96

12 RAK KULDI TELEPHONE POLASIS ITEM 1 43 2 1 46 9.2 55.2


MIXER,ROD & HEAD
13 ITEM 1 10 1 1 12 2.4 14.4
8" EXHAUST FAN
14 ITEM 1 30.5 1 2 33.5 6.7 40.2
12GALLON WATER HEATER

15 ONDA PLUS CERAMIC ITEM 1 76 10 2 88 17.6 105.6


ACCESSOREIS
GRAND TOTAL 1,128
MASTER
BATHROOM RATE ANALYSIS
GUEST TOILET
RATE ANALYSIS

PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking is
1 CERAMIC FLOOR TILES, GLUE SQM 2.5 3.5 3 1 18.75 3.75 22.5
included
2 4MM THICK WATER PROOFING SQM 5 6 1 2 45 9 54

3 DRAINAGE ITEM 1 4 4 4 12 2.4 14.4


Breaking is
4 CERAMIC WALL TILES, GLUE SQM 18 3.5 3 1 135 27 162
included
5 ITEM 1 60 20 14 94 18.8 112.8 2 PIPES
YOKSHIRE 22 mm DIA COPPER PIPE
6 RAK ORIENT/LIWAN ITEM 1 50 5 5 60 12 72
Including spray

7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 6.6 39.6 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 4.8 28.8
BASIN MIXER
9 ITEM 1 10 1 1 12 2.4 14.4
8" EXHAUST FAN
10 ITEM 1 30.5 1 2 33.5 6.7 40.2
12GALLON WATER HEATER

11 ONDA PLUS CERAMIC ITEM 1 57 10 2 69 13.8 82.8


ACCESSOREIS
GRAND TOTAL 644
GUEST TOILET
RATE ANALYSIS
KITCHEN
RATE ANALYSIS

PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%
Breaking is
1 CERAMIC FLOOR TILES, GLUE SQM 15 3.5 3 1 112.5 22.5 135
included
2 4MM THICK WATER PROOFING SQM 20 6 1 2 180 36 216 Flat & upstand

3 DRAINAGE ITEM 1 5.5 5 5 15.5 3.1 18.6


Breaking is
4 CERAMIC WALL TILES, GLUE SQM 45 3.5 3 1 337.5 67.5 405
included
5 ITEM 1 120 20 14 154 30.8 184.8 4 PIPES
YOKSHIRE 22 mm DIA COPPER PIPE
6 ITEM 1 10 1 1 12 2.4 14.4
8" EXHAUST FAN
7 ITEM 1 30.5 1 2 33.5 6.7 40.2
12GALLON WATER HEATER

GRAND TOTAL 1,014


KITCHEN
RATE ANALYSIS
S.NO DESCRIPTION UNIT QTY MATERIAL

1 ALUMINUM BASE CABINET RM 8.6 19

2 ALUMINUM WALL CABINET RM 2 19

BLACK GRANITE TOP 2MM


3 THICK, INCLUDING SQM 4.5 20
NOOSING

4 BLANCO DOUBLE ITEM 1 30


BOWLSINK

5 RAK KLUDI SINK MIXER ITEM 1 27

TOTAL
PLANT/ OH &
LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 20%

13 6 326.8 65.36 392.16

13 6 76 15.2 91.2

2 2 108 21.6 129.6

6 5 41 8.2 49.2

4 2 33 6.6 39.6

702
S.NO DESCRIPTION UNIT QTY RATE

1 1 GANG SWITCH NOS 5 0.5

2 2 GANG SWITCH 2 1

3 3 GANG SWITCH 6 1.3

4 W.H SWITCH 3 2.7

5 AC SWITCH 4 2.7

6 SINGLE SOCKET 10 1

7 TWIN SOCKET 6 1.6

8 TELEPHONE OUTLET 3 1.2

9 T.V OUTLET 3 0.9

10 KDK CEILING FAN 3 14.2

11 3 PENDANT LIGHT 2 15

12 SINGLE PENDENT LIGHT 4 8

13 DOME LIGHT 3 6

14 TWIN TUBE LIGHT FITTING 2 5

15 BELL 1 2.5

TOTAL
TOTAL
TOTAL RO REMARKS

2.5

7.8

8.1

10.8

10

9.6

3.6

2.7

42.6

30

32

18

10

2.5

192.2
51
JOTUN

Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO

Internal Paint System wall/ceiling - fenomastic matt dark


1 1
colour

Primer 1 8 to 10 9 1 7.800 0.05

Stucco 2 4 to 6 5 1 8.500 0.19

Fenomastic Silk Interior Emulsion paint (16.2lit) 2 8 to 10 9 1 28.000 0.384

0.624

SAY 0.625
JOTUN

Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO

Internal Paint System wall/ceiling - fenomastic matt dark


1 1
colour

Primer 1 8 to 10 9 1 7.800 0.05

Stucco 2 4 to 6 5 1 8.500 0.19

Fenomastic Matt Interior Emulsion paint (16.2lit) 2 8 to 10 9 1 24.000 0.329

0.569

SAY 0.570
JOTUN

Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO

Sadomastic emulsion (area 300sqm) 2 12 to 14 13 1 24.000 0.205

2 40 40 1 25 0.2
LABOUR

0.15
Tools

0.65

Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO

1 1 INterior Paint System wall/ceiling - Sadomastic emulsion


JOTUN

77 Sadolin Interior Emulsion paint 2 12 to 14 13 1 24.000 0.205

0.205

SAY 0.345

Avg. Material
ITEM Coverage Total Nett Price Total cost
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/Coat Area M2 /pack RO RO
M2/Ltr/Coat RO

1 1 Exterior Paint System wall - 88 Sadolin matt dark colour

Primer 1 8 to 10 9 1 5.500 0.03

Stucco 2 4 to 6 5 1 7.900 0.17


JOTUN
88 Sadolin Exterior Emulsion paint 2 12 to 14 13 1 16.000 0.136

0.336

SAY 0.340
JOTUN

Coverag
Avg. Material
ITEM e Total Area Nett Price Total
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/C M2 /pack RO cost RO
M2/Ltr/Coat RO
oat

Internal Paint System wall/ceiling - fenomastic matt dark


1 1
colour

Primer 1 8 to 10 9 1 7.800 0.05

Stucco 2 4 to 6 5 1 8.500 0.19

Fenomastic Silk Interior Emulsion paint (16.2lit) single


2 5 to 7 6 1 28.000 0.29
coat

0.530

SAY 0.550
JOTUN

Coverag
Avg. Material
ITEM e Total Area Nett Price Total
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/C M2 /pack RO cost RO
M2/Ltr/Coat RO
oat

Internal Paint System wall/ceiling - fenomastic matt dark


1 1
colour

Primer 1 8 to 10 9 1 7.800 0.05

Stucco 2 4 to 6 5 1 8.500 0.19

Fenomastic Matt Interior Emulsion paint (16.2lit) 2 5 to 7 6 1 24.000 0.5

0.740

SAY 0.750
JOTUN

Coverag
Avg. Material
ITEM e Total Area Nett Price Total
S/NO. DESCRIPTION No. of coat coverage cost/sqm
NO. M2/Ltr/C M2 /pack RO cost RO
M2/Ltr/Coat RO
oat

Internal Paint System wall/ceiling - fenomastic matt dark


1 1
colour

Primer 1 8 to 10 9 1 7.800 0.05

Stucco 2 4 to 6 5 1 8.500 0.19

Fenomastic Matt Interior Emulsion paint (16.2lit) 2 5 to 7 6 1 24.000 0.25

0.490

SAY 0.500
JOTUN
CHILDREN BATHROOM RATE ANALYSIS

PLANT/ OH &
S.NO DESCRIPTION UNIT QTY MATERIAL LABOUR SUM MLP TOTAL RO REMARKS
TOOLS PROFIT 15%
Breaking &
1 CERAMIC FLOOR TILES, GLUE SQM 5.5 3.5 2 2 41.25 6.1875 47.4375 transport is
included
2 4MM THICK WATER PROOFING SQM 10 6 1 2 90 13.5 103.5

3 DRAINAGE ITEM 1 5.5 5 5 15.5 2.325 17.825


Breaking &
4 CERAMIC WALL TILES, GLUE SQM 29 3.5 3 2 246.5 36.975 283.475 Transport is
included
5 ITEM 1 120 20 14 154 23.1 177.1 4 PIPES
YOKSHIRE 22 mm DIA COPPER PIPE
6 RAK ORIENT/LIWAN ITEM 1 50 5 5 60 9 69
Including spray

7 RAK ORIENT WASH BASIN WITH ITEM 1 23 5 5 33 4.95 37.95 Including Bottle
PEDESTAL trap, etc
RAK KULDI SINGLE HOLE WASH
8 ITEM 1 21 2 1 24 3.6 27.6
BASIN MIXER
RAK KULDI BIDET SINGLE HOLE
9 ITEM 1 20 2 1 23 3.45 26.45
MIXER
10 RAK ORIENT BIDET ITEM 1 12 5 5 22 3.3 25.3

11 ARCYLIC 8 MM THICK BATHTUB ITEM 1 50 20 10 80 12 92

12 RAK KULDI TELEPHONE POLASIS ITEM 1 43 2 1 46 6.9 52.9


MIXER,ROD & HEAD
13 ITEM 1 10 1 1 12 1.8 13.8
8" EXHAUST FAN
14 ITEM 1 30.5 1 2 33.5 5.025 38.525
12GALLON WATER HEATER

15 ONDA PLUS CERAMIC ITEM 1 76 10 2 88 13.2 101.2


ACCESSOREIS
GRAND TOTAL 1,114
CHILDREN BATHROOM RATE ANALYSIS
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
FLAT 109
Tenant (1BHK)
Location MSQ
ESTIMATION

Sl. No Description Unit Qty Rate Amount

CIVIL WORKS RO

1 INTERIOR PAINTING ITEM LS 110


PORCLEAIN FLOORING,SKIRTING IN
2
BEDROOMS & BALCONY (23 SQM)
ITEM LS 166

PORCLEAIN FLOORING,SKIRTING IN LIVING


3
ROOM & PASSAGE (54 SQM)
ITEM LS 389

4 RENOVATION OF GUEST TOILET ITEM LS 735

5 RENOVATION OF M.BATHROOM ITEM LS 1,207

KITCHEN ALUMINIUM CABINET BASE & WALL


6
INCLUDING GRANITE TOP,SINK & MIXER
ITEM LS 405

RENOVATION OF KITCHEN,(FLOOR,WALL TILES,


7
PLUMBING LINE,W/P)
ITEM LS 826

TEAK PLY DOORS , INCLUDING MIRANTI


8
FRAMES , VARNISH & IRONMONGERY 7 140 980

9 ELECTRICAL LIGHTS, SWITCHES, SOCKETS,ETC ITEM LS 149

LG SPLIT AC 2 TON ( 3NOS),INCLUDING


10
REMOVAL
ITEM 3 252 756

TOTAL 5,722

ADD 5% CONTIGENCY 286

GRAND TOTAL 6,008

07/24/2017 44
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

07/24/2017 45
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
FLAT 3
Tenant (3BHK)
Location MSQ
ESTIMATION

Sl. No Description Unit Qty Rate Amount

CIVIL WORKS RO

1 INTERIOR PAINTING ITEM LS 175

PORCLEAIN FLOORING,SKIRTING IN
2
BEDROOMS (77 SQM)
ITEM LS 554

PORCLEAIN FLOORING,SKIRTING IN LIVING


3
ROOM & PASSAGE (55 SQM)
ITEM LS 396

4 RENOVATION OF GUEST BATHROOM ITEM LS 654

5 RENOVATION OF CHILDREN BATHROOM ITEM LS 1,075


RENOVATION OF CHILDREN BATHROOM,WITH
6 ORIENT SANTARY FITTINGS & CERAMIC ITEM LS 1,075
ACCESSORIES

7 RENOVATION OF M.BATHROOM ITEM LS 1,262

KITCHEN ALUMINIUM CABINET BASE &


8 WALL INCLUDING GRANITE TOP,SINK & ITEM LS 702
MIXER

RENOVATION OF KITCHEN (FLOOR,WALL


9
TILES,PLUMBING LINE,W/P)
ITEM LS 1,226

TEAK PLY DOORS , INCLUDING MIRANTI


10
FRAMES , VARNISH & IRONMONGERY
11 140 1540

ELECTRICAL LIGHTS, SWITCHES,


11
SOCKETS,ETC
ITEM LS 277

LG SPLIT AC 2 TON ( 5NOS),INCLUDING


12
REMOVAL
ITEM 5 252 1260

TOTAL 10,195

ADD 5% CONTIGENCY 510

07/24/2017 46
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
GRAND TOTAL 10,705

07/24/2017 47
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

07/24/2017 48
HAY AL RAHBAH TRAD. AND CONTRACTING LLC
Owner CHAIRMAN
Bldg Name AH'C'
Building No 496
Way No 2307
FLAT 103
Tenant (2BHK)
Location MSQ
QUOTATION

Sl. No Description Unit Qty Rate Amount

CIVIL WORKS RO

1 INTERIOR PAINTING ITEM LS 130


PORCLEAIN FLOORING,SKIRTING IN BEDROOMS &
2
BALCONY (60 SQM)
ITEM LS 432

PORCLEAIN FLOORING,SKIRTING IN LIVING ROOM &


3
PASSAGE (57 SQM)
ITEM LS 410

4 RENOVATION OF GUEST TOILET ITEM LS 644

RENOVATION OF CHILDREN BATHROOM,WITH


5 ORIENT SANTARY FITTINGS & CERAMIC ITEM LS 1,128
ACCESSORIES

6 RENOVATION OF M.BATHROOM ITEM LS 1,128

KITCHEN ALUMINIUM CABINET BASE & WALL


7
INCLUDING GRANITE TOP,SINK & MIXER
ITEM LS 702

8 RENOVATION OF KITCHEN ITEM LS 1,014

TEAK PLY DOORS , INCLUDING MIRANTI FRAMES ,


9
VARNISH & IRONMONGERY
9 140 1260

10 ELECTRICAL LIGHTS, SWITCHES, SOCKETS,ETC ITEM LS 192

11 LG SPLIT AC 2 TON ( 4NOS),INCLUDING REMOVAL ITEM 4 252 1008

TOTAL 8047.06

ADD 5% CONTIGENCY 402.353

GRAND TOTAL 8,449

07/24/2017 49
HAY AL RAHBAH TRAD. AND CONTRACTING LLC

07/24/2017 50

S-ar putea să vă placă și