PGDM (2016-18)

Summer Internship Guidelines

th
x Submission of Project Report after clearing the plagiarism check July 15, 2017
x Proposed dates for Presentation to Faculty Panel Aug 16 31, 2017
x Evaluation Report by Company Guide to reach the Institute on or before July 10, 2017
PGDM (2015-17)
Summer Internship Project: Students Evaluation

Rubrics for Summer Project evaluation


Enclosed is the rubrics for Summer Project Evaluation. Please evaluation the student on a scale of 1 10 on the basis of below mentioned
description

Traits Below Expectation (1 3) Meets Expectation (4-7) Above Expectation (8-10)


1 Report Writing The report is incomplete/ vague The report is reasonably complete with The report is concise, clear with all
with irrelevant details; it has bad clarity of purpose but may not have all relevant details. Report is legible with
language with unclear formatting relevant details. Format and language clear formatting and language.
is satisfactory with scope to be better
2 Oral Communication Does not communicate effectively; Possesses limited proficiency to Possesses proficiency to
fails to articulate assertively and/or communicate effectively; partially communicate effectively; articulates
lacks reference to the context articulates in reference to the context appreciation of social responsibilities
and sustainability of businesses
assertively in reference to the context
3 Conceptual Clarity The student is not able to The student is able to identify key The student is clearly able to identify,
comprehend, define and identify the concepts but is not able to define and define and comprehend the key
key concepts comprehend them in relation to other concepts and all the related concepts.
related concepts.
4 Ask relevant questions Cant think and ask right questions The student can think and ask right The student can think and ask right
and hence can and not able to uncover questions; questions;
understand the assumptions with great details. But not able to uncover assumptions Can uncover assumptions with great
context/ issues related with great details. details.
to the project
5 Can identify and The problem statement is long, The problem statement is satisfactory A compelling comprehensive problem
structure the problems/ vague and lacks clear rationale and and comprehensive but some specifics statement with appropriate rationale
issues with clarity and understanding of context. The about the solution are assumed with and logic of assumptions given.
in detail student lacks clarity and is not able less logical reasoning, Student shows Student is absolutely clear and is
to align the problem with the clarity of thought but does not connect aligned to the business objectives.
business objectives to business objectives.
6 Can define appropriate Is not able to set clear objectives. Is able to set the objectives but is Is able to set clear objectives and can
objectives of the Has vague goals with no timelines unable to see the interconnection see the interconnections between
projects between them them
7 Quality of The primary/secondary work The student has taken efforts to The student has put in great effort and
primary/secondary conducted by student is superficial conduct reasonable primary work has undertaken extensive field work
work and sketchy e/secondary work as per requirements with all primary and secondary
audience/ secondary work to identify
and review the relevant information
and literature
8 Identification and Identifies only a few alternatives Identifies all possible alternatives but Identifies comprehensive set of
evaluation of and does not evaluate them evaluation is brief and not complete thoughtful alternative and evaluation
alternatives of solutions is deep and thorough.
9 Ability to make x Proposes vague and off the x Reasonable recommendations x Proposes comprehensive
appropriate shelf recommendations but may not include specifics recommendations with well-
recommendations for x No support, logic or feasibility x Acceptable feasibility and logic articulated and substantiated
actions using business provided for the provided for the feasibility and logic.
judgement recommendations recommendations x Recommendations are
x Lacks integrative knowledge x Important contextual factors integrative of all relevant
and application of contextual considered to propose contextual issues/ factors.
factors recommendations. x Put forth an excellent pros and
x Pros and cons statement for x Reasonably good pros and cons cons statement for
recommendations not statement for recommendations. recommendations considering
provided practical perspective.
10 Ability to put forth an x Implementation plan is generic x Implementation plan mapped to x Implementation plan is
actionable and not mapped to recommendation on a surface thoroughly and minutely mapped
implementation plan recommendations made level. to recommendations made.
x Timelines and people x Timelines and people adequately x Timelines with people
responsible are not identified mentioned (missed detailing) responsible are identified and
detailed.