BALUNDAGI LIFT MAIN CANAL
2
Providing and laying insitu vibrated M-15 (28 days cube
compressive strength not less than 15 N/sqmm ) grade cement
concrete using 20 mm downsize approved, clean, hard, graded
aggregates for sub-structure/ super structure works including cost
of all materials, machinery, labour, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with all leads and lifts. (Cement content: 270
kg/cum) (SR Item No.15, page 56 of WRD, for year 2003-04)
4
Providing semi-pervious/ pervious casing embankment with soil
from approved borrow areas in layers of 25 to 30 cm before
compaction including cost of all materials, machinery, labour, all
operations such as excavation, sortingout, transporting, spreading
in layer of specified thickness, breaking clods, sectioning,
watering, compacting to density control of not less than 95 percent
or as stipulated by power roller etc., complete with initial lead upto
1 km and all lifts.(SR Item No.8, page 39 of WRD, for year 2003-
04)
cum 68.000 123.82 8420/-
TOTAL 194996/-
______________________________________________________________________________________________
Secon Private Ltd., Bangalore-66 CAUSE WAY @ Ch: 26+940KM OF BALUNDAGI LIFT MAIN CANAL
________________________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BALIS
KARNATAKA NEERAVARI NIGAM LIMITED
BHIMA LIFT IRRIGATION SCHEME
1 2 3 4 5 6 7 8
1 Excavation in all kinds of soil including boulders upto 0.60 m dia.
(0.113 cum) for foundations of canal cross drainage and other
appurtenant structures and placing excavated stuff neatly in
specified dump area or disposing off the same as directed etc.,
complete with initial lead upto 50m and initial lift upto 1.5m. (SR
Item No.1, page 54 of WRD, for year 2003-04)
a) Lift 0.00 m to 1.50 m Cum
i) For Causeway 1 7.880 5.000 0.335 13.199
ii) For Cutoff walls 2 7.880 0.300 1.000 4.728
Total 17.927
Say 18.000
2
Providing and laying insitu vibrated M - 15 (28 days cube
compressive strength not less than 15N/Sqmm )grade cement
concrete using 20mm downsize approved, clean,hard, graded
aggregates for sub-structure/super structure works including
cost of all materials, machinery, labour, formwork , scaffolding,
cleaning, batching, mixing, placing in position levelling, vibrating,
finishing, curing, etc.,complete with initial lead upto 50m and all
lifts (Cement Content : 270Kg/cum)
cum
I) For Pipe 1 7.880 5.000 1.545 60.873
Deduct for Pipe 8 4.500 0.465 -16.740
Deduct for collars 8 0.500 0.636 -2.544
II)Cutoff walls 2 7.880 0.300 1.000 4.728
Total 46.317
Say 46.400
3 Providing ,hauling & laying NP3 RCC hume pipes in position
carefully & jointing with 1 : 2 and curing etc.,complete (including
cost of pipes) above 450mm dia and upto 600mm dia . Rmt
ii) For Causeway 16 2.500 - - 40.000
Total 40.000
Say 40.000
______________________________________________________________________________________________
Secon Private Ltd., Bangalore-66 CAUSE WAY @ Ch: 26+940KM OF BALUNDAGI LIFT MAIN CANAL
________________________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BALIS
ATAKA NEERAVARI NIGAM LIMITED
HIMA LIFT IRRIGATION SCHEME
REMARKS
______________________________________________________________________________________________
Secon Private Ltd., Bangalore-66 CAUSE WAY @ Ch: 26+940KM OF BALUNDAGI LIFT MAIN CANAL