Sunteți pe pagina 1din 2

QUARTER 1

AUGUST
4-9 New Educator
Training

9 Flex Day: All


Educators

10 Principal Directed Mission Possible- Morning Activities


PD AM -Team Building-
WE Learn So that we grow and expand our minds.
WE ReadSo that we can continue to learn beyond school.
We LeadSo that we can inspire others to do great things.
We Succeedbecause we can!

Building Directed
PD PM Goal Setting/ Mission Statements
Building our PLCs-
Creating the team and setting standards
-Turning in a PLC contract
-Developing a project based lesson (1st Semester)
Gillian and Brooklyn Present ideas/ PLC Group Work/ Present the Concept to
the staff
11 Building Directed Using our Time More Wisely:
PD AM ELL/ Title/ Sped Placement
-Using the If/Then document to help with MTSS
-Utilizing EPLCs once a quarter
Committees- Driving the BUS for the SIP Goal
--Mentor- Behavior Climate Goal (SPED)
--Motivate- Project Based Learning/ Integration
--Move- Math
--Move- ELA
--Mindset- Washington Family (ELL)
Staff Handbook Information
Individual Directed -General rules around the buildingPlayground/ Bathroom/ Locker Areas/
PD PM Hallways/ Arrival and Dismissal/ Lunchroom- Positive Referrals
-Self- Guided Tour

14 District PD AM Elementary Topics


Science Curriculum Resources Roll-Out
Integration of Curriculum Standards
Brief Math Pacing Guide Updates

Goal Setting/ Game Play/ Second Step/ Zones Lesson Planning


Principal Directed -Developing a Long Range Plan with your PLC for Champ Caf
PD PM

15 Building Directed Goal Setting/ Mission StatementsPLC work continued


PD AM MAP Data- for your students

Educator
Preparation PM
16 Half Day with
Students AM

Building Directed Pass the Data


PD PM

S-ar putea să vă placă și