This statement provide a method for
thecleaning,flushingandpassivation PlumbingMethodStatements
fortheHVACchilledwatersystemin TechnicalGuides
the site itself to be followed by the
thirdorindependentpart. Testing&Commissioning
Objective
"WerecommendtheseProject
The objective of cleaning , flushing
ManagementTemplatesfordelivering
and passivation is to remove debris yourprojectssuccessfully."
such as slit, sand, scale, iron oxide
deposits, weld slug and other
contaminants that are present in a
new pipe work system, The
passivationprocessinhibitsthesystemfromcorrosion.
Theprocessofthepreoperationalflushingandcleaningbecomesmoreimportantasif
these contaminants are to remain in the system then it directly effect the cooling
systemefficiencyandreducesflowthroughthesystem.
RecentlyViewed
These contaminants also prevent formation of formation of uniform protective
passivatinglayerswhichfurtherleadstocorrosioninthesystem. Methodstatements
Based on the above , it is of paramount importance to ensure that the proper pre
ViewProducts
operational cleaning/flushing programme is carried out before the system is put into
normaloperation.
CHILLEDWATERTREATMENT
Chilled water system is the system having recirculation in closed loop and the
temperatureofthesystemgenerallyrangefrom5.5to14degCelsius.
Aclosedrecirculatingsystemisisoneinwhichthewateriscirculatedinaclosedloop
with negligible evaporation or exposure to the atmosphere or other influence that
would change the water composition these system usually require high chemical
treatmentlevelandsincewaterlossesarenegligibletheselevelareeconomical.Good
qualitymakeupwaterisgenerallyusedforbestsystemoperation.
Heattransfertotheclosedcoolingwaterloopbytypicalheatexchangeequipmentand
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 1/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
isremovedfromtheclosedsystemloopbymeansofasecondexchangeofheatfrom
the closed loop to a secondary cooling cycle . The secondary loop could use either
evaporativeoroncethroughwatercooling,oraircooling.
Velocityofwaterinclosedsystemisgenerallyintherangeof0.9to1.5m/s
Temperature rise usually average 5.5 to 14 deg Celsius, Although some system can
exceed this substantially . Generally closed system require little or no makeup ,
Waterexceptforpumpsealleaks,expansiontankoverflowandsurfaceevaporation
from the system vent, This periodic makeup requires regular analysis for control of
correcttreatmentchemicalresiduals.
Closedsystemusuallycontaincombinationofdifferentmetal,whichprovideahigh
potentialforgalvaniccorrosion.Thepotentialfordissolvedoxygenattackisquiethigh
inclosedchilledwatersystembecauseofthepresenceofdissolvedoxygen.
Theoretically,scaleshouldbeaminorprobleminthechilledwatersystemsincethe
waterisnotconcentratedbyevaporation.
Withhighmakeuprate,However,additionalscaleformwitheachnewincrementof
water added so that in time , scale becomes significant , In addition, there is
opportunityforsludge,rustandsuspendedsolidstodropoutatlowpointandbakeon
heat transfer surface to form hard deposit. Therefore scale retardant and dispersant
are usually include as a part of a closed system treatment program where makeup
rateshigh.
Henceforanychilledwatersystemmainlytwoproblemarefound.
Corrosion
Microbiologicalfouling
CHILLEDWATERPIPINGFLUSHINGPROCESS
Themainobjectiveofflushingprocessistoremove,asmuchdirtanddebrisfromthe
pipe works system as possible , in order to reduce the livelihood of the system
blockageandcreatethebestpossiblecircumstancesforsuccessfulchemicalcleanand
subsequentwatertreatmentregime.
Contaminant such as mill scale , jointing compound and the building debris will
inevitablybefoundinnewlyfabricatedpipeworksystem.Itallowedtoremaininthe
systeminsufficientquality.Thesecontaminantswillmakesystempronetoblockage
at strainer , control valve and small bore heat exchanger . The microorganism may
alsoinitiatefurthercorrosionandmayencouragethegrowthofmicroorganism.
The first stage forward removal of these contaminants is to thoroughly flush the
system with clean water, However, System flushing by itself will not removed the
contaminant mainly metal oxide which adhere to the internal surfaces of the pipe ,
When the system is set to work , movement of the pipe works due to the thermal
expansionorcontraction,willcausethecontaminanttobereleasebackintothefluid
steam,Therefore,theobjectiveofchemicalcleaningaretoloosenthesurfacedeposit
sothattheycanbeflushawayandtocreatestablesurfacelayerinsidethepipewhich
itmaintainedbyaproperwatertreatmentregime,willresistfurthercorrosion.
Thereispotentialforachemicalcleantodomoreharmthangoodifitisnotcarried
out properly. The chemical used for cleaning must be compatible with the system
materials.
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 2/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
Thewatervelocityrequireforflushingmushsufficienttopickandcarrythemajority
of the dirt and debris of the system , Although it is quite feasible for much larger
particle to find their way into system, most of the debris will be below 5mm in
diameter.
Bend from the horizontal to vertical down & from down to horizontal or bend in the
same plane do not retard debris movement . The need to flush from horizontal to
vertical upward can be avoided in the first instance and should carried out by back
flushingofthesystem.
APPLICATIONOFCHEMICALS/METHODOFOPERATION
PRECLEANING/FLUSHINGSTARTUPCHECKLIST
General:
Checktheavailabilityoflabour/manpower(24hoursbasis)
Check the availability of chemical required for flushing / cleaning operation at
site.
Checktheinstallationworkiscompleted.
Identifyclearlyfeedanddrainpoint
Makeprovisionfordrainfromlowestpoints
Check availability of safety equipment at site and ensure that the workers are
trainedinsafetyrequirements.
Checkoperationofthesystempumpsortemporaryflushingpumpsasnecessary.
Checkandidentifyallairventspresentinthecircuit.
Makethecompletechilledwaterpiping(newline)intoasingleslopebymaking
necessarybypassconnectiontotheheatexchanger,AHUs,FCUsetc.
Thebypassconnectionshouldbesufficientlysized.
Check and ensure that all isolating valves enabling circulation in this circuit are
fully
Ensurethatallprecisionvalvesandallcoolingcoilsarebypassedasrequired
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 3/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
Preparation:
MethodofStatementforChemicalCleaning/Flushing
Theprocessinvolvethefollowingfourstates:
Initialstaticflushwithplainwater
Dynamicflushing
Chemicalcleaning
Finalinhibitionandpassivation
Reinstatementofplantitemsandbackflushing.
InitialStaticFlushingwithPlainWater
Fillthesystemwithplainwaterusingeithermainssupplyortinkeredwaterand
temporarypumps
Afterfillingthesystemdraintheentiresystemshouldbecarriedouttwice.
Fillthesystemagain.
Circulatethesystemusingthesystempumpfor8hours
Duringcirculation,TheYstrainerinthepumpsuctionhastovisuallycheckedand
cleanedatleastonceanhour
Aftercirculationopenthedrainvalvesatthelowestpointinthesystem.
Flushedwatershouldbedisposedoutofthestormwaterdrainordisposaltanks
providedatsite.
Thesystemistheagainrefilledanddynamicflushingstarted
DynamicFlush
Keepthesystemcirculation,usingthesystemflushingpumps
Openthecleanwaterfeedtothesystem(ortemporaryfeedifapplicable)
Slowlyopenthedrainvalvesatthelowestpointinthewholesystemandadjustit
toadequatemakeupanddrainage.
Note:Thedrainageflowmustneverbemorethanthecleanmakeupwaterflowas
toavoidsystempressurelossanddrainage
Duringdynamicflushingitisimportantthatthevelocityofthecirculatingwater
issufficienttoforcealldebrisfromthesystempipeworks
VelocityRequirement:
The water velocity require for flushing must be sufficient to pick up and carry the
majorityofthedirtdebrisinthesystem.Althoughitisquitefeasibleformuchlarger
particles to find way into the system , most of the debris will be below 5mm in
diameter.
The system pumps shall be able to match / achieve one of the following condition
givenbelow.
Avelocityinthesystemshouldbeatleast10%higherthanthedesignvelocity,
itwillachievewhenallthepermanentsystempumpareinoperation.
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 4/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
OR
NominalPipeSize(mm
Velocity(m/sec.) FlowRate(L/s)
)
15 0.96 0.20
20 1.00 0.37
25 1.03 0.60
32 1.06 1.08
40 1.08 1.49
50 1.11 2.45
65 1.15 4.25
80 1.17 4.98
Note : The system will have different pipe line but the above mentioned
velocityshouldbeachievedinthelargerpipesizeofthesystem.
Flowreadingmustbetakenateveryavailablebranchandrisermeasuringstation
toensurethecorrectvelocitiesarebeingachieved.
Ifthepumpscannotmatch/achievedtheseparametersthesystematthesame
timeitwillnecessarytomanipulatethesystembyclosingcertainsectiontoforce
thepumpstotalflowthroughtheopensectionofthesystemthusachievingthe
required flow velocity , The closed section will be then be opened and then the
open section will be closed so the required velocities will have been achieved
acrossthesystem.
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 5/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
Note : The opening and closing must be carried out in this order to ensure no
prolongedClosedHeadisaffectedonthepumps.
Carryoutfilling,draining&circulatinguntilthewaterisvisiblyclear.
During the dynamic flushing all strainer that have flow through them must be
checkedandcleanedregularlyuntilnomoredepositsarefoundinthem.
Temporary filters to be checked and cleaned regularly during dynamic flushing,
oncompletionofdynamicflushingallmustbeisolatedbeforechemicalcleaning.
The Water treatment third party will confirm acceptance of water quality ,
whichshallbeasperparametersmentionedbeloworisthesamequalityasthe
waterbeingfilledintothesystem,whicheverisoftheHighestquality.
PARAMETERS VALUE(PPM)
Ph 7.58.5
Conductivity(Siemens/cm) Max800
TDS(ppm) Max400
Chlorides(ppm) Max200
ChemicalCleaning
Priortostartupofchemicalcleaning,closealldrainvalveswhichwereopenedduring
dynamicflushing.
Doserequiredquantitiesofcleaningagent(assuggestedbychemicalsupplier)
usingtemporarytank/pumpsystemormanualdosingpot.ThechemicalB12@
11.5kg/mofsystemvolumeandshouldbecirculated24hrsandmaximum
of72hours
Thepumpareswitchedonandwillcontinueforaminimumperiod24hoursuntil
therecordeddissolvedironlevelhaveplateau.
Continuecirculationtill2consecutivesampletakenatanintervalof2hoursgive
samedissolvedironvalue.
When dissolved iron level reaches a constant value clear the system of
contaminatedwaterbycarryingoutthefilling&drainingprocedurestatedinstep
Buntilthewatersampletakenfromaminimumof2separatedrainpointonthe
system show the water per parameters as mention below or is the same quality
asthewaterbeingfilledintothesystem,whicheverisoftheHighestquality.
Flushedwatercanbedisposedouttothestormwaterdrainatthesitesubjectto
compliancewiththenormssetbymunicipalityfordisposalofwater,otherwiseit
maybetakenawaybytankersanddisposedofinasuitablelocation.
PARAMETERS VALUE(PPM)
Ph 7.58.5
Conductivity(Siemens/cm) Max800
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 6/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
TDS(ppm) Max400
Chlorides(ppm) Max200
FinalInhibition
WhenthecorrectwaterconditionhavebeenachievedwiththesystemCirculation
pump,closeallthedrainpoint
Passivationandmicrobiocidechemicalshallbeaddedatthispoint.Circulatethe
waterfor4hours.Corrosioninhibitorchemical2910attherateof3.4kg/cu.
mtrofthesystemvolume.microbiocidechemical651tobeadded@0.05kg/
mofsystemvolume.
Watersamplehastobecollectedattheendattheendofthisstageandiffound
withdissolvedironlevelhigherthanthepreviousvalue(analysistobedoneby
theapproved water treatment specialist)flushinghastobecarriedout
tomakethewaterclean.
Keep the system in circulation including all the equipments for the minimum
periodof24hours
Water samples have to be collected from the designated areas and the Water
treatmentThirdPartyconfirmthecorrosioninhibitorlevel(Nitriteminimum
700ppm)
Afinalwateranalysisindicatingalltherequiredparametersshallbesubmittedby
theatertreatmentThirdParty
PARAMETERS VALUE(PPM)
Ph 9.010.5
Conductivity(Siemens/cm Max3000
TDS(ppm) Max2000
DissolvedIron(ppmasFe) Max0.5
Chloride(ppm) Max200
Nitrite(ppm)chem.2910 Max7001300
Note: After addition of final treatment chemical , the system must be left full and
completelycirculatedwithoutanystagnancy
Biologicalcontrol
Chilled water system is an ideal breeding ground of bacterial and other micro
organism and it is necessary to control biological growth in the system , Supplier
recommendation entail shock dossing of biocide chemical chem. 651 @ 0.05 kgs per
cu. mtr , The product is closed into the system using the manual dosing pot and is
closed once every three months in order to control the growth of microorganism .
therefore , it is very important that residual level are constantly monitored and
maintained
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 7/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
ReinstatementofPlantItems&BackFlushing:
When the correct water conditions have been achieved with the inhibition
reinstatementandbackflushingofallplantitems(Coils,Heatexchangeretc.)
canbegin.
Ensureconstantmakeupissupplied
Closethebypass
OpentheflowisolationvalveensuringthereturnDRVisstillfullyclosed.
Slowlyopenthedraincockandletwaterflowintothedrainorcontaineruntilitis
visiblyclear.
Closethedraincock
Closetheflowisolationvalve
OpenthereturnDRV
Slowlyopenthedraincockandletwaterflowintothedrainorcontaineruntilitis
visiblyclear
Closethedraincock
Close all the valve serving the plant items, Remove the strainer ( Where
applicable)cleanandreplaced
Openboththeflowandreturnvalveensuringtheflushingbypassisfullyclosed
Continuethesestepwitheverypreviouslyisolatedplantitemonthesystem.
Note : After reinstatement of all plant items the level of inhibitors must be re
checkedandredosedasnecessary.
BRIEFDESCRIPTIONOFFLUSHINGPROCEDURE
WaterFilling
Potablewaterwillbefilledfromahighpointinthechilledwaterlinepreferablyinthe
AHU room or downstream of the drain point. The filling point position is critical and
care must be taken so as to ensure that fresh water make up water is not drained
immediatelyafterfilling.
SourceofWater
Existing potable water supply available in the station will be used . Otherwise water
willbesuppliedfromtankers.Anditwouldbecompensatedagainstthetotalsystem
volume
CirculationWater
Waterwillbecirculatedwiththehelpofthesystempumps,Duringcirculation,care
shouldbetakenthatwatertemperaturedoesnotrisetoanunsafelimitforpump.In
suchcase,eitherthecirculationshouldbetemporarystoppedotherwisewatershould
bepartiallydrainedandrefilledwithfreshwater.
DrainageofWater
Waterwillbedrainedfromthelowpointinthesystem,Thewatercanbedrainedinto
thefloordrainline,Itcanbealsocollectedinasmalltankandpumpouttosoakaway
ground outside the building, Third party ( Specialist in water treatment ) will guide
whetherthequalityofwaterissuitablefordrainageintosewersystem/stormwater
system or for land pump system. drainage, If it is not possible to drain into these
system,Thenthedrainedwaterwillbecollectedinatankandwillhavetobetaken
out of station premises for disposal by tankers to comply with the local drainage
practices.
ChemicalFilling
Thechemicalwillbefilledintothesystemthroughthemanualdosingpotinstalledin
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 8/9
6/7/2016 MethodOfStatementForCleaningFlushingAndPassivationOfChilledWaterPiping
theHeatExchangerroomoftemporarytank/
BypasstheVitalEquipment
BypasslineisprovidedforeveryAHUsandFCUs.Themaininletandoutletvalvesof
coolingcoilwillbeclosed.Bypassvalvewillbeopened.Whereverbypasslineisnot
provided , The supply and return water pipelines will be disconnected from the unit
andconnectedtoeachotherwithatemporaryhoseorpipe.
AirVents
Theairventareprovidedatselectedhighpointandwillbeusedforairentryandexit
duringdrainageandfillingoperations.
Water will not be circulated through the Cooling coil and plate heat exchangers until
thepipearecleanandthequalityofwaterisreasonablygood.
50% 40%
Buy Buy
HVACMethodStatements Testing&Commissioning
Corrosionprohibition.
MethodStatementForInstallationOf MethodStatementForInstallationOfAir
GICladdingForHVACDuctwork& HandlingUnitsAHUs
Pipework
Copyright201416 Allrightsreserved
http://safeworkmethodofstatement.com/methodofstatementforcleaningflushingandpassivationofchilledwaterpiping/ 9/9