NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT.

ABBREVIATIONS MECHANICAL LEGEND DUCTWORK LEGEND GENERAL NOTES:


& SYMBOLS 1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED
CWS -CONDENSER WATER SUPPLY -FIRE DAMPER
EQUIPMENT TAG LEGEND DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED
AFD -ADJUSTABLE FREQUENCY DRIVE 24x12 -NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN FOR EQUIPMENT FURNISHED.
AFF -ABOVE FINISHED FLOOR
(WITH ACCESS PANEL)
CWR -CONDENSER WATER RETURN TAG 2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO
AHU -AIR HANDLING UNIT 24x12 -EXISTING DUCTWORK TO REMAIN PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES
CHWS -CHILLED WATER SUPPLY -FIRE & SMOKE DAMPER A INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK
AP -ACCESS PANEL (WITH ACCESS PANEL) -AIR DISTRIBUTION DEVICE
CHWR -CHILLED WATER RETURN 24x12 -EXISTING DUCTWORK TO BE REMOVED
200
(INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR
BOP -BOTTOM OF PIPE CFM INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS
CD 24x12 -EXISTING FIRE DAMPER TO REMAIN INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH
BHP -BRAKE HORSEPOWER -CONDENSATE
-DUCT SECTION, POSITIVE PRESSURE, FIRST DIMENSION AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING,
BTU -BRITISH THERMAL UNIT CR -CONDENSATE RETURN INDICATES SIDE TO WHICH ARROW IS POINTING FLOOR LOCATED AHU NUMBER LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT.
h -CENTER LINE
DOWN UP W/IN FLOOR -EXISTING FIRE & SMOKE DAMPER TO REMAIN
3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION
PC
c -CFM (CUBIC FEET PER MINUTE)
-PUMPED CONDENSATE
-DUCT SECTION, EXHAUST AHU1-3 -AIR HANDLING UNIT OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD.
HWR -HOT WATER RETURN SA-1 -SOUND ATTENUATOR
CD -CEILING DIFFUSER 4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS,
HWS -HOT WATER SUPPLY
-DUCT SECTION, NEGATIVE PRESSURE, RETURN ETC., OF DUCTWORK.
CT -COOLING TOWER
-TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME 5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
CV -CONSTANT AIR VOLUME HPS -HIGH PRESSURE STEAM -DUCT SECTION UP THROUGH ROOF OR SLAB ABOVE VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS
P -CHANGE IN PRESSURE 6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL
MPS -MEDIUM PRESSURE STEAM UP DN -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME SUIT EQUIPMENT FURNISHED.
T -CHANGE IN TEMPERATURE -CHANGE OF ELEVATION WITH ELECTRIC HEAT
LPS -LOW PRESSURE STEAM AHU NUMBER 7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL
CFM -CUBIC FEET PER MINUTE TERMINAL UNIT TYPE REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES.
RL -REFRIGERANT LIQUID -FLEXIBLE DUCT
CU -CONDENSING UNIT VAV - VARIABLE TERMINAL UNIT
CTU - CONSTANT TERMINAL UNIT TERMINAL NUMBER 8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY
DDC -DIRECT DIGITAL CONTROLS RS -REFRIGERANT SUCTION -TRANSITION, CONCENTRIC SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE
PTU - PARALLEL TERMINAL UNIT VAV1-1
DN -DOWN STU - SERIES TERMINAL UNIT LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS.
-GATE VALVE
-TRANSITION, ECCENTRIC -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME,
EAT -ENTERING AIR TEMPERATURE FAN POWERED 9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR
ESP -EXTERNAL STATIC PRESSURE
-BALL VALVE SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A
10x8 8 -TRANSITION, SQUARE-TO-ROUND VIBRATION-FREE, RIGID INSTALLATION.
EWT -ENTERING WATER TEMPERATURE -CALIBRATING BALANCING VALVE
-TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME, 10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
FCU -FAN COIL UNIT -SQUARE THROAT ELBOW
-BUTTERFLY VALVE FAN POWERED, WITH ELECTRIC HEAT
FD -FIRE DAMPER
W/TURNING VANES 11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND
DIFFUSERS SHALL BE PAINTED FLAT BLACK.
-GAS COCK
FF -FINAL FILTERS
12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
FLA -FULL LOAD AMPS -UNION
-RADIUS ELBOW -MOTOR OPERATED CONTROL DAMPER (MOD)
M 13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE
FPM -FEET PER MINUTE -STRAINER PROVIDED FOR PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.
FM -AIR FLOW MEASURING STATION
GPM -GALLONS PER MINUTE
-CONTROL VALVE -RECTANGULAR/ROUND BRANCH TAKE-OFF 14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE
KW -KILOWATT OR ROUND/ROUND BRANCH TAKE-OFF REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL
S -MANUAL BALANCING DAMPER EQUIPMENT.
LAT -LEAVING AIR TEMPERATURE -SOLENOID VALVE
15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL
LWT -LEAVING WATER TEMPERATURE -PSI REG. -SQUARE THROAT TEE TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH
ASHRAE 62-99 COMPLIANCE
-BACKDRAFT DAMPER
LD -LINEAR DIFFUSER BD FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM
-CHECK VALVE OF BOTH BRANCHES, UPSTREAM OF SPLIT.
MBH -THOUSAND BTUs PER HOUR
MCA -MINIMUM CIRCUIT AMPS -ELECTRIC DUCT HEATER (W/ PANEL CLEARANCE) 16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED

MOCP -MAXIMUM OVER CURRENT PROTECTION


-FLOW SWITCH
PEOPLE CFM/PERS. OA CFM EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS.

NC -NORMALLY CLOSED
-SLOPE DIRECTION
12x8 -RADIUS TEE
CRU-1 BASEMENT (COLLECTIONS) 0 0 0 17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS,
DIFFUSERS, LOUVERS AND OTHER AIR DISTRIBUTION DEVICES.
NO -NORMALLY OPEN -FLEX CONNECTION
CRU-2 1ST LEVEL (COLLECTIONS) 0 0 0
18. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH
NTS -NOT TO SCALE CRU-3 2ND LEVEL (COLLECTIONS) 0 0 0 FAN, AIR HANDLING UNITS, AND FAN COIL UNITS.
OA -OUTSIDE AIR -O.S.&Y. GATE VALVE
-HYDRONIC REHEAT COIL AHU-1 1ST LEVEL (OFFICES/LABS) 25 20 500 19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF
OAL -OUTSIDE AIR LOUVER
-THREE-WAY CONTROL VALVE
-RECTANGLE-TO-ROUND TAKE-OFF
1ST LEVEL (EXHIBT #2) 60 15 900 FLEX DUCTS TO BE CONNECTED.
PRV -PRESSURE REDUCING VALVE 20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER
PRS -PRESSURE REDUCING STATION
-THERMOMETER
-DOOR GRILLE AHU-2 1ST LEVEL (LABS) 70 20 1,400 THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH
INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN
PSI -POUNDS PER SQUARE INCH -STANDARD BRANCH TAKE-OFF
UC
AHU-3 2ND LEVEL (EXHIBT #1) 200 15 3,000 CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH
EQUIP.
PSIG -PSI GAUGE - P-TRAP
-SPIN-IN TAKE-OFF
-UNDERCUT DOOR AHU-4 2ND LEVEL (OFFICES/LABS) 80 20 1,600
OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN
PERIOD AS BRIEF AS POSSIBLE.
PVC -POLYVINYL CHLORIDE PIPE
RA -RETURN AIR -TWO-WAY CHECK VALVE 21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF
-ACCESS DOORS, VERTICAL OR HORIZONTAL THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER.
RHC -REHEAT COIL
MV
-CEILING DIFFUSER, ROUND NECK
RHP -ROOFTOP HEAT PUMP -MANUAL VENT (CEILING DIFFUSERS ARE 4-WAY THROW UNO) TOTALS 435 7,400 22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING,
EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS,
RPM -REVOLUTIONS PER MINUTE -STAINLESS STEEL DUCTWORK TO ALLOW FOR INSPECTIONS OF RATED WALLS.
-ROUND DIFFUSER NOTE: THESE OUTSIDE AIR QUANTITIES ARE MINIMUMS BASED ON
RS/L -REFRIGERANT SUCTION & LIQUID LINES
OCCUPANCY, AND DO NOT INCLUDE ADDITIONAL MAKE-UP AIR 23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10'-0" CLEAR FROM ALL
-PRESSURE GAUGE PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS. LOWEST POINT OF
RTU -ROOFTOP AIR HANDLING UNIT -FLEXIBLE CONNECTION REQUIREMENTS FOR FUME HOODS.
-CEILING RETURN EACH OUTSIDE AIR INTAKE ON ROOF SHALL BE A MINIMUM OF 24" ABOVE ROOF.
SA -SUPPLY AIR -RELIEF VALVE
SP -STATIC PRESSURE
12x8 -FLAT OVAL DUCT
24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
FM -FLOW METER -CEILING EXHAUST

TSP -TOTAL STATIC PRESSURE
25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED
UNO -UNLESS NOTED OTHERWISE M -WATER METER -CEILING DIFFUSER, RECTANGULAR OR 5 PSI.
SQUARE NECK (CEILING DIFFUSERS -INLINE CENTRIFUGAL FAN
V/PH -VOLTS/PHASE 26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE
ARE 4-WAY THROW UNO)
DESIGN CONDITIONS
-INLINE PUMP INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN.
VAV -VARIABLE AIR VOLUME
-INLINE PUMP -SUPPLY REGISTER OR GRILLE 27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.
VFD -VARIABLE FREQUENCY DRIVE
(VERTICAL MOUNT, SIDEWALL) -PACKAGED TERMINAL AIR CONDITIONER (PTAC) PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT
WATER PIPING.
1 -REVISION REFERENCE -VALVE ON RISER COOLING (ASHRAE 1% CONDITION) 94F DB/79F WB
1 -DETAIL REFERENCE: TOP-DETAIL#, -CAP
-RETURN/EXHAUST REGISTER OR GRILLE HEATING (ASHRAE 99% CONDITION) 28. MAXIMUM LENGTH OF ALL FLEX DUCT TO BE 8'-0". IF LONGER RUNS ARE REQUIRED
M-1 BOTTOM-DRAWING# SHOWN ON (VERTICAL MOUNT, SIDEWALL) PROVIDE SHEET METAL EXTENSIONS WITH SNAP LOCK FITTINGS.
-CONNECTION, BOTTOM
T -THERMOSTAT/TEMPERATURE SENSOR
H -HUMIDISTAT/HUMIDITY SENSOR -CONNECTION, TOP INSIDE SETPOINT (COLLECTIONS) 75F DB (55% MAX RH)
INSIDE SETPOINT (EXHIBIT SPACES) 70F DB (45% WIN/55% SUM RH)
-DUCT SMOKE DETECTOR
-COUPLING
INSIDE SETPOINT (ALL OTHER SPACES) 75F DB (60% MAX RH)
-ELBOW, 90
-CONNECT TO EXISTING
-ELBOW, 45
-DEMOLISH TO POINT INDICATED
-ELBOW, TURNED DOWN
DIFFUSER AIR THROW LEGEND WALL U-VALUE 0.118 BTU/HR-SQFT-F HVAC DESIGN REQUIRES: YES NO
M -MOTORIZED CONTROL DAMPER
ROOF U-VALUE 0.046 BTU/HR-SQFT-F
-ELBOW, TURNED UP
NOTE: ALL CEILING DIFFUSER AIR THROW PATTERNS ARE FOUR-WAY UNLESS OTHERWISE INDICATED ON PLAN DRAWINGS IN ACCORDANCE WITH THE SYMBOLS SHOWN BELOW
GLASS U-VALUE/SHADING COEFFICIENT 0.32 BTU/HR-SQFT-F / 0.42 DUCT SMOKE DETECTORS
TS -TEMPERATURE SENSOR
-TEE, OUTLET DOWN FIRE DAMPER(S)
-PRESSURE SENSOR
P
-TEE, OUTLET UP
1W 2C SMOKE DAMPER(S)
-CEILING DIFFUSER, ONE-WAY THROW, -CEILING DIFFUSER, TWO-WAY CORNER THROW,
D D ARROW INDICATES DIRECTION OF ARROWS INDICATE DIRECTION OF AIR THROW. FIRE RATED ENCLOSURE
-45 PIPE RISE (R) / DROP (D) AIR THROW.
FIRE RATED ROOF/FLOOR
-SHUT OFF VALVE
CHILLED WATER DEMAND CEILING ASSEMBLY
FIRE STOPPING
SMOKE CONTROL
3W
2W -CEILING DIFFUSER, TWO-WAY THROW, -CEILING DIFFUSER, THREE-WAY THROW, CONDITIONED AREA: 38,000 SQFT
ARROWS INDICATE DIRECTION OF ARROWS INDICATE DIRECTION OF
BUILDING LOAD T. MARK KIRBY
AIR THROW. AIR THROW. 1,500 MBH MECHANICAL
COIL TEMP. DIFF: 14 F (BASED ON EXISTING PLANT) 45276
PEAK FLOW 215 GPM
M:\102014\01\ M001.dwg 11/06/02 14:26 vince.briones-1798

HVAC LEGENDS,
SYMBOLS AND
NOTES

M001
VFB
TMK
INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER
THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH
INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN
AHU-3 2ND LEVEL (EXHIBT #1) 200 15 3,000 CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH
AHU-4 2ND LEVEL (OFFICES/LABS) 80 20 1,600
OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN
PERIOD AS BRIEF AS POSSIBLE.

21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF


THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER.
TOTALS 435 7,400 22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING,
EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS,
TO ALLOW FOR INSPECTIONS OF RATED WALLS.
NOTE: THESE OUTSIDE AIR QUANTITIES ARE MINIMUMS BASED ON
OCCUPANCY, AND DO NOT INCLUDE ADDITIONAL MAKE-UP AIR 23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10'-0" CLEAR FROM ALL
PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS. LOWEST POINT OF
REQUIREMENTS FOR FUME HOODS. EACH OUTSIDE AIR INTAKE ON ROOF SHALL BE A MINIMUM OF 24" ABOVE ROOF.

24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.

25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED
5 PSI.
26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE
DESIGN CONDITIONS 27.
INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN.

SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.


PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT
WATER PIPING.
COOLING (ASHRAE 1% CONDITION) 94F DB/79F WB
HEATING (ASHRAE 99% CONDITION) 28. MAXIMUM LENGTH OF ALL FLEX DUCT TO BE 8'-0". IF LONGER RUNS ARE REQUIRED
PROVIDE SHEET METAL EXTENSIONS WITH SNAP LOCK FITTINGS.

INSIDE SETPOINT (COLLECTIONS) 75F DB (55% MAX RH)


INSIDE SETPOINT (EXHIBIT SPACES) 70F DB (45% WIN/55% SUM RH)
INSIDE SETPOINT (ALL OTHER SPACES) 75F DB (60% MAX RH)

WALL U-VALUE 0.118 BTU/HR-SQFT-F HVAC DESIGN REQUIRES: YES NO


ROOF U-VALUE 0.046 BTU/HR-SQFT-F
GLASS U-VALUE/SHADING COEFFICIENT 0.32 BTU/HR-SQFT-F / 0.42 DUCT SMOKE DETECTORS

FIRE DAMPER(S)
SMOKE DAMPER(S)
FIRE RATED ENCLOSURE

FIRE RATED ROOF/FLOOR


CHILLED WATER DEMAND CEILING ASSEMBLY
FIRE STOPPING
SMOKE CONTROL

CONDITIONED AREA: 38,000 SQFT


BUILDING LOAD 1,500 MBH
COIL TEMP. DIFF: 14 F (BASED ON EXISTING PLANT)
PEAK FLOW 215 GPM

REVISION: PROJECT: McGUIRE WORLD CENTER BR-161


SUPPLEMENT TO DRAWING No.: M001 TLC JOB No.: 102014.0 SCALE: NTS
SKETCH No.
DATE: 08/11/04 Tilden Lobnitz Cooper
1717 S. Orange Avenue
DESIGN: TMK Orlando, Florida 32806
Phone: 407.841.9050 EQ-PR1