FADHILI ONSHORE & OFFSHORE UPSTREAM FACILITIES DIVISION
DATE REVIEWED BY
APPROVED
PREPARED CHECKED
REV. ISSUED DATE DESCRIPTION BY
BY BY
(PEM or PM)
REVISION LOG
INDEX
S. NO. DESCRIPTION PAGE NO.
1.0 INTRODUCTION
This project is part of the KhursaniyahHasbah Gas Development Program to support the
corporate strategy to meet in-Kingdom energy demand and reduce crude burning.
This Program provides for a grassroots gas plant (Fadhili Gas Plant, FGP) to process a total
gas volume of 2,500 MMSCFD, made of 500 MMSCFD from Khursaniyah onshore and 2,000
MMSCFD from Hasbah offshore non-associated sour gas. The Program also provides for
upstream off-shore and on-shore facilities, downstream pipelines and supporting facilities. The
program will produce 1,530 MMSCFD of sales gas and 4,000 MTD of sulfur to meet the Kingdoms
sales gas demand and reduce crude oil burning.
The Hasbah Offshore Gas Facilities Increment II Project (the PROJECT) will provide the offshore
platforms and producing facilities to produce the sour gas to be fed to the FGP under Budget Item
BI 10-01902.
The purpose of the facilities under the PROJECT is to supply, gather and transport the gas from
Hasbah Wellhead Platforms to the FGP. The facilities to be provided within this Budget Item
include six new offshore gas production Wellhead Platforms, two Tie-in Platforms (HASBAH TP-
2 & TP-3), as well as the associated pipelines, power supply and telecommunication systems.
2.0 PURPOSE
The document is the set of detailed drawings of standard pipe support (Annexure PD-ST-0004)
are to design, fabrication and installation of pipe supports on metallic piping for onshore as per
ASME B 31.3, ASME B 31.4, ASME B 31.8 and Saudi Aramco Standards for HASBAH
OFFSHORE GAS FACILITIES INCREMENT II.
This document is not applicable to non-metallic piping. Pipe supports for GRE/GRP piping shall
comply with ISO 14692.
i. COMPANY-provided Waivers;
ii. SAUDI ARAMCO Engineering Standards (SAES);
iii. SAUDI ARAMCO Material Specifications (SAMSS)
iv. SAUDI ARAMCO Standard Drawings;
v. SAUDI ARAMCO Engineering Procedures (SAEP);
vi. SAUDI ARAMCO General Instructions (GIs)
c) COMPANY Preliminary Design, which, for clarity, includes, but is not limited to the following
COMPANY-provided documentation: design notes including comments wherever located in
the design documents, Licensor Data, process flow diagrams, heat and material balances,
material selection diagrams, piping and instrument diagrams, process datasheets, equipment
data sheets, equipment technical specifications, plot plans; and other design specifications.
4.0 DEFINITIONS
COMPANY : SAUDI ARAMCO organization.
SAPMT : SAUDI ARAMCO Project Management Team
CONTRACTOR : Consortium of L&T Hydrocarbon Engineering & EMAS AMC
5.0 ABREVIATIONS
ANSI : American National Standards Institute
Annexure
(PL-ST-0004)