Sunteți pe pagina 1din 33

CALENDARIO VALORIZADO DE OBRA MENSUAL

"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE
PROYECTO :
HUANUCO, PROVINCIA DE HUANUCO - HUANUCO"

FECHA : Apr-17
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 390,828.02

CALENDARIO VALORIZADO CONTRACTUAL


Parciales Sub Totales
Item Descripcin Und. Metrados
(S/.) (S/.)
MES 1 MES 2 MES 3

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40M und 1.00 600.00 600.00 600.00 0.00 0.00
01.01.02 ALMACEN DE OBRA glb 1.00 1,000.00 1,000.00 1000.00 0.00 0.00
01.01.03 TRANSPORTE DE MATERIALES A OBRA kg 52,882.96 0.06 3,172.98 3172.98 0.00 0.00
01.01.04 TRANSPORTE DE EQUIPOS Y MAQUINARIA A OBRA glb 1.00 1,000.00 1,000.00 1000.00 0.00 0.00
02 ESTRUCTURAS
02.01 RESERVORIO CON GEOMEMBRANA - RESERVORIO EXISTENTE
02.01.01 OBRAS PRELIMINARES
02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 228.49 0.97 221.64 221.64 0.00 0.00
02.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 228.49 2.79 637.49 637.49 0.00 0.00
02.01.02 MOVIMIENTO DE TIERRAS
02.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 21.59 29.82 643.81 643.81 0.00 0.00
02.01.02.02 EXCAVACION PARA ZANJA DE ANCLAJE m3 9.85 29.82 293.73 293.73 0.00 0.00
02.01.02.03 NIVELACION Y COMPACTACION MANUAL m2 44.37 7.00 310.59 310.59 0.00 0.00
02.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/CARRETILLA m3 37.72 9.36 353.06 353.06 0.00 0.00
02.01.02.05 PERFILADO DE TALUD DE CORTE m2 76.08 11.70 890.14 890.14 0.00 0.00
02.01.03 REVESTIMIENTO DE RESERVORIO CON GEOMEMBRANA
02.01.03.01 SUMINISTRO Y COLOCACION DE GEOMEMBRANA DE POLIETILENO 1 m2 142.65 38.40 5,477.76 5477.76 0.00 0.00
02.01.03.02 ACCESORIO DE ENTRADA Y SALIDA DE TUBERIA und 1.00 1,065.69 1,065.69 0.00 1065.69 0.00
02.01.04 OBRAS DE CONCRETO
02.01.04.01 CAJA DE REBOSE
02.01.04.01.0 SOLADO DE CONCRETO E=4" C:A 1:12 m2 0.49 27.62 13.53 13.53 0.00 0.00
02.01.04.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 8.17 35.65 291.26 0.00 291.26 0.00
02.01.04.01.0 CONCRETO F'C=175 KG/CM2 m3 0.65 325.81 211.78 0.00 211.78 0.00
02.01.04.01.0 ACERO DE REFUERZO FY=4200 KG/CM2 kg 3.08 4.56 14.04 0.00 14.04 0.00
02.01.04.02 LOSA DE CAIDA
02.01.04.02.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.56 35.65 55.61 55.61 0.00 0.00
02.01.04.02.0 CONCRETO F'C=175 KG/CM2 m3 0.31 325.81 101.00 101.00 0.00 0.00
02.01.05 TUBERIAS Y ACCESORIOS
02.01.05.01 CODO DE PVC SAL 90 DE 4" und 1.00 45.28 45.28 0.00 45.28 0.00
02.01.05.02 TUBERIA DE PVC SAL DE 4" m 6.36 29.28 186.22 0.00 186.22 0.00
02.01.06 CARPINTERIA METALICA
02.01.06.01 SUMINISTRO E INSTALACION DE TAPA METALICA 0.60X0.60 und 1.00 193.78 193.78 0.00 193.78 0.00
02.01.07 CERCO PERIMETRICO
02.01.07.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS m 55.70 22.60 1,258.82 0.00 1258.82 0.00
02.01.07.02 PUERTA DE ALAMBRE DE PUAS PARA CERCO und 1.00 304.60 304.60 0.00 304.60 0.00
02.02 CAJA DE VALVULAS - RESERVORIO EXISTENTE
02.02.01 OBRAS PRELIMINARES
02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.77 0.97 0.75 0.00 0.75 0.00
02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.77 2.79 2.15 0.00 2.15 0.00
02.02.02 MOVIMIENTO DE TIERRAS
02.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 0.62 29.82 18.49 0.00 18.49 0.00
02.02.02.02 NIVELACION Y COMPACTACION MANUAL m2 0.77 7.00 5.39 0.00 5.39 0.00
02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/CARRETILLA m3 0.74 9.36 6.93 0.00 6.93 0.00
02.02.03 OBRAS DE CONCRETO
02.02.03.01 SOLADO DE CONCRETO E=4" C:A 1:12 m2 4.46 27.62 123.19 0.00 123.19 0.00
02.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.69 35.65 131.55 0.00 131.55 0.00
02.02.03.03 CONCRETO F'C=175 KG/CM2 m3 0.24 325.81 78.19 0.00 78.19 0.00
02.02.03.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 3.08 4.56 14.04 0.00 14.04 0.00
02.02.04 REVOQUES ENLUCIDOS Y MOLADURAS
02.02.04.01 TARRAJEO DE MUROS m2 3.16 19.39 61.27 0.00 61.27 0.00
02.02.05 CARPINTERIA METALICA
02.02.05.01 SUMINISTRO E INSTALACION DE TAPA METALICA 0.35X0.60 und 1.00 133.59 133.59 0.00 133.59 0.00
02.02.06 TUBERIAS Y ACCESORIOS
02.02.06.01 VALVULA DE PASO DE 10" und 1.00 1,015.16 1,015.16 0.00 1015.16 0.00
02.02.06.02 TUBERIA DE PVC SAL DE 10" m 3.00 52.95 158.85 0.00 158.85 0.00
03 LINEA DE CONDUCCION
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,073.66 0.97 1,041.45 1041.45 0.00 0.00
03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,073.66 2.79 2,995.51 2995.51 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL DE ZANJAS m3 395.70 33.56 13,279.69 5016.77 8262.92 0.00
03.02.02 REFINE, NIVELACION Y CONFORMACION DE FONDOS m2 1,073.66 2.53 2,716.36 664.00 1810.91 241.45
03.02.03 CAMA DE APOYO PARA TUBERIAS m2 1,073.66 2.53 2,716.36 724.36 1992.00 0.00
03.02.04 RELLENO Y COMPACTACION DE ZANJAS m3 735.46 47.82 35,169.70 0.00 6029.09 29140.61
03.03 INSTALACION DE TUBERIAS
CALENDARIO VALORIZADO DE OBRA MENSUAL

"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE
PROYECTO :
HUANUCO, PROVINCIA DE HUANUCO - HUANUCO"

FECHA : Apr-17
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 390,828.02

CALENDARIO VALORIZADO CONTRACTUAL


Parciales Sub Totales
Item Descripcin Und. Metrados
(S/.) (S/.)
MES 1 MES 2 MES 3

03.03.01 TUBERIA DE PVC SAL DE 10" m 1,533.80 52.95 81,214.71 11602.10 69612.61 0.00
03.03.02 CODO DE PVC DE 10" und 30.00 68.40 2,052.00 1231.20 820.80 0.00
03.03.03 PRUEBA HIDRAULICA m 1,533.80 0.45 690.21 0.00 690.21 0.00
03.04 OBRAS DE CONCRETO SIMPLE
03.04.01 CONCRETO F'C=140 KG/CM2 PARA DADOS und 30.00 261.62 7,848.60 0.00 7848.60 0.00
04 TOMAS LATERALES
04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 23.85 0.97 23.13 0.00 23.13 0.00
04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 23.85 2.79 66.54 0.00 0.00 66.54
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 9.47 29.82 282.40 0.00 0.00 282.40
04.02.02 NIVELACION Y COMPACTACION MANUAL m2 23.85 7.00 166.95 0.00 0.00 166.95
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/CARRETILLA m3 11.36 9.36 106.33 0.00 0.00 106.33
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 CONCRETO F'C=140 KG/CM2 m3 5.18 231.82 1,200.83 0.00 0.00 1200.83
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 66.11 35.65 2,356.82 0.00 0.00 2356.82
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO F'C=175 KG/CM2 m3 1.40 325.81 456.13 0.00 0.00 456.13
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 21.16 35.65 754.35 0.00 0.00 754.35
04.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 9.58 4.56 43.68 0.00 0.00 43.68
04.05 CARPINTERIA METALICA
04.05.01 COMPUERTA METALICA SEGUN DISEO TIPO I und 6.00 222.82 1,336.92 0.00 0.00 1336.92
04.05.02 COMPUERTA METALICA SEGUN DISEO TIPO II und 6.00 201.76 1,210.56 0.00 0.00 1210.56
05 RESERVORIO
05.01 RESERVORIO (01 UNIDAD)
05.01.01 OBRAS PRELIMINARES
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 238.00 0.97 230.86 115.43 115.43 0.00
05.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 238.00 2.79 664.02 0.00 664.02 0.00
05.01.02 MOVIMIENTO DE TIERRAS
05.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 487.90 29.82 14,549.18 0.00 14549.18 0.00
05.01.02.02 NIVELACION Y COMPACTACION C/EQUIPO m2 238.00 5.52 1,313.76 0.00 1313.76 0.00
05.01.03 OBRAS DE CONCRETO SIMPLE
05.01.03.01 CONCRETO F'C=100 KG/CM2, SOLADO m3 35.70 217.35 7,759.40 0.00 7759.40 0.00
05.01.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.30 35.65 331.55 0.00 331.55 0.00
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.01 CONCRETO F'C=210 KG/CM2 m3 68.41 338.85 23,180.73 0.00 0.00 23180.73
05.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 116.44 35.65 4,151.09 0.00 0.00 4151.09
05.01.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 4,895.89 4.56 22,325.26 0.00 3189.32 19135.94
05.01.05 REVOQUES ENLUCIDOS Y MOLADURAS
05.01.05.01 TARRAJEO CON IMPERMEABILIZANTE m2 328.44 40.65 13,351.09 0.00 0.00 13351.09
05.02 CAJA DE VALVULAS
05.02.01 MOVIMIENTO DE TIERRAS
05.02.01.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 0.63 29.82 18.79 0.00 18.79 0.00
05.02.01.02 NIVELACION Y COMPACTACION MANUAL m2 0.81 7.00 5.67 0.00 5.67 0.00
05.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/CARRETILLA m3 0.75 9.36 7.02 0.00 7.02 0.00
05.02.02 OBRAS DE CONCRETO ARMADO
05.02.02.01 CONCRETO F'C=100 KG/CM2, SOLADO m3 0.06 217.35 13.04 0.00 13.04 0.00
05.02.02.02 CONCRETO F'C=175 KG/CM2 m3 0.27 325.81 87.97 0.00 87.97 0.00
05.02.02.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.20 35.65 149.73 0.00 149.73 0.00
05.02.02.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 35.78 4.56 163.16 0.00 163.16 0.00
05.02.03 REVOQUES ENLUCIDOS Y MOLADURAS
05.02.03.01 TARRAJEO DE MUROS m2 1.68 19.39 32.58 0.00 32.58 0.00
05.02.04 CARPINTERIA METALICA
05.02.04.01 TAPA METALICA DE 0.70 X 0.70 m und 1.00 207.22 207.22 0.00 207.22 0.00
05.02.05 ACCESORIOS
05.02.05.01 ADAPTADOR PVC SAP 4" C-10 C/RM und 4.00 25.28 101.12 0.00 101.12 0.00
05.02.05.02 UNION UNIVERSAL PVC SAP 4" und 4.00 110.18 440.72 0.00 440.72 0.00
05.02.05.03 CODO PVC SAP 4" und 1.00 23.51 23.51 0.00 23.51 0.00
05.02.05.04 NIPLE PVC SAP 4" C-10 C/RM und 4.00 70.89 283.56 0.00 283.56 0.00
05.02.05.05 VALVULA COMPUERTA DE 4" und 2.00 178.85 357.70 0.00 357.70 0.00
05.02.05.06 TEE PVC SAP 4" C-10 C/RH und 1.00 39.24 39.24 0.00 39.24 0.00
05.02.05.07 CANASTILLA DE SALIDA 6"x4" und 1.00 283.46 283.46 0.00 283.46 0.00
05.02.05.08 TUBERIA PVC 4" C-10 m 11.50 7.69 88.44 0.00 88.44 0.00
05.02.05.09 CONO DE REBOSE PVC DE 6"x4" und 1.00 84.66 84.66 0.00 84.66 0.00
05.03 CERCO PERIMETRICO
05.03.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS m 72.00 22.60 1,627.20 0.00 0.00 1627.20
05.03.02 PUERTA DE ALAMBRE DE PUAS PARA CERCO und 1.00 304.60 304.60 0.00 0.00 304.60
CALENDARIO VALORIZADO DE OBRA MENSUAL

"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE
PROYECTO :
HUANUCO, PROVINCIA DE HUANUCO - HUANUCO"

FECHA : Apr-17
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 390,828.02

CALENDARIO VALORIZADO CONTRACTUAL


Parciales Sub Totales
Item Descripcin Und. Metrados
(S/.) (S/.)
MES 1 MES 2 MES 3

01 CAPACITACION Y ASISTENCIA TECNICA


01.01 CAPACITACION A LAS AUTORIDADES glb 1.00 1,000.00 1,000.00 0.00 0.00 1000.00
01.02 CAPACITACION Y SENSIBILIZACION A LOS POBLADORES glb 2.00 1,000.00 2,000.00 0.00 0.00 2000.00
02 SEGURIDAD Y SALUD
02.01 EQUIPO DE PROTECCION INDIVIDUAL und 20.00 262.70 5,254.00 1773.23 1970.25 1510.53
02.02 EQUIPO DE PROTECCION COLECTIVA glb 1.00 740.00 740.00 249.75 277.50 212.75
02.03 CAPACITACION DE SEGURIDAD Y SALUD glb 1.00 850.00 850.00 850.00 0.00 0.00
03 PLAN DE MANEJO AMBIENTAL
03.01 MANEJO DE ALMACEN
03.01.01 IMPLEMENTACION DE BOTIQUIN und 1.00 195.91 195.91 195.91 0.00 0.00
03.01.02 DEPOSITOS RECOLECTORES DE PLASTICOS Y RESIDUOS ORGANICO und 1.00 60.00 60.00 60.00 0.00 0.00
03.01.03 INSTALACION DE TACHOS DE BASURA CON MENSAJES ALUSIVOS und 1.00 52.60 52.60 52.60 0.00 0.00
03.02 SEALIZACION AMBIENTAL
03.02.01 LETREROS AMBIENTALES und 2.00 58.87 117.74 117.74 0.00 0.00
03.02.02 LETREROS DE SEALIZACION (1.00mx0.50m) und 2.00 58.87 117.74 117.74 0.00 0.00
03.03 PLAN DE REFORESTACION
03.03.01 LIMPIEZA DE TERRENO MANUAL m2 1,020.50 0.98 1,000.09 0.00 0.00 1000.09
03.03.02 PREPARACION DE TERRENO PARA PLANTONES m2 1,020.50 5.02 5,122.91 0.00 0.00 5122.91
03.03.03 TRANSPORTE Y COLOCACION DE PLANTONES und 60.00 71.52 4,291.20 0.00 0.00 4291.20
03.04 EDUCACION AMBIENTAL
03.04.01 CHARLAS PARA EL PERSONAL DE OBRA glb 1.00 250.00 250.00 250.00 0.00 0.00
03.04.02 CHARLAS PARA LA COMUNIDAD glb 2.00 250.00 500.00 500.00 0.00 0.00
03.04.03 POLOS CON LOGOTIPO AMBIENTAL und 20.00 17.00 340.00 340.00 0.00 0.00
03.04.04 CARTILLAS INFORMATIVAS und 20.00 50.00 1,000.00 1000.00 0.00 0.00
03.04.05 MANEJO DE DEPOSITO DE MATERIAL EXCEDENTE m3 216.52 11.70 2,533.28 0.00 0.00 2533.28
03.05 CLAUSURA DE SERVICIOS PROVICIONALES
03.05.01 CLAUSURA DE SERVICIOS PROVISIONALES glb 1.00 300.00 300.00 0.00 0.00 300.00

PRESUPUESTO EJECUTADO : 295,723.39 43,669.12 134,969.29 117,084.98

PRESUPUESTO EJECUTADO : 43,669.12 134,969.29 117,084.98

GASTOS GENERALES : 6% 17,743.40 2,620.14 8,098.16 7,025.10


UTILIDAD : 6% 17,743.40 2,620.14 8,098.16 7,025.10

SUB TOTAL PRESUPUESTO : 331,210.19 48,909.40 151,165.60 131,135.18


IGV : 18% 59,617.83 8,803.69 27,209.81 23,604.33

TOTAL DEL PRESUPUESTO : 390,828.02 57,713.10 178,375.41 154,739.51


PRESUPUESTO MENSUALES : 57,713.10 236,088.51 390,828.02

% EJECUTADO : 100.00% 14.77% 45.64% 39.59%

% ACUMULADO EJECUTADO : 14.77% 60.41% 100.00%


RESUMEN DE PAGOS EFECTUADOS
PROYECTO : #REF!

FECHA : #REF!

LUGAR : #REF!

PRESUPUESTO : #REF!

RESUMEN DE LA VALORIZACIONES TRAMITADAS O AUTORIZADAS


MES-1 MES-1 MES-1
ITEM CONCEPTOS #REF! #REF! #REF!
TOTALES

II VALORIZACION
Costo Directo 1 + Utilidad + GG #REF! #REF! #REF! #REF!

II REAJUSTES Y REINTEGROS
Reajuste del mes S/. - S/. - S/. - S/. -

III DEDUCCIONES DE REAJUSTES


Deduccion del Reajuste por Adelanto Directo (-) S/. - S/. - S/. - S/. -
Deduccion del Reajuste por Adelanto de Materiales (-) S/. - S/. - S/. - S/. -

IV VALORIZACION BRUTA #REF! #REF! #REF! #REF!

V AMORTIZACION POR ADELANTO


Amortizaciones por Adelanto Directo (-) S/. - S/. - S/. - S/. -
Amortizaciones por Adelanto de Materiales (-) S/. - S/. - S/. - S/. -
Sub Total : S/. - S/. - S/. - S/. -

VI VALORIZACION NETA* #REF! #REF! #REF! #REF!


x Factor de Relacin: 1.00 #REF! #REF! #REF! #REF!

VII VALORIZACION NETA #REF! #REF! #REF! #REF!

VIII I.G.V. 19.00% #REF! #REF! #REF! #REF!

IX VALORIZACION EFECTIVA #REF! #REF! #REF! #REF!

X RETENCION
Retencin por Fiel Cumplimiento (10%) (-) S/. - #REF! #REF!

XI VALORIZACION NETA PAGADA #REF! #REF! #REF! #REF!


01.01 MOVILIZACION Y DESMOVILIZACION E INSTALACION DE EQUIPOS 10,641.69
01.02 TOPOGRAFIA Y GEOREFERENCIACION 4,304.85 1,557.07

02.01 REPOSICION DE AFIRMADO 27,271.08

03.01.01 RECONFORMACION DE CUNETAS CON MAQUINARIA

04.01 TRANSPORTE DE MATERIALES GRANULARES HASTA 1 KM


04.02 TRANSPORTE DE MATERIALES GRANULARES > 1 KM 5,307.77

05.01 REPOSICION O INSTALACION DE POSTES DE KILOMETRAJE

06.01 RESTAURACION DE PATIO DE MAQUINAS


39,158.47 39,158.47 39,158.47 39,158.47 39,158.47 39,158.47 39,158.47 39,158.47

4,705.95 17,568.87 17,568.87 17,568.87 17,568.87


7,621.42 7,621.42 7,621.42 7,621.42 5,579.97
39,158.47 39,158.47 23,075.53

9,939.18 10,580.41

17,568.87 17,568.87 10,353.08

2,208.76 3,169.10

1,759.45
80775.74 1183.28 1178.6 954.11
8874.8
877.97
4487.28
3509.55
2245.2
1100.56
1144.64
69655.74 1183.28 1178.6 954.11
1465.37
1136.4
1937.96
799.77 1183.28 1178.6 954.11
1015.85
48670
14630.39
47710.13 17690.13 55665.56
29038.49
1981.46
1875.33
10790.71
3300.25
723.89
12998.92 17331.89
4691.21 25019.81
6270.95
3527.46
152.81
3362.64
24575.25 3723.51 11011.84
3132.84 3535.55
3535.55
3132.84
187.96
68.61
119.35
21442.41
4507
2945.31
1561.69
16596.62
851.31
15745.31
338.79
338.79
11011.84
7914.36
1823.38
1274.1
94762.69 414012.88 134433.81
6921.14
2859.02
2078.29
1983.83
76276.84 113501.34
5525.65 5327.53
2790.61 5327.53
2735.04
70751.19 108173.81
21670.41 77394.34
49080.78 30779.47
24851.34
24851.34
11455.39
1547.67
11848.28
2332.79 15376.58
13563.69
4269.33
6648.83
2645.53
2332.79 1812.89
1369.05
1686.59 443.84
646.2
3469.57 13226.13
2773.06 7189.02
2459.7
3597.25
2773.06
1132.07
6037.11
1509.78
2072.9
2454.43
696.51
151.44
257.91
212.91
74.25
9231.92 32764.36
26021.85
6749.92
7794.81
11477.12
1311.96
327.21
461.71
523.04
9231.92 5430.55
5430.55
4550.28
4681.64
244.14 11519.13
4996.05
1224.78
1785.31
1985.96
6523.08
921.98
3163.46
2437.64
244.14
63.27
97.32
83.55
11086.98 62046.37
6016.28 62046.37
20883.36
6016.28 12032.55
29130.46
1304.8
404.86
508.11
391.83
3765.9
1238.13
1456.09
1071.68
4168.5 32448.88
11384.02
4168.5 8337
4960.1
7767.76
3495.03
1794.15
1226.05
474.83
490.64
122.03
58.94
21.97
244.63
26.91
16.16
205055.06 14702.66
83315.05 14702.66
47404.85
71242.17
3092.98
3725.8 19420.72
17337.76
17337.76
490.25
490.25
3235.55 1941.33
3235.55 1941.33
141.63
141.63
7221.64 3097.44 55564.15
1637.96 45865.91
161.43 1452.83
212.75 6169.62
213.2 6609.34
173.42 5029.2
594.38 17236.89
3644.63
107.54 2043.33
175.24 3680.07
9698.24
3933.03
2463.46
3301.75
7221.64 793.55
214.7
908.27
2380.64 793.55
1296.12
2024.85
128.02
145.63
123.41
600.51
600.51
65.42
65.42
554.85 14796.44
554.85
14796.44
39714.12 28233.3
20869.67
17358.81
2367.99
1142.87
24811.62
23264.89
307.84
296.82
942.07
14902.5 7363.63
5866.63
990.27
6448.77
238.56
885.31 295.1
472.96 2995.39
4073.14
7152.47
3269.51
349.97
1763.99
1019.96
135.59
3882.96
3882.96
16560.25
16560.25
15375.33
1105.8
79.12
1766.61 3724.62 19075.75
1766.61 3724.62 19075.75
3180
253.32
291.3
19075.75
1766.61
2174.17
1540.9
633.27
1839.72 13677.75
84.38 2105.66
2105.66
1382.63
723.03
84.38
53.68
30.7
1234.27 5949.74
4636.26
1602.42
3033.84
1220.69
213.33
1007.36
1165.6
1165.6
147.88
147.88
13.58
13.58
1910.11
1910.11
407.16 1093.75
329.76
1093.75
77.4
113.91 2618.49
113.91
2618.49
24602.37
22430.25
2172.12
770.58 2094.43 16666.58
832.86
334.88
321.64
176.34
162.05
54.98
107.07
594.59
274.92
72.56
247.11
1055.59
606
179.43
270.16
14711.51
14711.51
770.58 504.93 899.48
367.6
770.58
137.33 686.63
212.85
2098.04
2098.04
13649.25
12679.5
969.75
21165.36
15042.49
13964.38
6403.59
1028.99
2460.79
3296.11
774.9
1078.11
1058.97
11.68
7.46
3396.52
1992.96
1403.56
515.98
515.98
653.28
573.25
55.94
24.09
1250.54
1250.54
306.55
306.55
538.77 751.13
538.77
751.13
3365.66 26918.6 15770.31
5821.61
1390.2
539.01
1109.36
922.04
106.82
567.14
1047.6
139.44
7468.8 526.77
1792.66
543.69
730.62
518.35
1283.59
279.55
261.25
582.73
160.06
526.77
138.69
323.88
64.2
467.95
39.56
211.76
154.74
61.89
3924.6
3924.6
5043.76 748.28
1442.16
1442.16
1177.9
264.96
258.75
66.18
312.3
153.28
122.43
365.98
36.4
27.05
18.2
33.12
11.72
88.79
56.34
17.56
7.57
5.03
23.16
41.04
1100.99 712.95
219.9
195.6
469.76
272.09
308.04
81.24
131.76
83.97
51.58
956.73 35.33
126.93
829.8
35.33
54.37 1387.53 6351.41
6351.41
3305.4
1962.77
1083.24
54.37 1387.53
22.95
31.42
1387.53
3311.29 1549.82
1144.52 410.46
99.84
97.5
182.26
30.86
355.98
338.33
415.12
35.09
724.34
111.72
38.98
21.55
55.5
18.5
21.55
108.2
44.89
21.16
84.42
197.87
1442.43 109.95
109.95
630.9
342.9
102.91
201.72
32.8
65.6
65.6
1029.41
924.1
105.31
11468.69 2322.24
3393.53
273.81
250.99
22.82
3119.72
3119.72
1610.33
75.61
75.61
1534.72
61.77
232.85
559.96
109.54
570.6
5977.26 2322.24
1203.95 1251.07
1203.95
1251.07
4773.31 1071.17
846.88
3198.16 355.35
728.27
419.31
296.51
348.55
107.79
100.73
140.03
139.02
46.34
92.68
282.48
282.48
1262.41
909.68
202.76
149.97
3343.7
2332.44
712.01
299.25
8753.56
1556.17
3642.32
2448.07
605.95
501.05
3235.72 2734.76
2536.92
3235.72
197.84
3935.25
956.25
744.75
744.75
744.75
744.75
3693.08 860.1
860.1
1050.08
470.58
625.56
1307.13
239.73
13441.67
1334.77
12106.9
171.28 171.28
171.28
171.28
1919.3
1222.1
697.2
2336
2336
2082.9
2082.9
2743.28
428.24
389
642
1284.04
11553.07 2666.26 1471.6 2601.64
2733.76 2666.26
1366.88 1333.13
1366.88 1333.13
3004.96
1342.48
1662.48
3421.94
2292.94
346.4
782.6
750
750
1642.41 650
899.4
247.67
495.34
650
1007.48
1007.48
1471.6 944.16
1471.6 944.16
148.2
878.8
592.8
265.44
132.72
397.8
34019.59
5042.02
11716.75
2632.55
1299.78
7708.48
5620.01
01.01 CARTEL DE 529.25
01.02 ALMACEN Y 2,323.00
01.03 FLETE TERR 5,633.56
01.04 TRANSPORTE 2,871.28
01.05 TRANSPORTE 2,340.16

02.01.01.01 MANTE 500.94

02.01.02.01 REPOS 17.12

02.01.03.01 REPOS 565.04

02.01.04.01 RESAN 280.05

02.01.05.01 DESI 440.16


02.01.05.02 REPO 407.82
02.01.05.03 REPOS 615.56
02.01.05.04 REPOSI 313.67
02.01.05.05 DADO 32.92
02.01.05.06 MAMP. 186.09

02.01.06.01 RESAN 122.53


02.01.06.02 REPOS 61.2
02.01.06.03 REPOS 665.4

02.01.07.01.01 LIM 23.9


02.01.07.01.02 TRA 56.99

02.01.07.02.01 E 197.39
02.01.07.02.02 REF 65.34
02.01.07.02.03 EL 153.74

02.01.07.03.01.0 1,002.60

02.01.07.03.02.0 150.21
02.01.07.03.02.0 4.17

02.01.07.04.01 CE 9,889.37

02.01.07.05.01 PI 697.98

02.02.01.01.01 LIM 8.49


02.02.01.01.02 TRA 20.26

02.02.01.02.01 EXC 127.53


02.02.01.02.02 REF 77.43
02.02.01.02.03 EL 102.02

02.02.01.03.01 CO 46.48

02.02.01.04.01 ACE 6,419.00


02.02.01.04.02 CONC 3,703.13
02.02.01.04.03 EN 3,704.84

02.02.01.05.01 PIN 886.87


02.02.01.05.02 PIN 819.92

02.02.01.06.01 SU 66.56
02.02.01.06.02 SU 187.8

02.02.01.07.01 SU 195.32
02.02.01.07.02 SU 506.64
02.02.01.07.03 SU 185.32

02.02.01.08.01 COD 24
02.02.01.08.02 COD 70
02.02.01.08.03 ADA 8
02.02.01.08.04 ADA 20
02.02.01.08.05 TEE 12
02.02.01.08.06 TEE 12
02.02.01.08.07 CAN 120
02.02.01.08.08 CON 32
02.02.01.08.09 ACC 256
02.02.01.08.10 NIP 25
02.02.01.08.11 NIP 8
02.02.01.08.12 INS 1,085.50

02.02.01.09.01 TAPA 531.5


02.02.01.09.02 ESCA 309.61

02.02.01.10.01.0 3,228.07

02.02.01.10.02.0 384.49

02.02.01.10.03.0 T 600
02.02.01.10.03.0 603.58 86.23
02.02.01.10.03.0 CONTROL ESTATICO 397.36 137.3

02.02.01.10.04.0 251.58 898.5

02.02.02.01.01 RESANE E IMPERMEA 2,058.44

02.02.02.02.01 ACCESORIOS DEL IN 404.17


02.02.02.02.02 PINTURA ESMALTE 3,275.67
02.02.02.02.03 REPOSICION DE MAR 307.78
02.02.02.02.04 LIMPIEZA, DESINFE 446.14
02.02.02.03.01 REPOSICION DE AC 516.27
02.02.02.03.02 REPOSICION DE MAR 208.3

02.02.02.04.01.0 SUM Y COLOC D 3,228.07

02.02.02.04.02.0 PINTURA ANTICO 384.49

02.02.02.04.03.0 TANQUE DE 600LT Y 600


02.02.02.04.03.0 SUM E INST DE T 689.8
02.02.02.04.03.0 CONTROL ESTATICO 397.36

02.02.02.04.04.0 MADERA PARA SO 1,150.08

02.02.03.01.01 LIMPIEZA Y DEFORES 29.64


02.02.03.01.02 TRAZO NIVELES Y RE 70.68

02.02.03.02.01 EXCAVACION DE Z 244.59


02.02.03.02.02 REFINE, NIVELACIN 81.05
02.02.03.02.03 ELIMINACIN MANUA 190.71

02.02.03.03.01.0 CONCRETO F'C=1 1,243.57

02.02.03.03.02.0 CONCRETO F'c=1 186.13


02.02.03.03.02.0 ENCOFRADO EN D 5.56

02.02.03.04.01 CERCO CON MALLA 11,958.26 306.62

02.02.03.05.01 PINTURA EN BARANDAS METALICAS 865.64

02.03.01.01 LIMPIEZA Y DEFORESTACION MANUAL 57.85


02.03.01.02 TRAZO NIVELES Y REPLANTEO 137.96

02.03.02.01 EXCAV. MANUAL T/NATURAL P/TUB AGU 1,735.58


02.03.02.02 REFINE Y NIVELACION DE FONDO DE ZA 248.47
02.03.02.03 CAMA DE ARENA MANUAL E=0.10M A=0.7M 1,089.56
02.03.02.04 RELLENO DE ZANJA MATERIAL PROPIO 523.64
02.03.02.05 SUMINISTRO E INSTALACIN DE TUBER 171.24
02.03.02.06 SUMINISTRO E INSTALACIN DE TUBER 388.13
02.03.02.07 PRUEBA HIDRAULI + DESINFECCION TUBE 140.2

02.03.03.01 CODO HD CC 25mmx45 8


02.03.03.02 TEE HD CC 25mmx25mm 12
02.03.03.03 REDUCCIN HD 25mm A 20mm 8
02.03.03.04 UNION PVC 25mm 18
02.03.03.05 UNION PVC 20mm 6
02.03.03.06 INSTALACION DE ACCESORIOS HD Y PVC 393.84
02.03.03.07 CONCRETO F'c=140kg/cm2 ANCLAJE A 139.02

02.03.04.01 SUMINISTRO E INSTALACIN DE VLV 154.25


02.03.05.01 CMARA DE CONCRETO PARA VLVULA 223.01

02.04.01.01 LIMPIEZA Y DEFORESTACION MANUAL 33.54


02.04.01.02 TRAZO NIVELES Y REPLANTEO 79.98

02.04.02.01 EXCAVACION DE ZANJA MANUAL 1,170.88


02.04.02.02 RELLENO COMPACTADO ZANJA TN HAST 199.19
02.04.02.03 ELIMINACIN MANUAL DE MATERIAL EX 167.05 189.33

02.04.03.01 CONCRETO EN SOLADO DE 10cm MEZCLA 209.87

02.04.04.01 ACERO DE REFUERZO Fy=4200kg/cm2 2,440.19


02.04.04.02 CONCRETO F'c=210kg/cm2 14,307.35
02.04.04.03 ENCOFRADO Y DESENCOFRADO CARAVI 1,978.51

02.04.05.01 SUMINISTRO DE TUBERIA DE FG 3/4" 2,344.80


02.04.05.02 SUMINISTRO Y COLOCACION DE CABLE P 829.77
02.04.05.03 SUMINISTRO Y COLOCACION DE GRAPAS 120.96
02.04.05.04 SUMINISTRO Y COLOCACION DE PENDOL 248.38 35.48
02.04.05.05 DOBLADO Y SOLDADO DE EXTREMOS DE PENDOLAS SE 694.84

02.04.06.01 DISPOSITIVO DE SUJECCION PENDOLA - CABLE 4,395.53


02.04.06.02 DISPOSITIVO DE SUJECCION PENDOLA - TUBERIA 2,721.07
02.04.06.03 SUMINISTRO Y COLOCACION DE GUARD 46.06
02.04.06.04 CARRO DE DILATACION SEMICIRCULAR 982.08
02.04.06.05 MACIZO DE FIERRO LISO DE 1 1/4" PAR 424.91

02.04.07.01 PINTURA EN ESTRUCTURAS METALICAS 1,257.60

02.04.08.01 PRUEBA HIDRAULICA Y DESINFECCION 384.6

02.05.01.01 LIMPIEZA Y DEFORESTACION MANUAL 1,355.29


02.05.01.02 TRAZO NIVELES Y REPLANTEO 3,231.84

02.05.02.01 EXCAV. MANUAL T/NATURAL P/TUB AGUA A=0.7M H=1.0 37,202.68 3,455.99
02.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA T/NORMAL A 5,326.02 494.77
02.05.02.03 CAMA DE ARENA MANUAL E=0.10M A=0.7M 23,355.02 2,169.59
02.05.02.04 RELLENO DE ZANJA MATERIAL PROPIO COMPACTADO C/ 11,224.40 1,042.70
02.05.02.05 SUMINISTRO E INSTALACIN DE TUBERA PVC C-10 20 9,888.92 918.64
02.05.02.06 PRUEBA HIDRAULI + DESINFECCION TUBERIA 3,004.83 279.14

02.05.03.01 CODO HD CC 20mmx90 36


02.05.03.02 CODO HD CC 20mmx45 42
02.05.03.03 CODO HD CC 20mmx22.5 54
02.05.03.04 CODO HD CC 20mmx11.25 84
02.05.03.05 UNION PVC 20mm 26
02.05.03.06 TAPON HD CC 20mm 60
02.05.03.07 TEE HD CC 20mmx20mm 36
02.05.03.08 YEE HD CC 20mmx20mm 12
02.05.03.09 INSTALACION DE ACCESORIOS HD Y PVC 15mm - 25mm 2,931.92
02.05.03.10 CONCRETO F'c=140kg/cm2 ANCLAJE ACCESORIOS <60MM +ENCOFRAD 15.45

02.05.04.01 SUMINISTRO E INSTALACIN DE VLVULA COMPUERTA DE BRONCE 2 2,146.48


02.05.04.02 SUMINISTRO E INSTALACIN DE VLVULA DE PURGA DE BRONCE 20m 2,076.80

02.05.05.01 CMARA DE CONCRETO PARA VLVULA COMPUERTA SEGUN DISEO 3,122.14

02.06.01.01 TRAZO NIVELES Y REPLANTEO DE CONEXIN DOMICILARIA DE AGUA 290.37


02.06.01.02 EXCAVACION DE ZANJA MANUAL 4,615.94
02.06.01.03 REFINE, NIVELACIN Y COMPACTACIN 806.46 315.57
02.06.01.04 CAMA DE ARENA MANUAL E=0.10 mx0.4 m CONEXIN DOMICILIARIA 834.81
02.06.01.05 RELLENO COMPACTADO ZANJA 0.40 mx0.60 m TN CONEXIN DOMICILARIA 727.5
02.06.01.06 ELIMINACIN MANUAL DE MATERIAL EXCEDENTE 99.22
02.06.01.07 CONEXIN DOMICILIARIA DE AGUA CORTA 15mm A TUB PVC L = 5 m 10,998.12
02.06.01.08 CONEXIN DOMICILIARIA DE AGUA LARGA 15mm A TUB PVC L = 10 m 2,871.70

03.01.01.01 LIMPI 1,617.90


03.01.01.02 TRAZO 3,858.07

03.01.02.01 EXCAV 10,335.77 15,736.44


03.01.02.02 EXCAV 6,186.11 2,730.80
03.01.02.03 REFINE Y NVELACIN D 1,229.71 2,234.25
03.01.02.04 CAMA DE ARENA MANUAL E = 0.10 m A E = 11,206.24 7,627.77
03.01.02.05 RELLENO COMPACTADO ZANJA TN HASTA 1.50 m PROFUNDIDAD 19,062.52
03.01.02.06 RELLENO COMPACTADO ZANJA TN HASTA 2.00 m PROFUNDIDAD 2,186.31 5,148.41
03.01.02.07 ELIMINACIN DE MATERIAL EXCEDENTE 2,445.05 10,174.57

03.01.03.01 SUMINISTRO E INSTALACIN DE TUBERA PVC UF S-25 47,490.95 9,384.44


03.01.03.02 PRUEBA HIDRALICA, NIVELACIN, ALINEAMIENTO Y ESCORRENTA DE 5,019.64
03.01.03.03 PRUEBA HIDRALICA Y ESCORRENTA DE TUBERA A ZANJA TAPADA 1,001.05 1,840.65

03.01.04.01 BUZONETA DOMICILIARIA 23,795.06 12,656.94


03.01.04.02 BUZN TIPO I D = 1.20 m HASTA 2.00 m PROFUNDIDAD 31,451.99 64,911.55

04.01.01 LIMPIEZA Y DEFORESTACION MANUAL 985.64


04.01.02 TRAZO NIVELES Y REPLANTEO 2,350.37

04.02.01 CORTE Y PERFILADO DE TERRENO CON EQUIPO PESADO 5,888.56


04.02.02 EXCAVACION DE ZANJA MANUAL 4,256.75
04.02.03 REFINE, NIVELACIN Y COMPACTACIN 1,034.72
04.02.04 ELIMINACIN MANUAL DE MATERIAL EXCEDENTE 4,086.58

04.03.01.01 CONCRETO C:H 1:10 EN SOLADO 759.96

04.03.02.01 ACERO DE REFUERZO Fy=4200kg/cm2 878.35


04.03.02.02 CONCRETO F'c=210kg/cm2 CAMARA DE REGISTRO DE LODOS 7,827.62
04.03.02.03 ENCOFRADO Y DESENCOFRADO CARAVISTA 14,938.83
04.03.02.04 CURADO DE CONCRETO 167.73
04.03.03.01 TAPA METALICA ESTRIADA E=1/8" 0.60x0.60m 2,126.00

04.04.01 EXCAV. MANUAL T/NATURAL P/TUB AGUA A=0.7M H=1.0 M EN TERRENO NO 8,661.51
04.04.02 REFINE Y NIVELACION DE FONDO DE ZANJA T/NORMAL A=0.70M 1,240.00
04.04.03 CAMA DE ARENA MANUAL E = 0.10 m A E = 0.60 m 480.33
04.04.04 SUMINISTRO E INSTALACIN DE TUBERA PVC UF S-25 150 mm 386.28 55.18
04.04.05 SUMINISTRO E INSTALACIN DE TUBERA PVC UF C-5 100 mm 852.29
04.04.06 SUMINISTRO E INSTALACIN DE TUBERA PERFORADAS PVC UF C-5 100 mm 7,645.73
04.04.07 FILTRO DE GRAVA D: 15-25mm 36,464.69
04.04.08 RELLENO DE ZANJA MATERIAL PROPIO COMPACTADO C/EQUIPO A=0.70M, H=1.00M 2,613.26

04.05.01 CODO HD CC 100 mmx45 352


04.05.02 YEE PVC SAL 100 mm 120
04.05.03 INSTALACION DE ACCESORIOS HD Y PVC 60 mm - 100 mm 356.8
04.05.04 CONCRETO F'c=140kg/cm2 ANCLAJE ACCESORIOS HASTA 100MM +ENCOFRADO 465.04

04.06.01 SUMINISTRO E INSTALACIN DE VLVULA DE COMPUERTA HD 100 mm 4,576.64

04.07.01 CMARA DE CONCRETO PARA VLVULA COMPUERTA SEGUN DISEO 1,784.08

04.08.01 BUZN TIPO I D = 1.20 m HASTA 2.00 m PROFUNDIDAD 6,818.18 454.55

04.09.01 BIODIGESTOR AUTOLIMPIABLE RP: 7000lts 28,501.68


04.09.02 SUMINISTRO E INSTALACIN DE ACCESORIOS DE BIODIGESTOR 3,381.15 225.41

04.10.01.01 LIMPIEZA Y DEFORESTACION MANUAL 62.4


04.10.01.02 TRAZO NIVELES Y REPLANTEO 148.8

04.10.02.01 EXCAVACION DE ZANJAS PARA DADOS DE CIMIENTOS EN TERRENO NORMAL 514.93


04.10.02.02 REFINE, NIVELACIN Y COMPACTACIN 170.64
04.10.02.03 ELIMINACIN MANUAL DE MATERIAL EXCEDENTE 401.54

04.10.03.01.01 CONCRETO F'C=100KG/CM2 +30% P.M. PARA CIMIENTOS CORRIDOS 2,594.71

04.10.03.02.01 CONCRETO F'c=175kg/cm2 EN DADOS DE CONCRETO 431.03


04.10.03.02.02 ENCOFRADO EN DADOS DE CONCRETO 12.5

04.10.04.01 CERCO CON MALLA OLIMPICA GALVANIZADA Y ALAMBRE DE PUAS SEGUN DISEO H=2.00 25,820.80

04.10.05.01 PINTURA EN BARANDAS METALICAS CERCO PERIMETRICO 1,822.40

05.01.01.01 CHARL 312.75


05.01.01.02 CHARL 312.75
05.01.01.03 CHARLA 1,020.29
05.01.01.04 CURSO 171.38
05.01.01.05 BOLET 250
05.01.01.06 AFICHES 76.2
05.01.01.07 POLOS 1,394.00
05.01.01.08 ELAB 500

05.01.02.01 EQUIP 2,567.40


05.01.02.02 EQUIP 508.47
05.01.02.03 SEAL 241.52

05.01.03.01 LETRINAS 169.49


05.01.03.02 MICRO 169.49
05.01.03.03 CONTE 254.25
05.01.03.04 CONT 84.75

05.02.01.01 ANLIS 423.72


05.02.01.02 ANLI 254.23

05.02.02.01 ANLI 423.72


05.02.02.02 ANLI 254.23

05.02.03.01 FORM 500


05.02.03.02 COORD 500

05.03.01 CAPACITA 600


05.03.02 RECURSO 483.06

05.04.01 CLAUSURA DE MICRORELLENO SANITARIO 229.47


05.04.02 CLAUSURA DE SERVICIOS HIGIENICOS 229.47
05.04.03 MANEJO DEL REA DE CANTERA 200
05.04.04 RESTAURACION DEL AREA DEL CAMPAMENTO 468.03
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 5,772.98
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 5,772.98
CARTEL D und 1.00 600.00 600
ALMACEN glb 1.00 1,000.00 1,000.00
TRANSPO kg 52,882.96 0.06 3,172.98
TRANSPO glb 1.00 1,000.00 1,000.00
ESTRUCTURAS 8,998.36 5,321.02
RESERVORIO CON GEOMEMBRANA - RESERVORIO EXISTENTE 8,998.36 3,571.47
OBRAS PRELIMINARES 859.13
LIMPI m2 228.49 0.97 221.64
TRAZO m2 228.49 2.79 637.49
MOVIMIENTO DE TIERRAS 2,491.33
EXCA m3 21.59 29.82 643.81
EXCAV m3 9.85 29.82 293.73
NIVEL m2 44.37 7.00 310.59
ELIMI m3 37.72 9.36 353.06
PERFI m2 76.08 11.70 890.14
REVESTIMIENTO DE RESERVORIO CON GEOMEMBRANA 5,477.76 1,065.69
SUMI m2 142.65 38.40 5,477.76
ACCES und 1.00 1,065.69 1,065.69
OBRAS DE CONCRETO 170.14 517.08
CAJA DE REBOSE 13.53 517.08
SOL m2 0.49 27.62 13.53
E m2 8.17 35.65 291.26
CON m3 0.65 325.81 211.78
AC kg 3.08 4.56 14.04
LOSA DE CAIDA 156.61
E m2 1.56 35.65 55.61
CON m3 0.31 325.81 101
TUBERIAS Y ACCESORIOS 231.5
CODO DE und 1.00 45.28 45.28
TUBERIA m 6.36 29.28 186.22
CARPINTERIA METALICA 193.78
SUMIN und 1.00 193.78 193.78
CERCO PERIMETRICO 1,563.42
CERC m 55.70 22.60 1,258.82
PUERT und 1.00 304.60 304.6
CAJA DE VALVULAS - RESERVORIO EXISTENTE 1,749.55
OBRAS PRELIMINARES 2.9
LIMPI m2 0.77 0.97 0.75
TRAZO m2 0.77 2.79 2.15
MOVIMIENTO DE TIERRAS 30.81
EXCA m3 0.62 29.82 18.49
NIVEL m2 0.77 7.00 5.39
ELIMI m3 0.74 9.36 6.93
OBRAS DE CONCRETO 346.97
SOLADO m2 4.46 27.62 123.19
ENCO m2 3.69 35.65 131.55
CONCRE m3 0.24 325.81 78.19
ACERO kg 3.08 4.56 14.04
REVOQUES ENLUCIDOS Y MOLADURAS 61.27
TARRA m2 3.16 19.39 61.27
CARPINTERIA METALICA 133.59
SUMIN und 1.00 133.59 133.59
TUBERIAS Y ACCESORIOS 1,174.01
VALVULA und 1.00 1,015.16 1,015.16
TUBERIA m 3.00 52.95 158.85
LINEA DE CONDUCCION 23,275.39 97,067.14 29,382.06
OBRAS PRELIMINARES 4,036.96
LIMPIEZA m2 1,073.66 0.97 1,041.45
TRAZO Y m2 1,073.66 2.79 2,995.51
MOVIMIENTO DE TIERRAS 6,405.13 18,094.92 29,382.06
EXCAVACI m3 395.70 33.56 5,016.77 8,262.92
REFINE, m2 1,073.66 2.53 664 1,810.91 241.45
CAMA DE m2 1,073.66 2.53 724.36 1,992.00
RELLENO m3 735.46 47.82 6,029.09 29,140.61
INSTALACION DE TUBERIAS 12,833.30 71,123.62
TUBERIA D m 1,533.80 52.95 11,602.10 69,612.61
CODO DE P und 30.00 68.40 1,231.20 820.8
PRUEBA H m 1,533.80 0.45 690.21
OBRAS DE CONCRETO SIMPLE 7,848.60
CONCRET und 30.00 261.62 7,848.60
TOMAS LATERALES 23.13 7,981.51
OBRAS PRELIMINARES 23.13 66.54
LIMPIEZA m2 23.85 0.97 23.13
TRAZO Y m2 23.85 2.79 66.54
MOVIMIENTO DE TIERRAS 555.68
EXCAVAC m3 9.47 29.82 282.4
NIVELAC m2 23.85 7.00 166.95
ELIMINA m3 11.36 9.36 106.33
OBRAS DE CONCRETO SIMPLE 3,557.65
CONCRETO m3 5.18 231.82 1,200.83
ENCOFR m2 66.11 35.65 2,356.82
OBRAS DE CONCRETO ARMADO 1,254.16
CONCRETO m3 1.40 325.81 456.13
ENCOFR m2 21.16 35.65 754.35
ACERO D kg 9.58 4.56 43.68
CARPINTERIA METALICA 2,547.48
COMPUERT und 6.00 222.82 1,336.92
COMPUERT und 6.00 201.76 1,210.56
RESERVORIO 115.43 30,310.25 61,750.65
RESERVORIO (01 UNIDAD) 115.43 27,922.66 59,818.85
OBRAS PRELIMINARES 115.43 779.45
LIMPI m2 238.00 0.97 115.43 115.43
TRAZO m2 238.00 2.79 664.02
MOVIMIENTO DE TIERRAS 15,862.94
EXCA m3 487.90 29.82 14,549.18
NIVEL m2 238.00 5.52 1,313.76
OBRAS DE CONCRETO SIMPLE 8,090.95
CONCR m3 35.70 217.35 7,759.40
ENCO m2 9.30 35.65 331.55
OBRAS DE CONCRETO ARMADO 3,189.32 46,467.76
CONCRE m3 68.41 338.85 23,180.73
ENCO m2 116.44 35.65 4,151.09
ACERO kg 4,895.89 4.56 3,189.32 19,135.94
REVOQUES ENLUCIDOS Y MOLADURAS 13,351.09
TARRA m2 328.44 40.65 13,351.09
CAJA DE VALVULAS 2,387.59
MOVIMIENTO DE TIERRAS 31.48
EXCA m3 0.63 29.82 18.79
NIVEL m2 0.81 7.00 5.67
ELIMI m3 0.75 9.36 7.02
OBRAS DE CONCRETO ARMADO 413.9
CONCR m3 0.06 217.35 13.04
CONCRE m3 0.27 325.81 87.97
ENCO m2 4.20 35.65 149.73
ACERO kg 35.78 4.56 163.16
REVOQUES ENLUCIDOS Y MOLADURAS 32.58
TARRA m2 1.68 19.39 32.58
CARPINTERIA METALICA 207.22
TAPA ME und 1.00 207.22 207.22
ACCESORIOS 1,702.41
ADAPTA und 4.00 25.28 101.12
UNION und 4.00 110.18 440.72
CODO PV und 1.00 23.51 23.51
NIPLE P und 4.00 70.89 283.56
VALVUL und 2.00 178.85 357.7
TEE PVC und 1.00 39.24 39.24
CANASTI und 1.00 283.46 283.46
TUBERIA m 11.50 7.69 88.44
CONO D und 1.00 84.66 84.66
CERCO PERIMETRICO 1,931.80
CERCO P m 72.00 22.60 1,627.20
PUERTA und 1.00 304.60 304.6
CAPACITACION Y ASISTENCIA TECNICA 3,000.00
CAPACITACI glb 1.00 1,000.00 1,000.00
CAPACITACI glb 2.00 1,000.00 2,000.00
SEGURIDAD Y SALUD 2,872.98 2,247.75 1,723.28
EQUIPO DE und 20.00 262.70 1,773.23 1,970.25 1,510.53
EQUIPO DE glb 1.00 740.00 249.75 277.5 212.75
CAPACITACI glb 1.00 850.00 850
PLAN DE MANEJO AMBIENTAL 2,633.99 13,247.48
MANEJO DE ALMACEN 308.51
IMPLEMEN und 1.00 195.91 195.91
DEPOSIT und 1.00 60.00 60
INSTALA und 1.00 52.60 52.6
SEALIZACION AMBIENTAL 235.48
LETREROS und 2.00 58.87 117.74
LETREROS und 2.00 58.87 117.74
PLAN DE REFORESTACION 10,414.20
LIMPIEZA m2 1,020.50 0.98 1,000.09
PREPARA m2 1,020.50 5.02 5,122.91
TRANSPO und 60.00 71.52 4,291.20
EDUCACION AMBIENTAL 2,090.00 2,533.28
CHARLAS glb 1.00 250.00 250
CHARLAS glb 2.00 250.00 500
POLOS C und 20.00 17.00 340
CARTILLA und 20.00 50.00 1,000.00
MANEJO m3 216.52 11.70 2,533.28
CLAUSURA DE SERVICIOS PROVICIONALES 300
CLAUSUR glb 1.00 300.00 300
600 0 0
1000 0 0
3172.98 0 0
1000 0 0

221.64 0 0
637.49 0 0

643.81 0 0
293.73 0 0
310.59 0 0
353.06 0 0
890.14 0 0

5477.76 0 0
0 1065.69 0

13.53 0 0
0 291.26 0
0 211.78 0
0 14.04 0

55.61 0 0
101 0 0

0 45.28 0
0 186.22 0

0 193.78 0

0 1258.82 0
0 304.6 0

0 0.75 0
0 2.15 0

0 18.49 0
0 5.39 0
0 6.93 0

0 123.19 0
0 131.55 0
0 78.19 0
0 14.04 0

0 61.27 0
0 133.59 0

0 1015.16 0
0 158.85 0

1041.45 0 0
2995.51 0 0

5016.77 8262.92 0
664 1810.91 241.45
724.36 1992 0
0 6029.09 29140.61

11602.1 69612.61 0
1231.2 820.8 0
0 690.21 0

0 7848.6 0

0 23.13 0
0 0 66.54

0 0 282.4
0 0 166.95
0 0 106.33

0 0 1200.83
0 0 2356.82

0 0 456.13
0 0 754.35
0 0 43.68

0 0 1336.92
0 0 1210.56

115.43 115.43 0
0 664.02 0

0 14549.18 0
0 1313.76 0

0 7759.4 0
0 331.55 0

0 0 23180.73
0 0 4151.09
0 3189.32 19135.94
0 0 13351.09

0 18.79 0
0 5.67 0
0 7.02 0

0 13.04 0
0 87.97 0
0 149.73 0
0 163.16 0

0 32.58 0

0 207.22 0

0 101.12 0
0 440.72 0
0 23.51 0
0 283.56 0
0 357.7 0
0 39.24 0
0 283.46 0
0 88.44 0
0 84.66 0

0 0 1627.2
0 0 304.6

0 0 1000
0 0 2000

1773.23 1970.25 1510.53


249.75 277.5 212.75
850 0 0

195.91 0 0
60 0 0
52.6 0 0

117.74 0 0
117.74 0 0

0 0 1000.09
0 0 5122.91
0 0 4291.2

250 0 0
500 0 0
340 0 0
1000 0 0
0 0 2533.28
0 0 300

S-ar putea să vă placă și