1.

All workmanship and materials shall be in strict


accordance with applicable local codes, rules and ordinances.
LEGEND
2. The Plumbing Contractor shall be held to have verified all
existing conditions, including site visitation and review of as built 90 DEG ELBOW
documentation as applicable prior to bidding, ordering,
fabrication, installation of any materials or equipment on the UNION
project.
RUNNING TRAP
3. Unless otherwise specified, all materials shall be new; all CAP
work shall be performed by a licensed plumbing contractor in a
first class workmanlike manner. The completed system shall be VENT

VENT
fully operative. All excavation and backfill as required for this PIPE GOING DOWN
phase of construction shall be a part of the contract.
WYE
4. Required insurance shall be provided by the plumbing
contractor for protection against public liability and property P-TRAP
damage for the duration of work.
PIPE GOING UP
5. Drawings are Diagrammatic in nature and are to be read TEE
in conjunction with architectural, mechanical, electrical and
structural drawings are to be considered as one set of 45 DEG ELBOW
documents.

6. Utility lines are shown in approximate locations entering


the building entering the building. The contractor shall examine
the site and verify with local city and utility with local city and
utility officials the exact routing of utility lines to conform to the
existing location of utilities and obstacles that might affect the
routing.

7. Plumbing fixtures shall be as scheduled on the drawings


and shall be complete with all necessary fittings, angles, stops,
carriers, etc. as required for a complete service.