ESCALA DE TIEMPO DEL PROYECTO

2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3
1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3
INTRODUCIR FECHA DE INICIO: 7/31/2017
ACTIVIDAD INICIO FIN NOTAS
Inicio De Proyecto 8/3/2017
Hito 1 8/13/2017 8/16/2017
Hito 2 8/14/2017 8/17/2017
Hito 3 8/19/2017
Hito 4 8/29/2017 8/31/2017
Hito 5 9/8/2017 9/10/2017
Hito 6 9/18/2017 9/20/2017
Hito 7 9/28/2017
Hito 8 10/8/2017 10/10/2017
Hito 9 10/18/2017 10/20/2017
Hito 10 10/28/2017 10/30/2017
Fin De Proyecto 11/7/2017