MEMORANDUM
Attached are supplemental materials developed in conjunction with the FY18 budget. These
include:
Linking the FY18 Budget Process and the BART Strategic Plan
The Board-adopted BART Strategic Plan (BSP) now provides guidance for prioritization of
budgetary resources and uses, with the Strategies of the BSP providing the structure for decision-
making. Staff reviewed the impacts of budget alternatives on the two central Strategies Expand
Capacity, Manage Demand and Fix, Maintain and Modernize as well as on the other five BSP
Strategies. These conversations revealed the difficult trade-offs that had to be made in a year of
declining resources and a projected $31 million (M) operating shortfall.
As this is the first year of linking the BSP with the budget process, flexibility has been essential.
Over the next few years, the BSP-budget linkage will continue to evolve as staff gains a better
ability to evaluate how proposed investments would advance the BSP, and the tradeoffs and risks
of not investing.
In this first year, the BSP-directed FY18 budget process began by identifying strategic efforts
separately from day-to-day work tasks. Significant interdepartmental projects were called out
and prioritized, particularly those with a fiscal impact such as reducing fare evasion. Staff
focused on Board-directed Goals and Strategies when allocating resources to departmental and
strategic work supporting those priorities.
1
As FY18 progresses, staff will reinforce the linkage among the budget process and performance
metrics. During the coming year, staff will set performance standards and make more
performance information readily available to BART riders and the public. Staff will focus on
measurement as well as what is measured, to ensure the most useful and relevant information is
being reported.
In early April, BART received much-needed assistance in balancing the budget with the infusion
of approximately $16M of Senate Bill 1 (SB 1) Station Transit Assistance funding, and this
document sets out the revised FY18 budget based on SB 1 assistance and Board budget
discussions.
If you have any questions on the materials, please contact me at (510) 464-6194. Questions
specific to the Strategic Plan should be directed to Val Menotti, ChiefPlanning & Development
Officer, at (510) 287-4974.
.CarterMau
2
BART Strategic Plan Framework
Vision
BART supports a sustainable and prosperous Bay Area by connecting communities with seamless mobility.
Mission
Provide safe, reliable, clean, quality transit service for riders.
Goals
Leadership & Partnership in the Region Riders & Public Infrastructure & Service Organization
SYSTEM FINANCIAL
ECONOMY EQUITY ENVIRONMENT EXPERIENCE SAFETY WORKFORCE STABILITY
PERFORMANCE
Strategies FY 6 FY2020
CONNECT
ENGAGE & CREATE ADVANCE EXPAND CAPACITY, FIX, MAINTAIN, ALIGN WORKFORCE MODERNIZE
COMMUNITY GREAT SUSTAINABILITY MANAGE DEMAND & MODERNIZE WITH NEEDS BUSINESS PRACTICES
PLACES
3
BART Strategic 4-Year Work Plans Keyword Index
Affordable Housing
Strategy Document Strategic Activity
BART to Livermore
Strategy Document Strategic Activity
BART.gov
Strategy Document Strategic Activity
Canopies
Strategy Document Strategic Activity
Capitol Corridor
Strategy Document Strategic Activity
Connect & Create Great Places Activity 6: Enhance Capitol Corridor Customer Experience
Expand Capacity, Manage Demand Activity 6: Modernize Capitol Corridor Infrastructure to Meet Demand
Fare Evasion
Strategy Document Strategic Activity
Fleet
Strategy Document Strategic Activity
4
BART Strategic 4-Year Work Plans Keyword Index
Homelessness
Strategy Document Strategic Activity
Fix, Maintain, & Modernize Activity 7: Safety Upgrades for Employees & Infrastructure
Job Growth
Strategy Document Strategic Activity
Measure RR
Strategy Document Strategic Activity
Fix, Maintain, & Modernize Activity 10: State of Good Repair Initiatives
MET Building
Strategy Document Strategic Activity
MS4
Strategy Document Strategic Activity
Fix, Maintain, & Modernize Activity 4: Federal Stormwater Environmental Compliance (MS4)
Non-Fare Revenue
Strategy Document Strategic Activity
5
BART Strategic 4-Year Work Plans Keyword Index
Open Data
Strategy Document Strategic Activity
Parking
Strategy Document Strategic Activity
Expand Capacity, Manage Demand Activity 1: Modernize BART Infrastructure to Meet Demand
Police
Strategy Document Strategic Activity
Expand Capacity, Manage Demand Activity 1: Modernize BART Infrastructure to Meet Demand
Safety
Strategy Document Strategic Activity
Connect & Create Great Places Activity 6: Enhance Capitol Corridor Customer Experience
Fix, Maintain, & Modernize Activity 7: Safety Upgrades for Employees & Infrastructure
6
BART Strategic 4-Year Work Plans Keyword Index
Safety
Strategy Document Strategic Activity
Align Workforce With Needs Activity 1: Implement Road Map to Stabilize & Improve Labor Relations
See-Click-Fix
Strategy Document Strategic Activity
Station Modernization
Strategy Document Strategic Activity
Connect & Create Great Places Activity 5: Placemaking (Art, Retail, Activation)
Fix, Maintain, & Modernize Activity 4: Federal Stormwater Environmental Compliance (MS4)
Strategic Plan
Strategy Document Strategic Activity
7
THIS PAGE LEFT INTENTIONALLY BLANK
8
BART Strategic Plan
OVERVIEW
Lead Department: Office of External Affairs Supporting Departments: BPD/OIPA/OCIO/Operations
Preparer/Owner: K. Hamill
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
Expand opportunities for interacting with and engaging the public and BART riders to strengthen
relationships, to foster a better understanding of community concerns and to create interest and support
for BART programs, projects and ongoing capital needs. BART will accelerate its use of a variety of efficient
communication tools to reach our riders and the public, including social media, free media, staged
outreach events and strategic partnerships to broaden the publics interest and to satisfy their concerns.
Our near term focus will be to inform our constituents about the new rail car fleet, to introduce them to
expanded service to three new stations (Warm Springs, Berryessa, Antioch), and to keep them apprised of
the system improvements and enhancements that will be completed with the 2016 bond measure
revenues.
Strategic Activities
1. Interacting With & Educating Constituencies
3. Salesforce/Maximo Integration
4. BART.gov Modernization
9
BART Strategic Plan
Homeless Community
FINANCIAL PLANNING
2991 Fully Fund SF Homeless
Outreach Team (SFHOT)
POLICE DEPARTMENT
2193 Define Approach to Enhance Implement Phase 1 to Enhance Evaluate & Implement Phase 2 Maintain Community Outreach
Community Outreach Efforts to Community Outreach Efforts to to Enhance Outreach Efforts to Efforts to Connect Homeless
Connect Homeless with Connect Homeless with Connect Homeless with with Outside Assistance
Outside Assistance Outside Assistance Outside Assistance
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
10
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
POLICE DEPARTMENT
1271 Update the BPD Explorer Post
Youth Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
11
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
BUDGET
2992 Advance San Francisco
Transportation Task Force &
RM3 Strategies with Partners
CUSTOMER ACCESS
380 Plan Parking Fee Collection
Modernization Project
FINANCIAL PLANNING
328 Lead Strategic Fare Discussion
to Identify Option(s) for Further
Study
864 Obtain Customer & Board Issue Request for Proposal Transition to New District
Input prior to Rebid of the (RFP) & Award New Contract Advertising Franchise After
District Advertising Franchise for District Advertising Award of New Contract
OCIO
2170 Create Enterprise Database of Implement CCRP Train to
Fiber Optic Mapping to Ground Wireless Network
Support Commercial
Communications Revenue
Program (CCRP)
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
12
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
CUSTOMER SERVICES
930 Investigate Opportunities to Implement Phase 1 of the "See- Evaluate & Implement Phase 2
Advance the "See-Click-Fix" Click-Fix" Program of the "See-Click-Fix" Program
Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
13
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
COMMUNICATIONS
916 Plan the BART.gov Redesign to Implement the BART.gov
Improve Functionality & Redesign to Improve
Content (With OCIO) Functionality & Content (With
OCIO)
OCIO
2159 Implement Enhancements to
BART.gov to Improve
Accessibility, Mobility,
Navigation, & Ease Of Use
POLICE DEPARTMENT
1283 Create Customer Survey Implement Customer Survey on Analyze Survey Results &
Instrument on BART Safety & BART Safety & Police Presence Establish Plan of Action
Police Presence via BART Watch App
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
14
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OVERVIEW
Lead Department: Planning, Development & Supporting Departments: Customer Access/BART
Construction Police/Operations/Government & Community Relations
Preparer/Owner: V. Menotti
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
BART will Connect & Create Great Places by investing in transit-oriented development (TOD), access, and
placemaking enhancements at BART facilities and in surrounding neighborhoods. BART will lay the
groundwork for expanded TOD and Station Access programs and establish a strong pipeline of projects for
both. BART will continue to expand partnerships with local jurisdictions and community based
organizations to implement Plan Bay Area. BART will also enhance the sense of safety and place in station
areas through the Community-Based Policing and public art programs. Ultimately, these actions engage
the public, increase ridership, and enhance the sense of safety and cleanliness at stations through
activation of space.
Strategic Activities
1. Transit Oriented Development
15
BART Strategic Plan
PD&C: PLANNING
2344 Finalize TOD Business Practices Implement Changes to Pre- Ensure All New BART TOD Ensure All New BART TOD
& Guidelines to Clarify Roles & Solicitation & Ground Lease Projects Are Compliant with Projects Are Compliant with
Responsibilities Work with Stages to Clarify & Accelerate TOD Guidelines TOD Guidelines
Cities to Update & Refine PDA Process
Place Type Data
2345 Establish Priority Sites for Continue to Recalibrate Site Continue to Recalibrate Site
Future Solicitation Prioritization Data Based On Prioritization Data Based On
New Market, Policy Information New Market, Policy Information
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
16
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2350 Other Implementation Tools: Launch Parking Management & Establish New Legislative
Develop Approach to Implementation Technical Priorities for Implementation
Supporting Cities with Parking Support Tools
Mgmt. & Other Critical
Implementation Needs
2351 Economic Development & Job Work with Regional Agencies Explore State Legislative
Creation: Develop Approach to to Find Resources to Advance Strategy to Encourage Job
Encourage Job Growth & BART Technical Support to Cities Growth Near Transit (E.G.
Ridership at Existing East Bay Aiding In Creation of Transit Innovation Zones, Tax Credits).
Job Centers Rich Job Centers
2353 Engage Cities to Establish Place Continue Work with Cities to Continue Work with Cities to Ongoing Work with Cities to
Types Accurate to Envisioned Reduce Parking Requirements Reduce Parking Requirements Reduce Parking Requirements
Growth, & to Modify Parking & Update Station Area Plans & Update Station Area Plans & Update Station Area Plans
Requirements Accordingly
2354 Disseminate Completed TOD Evaluate New Joint Evaluate New Joint Evaluate New Joint
Guidelines to Cities & Development Projects Based Development Projects Based Development Projects Based
Developers, to Clarify BARTs On TOD Guidelines & On TOD Guidelines & On TOD Guidelines &
Expectations for High Quality Performance Targets Performance Targets Performance Targets
TOD
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
17
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2359 Complete Evaluation of Transit Explore Potential for EIFD in Explore Additional Value Explore Additional Value
Benefit Assessment District Partnership with Cities, MTC Capture Mechanisms & Needs Capture Mechanisms & Needs
Tool, & Explore Next Steps On
Other District-Based Financing
Mechanisms
2360 Develop BART TOD Investment Identify Remnant Parcels That Implement Investment Strategy Implement Investment Strategy
Strategy As Part of Land Use & BART Owns for Potential Sale & Provide Cost-Benefit Analysis & Provide Cost-Benefit Analysis
Affordable Housing Strategy to Generate Revenue to Board On Ongoing Basis to Board On Ongoing Basis
Invest Equitably
GOVERNMENT & COMMUNITY RELATIONS
2362 Integrate Subsidy Needs Into Integrate Subsidy Needs Into Integrate Subsidy Needs Into
Legislative Agenda at State, Legislative Agenda at State, Legislative Agenda at State,
Federal Level Federal Level Federal Level
PD&C: PLANNING
2361 Complete Affordable Housing
Strategy to Identify Potential
Additional Affordable Housing
Subsidy Needs & Potential
Sources
2363 Work with Strategic Growth Work with Strategic Growth Work with Strategic Growth Work with Strategic Growth
Council & Housing & Council & Housing & Council & Housing & Council & Housing &
Community Development to Community Development to Community Development to Community Development to
Make AHSC Program Make AHSC Program Make AHSC Program Make AHSC Program
Supportive of BART TOD Supportive of BART TOD Supportive of BART TOD Supportive of BART TOD
2365 Work with Cities & Counties Work with Cities & Counties Work with Cities & Counties Work with Cities & Counties
that have Local Sources of that have Local Sources of that have Local Sources of that have Local Sources of
Funds for Affordable Housing Funds for Affordable Housing Funds for Affordable Housing Funds for Affordable Housing
to Invest In BART to Invest In BART to Invest In BART to Invest In BART
2364 Establish Seamless Process for Establish Seamless Process for Establish Seamless Process for Establish Seamless Process for
Coordinating BART Affordable Coordinating BART Affordable Coordinating BART Affordable Coordinating BART Affordable
Housing & Station Access Housing & Station Access Housing & Station Access Housing & Station Access
Needs Into AHSC Applications Needs Into AHSC Applications Needs Into AHSC Applications Needs Into AHSC Applications
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
18
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2366 Align Resources Across Public Align Resources Across Public Align Resources Across Public Align Resources Across Public
& Non-Profit Sectors & & Non-Profit Sectors & & Non-Profit Sectors & & Non-Profit Sectors &
Develop Joint Strategies for Develop Joint Strategies for Develop Joint Strategies for Develop Joint Strategies for
Production of Housing with Production of Housing with Production of Housing with Production of Housing with
TOD TOD TOD TOD
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
19
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2394 Incorporate Access Policy in Ongoing Coordination Between Ongoing Coordination Between Ongoing Coordination Between
Daily Operations, Including BART & Local Partners BART & Local Partners BART & Local Partners
Ongoing Outreach &
Coordination Between BART &
Local Partners
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
20
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
972 Deploy Bike Capital Plans at Deploy Bike Capital Plans at Deploy Bike Capital Plans at Deploy Bike Capital Plans at
Concord, Pleasant Hill, & Lafayette, Lake Merritt, & San Leandro, & West Oakland & North
MacArthur including Expanding Berkeley including Expanding Dublin/Pleasanton including Berkeley including Expanding
Secure Bike Parking Secure Bike Parking Expanding Secure Bike Parking Secure Bike Parking
974 Develop 3rd Edition of the Bike Advance Top Priority Projects
Parking Capital Plan from 2017 Bike Program Capital
Plan
973 Complete Design of Stair Implement Stair Channels Implement Stair Channels Implement Stair Channels
Channels for Improved Bicycle Phase 1 Improved Bicycle Phase 2 Phase 3
Access Access
2401 Complete Universal Design Integrate Universal Design Integrate Universal Design Integrate Universal Design
Guidelines Guidelines with Accessibility Guidelines with Accessibility Guidelines with Accessibility
Improvement Program Improvement Program Improvement Program
971 Partner with Bay Area Bike Share Deploy Bay Area Bike Share
Partnership
PD&C: PLANNING
2398 Partner with Local Cities & Implement Key Projects & Implement Key Projects & Implement Key Projects &
Agencies to Identify Funding Maintain Ongoing Partnerships Maintain Ongoing Partnerships Maintain Ongoing Partnerships
Opportunities & to Support
Local Initiatives Such As Vision
Zero & SR2S
2399 Advocate for Improved BART Advocate for Improved BART Advocate for Improved BART Advocate for Improved BART
Station Access In Station Area Station Access In Station Area Station Access In Station Area Station Access In Station Area
& Local Transportation Plans & Local Transportation Plans & Local Transportation Plans & Local Transportation Plans
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
21
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2403 Partner with Local Transit Implement Key Projects & Implement Key Projects & Implement Key Projects &
Agencies on Key Initiatives & Maintain Ongoing Partnerships Maintain Ongoing Partnerships Maintain Ongoing Partnerships
Use AC Transit/BART IIC As a
Model for New Partnerships
2404 Assess Results of AC/BART Joint Dependent On Study Outcome, Dependent On Study Outcome Dependent On Study Outcome
Fare Study Pilot, & Implement Implement Results of AC
Next Steps Transit/BART Joint Fare Study
Pilot
Plan, Innovate, Partner Invest & Implement: Drive & Park Improvements
CUSTOMER ACCESS
2405 Begin Roll-Out of Real-Time Perform Ongoing Evaluation & Perform Ongoing Evaluation & Perform Ongoing Evaluation &
Parking Information Refinement of Real-Time Refinement of Real-Time Refinement of Real-Time
Parking Program Parking Program Parking Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
22
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: PLANNING
2407 Advance the Wayfinding & Complete Phase III of
Signage Improvement Project Wayfinding & Signage
Improvement Project
2409 Prepare for 2020 Station Profile Implement 2020 Station Profile
Survey Survey
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
23
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
To further strengthen efforts to enhance the Departments Community Oriented Policing philosophy, personnel will
be provided Fair and Impartial Policing, and Crisis Intervention Team training. Additionally, the Community
Oriented Policing Unit will received increased support through the assignment of additional personnel as points of
contact for each zone.
PD&C: PLANNING
2990 Define Enforcement/Public
Safety Signage Plan
POLICE DEPARTMENT
2371 Expand The Community Expand COP Efforts to all Expand COP Efforts to all Expand COP Efforts to all
Oriented Policing (COP) Unit to Zones, Utilizing the CSO as the Zones, Utilizing the CSO as the Zones, Utilizing the CSO as the
1 Community Service Officer Point Person to Point Person to Point Person to
(CSO) Per Zone Organize/Evaluate Those Efforts Organize/Evaluate Those Efforts Organize/Evaluate Those Efforts
2367 Use Crime Analysis to Deploy Use Crime Analysis to Deploy Use Crime Analysis to Deploy Use Crime Analysis to Deploy
Extra Patrol Detail Officers to Extra Patrol Detail Officers to Extra Patrol Detail Officers to Extra Patrol Detail Officers to
the Top Five Part 1 Crime the Top Five Part 1 Crime the Top Five Part 1 Crime the Top Five Part 1 Crime
Problem Stations Problem Stations Problem Stations Problem Stations
2368 Increase Visibility on Trains by Maintain A High Level Of Maintain A High Level Of Maintain A High Level Of
Conducting a Minimum Of 6 Visibility Of Patrol Personnel Visibility Of Patrol Personnel Visibility Of Patrol Personnel
Random Train Sweep On Trains & Platforms During On Trains & Platforms During On Trains & Platforms During
Inspections per Officer & Shift Revenue Hours Revenue Hours Revenue Hours
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
24
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2370 Provide Crisis Intervention Maintain Crisis Intervention Maintain Crisis Intervention Maintain Crisis Intervention
Team (CIT) Training To All Team (CIT) Training For All Team (CIT) Training For All Team (CIT) Training For All
Personnel Personnel Personnel Personnel
2369 Provide Fair & Impartial Maintain Fair & Impartial Maintain Fair & Impartial Maintain Fair & Impartial
Training To All Personnel Training For All Personnel Training For All Personnel Training For All Personnel
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
25
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: PLANNING
2426 Apply Additional Department Apply Additional Department Apply Additional Department
Resources to Continue the Resources to Continue the Resources to Continue the
Station Brightening Program Station Brightening Program Station Brightening Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
26
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2417 Ongoing Fabrication Of Art for Perform Installation Of 3 Develop Partnership Continue & Expand Partnership
Station Modernization Station Modernization Artworks Opportunities for Permanent & Program Throughout District
Temporary Projects
2418 Ongoing Work to Integrate Art Initiate Documentation, Continue Conservation & Continue Conservation &
Into Improvements On Visible Cataloguing, Conservation, & Maintenance Of Existing Art Maintenance Of Existing Art
BART Facilities Maintenance Of Existing Art Collection Collection
Collection
2419 Pilot Projects for Partnerships & Initiate Community Access & Collaborate With VTA to Ensure Implement Expanded
Temporary Art Engagement Through Art SVBX Includes Art Marketing Of The Art Program
Program Programming to All New & Collection As A
Stations BART/Community Asset
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
27
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2421 Establish Other Station Implement Strategic Activation Implement Strategic Activation
Activation Programs Through of BART Public Spaces at Select of BART Public Spaces at
TOD Program Work Plan (EG Stations Additional Select Stations
Farmers Markets, Off The Grid,
Performance Art)
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
28
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
CAPITOL CORRIDOR
547 Complete Design of the Station
Information Sign System
Improvement Project
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
29
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OVERVIEW
Lead Department: Planning, Development & Supporting Departments: Operations/OCIO
Construction
Preparer/Owner: V. Menotti
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
BART will continuously pursue opportunities to improve sustainability focusing on ongoing reductions of
the environmental footprint of BART and the Bay Area. Specifically, the BART Sustainability team will focus
on opportunities to conserve energy and reduce our greenhouse gas emissions, reduce waste generation,
conserve water, and adapt to climate changes. BARTs efforts will align with its Sustainability Policy and
follow best practices on sustainability from the transit industry.
Strategic Activities
1. Integrate Sustainability into BART Processes
2. Energy Efficiency, Shift Energy Portfolio To Zero/Low Carbon And Renewable Sources
3. Waste Reduction/Recycling
4. Water Conservation
30
BART Strategic Plan
The Sustainability Group will work with Operations, Sustainability Executive Steering Committee, Strategic Plan
Implementation Team, Marketing (on the Annual Sustainability Report), CLEAN/Green Team, and others throughout
the organization to ensure sustainability is integrated into many parts of the Districts work.
Sustainability Policy
PD&C: PLANNING
2452 Review 2003/Current
Sustainability Policy; Take to
Board to Request Adoption
Internal Integration
PD&C: PLANNING
2573 Establish Employee Review & Modify CLEAN/Green
Sustainability Awareness Team Employee Outreach
Program (CLEAN/Green Team) Activities
External Leadership
PD&C: PLANNING
2463 External Sustainability
Leadership (Participation in
APTA, CTA, & Coordination
with Relevant Agencies)
(Ongoing)
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
31
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
The Sustainability Group needs support from/funding for Operations and others to identify ways BART can
implement on-site solar, energy storage, EV charging, lighting and sub-metering projects. In addition funding and
potentially additional staff may be needed to build a pilot energy storage project, additional EV charging projects
and additional on-site solar projects.
Electricity Procurement
PD&C: PLANNING
2446 Develop Energy Policy for Develop Strategic Energy Plan
Board Consideration
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
32
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
Energy Efficiency
PD&C: PLANNING
2447 Work Cross Functionally to Implement Energy Efficiency Evaluate & Implement Lighting Implement Lighting Strategy at
Define Energy Efficiency Lighting Strategy at 3-4 Stations Strategy at an Additional 3-4 3-4 Additional Stations
Lighting Strategy & Stations
Procurement Strategy
2458 Investigate Breakdown of Define & Implement Phase 1 Evaluate Phase 1 of In-Station
Energy Use Inside Stations as for In-Station Energy Energy Conservation Program
Basis of Comparison for Future Conservation Program & Consider Next Steps
Improvements
Energy Storage
PD&C: PLANNING
2459 Investigate Options for Station Define Pilot Energy Storage Implement Pilot Energy Evaluate Pilot Energy Storage
& Wayside Energy Storage Project Storage Project Project & Define Next Steps
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
33
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
The Sustainability Group will work with other departments on waste reduction and recycling. The participation of
Operations in the trash audit is needed to ensure the findings are useful. In addition, the Sustainability Group will
need support from/funding for Operations in the next pilot recycling project, and in future shop and yard recycling
programs.
PD&C: PLANNING
2065 Audit Existing Trash & Pilot Project Procuring & Monitor & Evaluate
Recycling Receptacles at Implementing Trash & Effectiveness of Trash &
Stations Recycling Receptacles Recycling Receptacles to
Determine Next Steps
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
34
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
The Sustainability Group needs support of departments with the technical capabilities and in-depth knowledge of
BARTs facilities to implement these projects. Additional support from OCIO is needed to ensure TriRiga fits the
needs of the data tracking, and to evaluate TriRiga and next steps. Support from/funding for Operations is required
to investigate water use and implement conservation projects.
PD&C: PLANNING
2059 Pilot TriRiga Data Tracking Evaluate TriRiga Pilot (w/OCIO
Software for Water (w/OCIO Support)
Support)
2575 Investigate/Address High Water Initiate Partnerships with Define & Implement Phase 1 of Review Phase 1 of Water
Consumption at Stations Additional Water Districts to Program to Reduce Water Consumption Program; Define
(Ongoing) Audit Water Use & Secure Consumption at Stations & Begin Implementation of
Outside Funding as Feasible Phase 2
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
35
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
Note: Implementation of the Local Hazard Mitigation Plan (LHMP) will be performed in conjunction with the Fix,
Maintain, and Modernize Work Plan, Earthquake Safety Program, and Water Conservation (Activity 4 of this plan).
PD&C: PLANNING
2454 Develop Water-Related Climate Continue Vulnerability & Risk Conduct Vulnerability Develop Adaptation
Adaptation Plan for Train Assessment of Water-Related Assessment of Extreme Strategies/Design Criteria for
Control to be Integrated into Issues of other Critical Assets & Temperature/Wildfire Critical All Extreme Climate Issues of
BFS (Led by ODA) Develop Adaptation Strategies Assets (Led by ODA) other Operations-Critical Assets
(Led by ODA) (Led by ODA)
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
36
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OVERVIEW
Lead Department: Operations Supporting Departments: All
Preparer/Owner: P. Oversier/V. Menotti/D. Kutrosky
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
BART is engaged in a wide range of activities to address BARTs peak period, peak direction capacity
constraints, and to increase BARTs reach to more of the Bay Area. This strategy includes improvements to
capacity at the core of the BART system through ongoing investment in the Big 3: fleet expansion,
expansion of the Hayward Maintenance Complex and train control modernization. BART will also explore
innovative, non-capital approaches to managing demand to relieve crowding by encouraging travel at
other times of day.
The next four years will see the culmination of years of work on three expansion projects when the Warm
Springs Extension (2017), eBART, and BART to Silicon Valley Phase I extensions open. BART will continue to
study options to serve a larger geography in Alameda, Contra Costa and San Francisco Counties through
possible future expansions and/or improvements to other modes of access. The Capitol Corridor will
similarly work to update its infrastructure to meet significant increases in demand.
Strategic Activities
1. Modernize BART Infrastructure to Meet Demand
2. Expansion Projects
5. Fleet Management
37
BART Strategic Plan
Core Capacity
PD&C: PLANNING
756 Advance the Development Enter Engineering Phase of the
Phase of the FTA Core Capacity FTA Core Capacity Program
Program
758 Complete the Platform Screen Initiate Platform Screen Door Evaluate Platform Screen Door
Door Study Pilot Project Pilot Project, Consider Further
Implementation
POLICE DEPARTMENT
1262 Perform CALEA Internal Self Commission a CALEA External Obtain CALEA Accreditation
Assessment Mock Assessment
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
38
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: CONSTRUCTION
2983 Advance Construction of Phase Advance Construction of Phase Advance Construction of Phase
1 of the Hayward Maintenance 2 of the Hayward Maintenance 3 of the Hayward Maintenance
Complex Program Complex Program Complex Program (Continues
Beyond 2020)
1705 Design the Hayward Award Primary Contract for the Begin Construction of the HMC
Maintenance Complex (HMC) HMC Vehicle Overhaul Shop Vehicle Overhaul Shop
Vehicle Overhaul Shop
1703 Design the HMC Central Award Primary Contract for the Begin Construction of the HMC Commission Operation of HMC
Warehouse Construction of the HMC Central Warehouse Central Warehouse
Central Warehouse
1704 Design HMC Non Revenue Award Primary Contract for the Begin Construction of the HMC
Vehicle Shop HMC Non Revenue Vehicle Non Revenue Vehicle Shop
Shop
662 Continue the Procurement of Continue the Procurement of Continue the Procurement of Continue the Procurement of
HMC Tools & Equipment as HMC Tools & Equipment as HMC Tools & Equipment as HMC Tools & Equipment as
Needs Increase Needs Increase Needs Increase Needs Increase
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
39
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
40
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
41
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: PLANNING
1697 Update Irvington Site Plan & Acquire Funding for
Environmental Process, & Construction of the Irvington
Develop a Station Area Plan Extension
SYSTEM SAFETY
1232 Environmental Compliance Environmental Compliance
Procedures for Extensions - Procedures for Extensions -
Phase 1 Phase 2
1222 Train Emergency Personnel & Train Emergency Personnel & Train Emergency Personnel &
First Responders For Warm First Responders For eBART First Responders For SVBX
Springs Opening Opening Opening
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
42
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2095 Complete MET Building Plan & Begin MET Building Complete MET Building
Acquisition Activities Improvements Improvements
POLICE DEPARTMENT
1256 Complete Relocation of BPD
Headquarters to MET Building
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
43
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
CUSTOMER ACCESS
379 Propose New Daily Parking Fee Implement New Daily Fee
Policy for Board Consideration Parking Program
976 Design & Implement Parking Implement Parking Expansion Complete Parking Expansion
Expansion Plan at Dublin Plan at Dublin Pleasanton & Plan at Dublin Pleasanton &
Pleasanton & Pittsburg Bay Pittsburg Bay Point - Phase 2 Pittsburg Bay Point
Point - Phase 1
PD&C: PLANNING
754 Prepare Dublin / Pleasanton
Garage Expansion California
Environmental Quality Act
(CEQA) Addendum
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
44
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
Ridership Retention
OPERATIONS PLANNING
952 Identify Technological Solutions
to Modernize Train Schedule
Processes
PD&C: PLANNING
751 Complete the BART Perks Pilot Evaluate BART Perks Pilot Data
& Define Next Steps
806 Provide Stand-By Emergency & Provide Stand-By Emergency & Provide Stand-By Emergency &
Life Support Service During Life Support Service During Life Support Service During
Commute Hours Commute Hours Commute Hours
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
45
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
862 Perform BARTable Focus Launch BARTable 2.0 Website Perform a Return on
Groups & Test Licensing Investment (ROI) Study to
Strategy to Increase Off-Peak Assess the Impacts of the
Ridership & Revenue BARTable Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
46
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
655 Expand RS&S Strategic Expand RS&S Strategic Expand RS&S Strategic Expand RS&S Strategic
Maintenance Plan to all Maintenance Plan to all Maintenance Plan to all Maintenance Plan to all
Facilities, Fleet, & Work Facilities, Fleet, & Work Facilities, Fleet, & Work Facilities, Fleet, & Work
Activities Activities Activities Activities (Continues Beyond
2020)
663 Develop the new RS&S Implement the new RS&S Monitor & Evaluate the new
Facilities Maintenance Plan Facilities Maintenance Plan RS&S Facilities Maintenance
Plan
664 Develop the new RS&S Shop Implement the new RS&S Shop Monitor & Refine the new
Equipment Maintenance Plan Equipment Maintenance Plan RS&S Shop Equipment
Maintenance Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
47
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
654 Place New Rail Cars into Place up to 70 New Rail Cars Place up to 206 Additional New Place up to 192 Additional New
Revenue Service into Revenue Service Rail Cars into Revenue Service Rail Cars into Revenue Service
(Continues Beyond 2020)
652 Develop the Scope of Work for Develop the Scope of Work for Implement a 10 Car Pilot Implement the Plan to
Decommissioning of Rail Cars Decommissioning of Rail Cars Program to Decommission Rail Decommission Rail Cars on a
Cars Larger Scale (Continues Beyond
2020)
653 Develop the Contingency Fleet Implement Phase 1 of the Evaluate Phase 1 & Begin
Plan Program Contingency Fleet Plan Program Implementation of Phase 2 of
the Contingency Fleet Plan
Program (Continues Beyond
2020)
650 Develop the New Rail Car Implement the New Fleet Evaluate & Refine the New Evaluate & Refine the New
Graffiti Task Force for the Entire Graffiti Task Force Program for Fleet Graffiti Task Force Fleet Graffiti Task Force
Fleet the Entire Fleet Program Program (Continues Beyond
2020)
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
48
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
CAPITOL CORRIDOR
542 Develop the On Board Install the On Board PIS
Passenger Information System
(PIS)
548 Complete New Rolling Stock Complete New Rolling Stock Complete New Rolling Stock
Project Phase 1 to Procure Project Phase 2 of Additional Project Phase 3 of Additional
Additional Locomotives Locomotives Cars
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
49
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
50
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OVERVIEW
Lead Department: Operations Supporting Departments: All
Preparer/Owner: P. Oversier
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
In the Fix, Maintain & Modernize Work Plan, BART is continuing its ongoing efforts to ensure that existing
facilities can operate with minimal failures, and utilizing modern technology and equipment. This work will
be greatly enhanced by Measure RR funds. Over the period from 2016 to 2020 BARTs focus will be to
enhance safety of passengers and employees through efforts such as the Earthquake Safety Program, track
rehabilitation and replacement, traction power improvements, fire suppression upgrades, and various other
efforts to eliminate potential incidents in the operating envelope. Work on the new Transit Operations
Facility and the Train Control System will enable BART to operate both existing and new lines more
effectively. Other state of good repair initiatives will help prevent future system failures by addressing
degradation of BARTs electrical systems, water leakage, and structural and erosion issues.
Strategic Activities
1. Complete Earthquake Safety Program
51
BART Strategic Plan
Additional funding options will be explored to retrofit the Berkeley Hills Tunnel.
PD&C: CONSTRUCTION
1700 Award the Contract for the Initiate 5:00AM Opening & TBT Continue the TBT Earthquake Continue the TBT Earthquake
Transbay Tube (TBT) Earthquake Safety Retrofit Safety Retrofit Project Safety Retrofit Project
Earthquake Safety Retrofit Project (Continues Through FY22)
Project
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
52
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: CONSTRUCTION
1707 Select Site for & Design the Complete 65% Conceptual
Transit Operations Facility (TOF) Design of the Transit
Project Operations Facility (TOF) Project
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
53
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
While state of the art automated train control system when BART began service in 1972 the existing train control
equipment is now nearly 45 years old. That equipment is no longer supported by the industry, printed circuit are
difficult to repair and wiring to train control rooms and wayside facilities has become brittle. The equipment is
vulnerable to breakdowns and now regularly accounts for 15% to 20% of all train delays. Over the past 25 years the
BART system has been extended to Pittsburgh, Dublin and Millbrae so there is now a mix of more modern train
control equipment, some more reliable than others.
The new CBTC system will provide shorter headways, lower maintenance costs (due to less field equipment), greater
operational flexibility, enhanced safety (due to reduced requirements for human access to trackside equipment,
more precise tracking of trains and maintenance vehicles), smoother and more predictable operation, and improved
reliability and availability.
PD&C: CONSTRUCTION
1708 Issue the Request for Proposals Advertise & Evaluate RFQ/RFP Award the Primary Contract for Train Control Modernization
(RFP) for the Train Control for Primary Contract for the the Train Control Project Construction Phase 1
Modernization Project Train Control Modernization Modernization Project
Project
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
54
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
For other Sustainability efforts, please see Advance Sustainability work plan.
SYSTEM SAFETY
1234 Develop Trash Reduction &
Control Plans to Define Needs
to Meet New MS4
Requirements
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
55
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
Station Modernization
MAINTENANCE & ENGINEERING
1482 Improve Landscaping Improve Landscaping Improve Landscaping
Appearance & Corresponding Appearance & Corresponding Appearance & Corresponding
PES Score PES Score PES Score
PD&C: CONSTRUCTION
2316 Initiate Modernization Advance Modernization Initiate Modernization
Construction at 19th St / Construction at 19th St / Construction at Downtown
Oakland; Powell St; El Cerrito Oakland, Powell St; El Cerrito Berkeley; West Oakland; Lake
Del Norte Del Norte Merritt
2318 Complete Concept Plan for Start Station Modernization Complete Concept Plan for Initiate Preliminary Station
Improved Functionality at Concept Plan for Improved Improved Functionality at West Modernization Engineering at
Downtown Berkeley, & Initiate Functionality at West Oakland; Oakland; Richmond West Oakland
Preliminary Engineering Richmond
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
56
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: PLANNING
2466 Advance Berkeley Station Complete Berkeley Canopy &
Canopy & Plaza Plaza
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
57
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OPERATIONS PLANNING
2669 Implement a Technology Based
Fare Evasion Deterrence
Solution at 3 Stations
PD&C: CONSTRUCTION
2668 Develop & Implement A
Robust Elevator Fare Evasion
Deterrence Strategy at a
Minimum of 2 Downtown SF
Stations
PD&C: PLANNING
2666 Integrate Hardening Against
Fare Evasion at all Stations
Undergoing Station
Modernization
POLICE DEPARTMENT
2191 Establish & Adopt a Board Seek Approval for, &
Approved Surveillance Implement Board Approved
Technology Policy Surveillance Technology Policy
& Report Back to the Board
Annually
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
58
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
59
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
In Station Safety
MAINTENANCE & ENGINEERING
2471 Install Entrance Gates at Market Install Entrance Gates at
St Stations to Improve Station Mission St Stations to Improve
Agent Openings Safety & Station Agent Openings Safety
Stairwell/Escalator Cleanliness & Stairwell/Escalator Cleanliness
1592 Design & Install Wayside Install Wayside Regulatory Install Wayside Regulatory
Regulatory Signage Signage Signage
SYSTEM SAFETY
2470 Increase Safety Compliance
Checks & Safety Audits at
Stations, Yards & Wayside
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
60
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
61
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
1450 Perform Mapping of Running Perform Mapping of Running Perform Mapping of Running Perform Mapping of Running
Rail Bonding (C Line) Rail Bonding (M Line) Rail Bonding (A Line) Rail Bonding (K Line)
1451 Procure MUX Track Circuits Install MUX Track Circuits Into
the A50 Control Zone
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
62
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
1620 Design 34.5KV AC Pipe Cable Design & Construct 34.5KV AC Construct 34.5KV AC Pipe
From ACO-ABF (Left Only) Pipe Cable From ACO-ABF (Left Cable From ACO-ABF (Left
Only) Only)
1621 Design 34.5KV AC PILC Cables Design & Construct 34.5KV AC Construct 34.5KV AC PILC
From AHA-AUC PILC Cables From AHA-AUC Cables From AHA-AUC
1605 Design Phase 2 of the Continue Design of Phase 2 of Continue Design of Phase 2 of
Substation Replacement Plan the Substation Replacement the Substation Replacement
Plan Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
63
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
1617 Design Cast Coil Transformer Design Cast Coil Transformer Construct Cast Coil Transformer
Differential Protection Differential Protection Differential Protection
1611 Design KWS, COR, & CWC Bulk Perform KWS, COR, & CWC Perform KWS, COR, & CWC
Supply Transformer Bulk Supply Transformer Bulk Supply Transformer
Replacement Replacement Replacement
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
64
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
1610 Procure & Install Wayside Procure & Install Wayside Procure & Install Wayside Procure & Install Wayside
Coverboard Antenna Coverboard Antenna Coverboard Antenna Coverboard Antenna
Replacements Replacements Replacements Replacements
PD&C: CONSTRUCTION
2528 Design Replacement of the
4160V Cable Equipment in the
TBT as part of the TBT Retrofit
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
65
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
1625 Design 1 Replacement Liebert Procure Liebert Unit for LMA Install Liebert Unit for LMA
Unit at LMA
1473 Provide Support for Unfunded Provide Support for Unfunded Provide Support for Unfunded
Operating Projects (1,750 Hrs) Operating Projects (1,750 Hrs) Operating Projects (1,750 Hrs)
1448 Begin Design of Whistle Stop Complete Design of Whistle Develop, Advertise & Award
Profile For OHY & OCY Stop Profile For OHY & OCY Equipment Procurement
Contract for Whistle Stop
Profile for OHY & OCY
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
66
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
67
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OVERVIEW
Lead Department: Human Resources/Labor Relations Supporting Departments: All
Preparer/Owner: M. Jones
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
Given that eighty-five (85) percent of BARTs workforce is unionized, a key strategy for modernizing BARTs
workforce is developing agreed-upon initiatives and shared approaches between the District and BARTs
labor organizations. BARTs Human Resources group is committed to revitalizing and modernizing core
HR business process with a focus on documenting and implementing controls and efficient processes. This
work plan provides a framework for aligning and integrating workforce planning into the Districts overall
prioritization and performance-identifying management efforts, core business processes, and budgeting
activities. BARTs focus on providing upward mobility is integral to workforce readiness. We are defining
career pathways that engage our regional partners to support BARTs and the Bay Areas focus on greater
economic opportunity, shared prosperity and economic resilience.
Strategic Activities
1. Implement Road Map to Stabilize & Improve Labor Relations
68
BART Strategic Plan
2209 Conduct District-Union Retreat Develop Framework With Implement Phase 1 Working Complete Resolution of All
With ATU Unions On How To Resolve With Unions To Resolve Grievances Over 12 Months Old
Grievance Backlog Grievance Backlog Prior to 2021 Negotiations
2211 Provide High Quality Data For Establish District & Union Develop Effective Use Of
Negotiations Over Pensions & Process For Sharing Documents SharePoint To Support 2021
Police Agreements (e.g. SharePoint) Negotiations
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
69
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
986 Develop Joint Administrative Implement Procedure for Implement Plan for use of PDA
Committee, Major Projects Adding Projects to BMPSA & Work Force Training Funds
Stabilization Agreement Develop Plan for use of BMPSA
(BMPSA), & Project Procedures Work Force Training Funds
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
70
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
71
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
2143 Implement HR Recruitment Implement HR Hiring Process Implement HR & HRIS Assess Lessons Learned with
Process Improvement - Change Improvement (Phase 2) Improvement Plan (Phase 3) HR Hiring & HRIS Process
Management Program (Phase 1) Improvements
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
72
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
LABOR RELATIONS
984 Develop the Safety & Customer Implement the Safety &
Service Initiative for Employees Customer Service for
& Patrons of BART Employees & Patrons of BART
985 Plan the Joint Safety Initiative Implement the Joint Safety
to Target Emerging Safety Initiative to Target Emerging
Issues at Key Locations Safety Issues at Key Locations
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
73
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
HUMAN RESOURCES
1019 Prepare an Inventory of Current Develop an Action Plan in
K-12 Career Outreach Efforts Response to the Inventory of K-
12 Outreach Efforts
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
74
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OVERVIEW
Lead Department: OCIO/Admin & Budget Supporting Departments: All
Preparer/Owner: R. Misra/C. Mau
Describe high level actions that make up the strategy, how BART will pursue, and how this Strategy supports the
Strategic Plan goals and Key Performance Indicators.
BARTs Modernize Business Practices Strategy focuses on cost reduction, improved service delivery, and
agility to respond to the Districts growth and increasing customer demand through technology and
process improvements. In addition, this strategy focuses on building governance infrastructure to view
emerging and evolving technology in a cohesive and integrated way. These efforts magnify and help
transform the workforce through machine assisted learning, procedural efficiencies, and clear performance
metrics.
Over the next four (4) years, this work plan will provide a framework for aligning, integrating and executing
projects that will evolve and modernize Finance, Human Resources, Procurement and the Office of Civil
Rights. This work plan will also strengthen collaboration, resilience and access to Documentation, System
Safety, Asset Management, Cybersecurity and Telecommunications Revenue.
To this end, BART will evolve, mature, develop and advance key business functions through the adoption of
modern best practices and technology.
Strategic Activities
1. Modernization via Leveraging Technology
9. Collaboration Improvements
75
BART Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
76
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
2139 Implement OBIEE Business Implement OBIEE Performance Implement OBIEE Performance Implement OBIEE Performance
Analytics Performance Reporting (KPIs) Phase 2 Reporting (KPIs) Phase 3 Reporting (KPIs) Phase 4
Reporting (KPIs) Phase 1 Districtwide Districtwide Districtwide
Districtwide
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
77
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
2151 Perform Maintenance & Perform MARIS Upgrade 2
Reliability Information System
(MARIS) Upgrade 1
2141 Define Enterprise Scheduling Implement Phase 1 of the Implement Phase 2 of the Monitor & Evaluate Enterprise
Improvement Program Enterprise Scheduling Program Enterprise Scheduling Program Scheduling Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
78
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
FINANCE
1405 Investigate Options to Eliminate Paper Check
Eliminate Paper Check Payments
Payments
OCIO
2194 Define Improvements to Implement Phase 1 Implement Phase 2
Modernize the Overall Financial Improvements to Modernize Improvements to Modernize
Business Process the Overall Financial Business the Overall Financial Business
Process Process
2134 Position PeopleSoft Financial to Evaluate Mobile Technology for Implement Phase 2 of
Support the District's Business PeopleSoft Financial PeopleSoft Financial Upgrade
Process Modernization & Districtwide
Technology Initiatives (Phase 1)
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
79
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
Efforts are already underway to develop comprehensive metrics to improve and strengthen Human Resources
service delivery and responsiveness within our financial capacity; clarify accountability for strategy, outcome setting
and operational actives; as well as reinforce continuous improvement and innovation across the organization.
OCIO
2135 Position PeopleSoft Human Evaluate Mobile Technology for Implement PeopleSoft HCM
Capital Management (HCM) to PeopleSoft HCM Upgrade 2
Modernize HR's Business
Process & Technology Initiatives
2512 Implement
e-Performance in PeopleSoft
HCM
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
80
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
2149 Define & Assess Requirements Implement OCR Diversity
for the Office of Civil Rights Software
Diversity Software
1394 Implement
DBE/MBE/WBE/SB/SBE/MSBE
Support Services District-Wide
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
81
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PROCUREMENT
1147 Convene Working Group to Develop Implementation Monitor, Review, & Implement Monitor, Review, & Implement
Evaluate the Existing Schedule For Procurement Changes to Process Changes to Process
Procurement Process, Including Process Improvements Improvements via Regularly Improvements via Regularly
Organizational Structures & Scheduled Working Group Scheduled Working Group
Work Assignments Meetings Meetings
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
82
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
1216 Define & Assess the Implement Maximo HSE Phase Implement Maximo HSE Mobile Evaluate & Monitor HSE
Requirements of the Maximo 1 - Enterprise HSE Program for & Work Management for Program for Employees
Health, Safety & Environment Employees Employees
(HSE) Program
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
83
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
2195 Define & Analyze Adoption of Advance Adoption of the Asset Complete Adoption of the Evaluate & Monitor the Asset
the Asset Management System Management System Asset Management System Management System
2138 Define & Analyze Implement Asset Analytics Data Implement Asset Analytics Data
Implementation of Asset Quality & Data Hierarchy Quality & Data Hierarchy
Analytics Data Quality & Data Improvement Program (Phase 1) Improvement Program (Phase
Hierarchy Improvement 2)
Program
2137 Define & Analyze Implement Asset Management Implement Asset Management
Implementation of Asset Analytics into OBIEE (Phase 1) Analytics into OBIEE (Phase 2)
Management Analytics into
OBIEE
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
84
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
2167 Complete Regional Anti-
Terrorism Integrated Law
Enforcement System (RAILS)
Project
POLICE DEPARTMENT
1282 Implement Regional Anti-
Terrorism Integrated Law
Enforcement System (RAILS) &
Mobile PSIM Technology
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
85
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
OCIO
2186 Implement a Districtwide Upgrade SharePoint Platform
Collaboration & Information 2016 Program
Sharing Center Platform
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
86
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
BART Strategic Plan
PD&C: PLANNING
2996 Advance District-Wide Increase Number of
Integration of Budget, Departmental Measurable
Performance Evaluation, & Objectives for Day-to-Day
Performance Management Activities by at least 25%
Processes with Strategic Plan
*Rows with blue fill and italicized text indicate SIs assigned by the GM/DGM in May, 2017.
*Rows with a yellow fill indicate planned SIs impacted by budget reductions.
87
*Rows with a red fill indicate planned SIs eliminated due to budget reductions.
THIS PAGE LEFT INTENTIONALLY BLANK
88
SAN FRANCISCO BAY AREA RAPID TRANSIT
FY18 Preliminary Budget
ORGANIZATION CHART
BOARD OF DIRECTORS
CONTROLLER-TREASURER GENERAL COUNSEL GENERAL MANAGER DISTRICT SECRETARY INDEPENDENT POLICE AUDITOR
Rose Poblete Matthew Burrows Grace Crunican Kenneth A. Duron Russell Bloom
Security Programs & Procurement Employment & Transportation & System Program Management
Service Communications
Emergency Management Classification
Internal Audit BART Extensions
Professional Standards/Training Rolling Stock & Shops Marketing & Research
Workforce
Customer Access District Architect
Operations Development Customer Services
Maintenance & Engineering
Budgets Planning
Support Services Employee Services Grant Development
Financial Planning Operations Planning Stations
Earthquake Safety Program Govt & Community
eBART/OAC
Attendance Relations
MANAGING DIRECTOR, CAPITOL CORRIDOR Management Systems
David Kutrosky
Property Development & Real Estate
HRIS & Benefits
Sustainability
Marketing & Communications
Transportation
HEADCOUNT
Engineering
Total Allocation Net
Mechanical Operating 3,518.0 (48.0) 3,470.0
Capital 857.0 48.00 905.0
Planning & Programming
Reimbursable 41.5 - 41.5
Note: Annualized FTE as of FY18 year-end
89
GENERAL MANAGER OFFICE - 01
FY18 Preliminary Budget
General Manager
Grace Crunican
*The Department Manager, Office of Civil Rights, has dotted line reporting responsibility to the General Manager for all EEO, Title VI and DBE matters
90
SYSTEM SAFETY DEPARTMENT 1303
FY18 Preliminary Budget
Operating Rules and Procedures Safety Codes and Standards Injury and Illness Prevention
Accident/Incident Investigations BECO/Real Estate Reviews Facility Safety Inspections
Internal Safety and Security Audits Design and Const. Reviews Employee Safety Training
FTA Natl Transit Database Safety Certification Plans Industrial Hygiene Program
CPUC Operational Issues Emergency Exiting Program JUMHSC Meetings/Issues
Operations Safety Compliance
Program System Safety Program Plan CalOSHA Issues
Fire Department Programs Statistical Analysis/Reports Accident/Incident Investigations
RWP and Near-Miss Programs BART-to-OAK/eBART Safety
Safety Culture Improvement
Programs
Safety Complaint Investigation
Tort/Lawsuits Response
TOTAL HEADCOUNT
Environmental Permits and Plans
Operating 15.0
Hazardous Materials Management
Capital 4.0
Environmental Compliance Issues REI -
Note: Annualized FTE as of FY18 year-end.
91
Departmental Four Year Work Plan: SYSTEM SAFETY
SYSTEM SAFETY
Engineering Safety
Administer the BART Engineering Safety Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
92
Departmental Four Year Work Plan: SYSTEM SAFETY
SYSTEM SAFETY
Engineering Safety
Administer Design/Construction/BECO Safety Review -
Environmental Compliance
Administer Hazardous Material Business Plans at Covered -
Facilities
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
93
Departmental Four Year Work Plan: SYSTEM SAFETY
SYSTEM SAFETY
System Safety
Contribute to the FTA Transit Safety & Oversight Rulemaking: 49 Met
CFR Part 670, 672, 673, and 674
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
94
OFFICE OF CIVIL RIGHTS - 1304
FY18 Preliminary Budget
Department Manager*
Wayne Wong
Contract & Labor Compliance Economic Opportunity Policies and Workforce and Policy Compliance
Sharon Moore
Programs Programs
Hayden Lee Ruby Smith
Contract Compliance
Reporting
Subrecipient Monitoring
TOTAL HEADCOUNT
Operating 14.8
Capital 12.3
*The Department Manager, Office of Civil Rights, has dotted line reporting responsibility to the General Manager for all EEO, Title VI and DBE matters. REI -
Note: Annualized FTE as of FY18 year-end.
95
Departmental Four Year Work Plan: OFFICE OF CIVIL RIGHTS
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
96
Departmental Four Year Work Plan: OFFICE OF CIVIL RIGHTS
Respond to Internal & External EEO Complaints & Investigations <90 Days
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
97
Departmental Four Year Work Plan: OFFICE OF CIVIL RIGHTS
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
98
Office of the Chief Information Officer - 0504
FY18 Preliminary Budget
Administration
Portal/
Anti-terrorism Computer Support
Documentation
Application Support Administration
Materials &
Maintenance Database
Cyber Security
Administration
HCM Systems
Systems
Telecom Revenue
Programming
Business
Intelligence Information System
Security TOTAL HEADCOUNT
Operating 66.0
Budget/
Planning Capital 1.5
REI 0.5
Note: Annualized FTE as of FY18 year-end.
99
Departmental Four Year Work Plan: OCIO
OCIO
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
100
Departmental Four Year Work Plan: OCIO
OCIO
Process & Review Submitted Projects for the Knowledge >90% Intake
Management Governance Group
Operations
Ensure Availability of Oracle Database 99.9% Uptime
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
101
LABOR RELATIONS - 0505
FY18 Preliminary Budget
Records Management
TOTAL HEADCOUNT
Operating 12.0
Capital -
REI -
Note: Annualized FTE as of FY18 year-end.
102
Departmental Four Year Work Plan: LABOR RELATIONS
LABOR RELATIONS
Labor Relations
Manage the Labor Relations Department -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
103
OFFICE OF THE GENERAL COUNSEL - 02
FY18 Preliminary Budget
General Counsel
Matthew Burrows
Legal
Board of Directors
Capitol Corridor
Construction Contracts
Procurement Contracts
REI -
Note: Annualized FTE as of FY18 year-end.
Special Agreements
Real Estate
104
Departmental Four Year Work Plan: OFFICE OF THE GENERAL COUNSEL
GENERAL COUNSEL
Legal
Respond to all Board of Directors Related Matters Timely 100%
Respond to all Requests for Review of Stop Notices & Stop 10 Days
Notice Releases Timely
Respond to 90% of Requests for Review of Invitation for Bid (IFB) 5 Days
Award Documents Timely
Provide Legal Review & Advice Regarding All Labor Matters 5 Days
Timely
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
105
FINANCE 03
FY18 Preliminary Budget
Controller/Treasurer
Rose Poblete
106
Departmental Four Year Work Plan: FINANCE
FINANCE
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
107
Departmental Four Year Work Plan: FINANCE
FINANCE
Cash Handling
Achieve QPR Metric for AFC Equipment Reliability (shared with 95%
M&E)
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
108
Departmental Four Year Work Plan: FINANCE
FINANCE
Accounts Payable
Manage the Accounts Payable / Accounts Receivable Department -
Prepare & Submit Annual W-2 Files Within Required Timely 100%
Prepare & Distribute Annual 1099s to All Vendors & Contractors 100%
Timely
General Accounting
Manage the General Accounting Department -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
109
Departmental Four Year Work Plan: FINANCE
FINANCE
General Accounting
Submit Annual State Controller's Report eFiling Timely <110 days
Payroll Processing
Administer the Payroll Processing Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
110
Departmental Four Year Work Plan: FINANCE
FINANCE
Insurance
Administer a Compliant Certificates of Insurance Program -
Process Personal Injury & Property Damage Claims Timely <1 Day
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
111
DISTRICT SECRETARY OFFICE - 04
FY18 Preliminary Budget
District Secretary
Kenneth A. Duron
Board Support Regulatory Services Procurement Activities Records Management Authority Services
TOTAL HEADCOUNT
Operating 6.0
Capital -
REI -
Note: Annualized FTE as of FY18 year-end.
112
Departmental Four Year Work Plan: DISTRICT SECRETARY
Board Support
Record & Maintain Official Records of BART Board of Directors' -
Activities
Contract Administration
Sell Bid Documents & Standard Specifications -
Receive & Publicly Open Bids for Contracts & Invitations for Bids -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
113
Departmental Four Year Work Plan: DISTRICT SECRETARY
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
114
EXTERNAL AFFAIRS OFFICE - 06
FY18 Preliminary Budget
TOTAL HEADCOUNT
Operating 52.3
Capital 9.5
REI -
Note: Annualized FTE as of FY18 year-end.
115
MARKETING & RESEARCH - 0602
FY18 Preliminary Budget
Department Manager
Aaron Weinstein
Marketing Manager
AD REVENUE RESEARCH
David Martindale
Ecomarketing
Pre-sale of vouchers to tourists and TOTAL HEADCOUNT
conference attendees
BARTimes
Operating 12.8
Capital 4.0
DSS Postings
REI -
Station/Train Ads
Note: Annualized FTE as of FY18 year-end.
116
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
Promote & Manage BART Blue Sky Festival to Highlight BART April 2017
Sustainability & Environmental Partners in Celebration Of Earth
Day
Generate Ad Revenue
Achieve Advertising Franchise Annual Revenue Targets Meet or
Exceed
Budget
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
117
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
118
COMMUNICATIONS DEPARTMENT - 0603
FY18 Preliminary Budget
Department Manager
Alicia Trost
TOTAL HEADCOUNT
Operating 8.5
Capital 0.5
REI -
Note: Annualized FTE as of FY18 year-end.
119
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
COMMUNICATIONS
Communications
Publish Original Stories on BART.gov Targeted to BART Activities >15
& Spotlight Employees
Media Relations
Administer the 24/7/365 Media Relations Program -
Update the Media Voicemail Line Timely During Major Service =15 Minutes
Disruptions
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
120
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
COMMUNICATIONS
Multimedia
Manage the Multimedia Production Studio -
Public Information
Administer the Posted Fares, Schedules & Maps Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
121
GOVERNMENT & COMMUNITY RELATIONS - 0604
FY18 Preliminary Budget
Department Manager
Roddrick Lee
TOTAL HEADCOUNT
Operating 8.0
Capital 1.0
REI -
Note: Annualized FTE as of FY18 year-end.
122
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
Coordinate Legislative & Advocacy Efforts for BART Cap & Trade -
Projects
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
123
CUSTOMER SERVICES DEPARTMENT - 0605
FY18 Preliminary Budget
Department Manager
Julie Yim
Transit Info Center Customer Comments Customer Response Customer Service Center Ticket Programs Clipper Outreach
BART Info. Complaint Receipt, Customer Outreach Bike Locker program Clipper Program Distribution of Senior
Tracking and Logging & Youth Clipper cards
Interdepartmental Customer Tiny Tickets
Special Projects Administer Disabled Pass
Process & Refer Customer
Advocacy Employer Ticket Sales
Comments
Bulk Mailing of Collaterals Eligibility Program
Customer Service for Internet Ticket Sales
Non-Personnel Complaint CCJPA Company Store Sales
Capitol Corridor Info Teenage Student Discount
Investigation
Ticket Sales & Exchange Program
Support to Regional 511
Promos
Employee Recognition
Awards Program
Clipper
TOTAL HEADCOUNT
Operating 16.0
Capital 2.0
REI -
Note: Annualized FTE as of FY18 year-end.
124
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
CUSTOMER SERVICES
Respond to Customer Requests for Bike Locker Rentals Timely <3 Days
Ticket Programs
Administer the Customer Service Center & Ticket Office at Lake -
Merritt
Respond to Customer Requests for BART Tickets by Mail Timely <3 Days
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
125
GRANT DEVELOPMENT - 0606
FY18 Preliminary Budget
Department Manager
Michael Tanner
TOTAL HEADCOUNT
Operating 4.0
Capital 2.0
REI -
Note: Annualized FTE as of FY18 year-end.
126
Departmental Four Year Work Plan: EXTERNAL AFFAIRS
GRANT DEVELOPMENT
Grant Development
Administer the Federal Grant Application Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
127
POLICE DEPARTMENT - 07
FY18 Preliminary Budget
Chief of Police
Carlos Rojas
POLICE DEPARTMENT
BPD Operations
Maintain Professional & Well Trained Police Force 24/7/365 -
Conduct Train Sweep Inspections Each Shift Per Patrol Officer >6
Maintain Part 1 Crimes Against Persons Per Million Passengers <2 per
Trips Quarter
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
129
Departmental Four Year Work Plan: POLICE DEPARTMENT
POLICE DEPARTMENT
Security Programs
Administer the District Security Program -
Support Services
Manage the 24/7/365 Dispatch 911/ISRC Operation -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
130
Departmental Four Year Work Plan: POLICE DEPARTMENT
POLICE DEPARTMENT
Support Services
Administer the Community Oriented Policing & Problem Solving -
(COPPS) Program
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
131
OPERATIONS OFFICE - 08
FY18 Preliminary Budget
TOTAL HEADCOUNT
Operating 2,684.0
Capital 712.1
REI 14.0
Note: Annualized FTE as of FY18 year-end.
132
MAINTENANCE & ENGINEERING - 0802
FY18 Preliminary Budget
Right-of-Way Facilities
Maintenance Financial Analysis & Quality, Planning &
Maintenance Engineering
Shane Edwards Administration Logistics
Greg Lombardi Lori Lovett
Fannie Pettis (Interim) John Mazza
TOTAL HEADCOUNT
Operating 703.9
Capital 651.1
REI 7.0
Note: Annualized FTE as of FY18 year-end.
.
133
Departmental Four Year Work Plan: OPERATIONS
Facilities Maintenance
AFC
Perform All Inspections & Preventative Maintenance Activities 100%
Communications
Perform All Inspections & Preventative Maintenance Activities 100%
Perform Telephone Adds, Moves & Changes due to BART 3,480 Hrs /
Staffing Growth & Relocations As Needed
Computers
Perform All Inspections & Preventative Maintenance Activities on 100%
a Monthly Basis
Electrical/Mechanical Maintenance
Perform All Inspections & Preventative Maintenance Activities 100%
Administer Contract for In Station & Parking Lot Relamping 100% Monthly
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
134
Departmental Four Year Work Plan: OPERATIONS
Facilities Maintenance
Electrical/Mechanical Maintenance
Provide Project Support on District Wide Operating Projects 14,000 Hrs /
As Needed
Elevator/Escalator
Perform All Inspections & Preventative Maintenance Activities 100%
Facilities/Buildings
Perform All Inspections & Preventative Maintenance Activities 100%
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
135
Departmental Four Year Work Plan: OPERATIONS
Facilities Maintenance
Facilities/Buildings
Administer The Facility Graffiti Abatement Program 100%
Grounds
Perform All Inspections & Preventative Maintenance Activities 100%
Quality Assurance
Develop Quality Assurance Plan 100%
Develop & Maintain Lessons Learned Database For M&E 25% / 10%
Activities
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
136
Departmental Four Year Work Plan: OPERATIONS
Quality Assurance
Update the BFS Quality Specifications for CAD STD 50% / 10%
Update the CAD Manual & Rewrite S.O.P.S For Drafting 50%
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
137
Departmental Four Year Work Plan: OPERATIONS
Review Training Manuals & Deliver Training For SVBX 100% / 50%
(Contingent Upon Project Timeline)
Support Maintenance Groups' Efforts To Plan & Schedule Work 90% / 20%
In Maximo (For Projects & Preventative Maintenance)
Update All Existing Asset & PM Information in Maximo for 100% / 80%
Communications Assets
Review & Approve Site-Specific Work Plans for all Work on BART 100% / 85%
Property
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
138
Departmental Four Year Work Plan: OPERATIONS
Develop & Post Track Allocation KPIs on the M&E Kiosk Page 100% / 50%
Create a "Look Ahead" Process to Plan & Coordinate Long-Term 75% / 50%
Projects (5 Years or more)
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
139
Departmental Four Year Work Plan: OPERATIONS
Update Maximo Assets For New Non-Revenue Vehicles & SVBX 100% / 15%
Integrate Geocar & Maximo (Contingent Upon Geocar Arrival & 25%
IT's Schedule)
ROW Maintenance
NRVS
Perform All Inspections & Preventative Maintenance Activities 100%
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
140
Departmental Four Year Work Plan: OPERATIONS
ROW Maintenance
NRVS
Replace Rubber Tired NRVS Fleet 35 Vehicles /
As Needed
Structures
Perform All Inspections & Preventative Maintenance Activities 100%
Track
Perform All Inspections & Preventative Maintenance Activities 100%
Replace Wood Ties for At-Grade Track (not Interlockings) 800 Ties /
400 Ties
Traction Power
Perform All Inspections & Preventative Maintenance Activities 100%
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
141
Departmental Four Year Work Plan: OPERATIONS
ROW Maintenance
Traction Power
Rebuild Substation DC Rectifier 5/3
Train Control
Perform All Inspections & Preventative Maintenance Activities 100%
Perform Train Control Signal Ground Isolation & Stray Current 10% / As
Damage Repair Systemwide Needed
Provide Replacement & Repair of Yard Local Control Area Train 20% / As
Control Equipment Needed
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
142
Departmental Four Year Work Plan: OPERATIONS
ROW Maintenance
Train Control
Replace Train Control Wayside Impedance Bond (Alstom) with 10% / As
GRS Weezee Bonds Needed
Replace Yard Track Circuit Vital Relays, Cabling & Enclosures 1 Yard / As
Needed
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
*M&E records impacted by the budget display both current & adjusted targets.
143
ROLLING STOCK & SHOPS DEPARTMENT - 0803
FY18 Preliminary Budget
New Car Strategic Administrative Hayward Maintenance Revenue Vehicle Maintenance Reliability, Quality,
Vehicle Maintenance
Procurement Group Complex Sean Steele
Maintenance Engineering Planning Process Development
John Garnham Kimberly White Richard Severo Henry Kolesar Harold Engle Martin Atkinson
Electro Mechanical
Daly City Shop
Repair Shop
Car Appearance
144
Departmental Four Year Work Plan: OPERATIONS
Facilities Maintenance
Administer Ongoing RS&S Shop Equipment Maintenance Timely
Program Completion
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
145
Departmental Four Year Work Plan: OPERATIONS
Administer Regulatory Training for The Injury & Illness Prevention 100%
Program
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
146
Departmental Four Year Work Plan: OPERATIONS
Vehicle Maintenance
Ensure Train Interior Is Kept Free Of Graffiti (Passenger 3.375
Experience Survey Score)
Manage the Mean Time Between System Delays (Hours) >4,000 Hours
Minimize the Number of Repeater Car Hits Per 1,000 Hours <0.5
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
147
Departmental Four Year Work Plan: OPERATIONS
Vehicle Maintenance
Strategic Maintenance Plan (SMP) - Overhaul AC Traction Motors 12
Ensure Adequate Material Stock for the Electronic Repair Shop Within
(ERS) Targeted
Range - 100%
Minimize Supervisor Response Time for the Vehicle Trouble Desk 10 Minutes
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
148
Departmental Four Year Work Plan: OPERATIONS
Vehicle Maintenance
PED Checks - Move Crew 10%
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
149
OPERATIONS PLANNING DEPARTMENT - 0804
FY18 Preliminary Budget
Department Manager
John McCormick
TOTAL HEADCOUNT
Operating 16.0
Capital 5.0
REI -
Note: Annualized FTE as of FY18 year-end.
150
Departmental Four Year Work Plan: OPERATIONS
OPERATIONS PLANNING
Performance Management
Administer the Reliability & Performance Management Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
151
TRANSPORTATION & SYSTEM SERVICE DEPARTMENT - 0805
FY18 Preliminary Budget
Fremont, Dublin/Pleasanton,
Pittsburg/Baypoint & Richmond/Ashby SF & Millbrae/SFO Operations Support &
Operations Control Center
C Line S/A/L/R Lines M/W Lines Review
Frederick Edwards
Linda Vasquez Asiann Chan-Velasco Paula Fraser Tera Hankins
(Interim)
Rail and Station Support
Pts/Baypoint - West Oakland Fremont-Lake Merritt Service Embarcadero-Millbrae/SFO Train Service Delivery
Service Service Monitors Train Movement System Method,
Fremont-Lake Merritt Station Train/Customer On-Time Procedures & Bulletins
Pts/Baypoint - West Oakland Appearance Embarcadero-Millbrae/SFO Performance Administrative & Budget Support
Station Appearance Station Appearance System Emergency Response
Hayward Yard Delay Management Strategies Procurement, Personnel & Payroll
Concord Yard
Daly City Yard Administrative Foreworkers
Fremont TM
Baypoint TM Oversight of Track
Dublin Pleasanton-Castro Valley Maintenance Activities Rules Compliance
Daly City TM
Service Oversight of Fleet Distribution Crisis Intervention
Dublin Pleasanton-Castro Valley SFO & Millbrae TM
Transportation Systems Development
Station Appearance
Employee Development
Dublin TM Zone
Lost & Found
VTA Extension
Warm Springs
TOTAL HEADCOUNT
Training
Operating 1,177.1
Richmond Yard Capital 3.0
Richmond-Ashby Station Appearance REI 7.0
Note: Annualized FTE as of FY18 year-end.
Richmond-Ashby Service
152
Departmental Four Year Work Plan: OPERATIONS
System Service
Achieve Average PES Rating for "Environment - Inside Stations" 3.00
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
153
Departmental Four Year Work Plan: OPERATIONS
Achieve Average PES Rating for "Walkways & Entry Plaza 2.70
Cleanliness"
Transportation Service
Manage Train Delays Attributable to Operational Delays Per 100 <.50
Train Runs
Achieve Average PES Rating for Train Operators Making "Arrival 3.14
Announcements"
Achieve Average PES Rating for Train Operators Making "Train 3.26
Destination Announcements"
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
154
Departmental Four Year Work Plan: OPERATIONS
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
155
eBART/OAC - 0807
FY18 Preliminary Budget
Superintendent eBART
Superintendent- eBART
Operations Oakland Airport Connector
Vehicle Maintenance
Randall Roderick Michael Forte
Robert Haslam
(Interim)
TOTAL HEADCOUNT
Operating 72.0
Capital -
REI -
Note: Annualized FTE as of FY18 year-end.
156
Departmental Four Year Work Plan: OPERATIONS
eBART Operations
Vehicle Meantime Distance Between Failure (MDBF) 30,000 Miles
OAC Operations
Weekday Ridership 3,000
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
157
Planning, Development & Construction 10
FY18 Preliminary Budget
Capital Capital Capital Capital Program Cap ital Program Cor e Cap acity Station Area
Traction Power District Real Estate & Strategic &
Program Program Program Program Management Station s E ng./ Project Delivery Planning Sustainability
Syst ems Architect Prop. Devel. Policy Planning
ESP/HMC eBART WSX SVBX Franklin Wong Con st Mgmt Thomas Val Menotti Holly Gordon
Shir ley Ng (Vacant) Tian Feng Sean Brooks Ellen Smith
Tom Horton Ric Rattray Paul Medved Emile Jilwan (Interim) Dunscombe (Interim)
Aerial eBART Warm Silicon Valley Project Phase 1 Surveying, Station Area
Substation Facilities System
Structures & Extension Springs Berryessa Controls / Station Train Control Excess Land Planning Energy
Replacement Rehabilitation Expansion
Stations Extension Extension Contracts Modernization Sales
Retrofits Engineering / OCC Regional Rail TOD Environment
eBART ADA Projects Permitting,
Coordination Professional Joint New Substation Replacement Coordination Coordination Management
DMU Irvington
Transbay Services Development Leases & Art at System
Procurement Station BART Station
Tube Agreements Engineering / Licenses, BART
Cable Installation Facilities Comprehensive
Retrofits Administration Construction Property BART
Standards Co- Planning
Management, Metro
Other BART Procurement Livermore lead
Station Retail
Facilities Retrofits Oversight Extension EIR Community
Support Systemwide Coordination
(Yards, Shops, Project ROW/ Mapping
Access
Parking, Controls Station Project & GIS/ Placemaking
Structures, Support to Construction Certification Strategic
Systems, etc) Plan Station Project
other Depts
Appraisals/ Development
Security AFC Projects Regional
Acquisitions/
Program Relocations Planning
Construction
Hayward TOD
Maintenance Opportunities/
Complex Solicitation/ TOTAL HEADCOUNT
Negotiations/ Operating 34.9
Hayward Agreements
Yard East Capital 80.2
REI -
Note: Annualized FTE as of FY18 year-end.
158
Departmental Four Year Work Plan: PD&C
PD&C: CONSTRUCTION
Program Management
Meet Contracting Goals for MBE/DBE/WBE/SBE -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
159
Departmental Four Year Work Plan: PD&C
PD&C: PLANNING
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
160
Departmental Four Year Work Plan: PD&C
PD&C: PLANNING
Sustainability
Train Employees on Sustainability 100%
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
161
Departmental Four Year Work Plan: PD&C
PD&C: PLANNING
District Architect
Manage the District's Architect Office -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
162
ADMINISTRATION AND BUDGET OFFICE - 11
FY18 Preliminary Budget
Procurement Support
TOTAL HEADCOUNT
Operating 119.5
Capital 19.5
REI 2.0
Note: Annualized FTE as of FY18 year-end.
163
PROCUREMENT DEPARTMENT - 0503
FY18 Preliminary Budget
Department Manager
Richard Wieczorek
TOTAL HEADCOUNT
Operating 86.0
Capital 9.0
REI -
Note: Annualized FTE as of FY18 year-end.
164
Departmental Four Year Work Plan: ADMIN & BUDGET
PROCUREMENT
Contracts Management
Manage the Contracts Management Department -
Inventory Management
Manage the Inventory Management Department -
Logistics
Manage the Logistics Department -
Procurement Support
Administer the Records Storage Program -
Purchasing
Manage the Inventory & Non-Inventory Purchasing Department -
Strategic Maintenance
Administer the Strategic Maintenance Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
165
CUSTOMER ACCESS DEPARTMENT - 1102
FY18 Preliminary Budget
Department Manager
Bob Franklin
Parking Policy & Procedures ADA ParaTransit Station Feeder Service (Shuttles, Dept. Budget Coordination
AirBART)
Contract Arrangements (MUNI, Accounting
Paid Parking Programs (Monthly, LAVTA, CCTA, Tri-Delta) Transit Coordination
Reserved, Long Term, Daily Paid) Operating/Capital Projects
Systemwide Accessibility
Station Access Improvement
Contracted Services
TOTAL HEADCOUNT
Operating 7.0
Capital -
REI -
Note: Annualized FTE as of FY18 year-end.
166
Departmental Four Year Work Plan: ADMIN & BUDGET
CUSTOMER ACCESS
Accessibility Services
Administer BART Accessible Services Program -
Bicycle Program
Administer Bicycle Access Program -
Parking Program
Administer BART Paid Parking Permit Programs -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
167
BUDGET DEPARTMENT - 1104
FY18 Preliminary Budget
Department Manager
Robert Umbreit
Grant Compliance/
Operating Budgets
Kate Jordan
Capital Management
Janice Lee
168
Departmental Four Year Work Plan: ADMIN & BUDGET
BUDGET
Operating Budgets
Produce Preliminary Budget Memo by March 31st Met
Close Out Prior FY Budget & Obtain Board Approval by October Met
31
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
169
Departmental Four Year Work Plan: ADMIN & BUDGET
BUDGET
Operating Budgets
Prepare Monthly Budget Reports Met
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
170
FINANCIAL PLANNING DEPARTMENT - 1106
FY18 Preliminary Budget
Financial Planning
Pam Herhold
TOTAL HEADCOUNT
Operating 4.5
Capital 2.5
REI 2.0
Note: Annualized FTE as of FY18 year-end.
171
Departmental Four Year Work Plan: ADMIN & BUDGET
FINANCIAL PLANNING
Financial Planning
Manage BART's Operating Source & Allocation Budget -
Prepare the Short Range Transit Plan / Capital Improvement Odd Fiscal
Program, Biennially Years
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
172
INTERNAL AUDIT DEPARTMENT - 1302
FY18 Preliminary Budget
Department Manager
Terry Green (Interim)
Contract Audits/Claims/Rates
Compliance/Performance Audits
Performance/Compliance
Sales Tax Revenue Audits
Special Investigations
TOTAL HEADCOUNT
Operating 7.0
Capital 4.0
REI -
Note: Annualized FTE as of FY18 year-end.
173
Departmental Four Year Work Plan: ADMIN & BUDGET
INTERNAL AUDIT
Internal Audit
Conduct Contract Audits Supporting Capital Projects -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
174
CAPITOL CORRIDOR OFFICE - 14
FY18 Preliminary Budget
Managing Director
David B. Kutrosky
Equipment Allocation Train Operations Capital Program Planning Contract Management Promotions
Equipment Cleanliness Bus Operations Maintenance Planning Financial Planning BART TIC 1
Equipment Ops. & Storage On Board Services Track Maintenance Capital Program/Budget Website
Station Operations
Equipment Maintenance Stations Database Management
Budget
Renovation / Acquisition Maintenance Facilities Project Development
Contract Compliance
TOTAL HEADCOUNT
Operating -
Capital -
REI 24.0
Note: Annualized FTE as of FY18 year-end.
1: Day-to-day administrative responsibilities are with BART Transit Information Center (7.0 FTE) Customer Service (0605378)
175
Departmental Four Year Work Plan: CAPITOL CORRIDOR
CAPITOL CORRIDOR
Capitol Corridor
Budget Management <$35,855,000
Revenue >$29,558,000
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
176
INDEPENDENT POLICE AUDITOR 17
FY18 Preliminary Budget
TOTAL HEADCOUNT
Operating 3.0
Capital -
REI -
Note: Annualized FTE as of FY18 year-end.
177
Departmental Four Year Work Plan: INDEPENDENT POLICE AUDITOR
Review at Least One Policy per Year & Issue Recommendations 1 Policy Per
for Change When Appropriate Year
Facilitate Training Sessions for the Citizen Review Board >4 Exercises
Per Year
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
178
HUMAN RESOURCES- 18
FY18 Preliminary Budget
Workforce Development
Attendance Management
Employee Services
HRIS & Benefits
TOTAL HEADCOUNT
Operating 34.6
Capital 5.0
REI 1.0
Note: Annualized FTE as of FY18 year-end.
179
HUMAN RESOURCES ADMIN - 0502
FY18 Preliminary Budget
Human Resources
Dept Manager
Vacant
Compensation/Pay Rates Workforce Development Employment & Classification Employee Services Attendance Management
TOTAL HEADCOUNT
Operating 31.6
Capital 5.0
REI 1.0
180
Departmental Four Year Work Plan: HUMAN RESOURCES
HUMAN RESOURCES
Employee Relations
Administer the Health & Welfare Benefits Program -
Employee Services
Administer the Drug & Alcohol Testing Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
181
Departmental Four Year Work Plan: HUMAN RESOURCES
HUMAN RESOURCES
Workforce Development
Administer the Workforce Development Program -
*Rows with a yellow fill indicate day-to-day activities impacted by budget reductions.
*Rows with a red fill indicate day-to-day activities eliminated due to budget reductions.
182
THIS PAGE LEFT INTENTIONALLY BLANK
183
INCOMESTATEMENT Adopted Revised Change
($millions) FY17 FY18 $ %
Revenue
RailPassengerRevenue 510.0 510.8 0.8 0%
ADAPassengerRevenue 0.9 0.9 0.0 1%
SubtotalNetPassengerRevenue 510.8 511.7 0.8 0%
ParkingRevenue 33.5 35.0 1.5 5%
OtherOperatingRevenue 27.5 32.1 4.6 17%
TotalOperatingRevenue 571.8 578.8 6.9 1%
FinancialAssistance
SalesTaxRevenue 249.2 252.5 3.2 1%
PropertyTax 38.6 42.2 3.6 9%
VTAFinancialAssistance 7.1 7.1
StateTransitAssistance(STA) 8.9 26.8 17.9 200%
Local&OtherAssistance 13.4 10.2 (3.2) 24%
TotalFinancialAssistance 310.1 338.8 28.6 9%
OPERATINGSOURCES,Subtotal 882.0 917.5 35.6 4%
5307RailCarFundSwap(Federal) 47.1
CAPITALSOURCES 876.3 997.9 121.6 14%
TOTALOPERATING&CAPITALSOURCES 1,758.3 1,915.4 157.2 9%
NetLaborandBenefits* 499.6 541.9 42.3 8%
OPEBUnfundedLiability 2.4 3.1 0.6 25%
Traction/StationPower 41.0 43.3 2.3 6%
OtherNonLabor 120.5 125.1 4.6 4%
ADAParatransitService 14.2 15.0 0.8 5%
OAC 6.1 6.3 0.2 3%
OtherPurchasedTransportation 7.7 8.0 0.4 5%
TotalOperatingExpense 691.5 742.7 51.2 7%
5307RailCarFundSwapExpense 47.1
DebtService&Allocations
BondDebtService 51.7 50.8 (1.0) 2%
CapitalAllocations 141.1 127.1 (14.0) 10%
TotalDebtService&Allocations 192.9 177.9 (15.0) 8%
OPERATINGUSES,Subtotal 884.4 920.6 36.2 4%
OPEBUnfundedLiability 2.4 3.1 0.6
NETOPERATINGRESULT 0.0 0.0 (0.0)
SystemReinvestment 584.5 673.1 88.6 15%
Safety&Security 68.0 70.4 2.4 4%
EarthquakeSafety 60.6 100.6 40.0 66%
Service&CapacityEnhancement 48.6 74.8 26.2 54%
SystemExpansion 109.2 73.5 (35.7) 33%
Reimbursable/Other 5.5 5.5 0.0 1%
CAPITALUSESTOTAL 876.3 997.9 121.6 14%
TOTALOPERATING&CAPITALUSES 1,760.7 1,918.5 157.8 9%
NETRESULT 0.00 0.00
*NetLaborandBenefitsincludesapproximately$30MoflaborcostsforHMC,eBART,andSVBX.
184
FY18 Revised Preliminary Budget Balancing Proposals
To address the $31M operating deficit projected for the FY18 Revised Preliminary Budget,
expense reductions, fare increases, and adjustments to capital allocations are proposed to balance
the FY18 Adopted Budget.
Shortly after BART released its FY18 Preliminary Budget, the passage of Senate Bill 1 (SB1) greatly
improved BARTs financial outlook. SB1 provides for new formula-based funding sources for
public transit, with increases to the existing diesel sales tax rate augmenting the current State
Transit Assistance (STA) program. BART anticipates approximately $16.2M in STA funds in
FY18. Based upon this additional funding, staff proposed to remove service reductions and
reducing the discount for seniors and riders with disabilities from consideration in the FY18
budget.
Expense Reductions
Position Reductions - $5.3M savings
In FY18, a reduction of the operating headcount by 39.5 FTEs is proposed. Of these reductions, 15
vacant positons will be eliminated and 24.5 will be converted to capital positions. These
reductions will not result in any layoffs and will result in a total savings of approximately $5.3M
in FY18. Reductions by Executive Office are summarized below.
The reductions are distributed across BARTs collective bargaining units as follows:
Cuts Conversions Total % Total
Nonrep 4.0 3.5 7.5 19%
AFSCME 2.0 - 2.0 5%
ATU - - - 0%
SEIU 9.0 21.0 30.0 76%
BPOA/BPMA - - - 0%
TOTAL 15.0 24.5 39.5 100%
Fare Increases
Staff brought several fare modification options for Board consideration at its March 9th Board
meeting and the Board selected the following options for further study:
Surcharge on trips made with magnetic stripe paper tickets
185
Discount reduction from 62.5% to 50% for seniors, people with disabilities1, and youth age
5 through 12
Staff have completed the Title VI fare equity analysis and public outreach required for these fare
changes, and the following changes are proposed for the FY18 Budget, effective January 2018:
A. Implement a Magnetic Stripe Ticket Per Trip Surcharge - $5.6M additional revenue
Currently, about one-third of BART trips are made with magnetic stripe tickets, and the
remaining two-thirds with Clipper cards. By January 2018, BART anticipates having at least one
Clipper card dispensing ticket vending machine at each station. Placing a surcharge on fares paid
with magnetic stripe tickets could help shift riders to the Clipper card in support of the regional
goal of optimizing Clipper use on transit. A mag stripe surcharge could also generate additional
revenue. The flat surcharge is estimated to generate up to approximately $11.1M annually, or
$5.6M for one-half of FY18.
Results from the Title VI fare equity analysis showed that low-income riders could be
disproportionately impacted by either a flat or percentage surcharge. Of the 128 Title VI outreach
respondents who chose to comment on this option, approximately 59% were not in favor. Survey
option ratings show agreement and disagreement was split regarding a $0.50 flat surcharge, but
more respondents disagreed with a percentage surcharge of up to 10%. To address potential
adverse impacts on low-income riders, staff will implement a mitigation action plan to distribute
free Clipper cards, which low-inocme riders can use to pay their fares and avoid the surcharge.
A flat $0.50 surcharge on paper ticket fares, which is estimated to generate up to $5.6M for one-
half of FY18, is assumed for the FY18 Budget.
B. Reduce to 50% the 62.5% Discount for Youth Age 5-12 - $0.1M additional revenue
Results from the Title VI fare equity analysis show that the discount reduction could result in an
adverse impact on youth age 5 through 12, who are disproportionately minority and low-income.
The option of offering a 50% discount to riders through age 18, however, was rated as Excellent
or Good by almost 2/3s of surveyed parents of protected riders age 5-12. The proposed
mitigation for the discount reduction is the benefit to youth riders of a significant 50% discount
for an additional six years.
The FY18 Budget includes a revenue gain of $0.1M from reducing the discount for youth age 5
through 12 years to 50%. The cost of extending the 50% discount to riders through age 18 is
included in the FY18 Proposed Initiatives Section.
1 Discount change for seniors and people with disabilities was removed from consideration with the April 2017 passage of SB1.
186
ongoing capital projects for which grants are not typically available, such as stations and facilities
renovation, inventory buildup, non-revenue vehicle replacement, tools and other capitalized
maintenance. It is expected that unused prior year allocations to make up the shortfall from the
one-time FY18 reduction and that priority for FY18 allocations will be given to local match needs.
Fare Rev
OPERATING FTE Labor Non-Labor Total
Reduction
Fare Evasion Control* 7.0 $ 740,748 $ 50,000 $ 790,748
Weekend Ridership Promotion - - 300,000 300,000
Upgrade Board Room Equipment - - 75,000 75,000
Workforce Development Grant Match - 500,000 - 500,000
Extend 50% Discount to Riders age 13-18 (1,500,000)
OPERATING TOTAL 7.0 $ 1,240,748 $ 425,000 $ 1,665,748 $ (1,500,000)
* Funding supplemented by Access funding below
CAPITAL Total
Upgrade Board Room Equipment $ 50,000
CAPITAL TOTAL $ 50,000
187
to raise the stakes for fare evaders, and assure our riders that we value their patronage and
investment and foster the expectation that every rider pay their fair share. The activities directly
below will be funded by the General Fund; and the Access Initiatives section further below
details additional Fare Evasion activities funded by parking fees allocated to Access projects.
BARTs strategy includes increased staffing and establishing fare enforcement teams, clarifying
fare policy and rules through a new BART ordinance, and development of new tools that enable
ticket reading outside of station agent booths. An initial team of designated fare inspectors will
be engaged to focus on fare evasion, with support from sworn BART officers. BART proposes to
add six Community Service Officers (CSOs) and one Police Administrative Specialist (PAS) to
assist with fare evasion efforts.
Regulations prohibiting fare evasion exist today, but BART policy and specific rules related to
enforcing those regulations are outdated. BART has drafted an ordinance to reinforce that all
people in the paid area of BART must possess a valid ticket, and to clarify proof-of-payment
requirements. This draft ordinance will be brought to the Board for adoption.
Currently, the only method of checking whether a ticket is valid is at a station agent booth. BART
staff has designed and prototyped a remote hand-held device which can inspect fare media, note
their validity, and print a record of the inspection and findings. These devices will be procured
to BARTs specifications. With these devices, an officer or station agent can quickly check for a
valid ticket from any location.
Fare enforcement teams, equipped with the new hand-held fare media readers and the clarified
policy and rules from an Ordinance, will be positioned to fairly and equitably enforce fare
evasion throughout our stations and on-board trains.
188
development classes.
Extend a 50% Youth Discount to Riders through Age 18 $1.5M Fare Revenue Reduction
One additional proposed initiative would result in a reduction in fare revenue. The Board
directed staff to consider extending the age of the youth discount and staff has previously
completed the Title VI analysis and public outreach for this option.
BART currently offers a 62.5% discount to youth age 5 through 12, and a 50% discount with the
Orange ticket for students who attend middle and high schools participating in that discount
program. The option under consideration is to offer all youth age 5 through 18 a 50% discount.
Thus, the discount for youth age 5 through 12 would be reduced from 62.5% but still be
significant, and all youth age 13 through 18 would have access to a 50% discount. Offering a
discount to youth through age 18 supports the regions goal of consistent discount policies among
transit operators, as most of the regions operators offer a youth discount to riders through age
18, including Muni, AC Transit, SamTrans, Caltrain, Golden Gate Transit, and VTA.
As this option would extend a discount, there would be a cost to the program. The FY18 Budget
assumes that approximately 75% of eligible riders would use the discount, for an estimated
revenue reduction of $1.5M in FY18 if implemented in January 2018. FY18 Proposed Stations &
Access Initiatives
Stations & Access Initiatives are funded by estimated revenue from Parking Program fee
modifications (described in Section 4 of the Preliminary Budget Memo), and aim to directly
improve customer experience at stations.
CAPITAL Total
Fare Evasion Barriers & Control** $ 1,855,000
Parking Enforcement Productivity Improvement 400,000
Parking Program Software Upgrades 300,000
Carpool Enhancement Program 100,000
Public Safety & Security Initiative 415,629
Brentwood Transit Center 400,000
Public Address System Modernization 525,000
Station Sustainability 500,000
Station Entrance Security 270,000
CAPITAL TOTAL $ 4,765,629
** Funding supplemented by general funds above. The Fare Evasion Access capital funding programming is not
finalized, and may include capital FTE.
189
Fare Evasion Barriers & Control $1.9M Capital
As discussed in the Strategic Initiative section above, BART is taking steps to address fare evasion.
The activities below will be funded by Access funding and the Strategic Initiatives section above
details Fare Evasion activities funded by General Fund resources. As noted in the Capital table
above, the Fare Evasion capital project using Access funds is not yet finalized, and may include
changes to the detail of activities or addition of capital FTEs.
Station Hardening: Field observations and consultation with station agents have proven the
vulnerability of boundaries between paid and free areas. Barrier, exit, and fare gate
functionalities are being re-defined in BARTs Facility Standards, with evasion control as a
design criterion. Solutions include raising barriers and service gates to a uniform height of 60
inches, eliminating all non-fare gates other than one immediately adjacent to each station agent
booth, and ensuring that fare gates open to provide emergency egress capacity. Elevators
between free areas and platforms are being evaluated at specific locations regarding limiting
their use to passengers with valid fare media.
Specific investments vary from station to station according their size and equipage, and are being
incorporated in specifications for station modernization. Priority is given to those stations that
see the highest rates of evasion, specifically Embarcadero, Montgomery, Powell, and Civic
Center, as well as other high-volume stations throughout the network. All stations must
ultimately comply with the revised BART Facility Standards, through phased annual work
programming. BART is evaluating vulnerable points in the system and deploying improvements
to secure these areas.
Technology Investment: BART needs accurate fare evasion data to guide prioritization of our
capital plan and inform our fare evasion control teams. BART is piloting video analytics for fare
evasion by using existing camera feeds to gather person counts and provide improved fare
evasion data. With additional funding in FY18, BART can further develop fare evasion
monitoring and analysis.
Minimum Balance Requirement for Magnetic Stripe Tickets: A common method of fare
evasion is for passengers to gain access to the system with a minimum-fare ($1.95) ticket2, then to
leave the system at their destination station without processing their ticket at a fare gate. Initial
hardening efforts have revealed the number of passengers using this strategy to pay much less
than the valid fare for their trip. One strategy to deter this behavior is to increase the minimum
balance required to purchase a magnetic stripe ticket from a ticket vending machine by a factor
of at least two. This will reduce the number of potential trips for which this type of fare evasion
is advantageous and increase the revenue that BART collects on trips where this method of
evasion is employed, while minimizing the impact on customers acting in good faith. There is no
cost to implement this strategy.
2
The minimum fare will be $2.00 effective January 1, 2018 as determined by BARTs inflation-based fare increase
program.
190
permit and daily parkers payments with their license plates. In future budget years, this may
require the hiring of more administration review officers for the citation appeal process. It also
may require modifications in the medium term to parking validation machines for cash paying
parkers.
Public Safety and Security Initiative 8.0 FTE, $0.8M Operating, $0.4M Capital
BARTs Customer Satisfaction ratings have steadily declined over the past few years, from 74%
(2014) to 69% (2016). This decline can be attributed to many factors, including concerns over
public safety, security and station cleanliness. To address this issue, BART will implement an
initiative to address public conduct, trespassing, station cleanliness, and enforcement.
This initiative includes up to four Community Service Officers (CSOs) assigned to the downtown
San Francisco stations. BART commuters and staff have identified significant public health
concerns with the increased use of illegal injected drugs and related paraphernalia, which is
especially problematic at the Civic Center and Powell Street stations. The CSOs would be
dedicated to monitoring these two stations and reporting to BART police officers upon discovery
of illicit activities. The constant presence of CSOs in troubled areas of the station should improve
the station environment. The CSOs presence will be supplemented by four System Service
Workers (SSWs) to provide additional attention to station cleaning in the Market Street
stations, and other measures to activate these spaces to improve the station environment. To
facilitate compliance, BART will install signage at the downtown San Francisco stations to clearly
identify that disorderly conduct is not allowed.
It should be noted that the FY18 budget continues BARTs funding contribution to the San
Francisco Homeless Outreach Team (SFHOT). In FY17, BART allocated $50,000 to help fund
SFHOT, to develop a pilot program for outreach workers to engage the homeless population in
the Civic Center and Powell Street stations, and to potentially connect them to resources. BART
is working with the San Francisco Department of Homelessness and Supportive Housing and San
Francisco Municipal Transportation Agency on the details of this program, and aim to implement
in the summer, pending City staff availability. BART plans to continue this partnership and
investment in the future.
191
center served initially by TriDelta Transit, with access via the Mokelumne Coast to Crest multi-
use trail, and parking; Mokelumne Trail bridge over Highway 4 in Brentwood; and planning for
a possible future extension of eBART. Funding could contribute to partnered environmental
review, property acquisition, station design, bridge design, and TriDelta Transit route planning.
Brentwood Transit Center would serve Brentwood, Antioch, Oakley, and Byron/Discovery Bay.
192