Obra "CONSTRUCCIN E IMPLEMENTACIN DE LA INFRAESTRUCTURA DE LA I.E.I. DIVINO NIO JESUS, SATIPO - SATIPO - JUNN"
Localidad SATIPO
Distrito SATIPO
Provincia SATIPO
Regin JUNIN
Cliente GOBIERNO REGIONAL DE JUNN Fecha JULIO - 2017
Descripcin ESTRUCTURAS Hecho A.J.A.Q
METRADOS
PARTIDA DESCRIPCION
UND. VECES LARGO ANCHO ALTO AREA PARCIAL
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION MASIVA
02.01.01.01 EXCAVACION MASIVA CON EXCAVADORA 115-165HP m3
1.00 1347.79 1347.79
02.01.01.02 EXCAVACION PARA GEOMEMBRANA m3
1.00 17.56 0.42 1.75 12.75
02.01.02 EXCAVACION MANUAL
02.01.02.01 EXCAVACIN MANUAL DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL m3
ZC 01 1.00 1.70 40.53 68.90
CIMIENTO PARA ESCALERA -1.00 1.10 0.60 -0.66
ZC 02 1.00 1.65 1.65 1.70 4.63
ZC 03 1.00 5.30 1.80 1.70 16.22
ZC 04 1.00 1.70 12.35 21.00
ZC 05 1.00 25.65 1.40 1.70 61.05
ZC 06 1.00 1.70 46.17 78.49
ZC 07 1.00 23.07 1.20 1.70 47.06
02.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3
C-2 S/EJE B ENTRE EJE 4 Y EJE 5 1.00 2.73 0.50 1.10 1.50
C-3 S/EJE C ENTRE EJE 4 Y EJE 5 1.00 2.80 0.60 1.10 1.85
C-1 S/EJE 1 ENTRE EJE A Y B 1.00 2.15 0.60 1.15 1.48
C-1 S/EJE 1 ENTRE EJE B Y C 1.00 1.36 0.60 1.15 0.94
C-1 S/EJE 3 ENTRE EJE A Y B 1.00 1.22 0.60 0.95 0.70
C-1 S/ EJE 3 ENTRE EJE B Y C 1.00 1.50 0.60 0.95 0.86
C-1 S/EJE 4 ENTRE EJE A Y B 1.00 1.22 0.60 0.95 0.70
C-1 S/EJE 5 ENTRE EJE A Y B 1.00 2.28 0.60 0.70 0.96
C-1 S/EJE 5 ENTRE EJE B Y C 1.00 0.27 0.60 0.70 0.11
C-2 S/EJE 8 ENTRE B Y C 1.00 2.30 0.50 1.10 1.27
C-2 S/EJE 9 ENTRE B Y C 1.00 2.30 0.50 1.10 1.27
C-2 S/EJE 9 ENTRE C Y D 1.00 2.55 0.50 1.10 1.40
C-2 S/EJE B ENTRE EJE 9 Y 10 1.00 3.80 0.50 1.10 2.09
C-2 S/EJE 10 ENTRE B Y C 1.00 2.30 0.50 1.10 1.27
C-3 S/EJE 10 ENTRE C Y D 1.00 2.65 0.60 1.10 1.75
C-2 S/EJE 11 ENTRE B Y C 1.00 2.35 0.50 1.10 1.29
C-2 S/10-11 ENTRE B Y C 1.00 3.30 0.50 1.10 1.82
C-2 S/EJE 12 ENTRE B Y C 1.00 2.30 0.50 1.10 1.27
C-2 S/EJE 12 ENTRE C Y D 1.00 2.55 0.50 1.10 1.40
VIGA DE CIMENTACION EJE 1-1 1.00 3.40 0.40 1.00 1.36
VIGA DE CIMENTACION EJE 3-3 1.00 3.35 0.50 1.00 1.68
VIGA DE CIMENTACION EJE 4-4 1.00 3.85 0.50 1.00 1.93
VIGA DE CIMENTACION EJE 5-5 1.00 3.25 0.40 0.80 1.04
VIGA DE CIMENTACION EJE 7-7 1.00 4.85 0.25 0.40 0.49
VIGA DE CIMENTACION EJE 8-8 1.00 4.85 0.25 0.40 0.49
VIGA DE CIMENTACION EJE 9-9 1.00 4.85 0.25 0.40 0.49
VIGA DE CIMENTACION EJE 10-10 1.00 4.85 0.25 0.40 0.49
VIGA DE CIMENTACION EJE 11-11 1.00 4.85 0.25 0.40 0.49
VIGA DE CIMENTACION EJE 12-12 1.00 4.85 0.25 0.40 0.49
RAMPA DESDE EL EJE E 1.00 18.80 1.00 0.70 13.16
RAMPA DESDE EL EJE F 1.00 15.15 1.00 0.70 10.61
PLACA GUARDIANIA 1.00 0.80 1.00 0.80 0.64
CERCO CONCRETO 1.00 11.60 0.50 0.60 3.48
02.01.03 RELLENOS
02.01.03.01 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO CON PLANCHA 5.8 HP. m3
ZC 01 1.00 1.10 40.53 44.58
PLACA DEL EJE 1 -1.00 1.85 0.15 1.10 -0.31
PLACA DEL EJE 3 -1.00 2.45 0.15 1.10 -0.40
PLACA DEL EJE 4 -1.00 2.45 0.15 1.10 -0.40
PLACA DEL EJE 5 -1.00 1.75 0.15 1.10 -0.29
COLUMNAS T .50X.50 -2.00 AREA 0.1875 1.10 -0.41
MURO DE CONTENCION -1.00 16.41 0.15 1.10 -2.71
C -1 S/EJE 1 dentro de z1 -1.00 0.75 0.35 0.55 -0.14
C -1 S/EJE 3,4 dentro de z1 -1.00 0.80 0.35 0.35 -0.10
C -1 S/EJE 5 dentro de z1 -1.00 0.50 0.35 0.10 -0.02
CIMIENTO PARA ESCALERA -1.00 AREA 0.60 0.60 -0.36
ZC 02 1.00 1.10 2.73 3.00
COLUMNAS T .50X.50 -1.00 AREA 0.19 1.10 -0.21
C -1 S/EJE 1 dentro de z2 -1.00 1.40 0.35 0.55 -0.27
ZC 03 1.00 1.10 9.54 10.49
COLUMNA T .50X.60 -1.00 AREA 0.21 1.10 -0.23
COLUMNA T .50X.50 -1.00 AREA 0.19 1.10 -0.21
C -1 S/EJE 3 dentro de z3 -1.00 1.30 0.35 0.35 -0.16
C -1 S/EJE 4 dentro de z3 -1.00 0.65 0.35 0.35 -0.08
C -1 S/EJE B dentro de z3 -1.00 0.95 0.35 0.50 -0.17
ZC 04 1.00 1.10 12.35 13.59
COLUMNA .25X.40 -1.00 AREA 0.19 1.10 -0.21
COLUMNA L .40X.60 -1.00 AREA 0.10 1.10 -0.11
C -1 S/EJE 1 dentro de z4 -1.00 0.65 0.35 0.55 -0.13
C -3 S/EJE C dentro de z4 -1.00 0.92 0.35 0.50 -0.16
ZC 05 1.00 AREA 35.91 1.10 39.50
C -2 S/EJE 1 dentro de z5 -1.00 21.37 0.35 0.55 -4.11
C-1 S EJE/5 dentro z5 -1.00 0.38 0.35 0.10 -0.01
C -2 S/EJE 8 dentro de z5 -1.00 0.50 0.35 0.50 -0.09
C -2 S/EJE 9 dentro de z5 -1.00 0.50 0.35 0.50 -0.09
C -2 S/EJE 10 dentro de z5 -1.00 0.50 0.35 0.50 -0.09
C -2 S/EJE 11 dentro de z5 -1.00 0.50 0.35 0.50 -0.09
C -2 S/EJE 12 dentro de z5 -1.00 0.35 0.35 0.50 -0.06
C -2 S/EJE enter 10, 11 dentro de z5 -1.00 0.57 0.35 0.50 -0.10
COLUMNA T .50X.60 -1.00 AREA 0.21 1.10 -0.23
COLUMNA L .40X.40 -2.00 AREA 0.14 1.10 -0.30
COLUMNA T.40X.40 -5.00 AREA 0.14 1.10 -0.76
ZC 06 1.00 1.10 46.17 50.79
C -3 S/EJE C dentro de z6 -1.00 10.10 0.35 0.50 -1.77
C -3 S/EJE C' dentro de z6 -1.00 8.00 0.35 0.50 -1.40
C -2 S/EJE C dentro de z6 -1.00 3.20 0.35 0.50 -0.56
C-2 S/EJE 5 dentro de z6 -1.00 0.42 0.35 0.10 -0.01
C-2 S/EJE 8 dentro de z6 -1.00 0.50 0.35 0.50 -0.09
C-2 S/EJE 9 dentro de z6 -1.00 0.50 0.35 0.50 -0.09
C-2 S/EJE 10 dentro de z6 -1.00 0.60 0.35 0.50 -0.11
C-2 S/EJE 10 dentro de z6 -1.00 0.72 0.45 0.50 -0.16
C-2 S/EJE 11 dentro de z6 -1.00 0.55 0.35 0.50 -0.10
C-2 S/EJE 12 dentro de z6 -1.00 1.32 0.35 0.50 -0.23
COLUMNA L .40X.40 -1.00 AREA 0.14 1.10 -0.15
COLUMNA T.40X.40 -6.00 AREA 0.14 1.10 -0.91
COLUMNA .25X.40 -4.00 AREA 0.10 1.10 -0.44
PLACA EJE 5 dentro de z6 -1.00 AREA 0.54 1.10 -0.59
MURO DE RAMPA DE Z6 -1.00 3.55 0.15 1.10 -0.59
ZC 07 1.00 1.10 27.70 30.47
C-2 S/EJE D dentro de z7 -1.00 16.38 0.35 1.10 -6.31
C-2 S/EJE 9 dentro de z7 -1.00 0.40 0.35 0.50 -0.07
C-2 S/EJE 10 dentro de z7 -1.00 0.40 0.45 0.50 -0.09
C-2 S/EJE 12 dentro de z7 -1.00 0.40 0.35 0.50 -0.07
MURO RAMPA DENTRO DE Z7 -1.00 1.20 0.15 1.10 -0.20
COLUMNA T .40X.40 -1.00 AREA 0.14 1.10 -0.15
COLUMNA .25X.40 -4.00 AREA 0.10 1.10 -0.44
COLUMNA L .40X.40 -2.00 AREA 0.14 1.10 -0.30
C-2 S/EJE B ENTRE EJE 4 Y EJE 5 1.00 2.73 0.35 0.50 0.48
C-3 S/EJE C ENTRE EJE 4 Y EJE 5 1.00 2.80 0.35 0.50 0.49
C-1 S/EJE 1 ENTRE EJE A Y B 1.00 2.15 0.35 0.55 0.41
C-1 S/EJE 1 ENTRE EJE B Y C 1.00 1.36 0.35 0.55 0.26
C-1 S/EJE 3 ENTRE EJE A Y B 1.00 1.22 0.35 0.35 0.15
C-1 S/ EJE 3 ENTRE EJE B Y C 1.00 1.50 0.35 0.35 0.18
C-1 S/EJE 4 ENTRE EJE A Y B 1.00 1.22 0.35 0.35 0.15
C-1 S/EJE 5 ENTRE EJE A Y B 1.00 2.28 0.35 0.10 0.08
C-1 S/EJE 5 ENTRE EJE B Y C 1.00 0.27 0.35 0.10 0.01
C-2 S/EJE 8 ENTRE B Y C 1.00 2.30 0.35 0.50 0.40
C-2 S/EJE 9 ENTRE B Y C 1.00 2.30 0.35 0.50 0.40
C-2 S/EJE 9 ENTRE C Y D 1.00 2.55 0.35 0.50 0.45
C-2 S/EJE B ENTRE EJE 9 Y 10 1.00 3.80 0.35 0.50 0.67
C-2 S/EJE 10 ENTRE B Y C 1.00 2.30 0.35 0.50 0.40
C-3 S/EJE 10 ENTRE C Y D 1.00 2.65 0.35 0.50 0.46
C-2 S/EJE 11 ENTRE B Y C 1.00 2.35 0.35 0.50 0.41
C-2 S/10-11 ENTRE B Y C 1.00 3.30 0.35 0.50 0.58
C-2 S/EJE 12 ENTRE B Y C 1.00 2.30 0.35 0.50 0.40
C-2 S/EJE 12 ENTRE C Y D 1.00 2.55 0.35 0.50 0.45
RAMPA EJE E 1.00 18.80 0.80 0.40 6.02
RAMPA EJE F 1.00 15.15 0.80 0.40 4.85
PLACA GUARDIANIA 1.00 0.80 0.75 0.30 0.18
CERCO CONCRETO 1.00 11.60 0.25 0.30 0.87
02.01.04 NIVELACIONES
02.01.04.01 NIVELACION Y COMPACTADO DE T.N. m2
AREA TOTAL 1.00 783.00 783.00
AREA DE COLUMNAS (-) -8.00 0.40 0.25 -0.80
1360.54
12.75
296.68
60.69
183.36
751.94
184.98
177.43
63.16
1.03
13.49
247.43
0.97
8.21
101.32
40.53
18.56
HOJA DE METRADOS - ESTRUCTURAS
CREACION DE LA INFRAESTRUCTURA DE FORTALECIMIENTO EN GESTION COMUNITARIA EN EL CENTRO POBLADO DE SAN ISIDRO DE ACOBAMABA, DISTRITO DE SAN MARCOS DE ROCCHAC-TAYACAJA-
Obra
HUANCAVELICA"
Localidad SAN ISIDRO DE ACOBAMBA
Distrito SAN MARCOS DE ROCCHAC
Provincia TAYACAJA
Regin HUANCAVELICA
Cliente MUNICIPALIDAD DISTRITAL DE SAN MARCOS DE ROCCHAC Fecha AGO-2016
Descripcin ESTRUCTURAS Hecho B.L.S.G
CANTIDAD
PARCIAL
PARCIAL
CONCRETO ARMADO
3/8" 1/2" 5/8"
L A H L A #ELEM. LONG.
ITEM DESCRIPCION 0.560 0.994 1.552
1.01 BLOQUE 1
02.03.01 ZAPATAS
Z-1 1 AREA 40.53 0.50 20.27 9.00 20.81 5/8" 290.67
8.00 20.81 5/8" 258.38
22.00 2.40 3/4" INF./SUP.
15.00 4.76 3/4" INF.
10.00 4.76 5/8" SUP. 73.88
9.00 2.65 3/4" INF.
7.00 2.65 5/8" SUP. 28.79
49.00 1.05 5/8" INF./SUP. 79.85
19.00 2.45 3/4" INF.
14.00 2.45 5/8" SUP. 53.23
39.00 3.90 3/4" INF.
25.00 3.90 5/8" SUP. 151.32
40.00 2.45 3/4" INF./SUP.
Z-2 1 1.65 1.64 0.50 1.35 9.00 1.50 5/8" 20.95
9.00 1.49 5/8" 20.81
Z-3 1 5.30 1.80 0.50 4.77 7.00 5.15 5/8" 35.83
27.00 1.65 5/8" 44.28
Z-4 1 AREA 12.35 0.50 6.18 11.00 7.37 3/4" INF.
7.00 7.37 5/8" SUP. 80.07
14.00 1.60 5/8" INF./SUP. 34.76
24.00 2.29 5/8" INF./SUP. 54.63
60.00 1.25 5/8" INF./SUP. 116.40
Z-5 1 AREA 35.96 0.50 17.98 14.00 26.50 5/8" INF./SUP. 575.79
206.00 1.25 5/8" INF./SUP. 399.64
30.00 1.75 5/8" INF./SUP. 81.48
Z-6 1 AREA 46.10 0.50 23.05 14.00 24.62 5/8" INF./SUP. 534.94
26.00 2.85 5/8" INF./SUP. 115.00
190.00 1.55 5/8" INF./SUP. 457.06
Z-7 1 AREA 27.68 0.50 13.84 6.00 23.92 5/8" INF./SUP. 222.74
186.00 1.05 5/8" INF./SUP. 303.11
87.43 0.00 0.00 4033.63
02.03.02 VIGAS DE CIMENTACION
VC 0.40X0.80 EJE 01 1 ### ### ### 2.76 8.64 1.60 13.82 6.00 9.00 1/2" 53.68
3.00 10.96 1"
6.00 10.96 1"
51.00 2.40 1/2" 121.67
VC 0.50X1.00 EJE 03 y EJE 04 2 ### ### ### 6.93 6.93 2.00 27.72 8.00 7.10 1/2" 56.46
3.00 7.90 1"
7.00 7.90 1"
46.00 2.00 1/2" 91.45
VC 0.40X0.80 EJE 05 1 ### ### ### 2.21 6.90 0.80 5.52 6.00 7.06 1/2" 42.11
3.00 7.86 1"
6.00 7.86 1"
47.00 2.40 1/2" 112.12
VC 0.25X0.40 EJE 04 6 ### ### ### 4.14 6.90 0.80 33.12 2.00 8.32 1/2" 16.54
4.00 8.32 3/8" 18.64
4.00 7.52 5/8"
36.00 1.30 3/8" 26.21
16.04 80.18 44.84 494.02 0.00
02.03.03 SOBRECIMIENTO ARMADO
CONCRETO C:H 1:8 + 25% PM
C 1-1 EJE A-B 1 4.24 0.25 0.85 0.90 4.24 1.10 9.33 34.00 1.65 3/8" 31.42
6.00 4.44 3/8" 14.92
C 1-1 EJE B-C 1 2.59 0.25 0.85 0.55 2.59 1.10 5.70 20.00 1.65 3/8" 18.48
6.00 2.79 3/8" 9.37
C 3-3 y 4-4 EJE A-B 1 1.76 0.25 0.65 0.29 1.76 0.90 3.17 14.00 1.45 3/8" 11.37
4.00 1.96 3/8" 4.39
C 5-5 EJE A-B 1 3.17 0.25 0.40 0.32 3.17 0.65 4.12 25.00 1.20 3/8" 16.80
2.00 3.37 3/8" 3.77
C 8-8 EJE B-C 1 3.30 0.15 0.80 0.40 3.30 0.95 6.27 26.00 1.60 3/8" 23.30
6.00 3.50 3/8" 11.76
C 9-9 EJE B-D 1 7.60 0.15 0.80 0.91 7.60 0.95 14.44 62.00 1.60 3/8" 55.55
6.00 7.95 3/8" 26.71
C 9-9 EJE B-D ESP Y COL -1 2.05 0.15 0.80 -0.25 2.05 0.95 -3.90 16.00 1.60 3/8" -14.34
6.00 2.25 3/8" -7.56
C 10-10 EJE B-D 1 7.45 0.15 0.80 0.89 7.45 0.95 14.16 60.00 1.60 3/8" 53.76
6.00 7.65 3/8" 25.70
C 10-10 EJE B-D COL -1 0.40 0.15 0.80 -0.05 0.40 0.95 -0.76 4.00 1.60 3/8" -3.58
6.00 0.60 3/8" -2.02
C 11-11 EJE B-C 1 3.37 0.15 0.80 0.40 3.37 0.95 6.40 26.00 1.60 3/8" 23.30
6.00 3.57 3/8" 12.00
C 12-12 EJE B-D 1 7.45 0.15 0.80 0.89 7.45 0.95 14.16 60.00 1.60 3/8" 53.76
6.00 7.65 3/8" 25.70
C 12-12 EJE B-D COL ESP -1 1.30 0.15 0.80 -0.16 1.30 0.95 -2.47 10.00 1.60 3/8" -8.96
6.00 1.50 3/8" -5.04
ENTRE EJE 10-11 1 2.58 0.15 0.80 0.31 2.58 0.95 4.90 20.00 1.60 3/8" 17.92
6.00 2.78 3/8" 9.34
C B-B EJES 6-12 1 23.90 0.15 0.80 2.87 23.90 0.95 45.41 191.00 1.60 3/8" 171.14
6.00 24.10 3/8" 80.98
C B-B COL -7 0.40 0.15 0.80 -0.34 0.40 0.95 -5.32 4.00 1.60 3/8" -25.09
6.00 0.60 3/8" -14.11
C B-B EJES 4-5 1 4.34 0.15 0.80 0.52 4.34 0.95 8.25 34.00 1.60 3/8" 30.46
6.00 4.54 3/8" 15.25
C C-C EJES 4-5 1 6.07 0.25 0.80 1.21 6.07 1.05 12.75 48.00 1.60 3/8" 43.01
6.00 6.27 3/8" 21.07
C C-C y C C'-C' EJES 6-9 1 11.03 0.15 0.80 1.32 11.03 0.95 20.96 88.00 1.60 3/8" 78.85
6.00 11.23 3/8" 37.73
C C-C y C'-C' COL -4 0.40 0.15 0.80 -0.19 0.40 0.95 -3.04 4.00 1.60 3/8" -14.34
6.00 0.60 3/8" -8.06
C C-C 1 19.17 0.15 0.80 2.30 19.17 0.95 36.42 152.00 1.60 3/8" 136.19
6.00 19.31 3/8" 64.88
C C-C COL -4 0.40 0.15 0.80 -0.19 0.40 0.95 -3.04 4.00 1.60 3/8" -14.34
6.00 0.60 3/8" -8.06
C C-C ESP -1 4.87 0.15 0.80 -0.58 4.87 0.95 -9.25 38.00 1.60 3/8" -34.05
6.00 5.07 3/8" -17.04
C D-D EJES 9-12 1 12.47 0.15 0.80 1.50 12.47 0.95 23.69 100.00 1.60 3/8" 89.60
6.00 12.63 3/8" 42.44
C D-D EJES 9-12 ESP Y COL -1 3.65 0.15 0.80 -0.44 3.65 0.95 -6.94 28.00 1.60 3/8" -25.09
6.00 3.85 3/8" -12.94
ENTRE EJES B-C 1 7.43 0.15 0.80 0.89 7.43 0.95 14.12 60.00 1.60 3/8" 53.76
6.00 7.63 3/8" 25.64
14.29 209.52 1100.08
02.03.04 COLUMNAS
02.03.04.01 COLUMNAS RECTANGULARES
BLOQUE 1
C1-0.25X0.40
CORTE C'-C' y D-D - EJE 7 2 0.25 0.40 2.50 0.50 2.50 1.30 6.50 4.00 3.40 5/8" 42.21
2.00 3.40 1/2" 13.52
25.00 1.30 3/8" 36.40
CORTE C'-C' y D-D- EJE 8 2 0.25 0.40 3.00 0.60 3.00 ### 7.80 4.00 3.97 5/8" 49.29
2.00 3.97 1/2" 15.78
30.00 1.30 3/8" 43.68
CORTE C'-C' y D-D- EJE 9 2 0.25 0.40 3.63 0.73 3.63 ### 9.44 4.00 3.52 5/8" 43.70
2.00 3.52 1/2" 14.00
31.00 1.30 3/8" 45.14
CORTE C'-C' y D-D- EJE 10' 2 0.25 0.40 4.13 0.83 4.13 ### 10.74 4.00 5.00 5/8" 62.08
2.00 5.00 1/2" 19.88
34.00 1.30 3/8" 49.50
PORTICO DE INGRESO
C1'-0.25X0.50
CORTE A-A EJE 2' y 4' 2 0.25 0.50 4.54 1.14 4.54 ### 13.62 6.00 4.34 5/8" 80.83
22.00 1.50 3/8" 36.96
C2'-0.25X0.25
CORTE A-A EJE 3 y 4 2 0.25 0.25 7.85 0.98 7.85 ### 23.55 4.00 7.65 5/8" 94.98
43.00 1.50 3/8" 72.24
CORTE A'-A' EJE 3 y 4 2 0.25 0.25 7.85 0.98 7.85 ### 23.55 4.00 7.65 5/8" 94.98
43.00 1.50 3/8" 72.24
02.03.04.02 COLUMNAS T
BLOQUE 2
C3-0.40X0.40
CORTE B-B y C-C- EJE 7 2 0.25 0.40 7.05 1.41 7.05 ### 18.33 8.00 7.93 5/8" 196.92
0.25 0.15 7 0.26 7.05 ### 11.28 2.00 7.93 5/8" 49.23
54.00 1.30 3/8" 78.62
54.00 1.30 3/8" 78.62
CORTE B-B y C-C- EJE 8 2 0.25 0.40 6.48 1.30 6.48 ### 16.85 8.00 7.43 5/8" 184.50
0.25 0.15 6.48 0.24 6.48 ### 10.37 2.00 7.43 5/8" 46.13
53.00 1.30 3/8" 77.17
53.00 1.30 3/8" 77.17
CORTE B-B y C-C- EJE 9 2 0.25 0.40 5.93 1.19 5.93 ### 15.42 8.00 6.88 5/8" 170.84
0.25 0.15 5.93 0.22 5.93 ### 9.49 2.00 6.88 5/8" 42.71
49.00 1.30 3/8" 71.34
49.00 1.30 3/8" 71.34
CORTE B-B y C-C- EJE 10 2 0.25 0.40 5.38 1.08 5.38 ### 13.99 8.00 6.33 5/8" 157.19
0.25 0.15 5.38 0.20 5.38 ### 8.61 2.00 6.33 5/8" 39.30
44.00 1.30 3/8" 64.06
44.00 1.30 3/8" 64.06
CORTE B-B y C-C- EJE 11 2 0.25 0.40 4.80 0.96 4.80 ### 12.48 8.00 5.75 5/8" 142.78
0.25 0.15 4.80 0.18 4.80 ### 7.68 2.00 5.75 5/8" 35.70
37.00 1.30 3/8" 53.87
37.00 1.30 3/8" 53.87
CORTE B-B y C-C- EJE 12 1 0.25 0.40 4.75 0.48 4.75 ### 6.18 8.00 5.68 5/8" 70.52
0.25 0.15 4.75 0.18 4.75 ### 3.80 2.00 5.68 5/8" 17.63
37.00 1.30 3/8" 26.94
37.00 1.30 3/8" 26.94
CORTE D-D - EJE 11 1 0.25 0.40 4.75 0.48 4.75 ### 6.18 8.00 5.61 5/8" 69.65
0.25 0.15 5 0.18 4.75 ### 3.80 2.00 5.61 5/8" 17.41
37.00 1.30 3/8" 26.94
37.00 1.30 3/8" 26.94
BLOQUE 3
C4-0.50X0.50
CORTE A-A EJE 2 y 4' 2 0.25 0.50 7.25 1.81 7.25 ### 21.75 8.00 7.22 3/4"
0.25 0.25 7.25 0.45 7.25 ### 14.50 2.00 7.22 3/4"
2.00 7.22 5/8" 44.82
57.00 1.50 3/8" 95.76
57.00 1.50 3/8" 95.76
C4'-0.50X0.50
CORTE B-B - EJE 2 y 3 2 0.25 0.50 7.25 1.81 7.25 ### 21.75 8.00 7.22 5/8" 179.29
0.25 0.25 7.25 0.45 7.25 ### 14.50 2.00 7.22 5/8" 44.82
57.00 1.50 3/8" 95.76
57.00 1.50 3/8" 95.76
C5-0.50X0.60
CORTE B-B - EJE 4 y EJE 5 2 0.25 0.50 7.25 1.81 7.25 ### 21.75 8.00 7.22 5/8" 179.29
0.25 0.35 7.25 0.63 7.25 ### 17.40 2.00 7.22 5/8" 44.82
2.00 7.22 1/2" 28.71
57.00 1.50 3/8" 95.76
57.00 1.70 3/8" 108.53
02.03.04.03 COLUMNAS L
BLOQUE 2
C2-0.40X0.40
CORTE B-B y C'-C'- EJE 6 2 0.25 0.40 7.25 1.45 7.25 ### 18.85 6.00 8.17 5/8" 152.16
0.25 0.15 7.25 0.27 7.25 ### 11.60 2.00 8.17 5/8" 50.72
56.00 1.30 3/8" 81.54
56.00 1.30 3/8" 81.54
CORTE B-B y D-D- EJE 12 2 0.25 0.40 4.75 0.95 4.75 ### 12.35 6.00 5.68 5/8" 105.78
0.25 0.15 5 0.18 4.75 ### 7.60 2.00 5.68 5/8" 35.26
37.00 1.30 3/8" 53.87
37.00 1.30 3/8" 53.87
CORTE D-D- EJE 10 1 0.25 0.40 4.20 0.42 4.20 ### 5.46 6.00 5.12 5/8" 47.68
0.25 0.15 4.20 0.16 4.20 ### 3.36 2.00 5.12 5/8" 15.89
34.00 1.30 3/8" 24.75
34.00 1.30 3/8" 24.75
BLOQUE 3
C6-0.40X0.60
CORTE C-C- EJE 4 1 0.25 0.40 7.25 0.73 7.25 ### 9.43 6.00 7.22 5/8" 67.23
0.25 0.35 7.25 0.63 7.25 ### 8.70 4.00 7.22 5/8" 44.82
57.00 1.30 3/8" 41.50
57.00 1.70 3/8" 54.26
02.03.04.04 COLUMNAS CERCO PERIMETRICO
C-a 1.00 a ### 3 0.22 ### ### 3.45 4.00 4.27 5/8" 26.51
23.00 0.76 3/8" 9.79
C-b 1.00 a ### 3 0.40 ### ### 5.42 4.00 4.27 5/8" 26.51
4.00 4.27 1/2" 16.98
23.00 1.72 3/8" 22.15
C-b/ MUROS DE CONTENCION 2.00 a ### 3 0.81 ### ### 10.83 4.00 3.70 5/8" 45.94
4.00 3.70 1/2" 29.42
21.00 1.72 3/8" 40.45
C-c 1.00 a ### 3 0.24 ### ### 4.04 5.00 4.27 5/8" 33.14
23.00 0.89 3/8" 11.46
3/4" 8mm
2.260 0.395
119.33
161.36
53.90
105.20
343.75
221.48
183.22
1188.24
0.00 0.00
261.08
65.27
326.34
0.00
52.61
17.00
11.62
8.86
17.49
107.58
0.00
0.00
0.00
142.38
142.38
28.77
35.08
9.24
11.85
28.77
35.08
5.10
6.16
3.67
4.27
9.24
11.85
57.40
70.15
34.10
41.71
52.09
63.04
61.76
75.84
20.26
26.07
28.37
36.74
27.09
35.08
10.19
12.32
841.30
74.73
44.32
2.69
1.66
1.67
0.95
1.92
0.95
2.74
1.66
133.29
PARCIAL
1"
3.973
5221.87
130.63
261.26
188.32
439.41
93.68
187.37
1300.68 1839.54
1100.08
5559.22
3968.95
4190.58
40.59
2112.25
2182.03
414.86
1149.92
841.30
112.78
40.17
133.29
RESUMEN DE METRADOS - ESTRUCTURAS
Obra
"CONSTRUCCIN E IMPLEMENTACIN DE LA INFRAESTRUCTURADE LA I.E.I. DIVINO NIO JESUS, SATIPO -
SATIPO - JUNN"
Localidad SATIPO
Distrito SATIPO
Provincia SATIPO
Regin JUNN Fecha
Cliente GOBIERNO REGIONAL DE JUNN Hecho
Descripcin ESTRUCTURAS
JULIO-2017
A.Q.J.A.
METRADO
1,360.54
12.75
296.68
60.69
183.36
751.94
184.98
177.43
63.16
1.03
13.49
247.43
0.97
8.21
87.43
5,221.87
16.04
80.18
1,839.54
14.29
209.52
1,100.08
27.52
452.37
5,559.22
23.96
303.10
3,968.95
29.83
473.96
4,190.58
1.00
6.65
40.59
30.75
349.57
2,112.25
2,790.47
3.31
13.42
125.55
32.07
275.90
2,182.03
7.61
63.06
414.86
9.75
64.99
1,149.92
6.65
90.02
841.30
2.62
34.88
112.78
0.74
7.59
40.17
1.57
47.21
133.29
101.32
40.53
18.56