Sunteți pe pagina 1din 10

CONCOURSE D

FIRE LANE

COBUS BYPASS LANE


COBUS DROP-OFF
COBUS LOADING

SLOPED COVERED
WALKWAY
CONCOURSE D HARDSTAND HOLDROOM

SIDA GATE

MAIN COBUS LOADING


TERMINAL
COBUS BYPASS LANE FIRE ACCESS GATE

SIDA FENCE DEPARTURES DRIVE

ARRIVALS DRIVE

PARKING GARAGE

SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

SITE PLAN A101 1"


1" ==30'-0"
60'-0"
KEY PLAN NOTES
WINDOW WALL - HIGH PERFORMANCE
3 28 CHECK-IN CASEWORK
ALUMINUM FRAMED GLAZING
29 GRAVEL/STONE LANDSCAPE
6 SLOPED COVERED WALKWAY
ELEMENTS
7 ENCLOSED CONCOURSE D CONNECTOR 30 INTERIOR LANDSCAPE
BRIDGE
8 EXTERIOR PORTAL CANOPY 31 MEZZANINE ABOVE
10 GATE DOOR 33 DROP-OFF ZONE
14 SIDA FENCE 34 RETAINING WALL
15 MECHANICAL ROOM 35 EXISTING LANDSCAPE
17 MONUMENTAL STAIR 36 EXISTING STAIR CONCOURSE D
19 SLOPED WALKWAY 37 FIRE ACCESS GATE
22 EXTERIOR LANDSCAPE 38 SIDA GATE
23 CONCRETE CURB 40 FIRE PLACE
24 LINE OF ROOF ABOVE 41 MAJOR SIGNAGE BOARD
25 PLAY AREA 42 SEAT WALL
26 CHARGING STATION
1
27 PORT SEATING A701

1 2 3 4 6 7 8 9 10 11 12 13 14 15 16
405'-0"
30'-0" 30'-0" 30'-0" 30'-0" 15'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
2
FIRE RISER A501
ROOM
283 SF

7
DN 33
8

GATE 2
8
3 GATE 1
GATE COMM. WOMENS MENS
188 SF 1048 SF 699 SF CONCESSIONS
3
GATE GATE A
GATE JAN 585 SF 26
LOUNGE LOUNGE
6 LOUNGE 70 SF 40 2372 SF 2297 SF
2293 SF
2
A.1 UNISEX JAN

55'-5"
A701 UNISEX CIRCULATION 22 3
31 LACTATION 53 SF 70 SF 6262 SF 27 A701
75 SF 41 WALKWAY 1:20 SLOPE
UP 29 3
41'-0"

17 A501
GATE GATE
38 GATE 19 GATE
4 A.2 LOUNGE LOUNGE
LOUNGE 31 2471 SF 30 28 LOUNGE
A501
2224 SF 42 695 SF 1503 SF
22 B
10 22 25

12'-0"
8 GATE 4 GATE 5 8 8 GATE 6 GATE 6A

22 29 30
23 24

1
14 34 14 A501 37 14
35

SIDEWALK

36 DEPARTURES DRIVE

SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

FLOOR PLAN - LEVEL 1 A201 As indicated


1/32" = 1'-0"
KEY PLAN NOTES
WINDOW WALL - HIGH PERFORMANCE
3 28 CHECK-IN CASEWORK
ALUMINUM FRAMED GLAZING
6 SLOPED COVERED WALKWAY 29 GRAVEL/STONE LANDSCAPE
ELEMENTS
7 ENCLOSED CONCOURSE D CONNECTOR 30 INTERIOR LANDSCAPE
BRIDGE
8 EXTERIOR PORTAL CANOPY 31 MEZZANINE ABOVE
10 GATE DOOR 33 DROP-OFF ZONE
14 SIDA FENCE 34 RETAINING WALL
15 MECHANICAL ROOM 35 EXISTING LANDSCAPE
17 MONUMENTAL STAIR 36 EXISTING STAIR
19 SLOPED WALKWAY 37 FIRE ACCESS GATE CONCOURSE D
22 EXTERIOR LANDSCAPE 38 SIDA GATE
23 CONCRETE CURB 40 FIRE PLACE
24 LINE OF ROOF ABOVE 41 MAJOR SIGNAGE BOARD
25 PLAY AREA 42 SEAT WALL
7

26 CHARGING STATION
1
27 PORT SEATING A701

1 2 3 4 6 7 8 9 10 11 12 13 14 15 16

2
A501

DN

WALKWAY 1:20
SLOPE
STOR ELEC 8
166 SF 291 SF 8
6 8
CONCESSIONS
MECHANICAL 600 SF A
2098 SF SEATING
41 287 SF
2
MAIN A701 A.1
OPEN TO BELOW
TERMINAL OPEN TO BELOW
WALKWAY 1:20 SLOPE
OPEN TO BELOW DN 3
17 A501

A.2 19 WALKWAY 1:20 SLOPE


4 DN
A501

8 8 8

24
1
A501

SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

FLOOR PLAN - MEZZANINE A202 As indicated


1/32" = 1'-0"
2 1

6 8 10 EAST ELEVATION

2 4 11 11 5 1

3 8 9 10 4 4 7 4 6 38
WEST ELEVATION

ELEVATION/SECTION NOTES
7 1 1 11 4 12 7
1 METAL ROOF - LIGHT GRAY 11 CLERESTORY
2 STEEL INVERTED KING POST TRUSS 12 VISION GLASS
3 WINDOW WALL - GRAY TINTED HIGH PERFORMANCE 14
SIDA FENCE
ALUMINUM FRAMED GLAZING
4 WHITE METAL PANEL 15 MECHANICAL ROOM
CONCOURSE D
5 LOUVER 16 GATE LOUNGE
14
6 SLOPED COVERED WALKWAY 17 MONUMENTAL STAIR
11'-0"

7 ENCLOSED CONCOURSE D CONNECTOR 18 GLASS GUARDRAIL WITH


BRIDGE STAINLESS STEEL HANDRAIL
8 EXTERIOR PORTAL CANOPY 19 SLOPED WALKWAY
4 3 4 3
9 STRUCTURAL BRACE 38 SIDA GATE
10 GATE DOOR SOUTH ELEVATION NORTH ELEVATION

SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

BUILDING ELEVATIONS A501 1/32" = 1'-0"


As indicated
6 2 15 1 7 9 16 9

MAIN
TERMINAL
MEZZANINE
11' - 7"

LEVEL 1
0"

16 16 17 18 19 NORTH-SOUTH BUILDING SECTION - View West

3 1 6

MEZZANINE
11' - 7"

14
LEVEL 1
0"

16 16 19 17 7 16
NORTH - SOUTH BUILDING SECTION - View East

7 12 1
ELEVATION/SECTION NOTES

NEW
EXISTING
1 METAL ROOF - LIGHT GRAY 11 CLERESTORY 11 3 2 1
2 STEEL INVERTED KING POST TRUSS 12 VISION GLASS
3 WINDOW WALL - GRAY TINTED HIGH PERFORMANCE 14
SIDA FENCE
ALUMINUM FRAMED GLAZING
4 WHITE METAL PANEL 15 MECHANICAL ROOM
14
5 LOUVER 16 GATE LOUNGE MEZZANINE

14'-10"
11' - 7"

11'-10"
6 SLOPED COVERED WALKWAY 17 MONUMENTAL STAIR
7 ENCLOSED CONCOURSE D CONNECTOR 18 GLASS GUARDRAIL WITH LEVEL 1
0"
BRIDGE STAINLESS STEEL HANDRAIL
8 EXTERIOR PORTAL CANOPY 19 SLOPED WALKWAY
19 18
9 STRUCTURAL BRACE 38 SIDA GATE
10 GATE DOOR EAST-WEST BUILDING SECTION - View North

SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

BUILDING SECTIONS A701 1/32" = 1'-0"


As indicated
SECTION PERSPECTIVE NOTES
1 METAL ROOF - LIGHT GRAY 11 CLERESTORY
2 STEEL INVERTED KING POST TRUSS 12 CONCRETE SIDEWALK
3 WINDOW WALL - GRAY TINTED HIGH PERFORMANCE 13
LIGHTING
ALUMINUM FRAMED GLAZING
4 WHITE METAL PANEL 14 MECHANICAL DUCT
5 FIRE PLACE 15 RADIANT FLOOR HEATING
6 GATE LOUNGE 16 CONCESSIONS
7 GATE COUNTER 17 MONUMENTAL STAIR
8 EXTERIOR PORTAL CANOPY 18 GLASS GUARDRAIL WITH
STAINLESS STEEL HANDRAIL
9 GATE SIGNAGE 19 SLOPED WALKWAY
10 GATE DOOR 20 LANDSCAPE

4 3 11 2

11

14
14
13
16
13
9

8 19 18 8

10 17 5 7 10
15
16
20 6
12 15

SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

SECTION PERSPECTIVE A703 3/4" = 1'-0"


SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

EXTERIOR PERSPECTIVE - NE A704


SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

EXTERIOR PERSPECTIVE - NW A705


SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

INTERIOR PERSPECTIVE - FROM MEZZANINE A706


SEATAC CONCOURSE D HARDSTAND HOLDROOM - MAR. 6, 2017

INTERIOR PERSPECTIVE - GROUND LEVEL A707

S-ar putea să vă placă și