Sunteți pe pagina 1din 13

Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY

AMJ
KSA

KSA
ENGG CERT

AMJ
AAA

AAA

AHS
MAH
MAH

RE-ISSUED FOR APPROVAL


ISSUED FOR APPROVAL

KAPSARC & COMMUNITY PROJECTS DEPARTMENTS


DESCRIPTION

DHAHRAN COMMUNITY HOUSING PROJECTS DIVISION


AS-BUILT

BI-10-01382

EXPAND DHAHRAN RESIDENTIAL COMMUNITY


UTILITIES INFRASTRUCTURES AND NETWORKS
JO/EWO

PACKAGE - 2
05/08/15

09/09/15
DATE

07/27/17
NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS

DATE:
07/27/17 ARC FLASH STUDY FOR
PROJECT
ENGINEER
JZM
S/S #46A, S/S #46B AND RESIDENTIAL PAD-MOUNTED
DATE:
CERTIFIED
07/27/17
SF6 LOOPS
AMJ

07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
OPERATIONS
AFS

07/27/17
DATE:
Prepared by
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004

SEPTEMBER 2015
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 1
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY

AMJ
KSA

KSA

TABLE OF CONTENTS
ENGG CERT

AMJ
AAA

AAA

AHS
MAH
MAH

1. OBJECTIVES .................................................................................................................... 3
2. REFERENCE STANDARDS .............................................................................................. 3
3. ELECTRICAL SYSTEM DESCRIPTION ............................................................................ 3
4. VENDOR INFORMATION .................................................................................................. 4
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

5. ARC FLASH STUDY BASIS .............................................................................................. 4


DESCRIPTION

AS-BUILT

6. CALCULATION BASIS ..................................................................................................... 6


7. DATA FOR CALCULATION .............................................................................................. 7
8. LIST OF SWITCHGEAR AND PROTECTIVE RELAY ....................................................... 8
9. ARC FLASH CALCULATION STUDY CASE .................................................................. 11
10. OBSERVATIONS ............................................................................................................ 12
11. RECOMMENDATIONS .................................................................................................... 13
JO/EWO

12. ATTACHMENT ................................................................................................................ 13


05/08/15

09/09/15
DATE

07/27/17
NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS

07/27/17
DATE:
PROJECT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED
AMJ

07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
OPERATIONS
AFS

07/27/17
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 2
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
1. OBJECTIVES
AMJ
KSA

KSA
ENGG CERT

This document specifies worker potential exposure to arc flash energy, which may required
AMJ
AAA

AAA

for the purpose of injury prevention and determination of appropriate levels of personal
AHS
MAH
MAH

equipment (PPE), for the electrical system for the new double-ended 13.8kV substation
46B which will feed the residential pad-mounted SF6 switchgears and 13.8kV distribution
system such as SWCC pump station, and the existing substation No. 16. at Dhahran
residential community.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

2. REFERENCE STANDARDS

2.01 Saudi Aramco Engineering standards

SAES-P-100 BASIC POWER SYSTEM DESIGN CRITERIA


SABP-P-051 ARC FLASH HAZARD ANALYSIS PROCEDURE USING
ETAP SOFTWARE
JO/EWO

2.02 IEEE standards


05/08/15

09/09/15

IEEE STD 1584-2002 Guide for performing Arc flash hazard calculations.
DATE

07/27/17

ANSI C37.91 Guide for Protective Relay Applications to Power system


NFPA 70 National Electric Codes
NO.
REV

01
A

DISCIPLINE

3. ELECTRICAL SYSTEM DESCRIPTION


ENGINEER
AHS

DATE:
07/27/17 It is proposed to expand Dhahran residential community in order to support company
PROJECT
ENGINEER mission and accommodate manpower projected in the future. Under this BI, it is required to
JZM

DATE:
07/27/17 construct new residential villas, apartment buildings, schools, community facilities, and
CERTIFIED
AMJ support facilities to achieve Saudi Aramco residential program. In addition, it is compulsory
DATE:
07/27/17
to design new electrical power distribution system. It is planned to design a new 115kV gas
CONSTRUCTION
AGENCY
AMJ
insulated switchgear (GIS) substation that will interface with National Grid 115kV substation
DATE:
07/27/17
located at Half-moon bay via 2 underground cables.
OPERATIONS
AFS
Moreover, the residential primary distribution system will operate at 13.8kV through looped
07/27/17
DATE:
pad-mounted SF6 switchgears, underground cables, and looped package substations. As a
CONTROL NUMBER
VERIFICATION

result, new double-ended 13.8kV substation will be constructed to feed the residential pad-
EDSD

mounted SF6 loops and all other facilities requires a 13.8kV distribution system such as
DATE:
BY:

SWCC pump station, and the existing substation No. 16.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 3
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
4. VENDOR INFORMATION
AMJ
KSA

KSA

4.1 ABB, 115kV switchgear documents APEP


ENGG CERT

AMJ
AAA

AAA

4.2 EEIC-13.8kV, 480V switchgear,


AHS

4.3 EEIC-package substation


MAH
MAH

4.4 EEIC-13.8kVpad mounted switchgear documents


4.5 ALFANAR- 480V switchgear
4.6 SPTC and WESCOSA, power transformer documents
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

4.7 SEL, MERLIN GERIN, ABB protective relay documents


DESCRIPTION

AS-BUILT

5. ARC FLASH STUDY BASIS

5.1 DEFINITIONS

The following definitions are quoted from IEEE 1584-2002.


JO/EWO

Arc Flash Hazard: A dangerous condition associated with the release of the energy
caused by an electric arc.
05/08/15

09/09/15
DATE

07/27/17

Bolted Fault Current: A short circuit or electrical contact between two conductors at
different potentials in which the impedance or resistance between the conductors is
NO.
REV

01
A

DISCIPLINE essentially zero.


ENGINEER
AHS
Arcing Fault Current: A fault current flowing through electrical arc plasma, also called arc
07/27/17
DATE:
PROJECT fault current and arc current.
ENGINEER
JZM
Working Distance: The dimension between the possible arc point and the head and body
07/27/17
DATE:
CERTIFIED of the worker positioned in place to perform the assigned task.
AMJ

07/27/17 Incident Energy: The amount of energy impressed on a surface, at certain distance from
DATE:
CONSTRUCTION
AGENCY
the source, generated during an electrical arc event.
AMJ
07/27/17
Incident energy is measured in Cal/cm or J/cm
DATE:
OPERATIONS Flash Protection Boundary: An approach limit at a distance from live parts that are
AFS

07/27/17
uninsulated or exposed within which a person could receive a second degree burn. (Syn:
DATE:
arc-flash protection boundary),distance at which the incident energy equals 1.2 Cal/cm or
CONTROL NUMBER
VERIFICATION

5.0 J/cm
EDSD

DATE:
BY:

5.2 CALCULATION METHOD


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

IEEE 1584 Method in ETAP was used in the calculation. It should be noted that the
10-01382-0004
(DCC) NO. _____________________

modeling used by IEEE 1584 and ETAP assumes the worst case scenario that the operator

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 4
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
being exposed to the energized equipment. This means that the operator would be in front
AMJ
KSA

KSA

of the equipment with the doors open at the time the arc was generated at the electrodes.
ENGG CERT

AMJ
AAA

AAA

In Table 130.7(C) (9) of NFPA 70E, Arc Flash Hazard/Risk Category for many tasks in
AHS
MAH
MAH

different equipment are listed, which shall be used when applicable. However it shall be
noted that there are limitations to short Circuit levels and Fault Clearing Times, which are
specified in the notes.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

5.3 FAULT CLEARING TIME (FCT)


AS-BUILT

This is the calculated time in seconds which is needed by the protective device to
completely open and clear the arc fault (extinguish the arc). The protective device (PD)
considered to clear the fault is the one that takes the longer to trip, and it is called source
PD.
JO/EWO

FCT at buses of interest was considered as per the respective primary relay/LVCB settings.
The operation time of Bus Bar protection at 13.8kV is considered to be 0.125 sec. This
05/08/15

09/09/15
DATE

07/27/17

includes relay time of 0.075sec and respective breaker time of 3 cycles (0.05 sec).
NO.
REV

01
A

DISCIPLINE
ENGINEER
5.4 GAP DATA:
AHS

DATE:
07/27/17 The gap between the conductors/buses has been considered from the typical data as
PROJECT
ENGINEER presented in NFPA 70E 2009. The bus gaps and working distances for various bus types
JZM

DATE:
07/27/17 considered for the study are listed in Table-1.
CERTIFIED
AMJ Table 1: Bus Gap & Working Distance
07/27/17
DATE: Voltage Level Bus Gap Working Distance
CONSTRUCTION
AGENCY
S.no Bus Type
AMJ (kV) (mm) (cm)
07/27/17
DATE:
OPERATIONS
1 Switchgear 13.8 153 91.4
AFS
2 Switchgear 0.48 32 61
07/27/17
DATE:
3 Switch Board 0.48 25 45.7
CONTROL NUMBER
VERIFICATION

4 Panel Board 0.48 25 45.7


EDSD

DATE:

5 MCC 0.48 25 45.7


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 5
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY

AMJ
KSA

KSA

5.5 Arc Flash Energy Levels:


ENGG CERT

AMJ
AAA

AAA

The Arc Flash Energy levels are based on Saudi Aramco Standard SABP- P-051 and are
AHS
MAH
MAH

listed in Table-2. It is to be noted that in this report 12 cal/cm2 is considered as limiting level
as per SABP- P-051.
Table 2 - Arc Flash Energy Levels
RE-ISSUED FOR APPROVAL

Minimum Calculated Maximum Calculated


ISSUED FOR APPROVAL

Energy Level
Incident Energy (cal/cm) Incident Energy(cal/cm)
DESCRIPTION

AS-BUILT

0.0 1.2 A
> 1.2 12 B
> 12 40 C
> 40 NA DANGER

6. CALCULATION BASIS
The calculation bases adopted in this document are summarized as shown below.
JO/EWO

6.1 Load data in this calculation is based on following Electrical Load List& Load
05/08/15

09/09/15
DATE

07/27/17

Summary for Substation 46A & 46B as a result of detail design.


NO.
REV

01
A

HE-361186 (Rev.B)
DISCIPLINE
ENGINEER
AHS 6.2 Simplified one line diagram for calculation is based on following one line diagram
07/27/17
DATE:
PROJECT
as a result of detail design.
ENGINEER
JZM

DATE:
07/27/17 Electrical One Line Diagram, LOOP-01 & LOOP-02, FEEDER-4 S/S-46, DWG. AYC-
CERTIFIED
AMJ
E-107-SHT.074 REV. 01
07/27/17
DATE: Electrical One Line Diagram, LOOP-04 & LOOP-05, FEEDER-2 S/S-46, DWG. AYC-
CONSTRUCTION
AGENCY
AMJ
E-107-SHT.075 REV. 01
07/27/17
DATE: Electrical One Line Diagram, SEWAGE LIFT STATION-1 PKJ-2, AYC-E-107-
OPERATIONS
AFS SHT.288-REV.01
07/27/17
DATE: Cable & Conduit Schedule, AYC-E-107-SHT.128-130 REV.03 & SHT.207-
CONTROL NUMBER
VERIFICATION

215-REV.01
EDSD

6.3 Electrical power study-short-circuit parameters at network interface locations


DATE:
BY:

are based on information from Saudi Electricity Company through contractor.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 6
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
7. DATA FOR CALCULATION
AMJ
KSA

KSA

Input data to the calculation software is as listed below


ENGG CERT

AMJ
AAA

AAA

7.1 SYSTEM SHORT CIRCUIT CAPACITY AT THE INTERFACE POINTS.


Table 3: Utility short circuit parameters
AHS
MAH
MAH

LOCATION 3-Phase Single-Line-Ground


115kV GIS kV
I sym (kA) X/R I asym (kA) I sym (kA) X/R I asym (kA)

- MAX 115 15.5 20 - 17.5 6.2 -


RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

- MIN 115 14.2 19.7 - 15.9 6.3 -


DESCRIPTION

AS-BUILT

The above Maximum and Minimum short circuit fault level are consider on the 115kv GIS
substation as received from national grid .

7.2 SWITCHGEAR AND CONTROLGEAR

The switchgears and control gears under Package-2 Contractor scope of work are
included in this report as per substation #SS46A & 46B one line diagrams and
JO/EWO

information from selected manufacturer (ABB, EEIC and ALFANAR).

Data for each transformer is based on vendor (SPTC, WESCOSA) information and
05/08/15

09/09/15
DATE

07/27/17

project specification requirements.


For details of each transformer rating, please refer to the following table. The transformer
NO.
REV

01
A

DISCIPLINE tap setting is selected to achieve close to 100% of nominal voltage as much as possible.
ENGINEER
AHS
The tapping position was applied for all studies.
07/27/17
DATE:
PROJECT
ENGINEER Transformer MVA NOM Open circuit Widing Neutral Selecte Re
JZM %Z voltage (kV) connec Earth d tap mar
07/27/17
DATE: tion Resistor k
CERTIFIED ONA ON prim SEC
AMJ valve[A]
N AF
07/27/17
DATE:
CONSTRUCTION 208-46-XFR- 50 67 9 115 13.8 Dyn1 1000 AOLTC
AGENCY
AMJ 601
07/27/17
DATE:
OPERATIONS 208-46-XFR- 50 67 9 115 13.8 Dyn1 1000 AOLTC
AFS 602
07/27/17
DATE: 208-46-XFR- 1.5 5.75 13.8 0.48 Dyn11 Solidly
CONTROL NUMBER
VERIFICATION

301 grounded
EDSD

208-46-XFR- 1.5 5.75 13.8 0.48 Dyn11 Solidly


DATE:

302 grounded
BY:
REVISIONCERTIFICATION

Loop XFR 1.5 5.75 13.8 0.40 Dyn1 Solidly -2.5%


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

Typ-1 grounded
10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 7
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY

AMJ
KSA

Loop XFR 1.0 5.75 13.8 0.40 Solidly -2.5%


KSA
Dyn1
Typ-2 grounded
ENGG CERT

AMJ
AAA

AAA

Loop XFR 0.5 5.75 13.8 0.40 Dyn1 Solidly -2.5%


AHS

Typ-3 grounded
MAH
MAH

Loop XFR 0.3 5.75 13.8 0.40 Dyn1 Solidly -2.5%


Typ-4 grounded
RE-ISSUED FOR APPROVAL

7.3 CABLE SIZE AND IMPEDANCE DATA


ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

Cable technical data is based from Riyadh Cable information as selected cable
manufacturer.
Followings are used for cable modeling:
- Cable cross sectional area space.
- Cable allowable ampere rating.
- Cable resistance value.
JO/EWO

- Cable reactance value.


- Cable installation length for each load.
05/08/15

09/09/15
DATE

07/27/17

7.4 ELECTRICAL LOAD


NO.
REV

01
A

DISCIPLINE
Electrical load is based on Electrical load list &Load Summary .The load are modeled as
ENGINEER
AHS lumped under each package substation by considering 70% constant KVA and 30%
07/27/17
DATE:
PROJECT
constant Z load.
ENGINEER
JZM The operating conditions were been regarded as:
07/27/17
DATE:
CERTIFIED
C - Continuous Loads (Loads that may continuously be required for normal operation)
AMJ
I - Intermittent Loads (Loads that are required for intermediate operation)
07/27/17
DATE:
CONSTRUCTION S - Standby Loads (Loads that are not required for normal operation and/or for standby
AGENCY
AMJ
duty)
07/27/17
DATE:
OPERATIONS
AFS 8. LIST OF SWITCHGEAR AND PROTECTIVE RELAY
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION

Protective relays for this Project are as following table, further more data refer to vendors
EDSD

data sheet.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 8
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
Table 4: Bus and respective relay details
AMJ
KSA

KSA
ENGG CERT

AMJ
AAA

AAA

SWGR FEEDER NAME DESCRIPTION CT & PT


PROTECTIVE RELAY
AHS
MAH
MAH

FUNC- TYPE
TION / MAKER
13.8kV 208-46-SG-301-A 13.8kV INCOMER A CT1:3000/5A 51P-1 SEL 451/
Switchgear /51NB/27p Schweitzer
( From : 208-46-XFR-
(S60-46-SG301A 1
0-601 )
S60-46-SG301B) CT2:3000/5A 87B1 SEL 587Z/
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

Schweitzer
DESCRIPTION

CT3:3000/5A 87T SEL 487E/


AS-BUILT

Schweitzer
NCT:3000/5A 51NT/51N SEL 751A/
L Schweitzer
PT:13.8kV/12
0v
13.8kV INCOMER B CT1:3000/5A 51P-2 SEL 451/
/51NB/27p Schweitzer
( From : 208-46-XFR-
2
0-602 )
CT2:3000/5A 87B2 SEL 587Z/
JO/EWO

Schweitzer
CT3:3000/5A 87T2 SEL 487E/
Schweitzer
05/08/15

09/09/15
DATE

07/27/17

NCT:3000/5A 51NT/51N SEL 751A/


L Schweitzer
PT:13.8kV/12
NO.
REV

01
A

0V
DISCIPLINE
ENGINEER
208-46-SG-301-A BUS Protection CT: 3000/5A 87B1 SEL 587Z
AHS

07/27/17 208-46-SG-301-B / Schweitzer


DATE:
PT13.8kV/120 87B2
PROJECT
ENGINEER V SEL 451/
JZM
07/27/17 Schweitzer
DATE: CT:3000/5A 51/51G/25
CERTIFIED /27
AMJ
208-46-XFR-301 1.5MVA TR FEEDER CT:100/5A 51/50/50G SEL 751A/
07/27/17
DATE:
208-46-XFR-302 (13.8kV/0.48kV %Z: /27 Schweitzer
CONSTRUCTION CT:50/5A With RELT
AGENCY
AMJ
07/27/17
DATE: Feeder CB B309 to Feeders to 13.8kv CT:600/5A 51/50/50G SEL 751A/
OPERATIONS CB B318 & CB B 321 pad mounted /27 Schweitzer
AFS to CB B330 switchgear at CT:50/5A With RELT
07/27/17 PKG,3,4,5,6,7 , sub
DATE:
16 and SWCC
CONTROL NUMBER
VERIFICATION

480V 208-046-SG-001A 480V Incomer A ACB 2000A LSIG GE entelligaurd


With RELT
EDSD

switchgear 208- (From 208-46-XFR-


046-SG-001 301)
DATE:

(S60-046-SG-
BY:

021A ACB 2000A LSIG GE entelligaurd


208-046-SG-001B 480V Incomer B
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

S60-046-SG-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

With RELT
OF THIS DRAWING IS COVERED, FOR ALL

(From 208-46-XFR-
BY DRAWING COMPLETION CERTIFICATE
01

021B)
302)
10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 9
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY 208-046-SG-001-T ACB 2000A LSIG GE entelligaurd


480VTIE CB
AMJ
KSA

KSA

With RELT
ENGG CERT

480V OUTGOING
AMJ
AAA

AAA

FEEDER
208-046-SG-001CB TO :208-26-MCC-001 ACB 800A LSIG GE entelligaurd
AHS
MAH
MAH

005 With RELT


208-046-SG-001CB ACB 800A
TO :208-26-MCC-002
006

Pad mounted S60-046-PMSG-305 To LOOP 5A CT 1250/1A VIP 300 Merlin Gerin


switchgear S60-046-PMSG-306 To LOOP 5B
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

CT 1250/1A
DESCRIPTION

S60-046-PMSG-305A To LOOP 4A CT 1250/1A VIP 300 Merlin Gerin


AS-BUILT

S60-046-PMSG-306A To LOOP 4B
CT 1250/1A
S60-046-PMSG-301 To LOOP 1 CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-302 To LOOP 2
CT 1250/1A
S60-046-PMSG-333 To LOOP 34 CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-334 To LOOP 33
CT 1250/1A
JO/EWO

S60-046-PMSG-331 To LOOP 31 CT 1250/1A VIP 300 Merlin Gerin


S60-046-PMSG-332 To LOOP 32
CT 1250/1A
05/08/15

09/09/15
DATE

07/27/17

S60-046-PMSG-320 To LOOP 11A CT 1250/1A VIP 300 Merlin Gerin


S60-046-PMSG-321 To LOOP 11B
CT 1250/1A
NO.
REV

01
A

DISCIPLINE S60-046-PMSG-322 To LOOP 12A CT 1250/1A VIP 300 Merlin Gerin


ENGINEER
AHS S60-046-PMSG-323 To LOOP 12B
07/27/17 CT 1250/1A
DATE:
PROJECT S60-046-PMSG-319 To LOOP 58 CT 1250/1A VIP 300 Merlin Gerin
ENGINEER
JZM
S60-046-PMSG-318
07/27/17 Sub 16 switchgear CT 1250/1A
DATE:
CERTIFIED
AMJ S60-046-PMSG-317 To Zone -3 CT 1250/1A VIP 300 Merlin Gerin
DATE:
07/27/17 SG#049-016-301 To existing loads CT 1250/1A VIP 300 Merlin Gerin
CONSTRUCTION
AGENCY
AMJ
07/27/17 LOOP-1,2 Transformer 13.8kV
DATE: Package
OPERATIONS
substation 5A,5B,4A,4B /400v
AFS Primary CT 200 /1A VIP 35
07/27/17
DATE:
Outgoing feeder MCCB MF1 MEMF
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 10
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
9. ARC FLASH CALCULATION STUDY CASE
AMJ
KSA

KSA

9.1 ARC FLASH STUDY NORMAL CASE


ENGG CERT

AMJ
AAA

AAA

AHS

9.1.1 CONFIGURATION
MAH
MAH

a) Incomer-1 ,incomer-2 breaker are closed and bus-tie breakers is


normally open state for 13.8kV switchgear Bus# S60-46-SG301A and
Bus# S60-46-SG301B at substation #46B
b) Minimum short circuit current is contributed from Saudi Electricity
RE-ISSUED FOR APPROVAL

Company grid connected at Sub 46A.


ISSUED FOR APPROVAL

c) Motor contribution is based on Motor Status and Loading Category


DESCRIPTION

AS-BUILT

d) Transformer Tap is considered as Adjust Base kV


e) Pre-fault Voltage = 100%
f) Short circuit current is measured at cycle
g) Transformer impedance tolerance is considered as individual one.

9.1.2 ETAP MODEL SETTING


Revision Presentation Configuration Study Case Output
Status report
JO/EWO

Base OLV1 ARCFLASH_NOR ARCFLASH AF _NOR


NOR
05/08/15

09/09/15
DATE

07/27/17

Scheme- OLV1 ARCFLASH_NOR ARCFLASH AF


2-RELT NOR _NOR_R
NO.
REV

01
A

DISCIPLINE
ENGINEER
AHS For study one line diagram, incident energy summary report and summary table
DATE:
07/27/17 refer to attachments 2, 3 and 4 respectively.
PROJECT
ENGINEER
JZM 9.2 ARC FLASH STUDY MAXIMUM CASE
07/27/17
DATE:
CERTIFIED 9.2.1 CONFIGURATION
AMJ

07/27/17 a) Incomer-1 bus-tie breaker are closed while incomer 2 breaker is in open
DATE:
CONSTRUCTION state for 13.8kV switchgear Bus# S60-46-SG301A and Bus# S60-46-
AGENCY
AMJ SG301B at substation #46B
DATE:
07/27/17 b) Maximum short circuit current is contributed from Saudi Electricity
OPERATIONS Company grid connected at Sub 46A
AFS
c) Motor contribution is based on Motor Status & Loading Category
d) Transformer Tap is considered as Adjust Base kV
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION

e) Pre-fault Voltage = 102%


f) Short circuit current is measured at 1/2 cycle
EDSD

g) Type of fault = Phase fault or Line to Ground fault


DATE:
BY:

h) Transformer impedance tolerance is considered as individual one.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 11
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
9.2.2 ETAP MODEL SETTING
AMJ
KSA

KSA

Revision Presentation Configuration Study Case Output report


ENGG CERT

AMJ
AAA

AAA

Status
Base OLV1 ARCFLASH_MAX ARCFLASH MAX AF _MAX
AHS
MAH
MAH

Scheme- OLV1 ARCFLASH_MAX ARCFLASH MAX AF _MAX_R


2-RELT

For study one line diagram, incident energy summary report and summary table
refer to attachments 2, 3 and 4 respectively.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

AS-BUILT

9.3 ARC FLASH STUDY MINIMUM CASE

9.3.1 CONFIGURATION
a) Incomer-,incomer-2 breaker are closed and bus-tie breakers is normally
open state for 13.8kV switchgear Bus# S60-46-SG301A and Bus# S60-
46-SG301B at substation #46B .
JO/EWO

b) Minimum short circuit current is contributed from Saudi Electricity


Company grid connected at Sub 46A.
c) Motor contribution is based on Motor Status & Loading Category
05/08/15

09/09/15
DATE

07/27/17

d) Transformer Tap is considered as Adjust Base kV


e) Pre-fault Voltage = 100%
NO.
REV

01
A

f) Short circuit current is measured at 1.5 cycle


DISCIPLINE
ENGINEER
AHS
g) Type of fault = Phase fault or Line to Ground fault
07/27/17 h) Transformer impedance tolerance is considered as individual one.
DATE:
PROJECT
ENGINEER
JZM
07/27/17 9.3.2 ETAP MODEL SETTING
DATE:
CERTIFIED
AMJ
Revision Presentation Configuration Study Case Output report
07/27/17
Status
DATE:
CONSTRUCTION
Base OLV1 ARCFLASH_MIN ARCFLASH MIN AF _MIN
AGENCY
AMJ
07/27/17
Scheme- OLV1 ARCFLASH_MIN ARCFLASH MIN AF _MIN_R
DATE:
2-RELT
OPERATIONS
AFS
For study one line diagram, incident energy summary report and summary table
07/27/17
DATE:
refer to attachments 2, 3 and 4 respectively.
CONTROL NUMBER
VERIFICATION
EDSD

10. OBSERVATIONS
DATE:
BY:
REVISIONCERTIFICATION

10.1 SCHEME 1-MAXIMUM, MINIMUM AND NORMAL CONDITION


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004

A few violations of energy levels for bus fault condition are observed. The worst
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 12
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

AFS
AAY

AAY
energy levels are listed in Attachment 5.
AMJ
KSA

KSA
ENGG CERT

AMJ
AAA

AAA

10.2 SCHEME 2- PROPOSED MAXIMUM, MINIMUM AND NORMAL CONDITION


AHS
MAH
MAH

In order to reduce the energy level RELT scheme is used . After implementing the
recommendation it was noticed that there are no violations observed for bus fault
condition. The energy levels are listed in Tables in attachment 7.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION

11. RECOMMENDATIONS
AS-BUILT

Following are the recommendations proposed in order to reduce the incident energy levels
below 8 cal/cm2 considering bus side fault conditions.

Reduced Energy Let-Through (RELT) Instantaneous Trip:


The RELT function basically consists of maintenance switch which will enable the
JO/EWO

Instantaneous function during maintenance. The drawback of this operation is losing


05/08/15

09/09/15

discrimination if fault occurs during the maintenance time which is a rare phenomenon.
DATE

07/27/17

The proposed RELT settings are considered as 85% of maximum bus fault current have been
NO.
REV

01
A

provided in Table of Attachment: 3


DISCIPLINE
ENGINEER
AHS

07/27/17
DATE:
PROJECT 12. ATTACHMENT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED Attachment#1-One Line Diagrams
AMJ

07/27/17
Attachment#2- Study Cases One Line Diagrams
DATE:
CONSTRUCTION Attachment#3- Incident Energy Summary Report
AGENCY
AMJ
07/27/17
Attachment#4- Bus and Line Side Summary Results
DATE:
OPERATIONS Attachment#5- Study Cases One Line Diagrams for Recommendation Case
AFS
Attachment#6- Incident Energy Summary Report for Recommendation Case
07/27/17
DATE:
Attachment#7- Bus and Line Side Summary Results for Recommendation Case
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


01

10-01382-0004
(DCC) NO. _____________________

ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC


208 P HE-P61265 13
UTILITIES INFRASTRUCTURES AND NETWORKS 01
OF
DHAHRAN COMMUNITY SAUDI ARABIA JO / EWO: 10-01382-0004 38
A1 EDSD/2616-0399.doc

S-ar putea să vă placă și