07/27/17 ARC FLASH STUDY FOR
PROJECT
ENGINEER
JZM
S/S #46A, S/S #46B AND RESIDENTIAL PAD-MOUNTED
DATE:
CERTIFIED
07/27/17
SF6 LOOPS
AMJ
07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
OPERATIONS
AFS
07/27/17
DATE:
Prepared by
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
SEPTEMBER 2015
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
AMJ
KSA
KSA
TABLE OF CONTENTS
ENGG CERT
AMJ
AAA
AAA
AHS
MAH
MAH
1. OBJECTIVES .................................................................................................................... 3
2. REFERENCE STANDARDS .............................................................................................. 3
3. ELECTRICAL SYSTEM DESCRIPTION ............................................................................ 3
4. VENDOR INFORMATION .................................................................................................. 4
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
AS-BUILT
09/09/15
DATE
07/27/17
NO.
REV
01
A
DISCIPLINE
ENGINEER
AHS
07/27/17
DATE:
PROJECT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED
AMJ
07/27/17
DATE:
CONSTRUCTION
AGENCY
AMJ
07/27/17
DATE:
OPERATIONS
AFS
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
1. OBJECTIVES
AMJ
KSA
KSA
ENGG CERT
This document specifies worker potential exposure to arc flash energy, which may required
AMJ
AAA
AAA
for the purpose of injury prevention and determination of appropriate levels of personal
AHS
MAH
MAH
equipment (PPE), for the electrical system for the new double-ended 13.8kV substation
46B which will feed the residential pad-mounted SF6 switchgears and 13.8kV distribution
system such as SWCC pump station, and the existing substation No. 16. at Dhahran
residential community.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION
AS-BUILT
2. REFERENCE STANDARDS
09/09/15
IEEE STD 1584-2002 Guide for performing Arc flash hazard calculations.
DATE
07/27/17
01
A
DISCIPLINE
DATE:
07/27/17 It is proposed to expand Dhahran residential community in order to support company
PROJECT
ENGINEER mission and accommodate manpower projected in the future. Under this BI, it is required to
JZM
DATE:
07/27/17 construct new residential villas, apartment buildings, schools, community facilities, and
CERTIFIED
AMJ support facilities to achieve Saudi Aramco residential program. In addition, it is compulsory
DATE:
07/27/17
to design new electrical power distribution system. It is planned to design a new 115kV gas
CONSTRUCTION
AGENCY
AMJ
insulated switchgear (GIS) substation that will interface with National Grid 115kV substation
DATE:
07/27/17
located at Half-moon bay via 2 underground cables.
OPERATIONS
AFS
Moreover, the residential primary distribution system will operate at 13.8kV through looped
07/27/17
DATE:
pad-mounted SF6 switchgears, underground cables, and looped package substations. As a
CONTROL NUMBER
VERIFICATION
result, new double-ended 13.8kV substation will be constructed to feed the residential pad-
EDSD
mounted SF6 loops and all other facilities requires a 13.8kV distribution system such as
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
4. VENDOR INFORMATION
AMJ
KSA
KSA
AMJ
AAA
AAA
AS-BUILT
5.1 DEFINITIONS
JO/EWO
Arc Flash Hazard: A dangerous condition associated with the release of the energy
caused by an electric arc.
05/08/15
09/09/15
DATE
07/27/17
Bolted Fault Current: A short circuit or electrical contact between two conductors at
different potentials in which the impedance or resistance between the conductors is
NO.
REV
01
A
07/27/17 Incident Energy: The amount of energy impressed on a surface, at certain distance from
DATE:
CONSTRUCTION
AGENCY
the source, generated during an electrical arc event.
AMJ
07/27/17
Incident energy is measured in Cal/cm or J/cm
DATE:
OPERATIONS Flash Protection Boundary: An approach limit at a distance from live parts that are
AFS
07/27/17
uninsulated or exposed within which a person could receive a second degree burn. (Syn:
DATE:
arc-flash protection boundary),distance at which the incident energy equals 1.2 Cal/cm or
CONTROL NUMBER
VERIFICATION
5.0 J/cm
EDSD
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
IEEE 1584 Method in ETAP was used in the calculation. It should be noted that the
10-01382-0004
(DCC) NO. _____________________
modeling used by IEEE 1584 and ETAP assumes the worst case scenario that the operator
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
being exposed to the energized equipment. This means that the operator would be in front
AMJ
KSA
KSA
of the equipment with the doors open at the time the arc was generated at the electrodes.
ENGG CERT
AMJ
AAA
AAA
In Table 130.7(C) (9) of NFPA 70E, Arc Flash Hazard/Risk Category for many tasks in
AHS
MAH
MAH
different equipment are listed, which shall be used when applicable. However it shall be
noted that there are limitations to short Circuit levels and Fault Clearing Times, which are
specified in the notes.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION
This is the calculated time in seconds which is needed by the protective device to
completely open and clear the arc fault (extinguish the arc). The protective device (PD)
considered to clear the fault is the one that takes the longer to trip, and it is called source
PD.
JO/EWO
FCT at buses of interest was considered as per the respective primary relay/LVCB settings.
The operation time of Bus Bar protection at 13.8kV is considered to be 0.125 sec. This
05/08/15
09/09/15
DATE
07/27/17
includes relay time of 0.075sec and respective breaker time of 3 cycles (0.05 sec).
NO.
REV
01
A
DISCIPLINE
ENGINEER
5.4 GAP DATA:
AHS
DATE:
07/27/17 The gap between the conductors/buses has been considered from the typical data as
PROJECT
ENGINEER presented in NFPA 70E 2009. The bus gaps and working distances for various bus types
JZM
DATE:
07/27/17 considered for the study are listed in Table-1.
CERTIFIED
AMJ Table 1: Bus Gap & Working Distance
07/27/17
DATE: Voltage Level Bus Gap Working Distance
CONSTRUCTION
AGENCY
S.no Bus Type
AMJ (kV) (mm) (cm)
07/27/17
DATE:
OPERATIONS
1 Switchgear 13.8 153 91.4
AFS
2 Switchgear 0.48 32 61
07/27/17
DATE:
3 Switch Board 0.48 25 45.7
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
AMJ
KSA
KSA
AMJ
AAA
AAA
The Arc Flash Energy levels are based on Saudi Aramco Standard SABP- P-051 and are
AHS
MAH
MAH
listed in Table-2. It is to be noted that in this report 12 cal/cm2 is considered as limiting level
as per SABP- P-051.
Table 2 - Arc Flash Energy Levels
RE-ISSUED FOR APPROVAL
Energy Level
Incident Energy (cal/cm) Incident Energy(cal/cm)
DESCRIPTION
AS-BUILT
0.0 1.2 A
> 1.2 12 B
> 12 40 C
> 40 NA DANGER
6. CALCULATION BASIS
The calculation bases adopted in this document are summarized as shown below.
JO/EWO
6.1 Load data in this calculation is based on following Electrical Load List& Load
05/08/15
09/09/15
DATE
07/27/17
01
A
HE-361186 (Rev.B)
DISCIPLINE
ENGINEER
AHS 6.2 Simplified one line diagram for calculation is based on following one line diagram
07/27/17
DATE:
PROJECT
as a result of detail design.
ENGINEER
JZM
DATE:
07/27/17 Electrical One Line Diagram, LOOP-01 & LOOP-02, FEEDER-4 S/S-46, DWG. AYC-
CERTIFIED
AMJ
E-107-SHT.074 REV. 01
07/27/17
DATE: Electrical One Line Diagram, LOOP-04 & LOOP-05, FEEDER-2 S/S-46, DWG. AYC-
CONSTRUCTION
AGENCY
AMJ
E-107-SHT.075 REV. 01
07/27/17
DATE: Electrical One Line Diagram, SEWAGE LIFT STATION-1 PKJ-2, AYC-E-107-
OPERATIONS
AFS SHT.288-REV.01
07/27/17
DATE: Cable & Conduit Schedule, AYC-E-107-SHT.128-130 REV.03 & SHT.207-
CONTROL NUMBER
VERIFICATION
215-REV.01
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
7. DATA FOR CALCULATION
AMJ
KSA
KSA
AMJ
AAA
AAA
AS-BUILT
The above Maximum and Minimum short circuit fault level are consider on the 115kv GIS
substation as received from national grid .
The switchgears and control gears under Package-2 Contractor scope of work are
included in this report as per substation #SS46A & 46B one line diagrams and
JO/EWO
Data for each transformer is based on vendor (SPTC, WESCOSA) information and
05/08/15
09/09/15
DATE
07/27/17
01
A
DISCIPLINE tap setting is selected to achieve close to 100% of nominal voltage as much as possible.
ENGINEER
AHS
The tapping position was applied for all studies.
07/27/17
DATE:
PROJECT
ENGINEER Transformer MVA NOM Open circuit Widing Neutral Selecte Re
JZM %Z voltage (kV) connec Earth d tap mar
07/27/17
DATE: tion Resistor k
CERTIFIED ONA ON prim SEC
AMJ valve[A]
N AF
07/27/17
DATE:
CONSTRUCTION 208-46-XFR- 50 67 9 115 13.8 Dyn1 1000 AOLTC
AGENCY
AMJ 601
07/27/17
DATE:
OPERATIONS 208-46-XFR- 50 67 9 115 13.8 Dyn1 1000 AOLTC
AFS 602
07/27/17
DATE: 208-46-XFR- 1.5 5.75 13.8 0.48 Dyn11 Solidly
CONTROL NUMBER
VERIFICATION
301 grounded
EDSD
302 grounded
BY:
REVISIONCERTIFICATION
Typ-1 grounded
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
AMJ
KSA
AMJ
AAA
AAA
Typ-3 grounded
MAH
MAH
AS-BUILT
Cable technical data is based from Riyadh Cable information as selected cable
manufacturer.
Followings are used for cable modeling:
- Cable cross sectional area space.
- Cable allowable ampere rating.
- Cable resistance value.
JO/EWO
09/09/15
DATE
07/27/17
01
A
DISCIPLINE
Electrical load is based on Electrical load list &Load Summary .The load are modeled as
ENGINEER
AHS lumped under each package substation by considering 70% constant KVA and 30%
07/27/17
DATE:
PROJECT
constant Z load.
ENGINEER
JZM The operating conditions were been regarded as:
07/27/17
DATE:
CERTIFIED
C - Continuous Loads (Loads that may continuously be required for normal operation)
AMJ
I - Intermittent Loads (Loads that are required for intermediate operation)
07/27/17
DATE:
CONSTRUCTION S - Standby Loads (Loads that are not required for normal operation and/or for standby
AGENCY
AMJ
duty)
07/27/17
DATE:
OPERATIONS
AFS 8. LIST OF SWITCHGEAR AND PROTECTIVE RELAY
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION
Protective relays for this Project are as following table, further more data refer to vendors
EDSD
data sheet.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
Table 4: Bus and respective relay details
AMJ
KSA
KSA
ENGG CERT
AMJ
AAA
AAA
FUNC- TYPE
TION / MAKER
13.8kV 208-46-SG-301-A 13.8kV INCOMER A CT1:3000/5A 51P-1 SEL 451/
Switchgear /51NB/27p Schweitzer
( From : 208-46-XFR-
(S60-46-SG301A 1
0-601 )
S60-46-SG301B) CT2:3000/5A 87B1 SEL 587Z/
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
Schweitzer
DESCRIPTION
Schweitzer
NCT:3000/5A 51NT/51N SEL 751A/
L Schweitzer
PT:13.8kV/12
0v
13.8kV INCOMER B CT1:3000/5A 51P-2 SEL 451/
/51NB/27p Schweitzer
( From : 208-46-XFR-
2
0-602 )
CT2:3000/5A 87B2 SEL 587Z/
JO/EWO
Schweitzer
CT3:3000/5A 87T2 SEL 487E/
Schweitzer
05/08/15
09/09/15
DATE
07/27/17
01
A
0V
DISCIPLINE
ENGINEER
208-46-SG-301-A BUS Protection CT: 3000/5A 87B1 SEL 587Z
AHS
(S60-046-SG-
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
S60-046-SG-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
With RELT
OF THIS DRAWING IS COVERED, FOR ALL
(From 208-46-XFR-
BY DRAWING COMPLETION CERTIFICATE
01
021B)
302)
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
KSA
With RELT
ENGG CERT
480V OUTGOING
AMJ
AAA
AAA
FEEDER
208-046-SG-001CB TO :208-26-MCC-001 ACB 800A LSIG GE entelligaurd
AHS
MAH
MAH
CT 1250/1A
DESCRIPTION
S60-046-PMSG-306A To LOOP 4B
CT 1250/1A
S60-046-PMSG-301 To LOOP 1 CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-302 To LOOP 2
CT 1250/1A
S60-046-PMSG-333 To LOOP 34 CT 1250/1A VIP 300 Merlin Gerin
S60-046-PMSG-334 To LOOP 33
CT 1250/1A
JO/EWO
09/09/15
DATE
07/27/17
01
A
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
9. ARC FLASH CALCULATION STUDY CASE
AMJ
KSA
KSA
AMJ
AAA
AAA
AHS
9.1.1 CONFIGURATION
MAH
MAH
AS-BUILT
09/09/15
DATE
07/27/17
01
A
DISCIPLINE
ENGINEER
AHS For study one line diagram, incident energy summary report and summary table
DATE:
07/27/17 refer to attachments 2, 3 and 4 respectively.
PROJECT
ENGINEER
JZM 9.2 ARC FLASH STUDY MAXIMUM CASE
07/27/17
DATE:
CERTIFIED 9.2.1 CONFIGURATION
AMJ
07/27/17 a) Incomer-1 bus-tie breaker are closed while incomer 2 breaker is in open
DATE:
CONSTRUCTION state for 13.8kV switchgear Bus# S60-46-SG301A and Bus# S60-46-
AGENCY
AMJ SG301B at substation #46B
DATE:
07/27/17 b) Maximum short circuit current is contributed from Saudi Electricity
OPERATIONS Company grid connected at Sub 46A
AFS
c) Motor contribution is based on Motor Status & Loading Category
d) Transformer Tap is considered as Adjust Base kV
07/27/17
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
9.2.2 ETAP MODEL SETTING
AMJ
KSA
KSA
AMJ
AAA
AAA
Status
Base OLV1 ARCFLASH_MAX ARCFLASH MAX AF _MAX
AHS
MAH
MAH
For study one line diagram, incident energy summary report and summary table
refer to attachments 2, 3 and 4 respectively.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION
AS-BUILT
9.3.1 CONFIGURATION
a) Incomer-,incomer-2 breaker are closed and bus-tie breakers is normally
open state for 13.8kV switchgear Bus# S60-46-SG301A and Bus# S60-
46-SG301B at substation #46B .
JO/EWO
09/09/15
DATE
07/27/17
01
A
10. OBSERVATIONS
DATE:
BY:
REVISIONCERTIFICATION
10-01382-0004
A few violations of energy levels for bus fault condition are observed. The worst
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
AFS
AAY
AAY
energy levels are listed in Attachment 5.
AMJ
KSA
KSA
ENGG CERT
AMJ
AAA
AAA
In order to reduce the energy level RELT scheme is used . After implementing the
recommendation it was noticed that there are no violations observed for bus fault
condition. The energy levels are listed in Tables in attachment 7.
RE-ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
DESCRIPTION
11. RECOMMENDATIONS
AS-BUILT
Following are the recommendations proposed in order to reduce the incident energy levels
below 8 cal/cm2 considering bus side fault conditions.
09/09/15
discrimination if fault occurs during the maintenance time which is a rare phenomenon.
DATE
07/27/17
The proposed RELT settings are considered as 85% of maximum bus fault current have been
NO.
REV
01
A
07/27/17
DATE:
PROJECT 12. ATTACHMENT
ENGINEER
JZM
07/27/17
DATE:
CERTIFIED Attachment#1-One Line Diagrams
AMJ
07/27/17
Attachment#2- Study Cases One Line Diagrams
DATE:
CONSTRUCTION Attachment#3- Incident Energy Summary Report
AGENCY
AMJ
07/27/17
Attachment#4- Bus and Line Side Summary Results
DATE:
OPERATIONS Attachment#5- Study Cases One Line Diagrams for Recommendation Case
AFS
Attachment#6- Incident Energy Summary Report for Recommendation Case
07/27/17
DATE:
Attachment#7- Bus and Line Side Summary Results for Recommendation Case
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-01382-0004
(DCC) NO. _____________________
ARC FLASH STUDY DHAHRAN COMMUNITY DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION