DEMO DESCRIPTION
The Demo Script, S/4 HANA Plan to Product: Repetitive Manufacturing focuses on
Sales Order Independent production using Make to Stock (MTS) process order manufacturing
MRP Planning with Independent requirements
Making entry in Planning Table
Back Flush for Dependent Materials
This script starts with creation of Planned Independent Requirements (PIR) manually. The result is
the Independent Requirements for Finished Material, which would be base for MRP Run for
components.
Material Requirements Planning (MRP) run will generates replenishment elements for all the BOM
Components of the finished material. System automatically generates the Planned Order as MRP
element, through which Purchase Requisition generated for Externally Procured materials and
Process Orders for the materials produced in-house. Production Planner will convert theses planned
orders in to process order. As a result, the system reserves all the required components.
Planner will make entries in the planning table for specific production line in Repetitive
Manufacturing. In scheduling, the system calculates the production start and finish dates of the
orders. The finish date determines the period to which the production quantities are assigned in the
planning table. The system also calculates the dates of the planning operation (that is, the operation
with the work center used for scheduling - usually the production line), which are then displayed
separately. If capacity planning is activated, the system carries out the scheduling automatically
when you invoke the planning table.
In this step, components consumption would be done automatically from the system, there by
manual transaction is avoided.
3 Scenario ID 12741
STORYFLOW SUMMARY
Repetitive Manufacturing is commonly used when a production process meets the following criteria:
The same or similar products are produced over a lengthy period of time. The products produced
are not manufactured in individually defined lots. Instead, total quantity is produced over a certain
period at a certain rate per part-period. The products produced always follow the same sequence
through the machines and work centers in production. Routings tend to be simple and do not vary
much.
This document provides a detailed procedure for testing the scope item Error! Reference source
not found. after solution activation, reflecting the predefined scope of the solution. Each process
step, report, or item is covered in its own section, providing the system interactions (test steps) in a
table view. Steps that are not in scope of the process but are needed for testing are marked
accordingly. Project-specific steps must be added.
4 Scenario ID 12741
2. TECHNICAL REQUIREMENTS
SAP DEMO CLOUD - SHOWROOM INFORMATION
For instructions on accessing SDC showrooms see Scenario 8024 in the Demo Store
If this scenario includes a mobile component, instructions for using the SDC Connector are also in
8024. www.sapdemostore.com
Check the Showroom Section for the scenario 12741 in the Demo Store to find the relevant
showrooms for this scenario.
https://cimg4.wdf.sap.corp:44302/sap/bc
RMUSER Welcome1 HE4 400 /ui5_ui5/ui2/ushell/shells/abap/FioriLaun
chpad.html
LOCALIZATION
If translation is available then the screens display is the languages available as indicated below. If
localization is available then the regional data sets are provided in the Data Section.
English Portuguese
German Japanese
French Simplified Chinese
Spanish
Russian
5 Scenario ID 12741