Documente Academic
Documente Profesional
Documente Cultură
5 RD 30 hari
6 GN = genangan
Q4-2016
Luas DTH
Daerah Tangkapan Hujan Lokasi Lokasi Pembuangan
(km2)
DTH 1 Sump A Pond Luar Inul Lignit 1.77
DTH 2 GN B GN A 1.00
DTH 3 GN C GN B 0.74
DTH 4 channel kiri GN A 0.04
DTH 5 channel kanan GN B 0.04
Q1-2017
Luas DTH
Daerah Tangkapan Hujan Lokasi Lokasi Pembuangan
(km2)
DTH 1 Sump A Pond Luar Inul Lignit 1.39
DTH 2 GN B GN A 1.48
DTH 3 GN C GN B 0.76
DTH 4 channel kiri GN A 0.06
DTH 5 channel kanan GN B 0.04
DTH 6 Sump Dump GN A 0.56
Q2-2017
Luas DTH
Daerah Tangkapan Hujan Lokasi Lokasi Pembuangan
(km2)
DTH 1 Sump A Pond Bengkoang 1.33
DTH 2 GN B GN A 1.48
DTH 3 GN C GN B 0.80
DTH 4 channel kiri GN A 0.05
DTH 5 channel kanan GN B 0.04
Q3-2017
Luas DTH
Daerah Tangkapan Hujan Lokasi Lokasi Pembuangan
(km2)
DTH 1 Sump A Pond Bengkoang 1.15
DTH 2 GN B GN A 0.56
DTH 3 GN C GN B 0.82
DTH 4 sump 1 GN A 0.74
DTH 5 sump 2 GN B 0.82
DTH 6 channel kiri GN A 0.06
DTH 7 channel kanan GN B 0.03
Luas DTH
Daerah Tangkapan Hujan Lokasi Lokasi Pembuangan
(km2)
DTH 1 Sump A Pond Bengkoang 1.00
DTH 2 GN B GN A 0.13
DTH 3 GN C GN B 0.83
DTH 4 sump 1 GN A 0.99
DTH 5 sump 2 GN B 1.08
DTH 6 channel kiri GN A 0.07
DTH 7 channel kanan GN B 0.03
Q4_2016
Air yang sudah ada di sump A
meter
Intensitas Curah Hujan debit Limpasan Vol. Limpasan Volume Air Tanah
Koef
(mm/jam) (m3/s) (m3) (m3)
0.9 25.57 11.3 1,225,787 25,920
0.9 25.57 6.4 690,942 25,920
0.9 25.57 4.7 508,183 25,920
0.9 25.57 0.2 25,945 25,920
0.9 25.57 0.2 24,904 25,920
MF 390
Head Loss Factor Total Head Q (L/s) Q (m3/s) RPM
0.75 88 300 0.3 1120
Intensitas Curah Hujan debit Limpasan Vol. Limpasan Volume Air Tanah
Koef
(mm/jam) (m3/s) (m3) (m3)
0.9 25.57 8.9 962,007 25,920
0.9 25.57 9.5 1,024,806 25,920
0.9 25.57 4.8 523,559 25,920
0.9 25.57 0.4 40,577 25,920
0.9 25.57 0.2 26,815 25,920
0.9 25.57 3.6 389,729 25,920
MF 390
Head Loss Factor Total Head Q (L/s) Q (m3/s) RPM
1.09 98 275 0.275 1120
0.38 14 100 0.100 500
Intensitas Curah Hujan debit Limpasan Vol. Limpasan Volume Air Tanah
Koef
(mm/jam) (m3/s) (m3) (m3)
0.9 25.57 8.5 922,060 25,920
0.9 25.57 9.5 1,026,049 25,920
0.9 25.57 5.1 553,586 25,920
0.9 25.57 0.3 37,160 25,920
0.9 25.57 0.2 24,468 25,920
MF 390
Head Loss Factor Total Head Q (L/s) Q (m3/s) RPM
0.31 13 140 0.140 500
Intensitas Curah Hujan debit Limpasan Vol. Limpasan Volume Air Tanah
Koef
(mm/jam) (m3/s) (m3) (m3)
0.9 25.57 7.3 792,321 25,920
0.9 25.57 3.6 388,022 25,920
0.9 25.57 5.2 564,502 25,920
0.9 25.57 4.8 513,461 25,920
0.9 25.57 5.2 566,624 25,920
0.9 25.57 0.4 41,506 25,920
0.9 25.57 0.2 17,475 25,920
MF 390
Head Loss Factor Total Head Q (L/s) Q (m3/s) RPM
0.31 13 93 0.093 500
MF 390
Head Loss Factor Total Head Q (L/s) Q (m3/s) RPM
0.31 13 93 0.093 500
MF 390
Static Head (m) Head Loss Factor Total Head Q (L/s) Q (m3/s)
52 0.75 88 300 0.3
Volume Limpasan Total
(m3)
1,251,707
716,862
534,103
51,865
50,824
MF 420
Static Head (m) Head Loss Factor Total Head Q (L/s) Q (m3/s)
52 0.75 88 380 0.38
MF 420
Static Head (m) Head Loss Factor Total Head Q (L/s) Q (m3/s)
51 1.35 110 310 0.310
10 0.31 13 240 0.240
MF 420
Static Head (m) Head Loss Factor Total Head Q (L/s) Q (m3/s)
8 0.31 13 290 0.290
MF 420
Static Head (m) Head Loss Factor Total Head Q (L/s) Q (m3/s)
8 0.24 12 281 0.281
MF 420
Static Head (m) Head Loss Factor Total Head Q (L/s) Q (m3/s)
8 0.24 12 310 0.310
MF 420
Q (m3/s) RPM Static Head (m) Head Loss Factor Total Head Q (L/s)
0.3 1120 52 0.75 88 380
Pompa working Volume pompa (m3) 3bulan Jumlah
Q (m3/s) RPM (Jam) MF 390 MF 420 MF 390
0.38 1200 21 2,041,200 2,585,520
TOTAL
TOTAL
TOTAL
1
1
6
1
1
C= 0.546
= 0.6
Ke = 1.0
GN B V Out
Tipe Inlet = Projecting
Cd= 0.546
= 0.6
Ke = 1.0
D = 1.2 m (inside diameter )
Hw = 2.5 m ( min. head )
g = 10 m2/s
L y
Q (gorong-gorong) 4 m3/s
16 RL Diameter 1.2
292,942 RL 2,5D 3
m
m
MANNING'S COEFFICIENT Coef y/x
1:1
tanah yang
7 ditanam 0,025-0,040
Saluran 1
h=
b=
x=
f=
OUTPUT DATA :
Channel Top Width CW = 3.815789 m
Water surface Width W = 2.7 m
Height of Channel H= 2 m
Wet Area A = 3.58 m2
Wet Perimeter O* = 3.81 m
Hydrolic Radius R = 0.94 m
Discharge Capacity Q = 14.71 m3/sec
Velocity V = 4.11 m/sec
h=
b=
x=
f=
OUTPUT DATA :
Channel Top Width CW = 3.815789 m
Water surface Width W = 2.7 m
Height of Channel H= 2 m
Wet Area A = 3.58 m2
Wet Perimeter O* = 3.81 m
Hydrolic Radius R = 0.94 m
Discharge Capacity Q = 10.40 m3/sec
Velocity V = 2.91 m/sec
26.56 Degree
18.43 Degree
14.04 Degree
63.43 Degree
71.56 Degree
75.96 Degree
INPUT DATA :
1 m y= 1.9
1.5 m n= 0.03 ( manning's )
1.1 S= 0.02 ( bed slope )
1 m (free board) Kemiringan = 60 degree
Pompa 390
Debit Q 0.30 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 2,041,200 m3
pompa
MF 420 3 unit
MF 390 4 unit
Q1 2017
Pompa 390
Debit Q 0.28 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,871,100 m3
pompa
MF 420 4 unit
MF 390 5 unit
Q2 2017
Volume limpasan (v1) 922,060 m3
Sump A Volume air (v2) 25,920 m3
Total Volume masuk 3 bulan 8,078,769 m3
Outflow
Pompa 420
Debit Q 0.29 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,973,160 m3
Pompa 390
Debit Q 0.14 m3/s
Pompa working 19 jam/hari
volume pompa 3 bulan 952,560 m3
pompa
MF 420 4 unit
MF 390 9 unit
Q3 2017
Pompa 390
Debit Q 0.09 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 632,772 m3
pompa
MF 420 4 unit
MF 390 15 unit
Q4 2017
Volume limpasan (v1) 692,706 m3
Sump A Volume air (v2) 25,920 m3
Total Volume masuk 3 bulan 9,086,583 m3
Outflow
Pompa 420
Debit Q 0.31 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 2,109,240 m3
Pompa 390
Debit Q 0.09 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 632,772 m3
pompa
MF 420 4 unit
MF 390 14 unit
Air terdahulu
Pompa 390
Debit Q 0.30
Pompa working 21
volume pompa 1 hari 22,680
pompa
MF 420 1
MF 390 2
Pompa 390
Debit Q 0.100
Pompa working 21
volume pompa 3 bulan 680,400
pompa
MF 420 1
MF 390 2
Volume limpasan (v1) 513,461 m3
sump 1 Volume air (v2) 25,920 m3
Total Volume masuk 3 bulan 1,618,144 m3
Outflow
Pompa 420
Debit Q 0.23 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,564,920 m3
Pompa 390
Debit Q 0.11 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 741,636 m3
pompa
MF 420 1 unit
MF 390 2 unit
Volume limpasan (v1) 683,113 m3
sump 1 Volume air (v2) 25,920 m3
Total Volume masuk 3 bulan 2,127,100 m3
Outflow
Pompa 420
Debit Q 0.24 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,598,940 m3
Pompa 390
Debit Q 0.11 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 741,636 m3
pompa
MF 420 1 unit
MF 390 3 unit
m3
m3/s
jam/hari
m3
m3/s
jam/hari
m3
unit
unit
m3
m3
m3
m3/s
jam/hari
m3
m3/s
jam/hari
m3
unit
unit
Volume limpasan (v1) 566,624 m3
sump 2 Volume air (v2) 25,920 m3
Total Volume masuk 3 bulan 1,777,631 m3
Outflow
Pompa 420
Debit Q 0.23 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,571,724 m3
Pompa 390
Debit Q 0.10 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 646,380 m3
pompa
MF 420 1 unit
MF 390 3 unit
Volume limpasan (v1) 743,967 m3
sump 2 Volume air (v2) 25,920 m3
Total Volume masuk 3 bulan 2,309,660 m3
Outflow
Pompa 420
Debit Q 0.27 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,803,060 m3
Pompa 390
Debit Q 0.17 m3/s
Pompa working 21 jam/hari
volume pompa 3 bulan 1,122,660 m3
pompa
MF 420 1 unit
MF 390 2 unit
Q416
Q117
Panjang atas 10 m
panjang bawah 7 m
lebar 5 m
kedalaman 4 m
kemiringan 45 derajat
volume sump 170 m3
0,5*(panjang atas+bawah) *lebar*kedalaman
Q317
Panjang atas 35 m
panjang bawah 20 m
lebar 30 m
kedalaman 4 m
kemiringan 45 derajat
Q417
Panjang atas 35 m
panjang bawah 20 m
lebar 30 m
kedalaman 4 m
kemiringan 45 derajat