Documente Academic
Documente Profesional
Documente Cultură
40
11.82
1.10 1.10 1.20 1.20
0.40 5.51 5.51 0.40
0.85 0.50 0.85
0.95 0.50 0.95
THIS STRUCTURE
0.41 0.41 0.45 0.45
0.20 1.52 4.39 4.39 1.52
A 0.46 0.46 0.49 0.49
STYROFOAM A
(t=20mm) KEY PLAN
1.12 1.12
NOTES
0.75
0.75
B
M F
0.75
1.25
F M 1. ALL COORDINATES, DIMENSIONS, ELEVATIONS AND STATIONS
ARE IN METERS, UNLESS OTHERWISE NOTED.
0.50
1% 1%
0.50
1% 1% 2. COORDINATE SYSTEM
0.50
1.100
0.80
0.40 0.80
C 3. CONTRACTOR SHALL CHECK AND VERIFY ALL EXISTING UTILITIES
C
0.80
0.200
0.20
4. STRUCTURE SUBJECT TO CHANGE DUE TO LACK OF FORMAL
0.20
0.40
0.40
APPROVAL FROM RELATED UTILITIES OWNERS.
5. MATERIAL PROPERTY
- RC : C35 (35MPa)
- BC : C20 (20MPa)
0.40 0.40 1.40 0.40 6. FOR CAPBEAM JOINT DETAIL, REFER TO DWG-6006
1.91 0.70 1.00 0.70 1.20 1.20 0.70 1.00 0.70 1.91
0.40 0.40 1.40 0.40
0.10 0.10
H
A
B
H1
H1
-
LEGEND/ABBREVIATIONS
CENTER LINE
1.40
A
1.50
1.50
E E
SECTION B
-
SCALE1:50
0.10
0.10
4x2 PILE 0.8m 4x2 PILE 0.8m
L L
8.80
MAIN LINE CH.
CH.+
DESIGNER
0.49
CONTRACTOR
0.46
0.90
0.95
1.20
0.85
1.10
N
0.45
AZ
0.41
3.60
2.00
1.12 STYROFOAM
0.50
0.85 0.50
2.40
2.20
0.50
1.12
(t=20mm)
0.41
0.45
AZ
1.20
1.10
0.95
0.90
8 7 6 5
0.46
0.49
PROJECT TITLE:
0.80
1.37 0.57 0.50 0.57 0.50 0.57 0.50 0.57 0.72 0.57 0.50 0.57 0.50 0.57 0.50 0.57 1.37 2 DRAWING TITLE:
Original A1 CTW130-SYS-FD-MAS-DWG-9707 B0
SETTING OUT TABLE
4 43133.343 61034.341 11 43136.225 61032.737 4 43137.156 61048.860 11 43140.054 61047.284 4 43140.823 61063.416 11 43143.736 61061.869
5 43133.387 61031.430 12 43133.907 61033.361 5 43137.230 61045.949 12 43137.730 61047.885 5 43140.926 61060.505 12 43141.407 61062.447
ENGINEER
CONTRACTOR DESIGNER
PROJECT TITLE:
DRAWING TITLE:
KRT-RUB1
PIER 44 TO 49
LAYOUT (2/2)
SCALE: DRAWING No.
Original A1 CTW130-SYS-FD-MAS-DWG-9708 B0