Sunteți pe pagina 1din 2

MAINTENANCE TASK CARD WORK NO: PLM-CC-1125001

Fleet Job No Job Title Prepared STEP / REV AC REG. / ENG.MODEL


A330-200 PLM ENG 1 / 1 EC-MJS
Mat Order 0 COMPONENT CHANGE ETOPS TASK? ISSUE DATE PAGE
- NO 31/03/2017 Page 1 of 2
ORDER STAGE CHECK DEPT. CONTACT
EQUIPMENT/FURNISHINGS Engineering MAD
FIRST AID EQUIPMENT RPL + 34 91 418 87 60
FAK REPLACEMENT engineeringmto@wamosair.com
REFERENCES PERSONS MANPOWER DOWNTIME

AMM 25-64-00
ENGINEERING EVALUATION (Engineering use only)

Remarks: N/A

CHECKED BY DATE SIGNATURE

TASK / JOB DESCRIPTION

This Job Card contains instructions to replace the First Aid Kit.

General information:

FAK OFF

POS: _____________________

PN OFF: _____________________________

SN OFF: ___________________________________

FAK ON

POS: _____________________

PN ON: ____________________________________

SN ON: ______________________________

STATION DATE ACCOMPLISHED


MAINTENANCE TASK CARD
WORK NO: PLM-CC-1125001
Fleet Job No Job Title Prepared STEP / REV AC REG. / ENG.MODEL
A330-200 0 PLM ENG 1 / 1 EC-MJS
Mat Order COMPONENT CHANGE ETOPS TASK? ISSUE DATE PAGE
- NO 31/03/2017 Page 2 of 2
Task Pos Job Description Mech Insp
-
1 ZONE 200

FAK verification

SN OFF installed? YES: ___ NO: ___

If YES, continue with Pos 2.

If NO, report installed part and serial number: _________________

No further action under Pos. 2 required. Please cross and mark with N/A.

-
2 ZONE 200

FAK replacement

Change component in accordance with AIRBUS AMM 25-64-00 and all relevant procedures.

All necessary work performance has to be notified and certified into job summary sheet.

Attach the PLM-TF-705-3 FORM (Component Installation/Removal Report) and EASA Form 1 to this
Job Card.

-
3 - BACK TO SERVICEABLE CONDITIONS

Put the aircraft back to a serviceable condition.

STATION DATE ACCOMPLISHED

S-ar putea să vă placă și