Sunteți pe pagina 1din 28

SIMULACIN DE POZOS DE PRODUCCIN DE

GAS Y PETRLEO CON PROSPER DE PETEX

Ing. Freddy Javier Puma Rodrguez


CASO: CAMPO EL DORADO
POZO DRD-X1002
MTODOS PARA MEJORAR LA PRODUCCIN
Esquema de ductos Planta de Gas Percheles

POZO
RECEPTOR
DRD-X1002

POZO
INYECTOR
DRD-X1001
PRUEBAS DE PRODUCCIN DEL POZO DRD-X1002

Depths
Perforations Memory Gauge
Top Bottom Top Bottom DATUM
Date Test MD MD TVD TVD MD TVD TVDSS Elevation
[dd - mmm - yyyy] Type [m] [m] [m] [m] [m] [m] [m] [m]
01 - dic - 2000 DST 4161.0 4189.0 4161.0 4189.0 3870.0 3870.0 -3737.0 446.0

Memory Gauge Estimated Estimated Reservoir Parameters


ory Gauge Readings without PTA Pressure Temperature * Required if PTA exists
DATUM @ MG Depth Gradient Gradient
TVD TVDSS Elevation Pressure Temperature dP/dD dT/dD Thickness Porosity Sw R
[m] [m] [m] [psi] [F] [psi/ft] [F/100 ft] [m] [decimal] [decimal]
3870.0 -3737.0 446.0 6275.0 230.0 0.1010 -- -- -- --
PRUEBAS DE PRODUCCIN DEL POZO DRD-X1002

Deliverability Analysis
Fluid Rates Flowing Bottom Hole Pressure Absolute
[MMscfd] [psi] Coefficient Coefficient Open Flow
C n AOF
Q_1 Q_2 Q_3 Q_4 Q_5 P_1 P_2 P_3 P_4 P_5 [MMscf/day/psi^2n] [MMscfd]
3.00 5.40 7.50 9.50 -- 5620.0 5120.0 4781.0 4263.0 -- 2.472 E-07 1.037 --

PTA Results Estimated Pressures


olute Pressure Pressure Pressure
Flow Pressure @ MG @ Top Perf. @ DATUM
AOF k-h Perm. Skin Reservoir @ MG depth Depth Depth Depth
scfd] [md-ft] [md] [S] Model [psi] [psi] [psi] [psi]
-- 162.0 7.6 2.4 - 6273.0 6273.0 6369.4 6376.7
DATOS ADICIONALES
Datos de produccin del pozo DRD-X1002
Presin Produccin
Produccin Produccin
de de Petrleo GOR Salinidad Gravedad
Fecha de Gas de Agua API
Cabeza Condensado [scf/STB] del Agua del gas
[Mscfd] [bpd]
[Psi] [bpd]

01/12/2000 2600 9500 274 17 54 34672 4950 0.686

Parmetros fsicos para caracterizar el fluido del pozo DRD - X1002


DATOS
Reservorios de Reservorios de Reservorios
Parmetros Pozo DRD-
Gas Retrogrado Gas Hmedo de Gas Seco
X1002
GOR [scf/stb] 34 672 8 000 70 000 60 000 - 100 000 > 100 000

Gravedad API 54 > 50 > 60 ----


SELECCIN DEL MTODO DE LEVANTAMIENTO
ARTIFICIAL
INICIO

POZO E
LIMITACIONES Y
INFORMACIN DE
REQUERIMIENTOS
LA PRODUCCIN

ETAPA 1:
SELECCIN PRELIMINAR

PROPIEDAD DE FACILIDADES DE
INFORMACIN ESTADO DE LA LOS FLUIDOS Y DISPONIBILIDA PRODUCCIN Y
DEL POZO PRODUCCIN PRODUCCIN D DE ENERGA CONDICIONES
DE ARENA DEL RESERVORIO

PERFIL DE
PRODUCCIN Y
COSTOS

ETAPA 2: ETAPA 3:
EVALUACIN TCNICA EVALUACIN ECONMICA

SELECCIN FINAL
Y CLASIFICACIN
RESULTADOS ETAPA 1 EVALUACIN PRELIMINAR

Bombeo Mecnico (BM)


Bombeo por Cavidad

Inyeccin de Espuma

Sarta de Velocidad
Electro centrfugo

Calentamiento de
Piston Pump
Plunger Lift

Progresiva
Gas Lift

Bombeo

Tubera
Jet Lift
(BEC)

(BCP)
DATOS
CRITERIOS
POZO
CATEGORAS DE RANGOS
DRD-
ENTRADA
X1002

[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]

Localizacin
Onshore SI 1 1 1 1 1 1 1 1 1 1
del Pozo
INFORMACIN Desviacin
1 Pozo Vertical SI 0 1 1 1 0 1 1 1 1 1
DEL POZO del pozo
Profundidad
13652
del pozo 12000<D<15000 0 1 1 0 0 1 1 1 1 0
pies
(pies)
Volumen
Lmite de
200<V<500 274 bpd 0 1 1 1 0 1 1 1 1 0
Operacin de
CONDICIONES Lquido (bpd)
2 DE RGL 34672
RGL>15000 0 1 0 0 0 0 0 1 1 0
PRODUCCIN (scf/bbl) scf/bbl
Temperatura
de Operacin T<250 230 0 1 1 0 0 1 1 1 1 0
(F)
API API > 40 54 1 1 1 0 1 1 1 1 1 1
PROPIEDADES
3
DEL FLUIDO Produccin
Slidos SI 0 1 0 1 1 1 1 1 1 1
de arenas
Energa
Natural del IR AL PASO 2 y 3
Pozo
Disponibilidad de
0 1 0 0 0 1 1 1 1 0
gas comprimido
DISPONIBILIDAD Suministro
4 0 0 0 0 0 1 1 1 1 0
DE ENERGA econmico de gas
Energa
Externa Disponibilidad de
0 1 0 0 0 1 1 1 1 0
electricidad
Suministro
econmico de 0 1 0 0 0 0 0 1 1 0
electricidad

TOTAL PUNTOS 2 12 6 3 2 10 10 12 12 4
RESULTADOS ETAPA 2 EVALUACIN TCNICA

Cavidad Progresiva

Sarta de Velocidad
Bombeo Mecnico

Calentamiento de
Electrocentrfugo

Inyeccin de
Piston Pump
Bombeo por
Plunger Lift

Espuma
Gas Lift

Bombeo

Tubera
Jet Lift
(BEC)

(BCP)

(BM)
DATOS POZO
CONSIDERACIONES RANGOS
DRD-X1002

[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
Localizacin del
1 SI Onshore 0,75 0,75 0,75 0,75 0,75 0,75 0,75 0,75 0,75 0,75
pozo
2 Tipo de Pozo SI Vertical 0,75 0,75 0,75 0,75 0,75 0,75 0,75 0,90 0,90 0,90
3 Profundidad SI 12000<D<15000 0,75 0,75 0,75 0,00 0,75 0,75 0,75 0,50 0,75 0,25
Volumen de
4 274 200<V<500 0,00 0,90 0,90 0,90 0,90 0,90 0,90 0,50 0,75 0,50
operacin (bpd)
5 Manejo de slidos 0,25 0,90 0,25 0,90 0,50 0,75 0,50 0,75 0,50 0,50

6 Manjeo de parafinas 0,50 0,25 0,75 0,90 0,50 0,75 0,75 0,25 0,25 0,75

7 Manejo de corrosin 0,90 0,75 0,75 0,50 0,75 0,90 0,75 0,75 0,90 0,75

8 Pozo desv iado 0,25 0,75 0,25 0,45 0,25 0,75 0,50 0,25 0,50 0,50
9 Escala 0,50 0,50 0,25 0,75 0,75 0,50 0,50 0,25 0,25 0,50
4,65 6,30 5,40 5,90 5,90 6,80 6,15 4,90 5,55 5,40
Calificaciones:
1,00 Ex celente 0,25 Malo
0,75 Bueno 0,00 Limitado (No Apropiado)
0,50 Medio
RESULTADOS ETAPA 3 EVALUACIN ECONMICA

Bombeo por Cavidad Bombeo Mecnico


Jet Lift Piston Pump
Gas Lift Bombeo Progresiva (BCP) (BM)
(***) Inyeccin Sarta de (***) Calentamiento
TIPO DE Plunger Lift Inyecc.= 1,7 Electrocentrfugo Tasa neta =
CONCEPTO Motor Motor Motor de Espuma Velocidad de Tubera
COSTO MMscfd (BEC) 500 STB/d Motor a gas Motor a gas Motor a gas Motor a gas
elctrico elctrico elctrico
(<250F)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10]
Instalacin
CAPEX $5.000,00 $1.696.250,00 $232.500,00 $66.500,00 $50.000,00 $106.500,00 $30.000,00 $37.930,00 $47.300,00 $126.800,00 $50.170,00 $3.550,00 $130.000,00 $852.325,00
[A]

(*) Mantenimiento
($/ao) $9.000,00 $84.812,50 $72.350,00 $6.900,00 $6.742,00 $7.750,00 $6.742,00 $1.600,00 $2.975,00 $9.458,00 $7.097,00 $9.264,00 $24.000,00 $433.620,00
[B]
OPEX
(**)Energa
($/kwh) $0,00 $0,00 $9.545,00 $5.900,00 $11.989,00 $8.485,00 $13.079,00 $27.949,00 $35.967,00 $5.455,00 $20.553,00 $0,00 $0,00 $0,00
[C]
Costo Total en Dlares
$14.000 $1.781.063 $314.395 $79.300 $68.731 $122.735 $49.821 $67.479 $86.242 $141.713 $77.820 $12.814 $154.000 $1.285.945
[A]+[B]+[C] =

Costo Total (M$us) $14 $1.781 $314 $79 $69 $123 $50 $67 $86 $142 $78 $13 $154 $1.286

CONSIDERACIONES:
(*) Para el Costo de Mantenimiento (OPEX) se asumi 1 ao para el clculo del costo por este concepto.
(**) Para el Costo de Energa (OPEX) se asumi 1 kw h para el clculo del costo por este concepto.
(***) Segn Soponsakulkaew los datos para los mtodos de lev antamiento [8] y [10], no corresponden a datos de operacin de campo real. Estos datos fueron obtenidos a partir de artculos de estudio y juicio personal del inv estigador.
DATOS DE PRODUCCIN
*Completion: DRD-1002:X Reservoir: Guanacos GAS [M scfd] OIL [bpd] WHP [psi] WATER [bpd]

100,000 100,000

10,000 10,000
1398 psi

1,000 1,000

100 100

10 10

1 1
27 - ene 14 - ago 02 - mar 18 - sep 06 - abr 23 - oct 11 - may 27 - nov 14 - jun 31 - dic
Volmenes producidos de Gas e Hidrocarburos Campo
El Dorado (a Agosto de 2013)

TIPO DE PRODUCCIN MENSUAL PRODUCCIN DIARIA PRODUCCIN AUMULADA


SISTEMA
POZO Y/O ESTADO PRODUCCI PETRLEO GAS AGUA PETRLEO GAS AGUA PETRLEO GAS AGUA GAS
EXTRAC.
LINEA ACTUAL N
ACTUAL BBL MPC BBL BPD MMPCD BPD BBL MPC BBL %
ACTUAL
SURGENTE PRODUCTOR
DRD-X1001 ACTIVO
NATURAL PRIMARIO
2.576,62 102.893,00 418,0 85,89 3,43 13,93 168.291,70 7.373.175 16.084,87 42%
PARADO
SURGENTE PRODUCTOR
DRD-X1002 TRANSITORI NATURAL PRIMARIO
0,00 0,00 0,0 0,00 0,00 0,00 82.705,16 3.582.364,00 10.112,50 21%
AMENTE
SURGENTE PRODUCTOR
DRD-1005 ACTIVO
NATURAL PRIMARIO
3.392,71 138.215,00 329,0 113,09 4,61 10,97 138.194,10 6.400.757,00 12.105,86 37%

TOTAL RESERVORIO 5.969,33 241.108 747,00 198,98 8,04 24,90 389.190,96 17.356.296,00 38.303,23 100%

TOTAL CAMPO 5.969,33 241.108 747,00 198,98 8,04 24,90 389.190,96 17.356.296,00 38.303,23 100%
MODELO DE RAWLINS & SCHELLHARDT
EQUIPOS PARA PRUEBAS DE PRODUCCIN

Juego de equipos del Memory Gauge Armado Prueba Produccin


ARMADO DE EQUIPOS PARA PRUEBA DE
PRODUCCIN FAF

Instalacin de equipos Armado Prueba Produccin


PRUEBAS DE PRODUCCIN
CADA DE PRESIN EN FLUJO MONOFSICO
CADA DE PRESIN EN FLUJO MONOFSICO

Flujo Ascendente (Upward Flow)

Flujo Descendente (Downward Flow)


CLCULO CURVA IPR CON DATOS DE PRUEBA

Curva IPR Datos de Prueba P_reservorio: 6275.0 [psi]


AOF: 16.2 [MM scfd] Coeficiente n: 0.94 Coeficiente C: 1.26 E-06 MM scfd/psi2n
7000

6000

5000
Presin [psi]

4000

3000

2000

1000

0
-- 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0
Caudal de Gas [MMscfd]
CORRELACIONES FLUJO MULTIFSICO


= + +


Duns & Ros Modified


Hagedorn Brown
Beggs & Brill
Petroleum Experts
(HB-Flujo Tapn/DR-Flujo Niebla)
Orkiszewski
Duns & Ros Original
GRE (modified by PE)
CADA DE PRESIN EN FLUJO BIFSICO
CADA DE PRESIN EN FLUJO BIFSICO
CADA DE PRESIN EN FLUJO BIFSICO
CURVAS IPR Y VFP

Fuente: Economides M, Hill A, Eligh-Economides C, Zhu D. Petroleum Production Systems. 2nd ed. Unites States: Prentice Hall; c2013., p. 20.
ETAPAS DE RECUPERACIN DE HIDROCARBUROS

Factores de Recuperacin Tpicos

Rec. Primaria
Sistema Artificial
40% Rec. Secundaria
25%
Produccin

Rec. Mejorada
Primaria Volumen Remanente
10% 10%
15%
Secundaria

Mejorada

Emplea energa natural del Agrega energa Libera aceite atrapado Tiempo
yacimiento. al yacimiento. en el yacimiento.
Usa sistemas artificiales de Acelera produccin de
aceite mvil.
produccin.

Arana, y Rodriguez: Administracin de yacimientos, PEP, 2011


HOLDUP

= 1
VELOCIDADES DE DESLIZAMIENTO

Velocidad de Deslizamiento Velocidades Superficiales


= = =

Velocidad de No Deslizamiento Velocidad de mezcla

= +
= =
+ +

Velocidades superficiales Densidad de la mezcla


= = = + (1 )